![Page 1: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/1.jpg)
11
Farid M. BerryVice President & Project Director
Sargent & Lundy LLCApril 8, 2014
Role of the OWNER’S ENGINEER
Technical Meeting on Becoming a Knowledgeable Customer
Obninsk and Novovoronezh, Russian Federation
![Page 2: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/2.jpg)
22
• Sargent & Lundy
• Owner’s Engineer
– Why Owner’s Engineer?
– Owners Engineer Roles/Tasks
• Selecting an Owners Engineer
• Summary
![Page 3: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/3.jpg)
33
• 122 years of leading global power industry experience
• Headquartered in Chicago, USA
• Exclusive focus on power industry
• Nuclear Quality Assurance Program
– Topical Report which has been reviewed and accepted by the USNRC.
• ISO 9001:2008 Certified Quality System
• 2,600+ staff members
• Ranked in top 5 AE’s Globally in Power by Engineering News-Record.
ProfileProfile
![Page 4: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/4.jpg)
44
• Over 600 clients– 150 fossil power clients– 120 nuclear power clients– 40 power delivery service clients– 340 consulting clients
Client BaseClient Base
![Page 5: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/5.jpg)
55
Areas of Expertise Include:Areas of Expertise Include:-- Project Concept Development
-- Preliminary Financial Evaluation/Capital Cost Estimating-- Site Selection, Feasibility studies
-- Transmission Impact Studies-- Environmental Evaluation
-- Licensing, Permitting, and Document Preparation-- Detailed Design/EPC Implementation
-- Procurement/Quality Control -- Construction Management/Oversight
-- Preparation and System Startup Testing-- Operations & Maintenance Consulting
![Page 6: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/6.jpg)
66
OwnerOwner’’s Engineers Engineer
Owner's Engineer is a term given to an independent Owner's Engineer is a term given to an independent party representative of the party representative of the OWNEROWNER of a of a constructionconstructionor or engineeringengineering project. project.
![Page 7: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/7.jpg)
77
New Nuclear Plant TimelineNew Nuclear Plant TimelineGreenfield SiteGreenfield Site
Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8
Feasibility Studies/ Technology Assessment
Select EPC/Technology Contractor
Construction License Issued
Fuel Load
COD
Reactor, Simulator order
Year 9 Year 10
EPC Negotiations LWA Granted
EPC Site Mobilization
Preliminary Rx Technology Selection
Final Site Selection
Licensing
Startup &
Testing
Construction
Training
![Page 8: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/8.jpg)
88
Why OwnerWhy Owner’’s Engineer?s Engineer?
• Owner’s engineer support the owner in a successful planning, oversight, execution and implementation of the project from inception through commissioning.
• Owner’s engineer ensures deliverables are in-line with owner’s expectations.
• Owner’s engineer, involved from project inception can help with defining the project size, location, technology selection, contracting strategy, scope, DOR/interfaces, and schedule.
• Owner’s engineer can reduce a project’s overall project cost(capital, operation and maintenance) and project risk
• Design optimization that reduce the owner’s lifecycle costs.
![Page 9: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/9.jpg)
99
Why OwnerWhy Owner’’s Engineer? (continued)s Engineer? (continued)• Owner benefits from having a dedicated engineering advisor who is familiar
with all aspects of the project and will help the owner identify opportunities that may otherwise be overlooked while avoiding or minimizing risks.
» Preparation and/or review of equipment procurement specifications and ensure suppliers are in compliance with all contract requirements.
» Support development of configuration management control that captures the plant design basis.
» Develop of the training program and capacity building» Support plant commissioning process (system turnover, start-up tests,
punch lists, performance testing, etc…).» Preparing integrated project schedules.» Preparing technical commercial requirement.» Support with the licensing process, permitting and environmental
processes» Support with EPC contract documents and negotiations, including RFP
(request for proposal) and evaluations.» Provide design when necessary, overall project management, contract
administration, and construction oversight.
![Page 10: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/10.jpg)
1010
OwnerOwner’’s Engineer Roles/Taskss Engineer Roles/Tasks• Site Selection• Technology Assessment/Selection• Licensing support• Engineering, Procurement, Construction (EPC) Commercial
Technical Requirements and Bid Assistance• Division Of Responsibilities (DOR)• Contract negotiations support• Develop overall project execution plan • Develop an integrated master project schedule• Identify and quantify project risks and develop a risk mitigation
plan
![Page 11: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/11.jpg)
1111
OwnerOwner’’s Engineer Roles/Taskss Engineer Roles/Tasks(continued)(continued)
• Develop design for site specific activities and owners assigned activities• Develop & update project cost estimate
• EPC experience• Maturity of Design• Regulatory Environment• Procurement
• Review EPC contractor’s procedures and related documents• Perform audits on behalf of the Owner• Represent Owner in EPC contractor’s procurement activities
![Page 12: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/12.jpg)
1212
OwnerOwner’’s Engineer Roles/Taskss Engineer Roles/Tasks(continued)(continued)
• Perform design reviews on behalf of the Owner of vendor documents (e.g., drawings, calculations, specifications, constructor/vendor document submittals, etc…)
• Support Owner with reviewing EPC contractor costs, schedule, andprogress
• Support the owner with plant testing and startup
• Provide construction support: oversight, engineering, licensing,procurement and commissioning.
• Support design activities/interface with operating units
• Independent engineer evaluation
• Training
• Miscellaneous support (Knowledge transfer, etc…)
![Page 13: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/13.jpg)
1313
Technology AssessmentTechnology Assessment• Suitability for available sites• Amount of power needed • Reliability / Availability• Costs
– Capital– O&M
• Risks associated with each technology– Technical (First-of-Kind issues)
» Passive vs, active– Licensing– Schedule
![Page 14: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/14.jpg)
1414
Technology Assessment (continued)Technology Assessment (continued)• No reliance on AC power for safety systems• Reduced reliance on operator actions• Large margin to safety limits
• Fewer Active components - less capital / O&M Costs• Modular construction
• Better predictability of cost and schedule• Etc…
![Page 15: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/15.jpg)
1515
LicensingLicensing• IAEA General Guidance for the Licensing Process
– Pre-Construction SAR (PCSAR)– Pre-Operation SAR (POSAR)– Station SAR (SSAR)
• US NRC (10 CFR 50 and 52)– 10 CFR 52- Single process
» Early Site Permit (ESP)• Approval to secure one or more sites for future use
» Combined Construction and Operating License (COL)• ITAAC unchartered
– 10 CFR 50- Two step process» Separate construction and operating license
• OE support: License application, RAI’s, Analysis, etc…
![Page 16: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/16.jpg)
1616
0
100
200
300
400
500
600
700
# of RAIs
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22Chapter
New Technology RAI Review Experience
![Page 17: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/17.jpg)
1717
EPC Commercial Technical RequirementsEPC Commercial Technical Requirements
![Page 18: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/18.jpg)
1818
EPC Commercial Technical Requirements EPC Commercial Technical Requirements OverviewOverview
• Relationship to EPC Contract
– Will be a Supplement to EPC contract
– Includes technical requirements
» Owners requirements
» Country local and regional requirements
» Industry Lessons Learned
» Regulatory requirements
![Page 19: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/19.jpg)
1919
• Goal = Issue Commercial Technical Requirements that delivers a State of the Art Plant to the owner
– Emphasis on nuclear industry Lessons Learned to date
» 60 year design life
» Industry requirements (EUR/URD)
» Specific operating experience
» INPO/WANO operating experience
» S&L design experience
– Specify critical design and procurement requirements
EPC Commercial Technical Requirements EPC Commercial Technical Requirements Overview (ContOverview (Cont’’d)d)
![Page 20: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/20.jpg)
2020
– Adds value relative to requirements affecting:» Plant operations
» Reliability
» Availability
» Maintenance
» ISI/IST
» ALARA
» Design philosophy
» Design margin
» Construction and transition from construction to operation
» Outage optimization
EPC Commercial Technical Requirements EPC Commercial Technical Requirements Overview (ContOverview (Cont’’d)d)
![Page 21: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/21.jpg)
2121
• EPC Commercial Technical Structure– Parallels US NRC NUREG-0800 (Standard Review Plans)– Additional sections added for:
» Regulatory (Country specific)» Cooling Media» Site Infrastructure - Barge Facility, Haul Road, etc…» Initial Site Development» Final Site Development » Fukushima Impact/Requirements» Misc. Sections
EPC Commercial Technical Requirements EPC Commercial Technical Requirements Overview (ContOverview (Cont’’d)d)
![Page 22: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/22.jpg)
2222
Design Departures
EPC CommercialTechnical
Requirements
EPC CommercialEPC CommercialTechnical Technical
RequirementsRequirements
Lessons Learned from the 1970s and
1980s on LWRs
Industry Codes, Standards, Regulatory
Industry Experience, EUR,
URD, EPRI, WANO, INPO,
etc..
S&L Nuclear New Build Design, etc.
Project Specific Details
Technology Design
Licensing Requirements,
Local and Regional
Requirements
QA/QC Requirements
Inputs to EPC Commercial Technical Inputs to EPC Commercial Technical RequirementsRequirements Operating
Experience
![Page 23: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/23.jpg)
2323
CONTENTS of the
EPC Commercial Technical Requirements Document
Technical Requirements (ContTechnical Requirements (Cont’’d)d)
![Page 24: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/24.jpg)
2424
1. General Plant Description and Design Philosophy2. Site Characteristics 3. Design of Systems, Structures, and Components4. Reactor5. Reactor Coolant System and Connected Systems6. Engineered Safety Features7. Instrumentation and Controls8. Electrical Systems and Equipment9. Auxiliary Systems10. Steam and Power Conversion
Technical Requirements (ContTechnical Requirements (Cont’’d)d)
![Page 25: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/25.jpg)
2525
11. General Radwaste Protection
12. Radiation Protection
13. Conduct of Operations
14. Initial Test Program
15. Accident Analysis
16. Technical Specification
17. Quality Assurance
18. Human Factors Engineering
Technical Requirements (ContTechnical Requirements (Cont’’d)d)
![Page 26: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/26.jpg)
2626
19. Severe Accidents
20. Cooling media and Related Facilities
21. Site Infrastructure- Barge Facility, Haul Road, etc…
22. Initial Site Development
23. Final Site Development
24. Unit 1 Transition from Construction to Operation
25. Items Critical to Quality
Technical Requirements (ContTechnical Requirements (Cont’’d)d)
![Page 27: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/27.jpg)
2727
26. Construction Oversight, Construction Optimization Including Construction Command Center
27. Procurement Plan, Requirements and Oversight
28. Risk Analysis and Mitigation
29. Fukushima Impact/Requirements– Hazards (Flooding and Seismic)
– Mitigating Strategies for Beyond Design Basis Events
– Etc…
30. Training and Training Facilities
Technical Requirements (ContTechnical Requirements (Cont’’d)d)
![Page 28: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/28.jpg)
2828
Division of ResponsibilitiesDivision of Responsibilities
![Page 29: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/29.jpg)
2929
DORDOR Site Infrastructure
Power Block
Licensing
Permitting
Security
Fire Protection
Etc…
![Page 30: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/30.jpg)
3030
Quality Assurance/Vendor OversightQuality Assurance/Vendor Oversight
![Page 31: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/31.jpg)
3131
Quality Assurance/ Vendor OversightQuality Assurance/ Vendor Oversight Quality Assurance/Quality Control
– Develop and Implement QA/QC Program for an independent assessment of the effectiveness of programs and processes related to design, procurement, construction, maintenance and operationactivities, as well as the effectiveness of human performance inimplementing program and process requirements
– Objective:
» Ensure that the programs and processes deliver high quality project work. This should account for safety culture, including the establishment of a safety-conscious work environment, QA, industrial safety, radiological safety and problem identification and resolution
![Page 32: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/32.jpg)
3232
Quality Assurance/ Vendor OversightQuality Assurance/ Vendor Oversight Quality Assurance/Quality Control Approach
– QA/QC is integrated in design, construction and procurement
– Utilize Commercial Grade Dedication requirements
» Technical requirements
» Quality requirements
» Acceptance Method
– Verify each level of the procurement chain - audit suppliers often
– Establish an inspection frequency and scope
– Emphasize QA and technical requirements through performance-based inspections
![Page 33: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/33.jpg)
3333
Quality Assurance/ Vendor OversightQuality Assurance/ Vendor Oversight
Quality Assurance/Quality Control Approach (continued)– Assess effective implementation of manufacturing and fabrication
processes to provide assurance of product quality
– Establish and maintain document control and records management systems early
– Establish a corrective action program
– Emphasize root cause analysis and/or extent of condition as required to ensure that any proposed corrective action addressesthe underlying QA performance drivers
![Page 34: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/34.jpg)
3434
Quality Assurance/ Vendor OversightQuality Assurance/ Vendor Oversight Quality Assurance/Quality Control Approach (continued)
– Inspection and test process verifies that the completed project meets specified design basis attributes, including performance features and characteristic
– Historical records of calibrations, audits, testing, maintenance, certifications, etc… need to be maintained as part of the permanent plant records
– Ensure installed material/components meet intended function and operability requirements
– Oversight and inspections of suppliers’ facilities
![Page 35: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/35.jpg)
3535
Quality Assurance/ Vendor OversightQuality Assurance/ Vendor Oversight Quality Assurance/Quality Control Approach (continued)
– Counterfeit material can compromise safety related components/systems/structures
» Establish a process to quickly identify counterfeit material• Qualified suppliers
• Oversight and inspections of supplier facilities
• Proper material documentation and traceability
• Material that cannot be traced back to the original source should be considered suspect
• Corrective action program
![Page 36: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/36.jpg)
3636
Prevention, Detection, CorrectionPrevention, Detection, CorrectionPROCUREMENT PROCESSEARLY LATER
PREVENT DETECT CORRECT
![Page 37: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/37.jpg)
3737
Manufacturing OversightManufacturing Oversight• Develop a Manufacturing Quality Oversight Plan for successful
overview of equipment and component fabrication
![Page 38: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/38.jpg)
3838
Manufacturing Oversight Manufacturing Oversight -- Witness Point Trip Witness Point Trip ObservationsObservations
• Equipment calibration documentation acceptable?
• Work control documentation maintained current?
• Procedure requirements correctly reflected in work control documents?
• Heat analysis documents material specification compliance?
• Shop quality control reviews completed as required?
• Impact of risks that can occur during the test:
– Example, Seismic event-Had no effect on operations but no procedure in place to mitigate
![Page 39: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/39.jpg)
3939
Integrated Project ScheduleIntegrated Project Schedule
![Page 40: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/40.jpg)
4040
Master BaselineSchedule
ProjectSchedule
SubprojectTrainingSchedule
OE Activities Schedule
Start-upDesignSchedule
ProcurementSchedule
SubprojectOwner
Schedule
ConstSchedule
18 MonthPre-ConstSchedule
Owners ActivitiesSchedule
DevelopTraining Program
ImplementTraining
TestingSchedule
![Page 41: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/41.jpg)
4141
Level I: Project Summary ScheduleLevel I: Project Summary Schedule
Level III: Publication / Control Level ScheduleLevel III: Publication / Control Level Schedule
Level IV: Supporting DetailsLevel IV: Supporting DetailsSchedule fragments or Schedule fragments or Deliverable listings, quantityDeliverable listings, quantitydata, etc..data, etc..
Level II: Management SummaryLevel II: Management Summary
Level 0: Project Milestone SummaryLevel 0: Project Milestone Summary
![Page 42: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/42.jpg)
4242
Integrated Project ScheduleIntegrated Project Schedule--Output Output (Continued)(Continued)
– Around the clock critical path/near critical path to optimize the schedule
» Critical path
» Near critical path
– Parallel activities and resource management
» Parallel paths with manpower and equipment
» Use the largest of the large equipment/modules to optimize tasks
– Contingency planning
![Page 43: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/43.jpg)
4343
Training Activities/PlansTraining Activities/Plans
![Page 44: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/44.jpg)
4444
Training Activities/PlansTraining Activities/Plans• Training Planning Activities
1. Training Plans » QA» Construction» Technical» Security» Operation» Etc…
2. Training Material Development» Systems, Maintenance, Construction, Radiation Protection,
Engineering, etc…3. Training Implementation
![Page 45: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/45.jpg)
4545
Selecting an OwnerSelecting an Owner’’s Engineer?s Engineer?• Prior experience:
» Design (NI, TI and BOP)
» Licensing (IAEA Guidelines, Regulatory Authority, etc…)
» Procurement
» Quality
» NSSS (Technology Vendor) experience
» Operation
» Oversight
» Project Management
![Page 46: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/46.jpg)
4646
SummarySummary Planning through operationDevelop and Monitor an integrated plan that captures information and data for:
» Planning (Site selection, technology selection, Material reservation, etc…)
» Design (Systems, foundations, structures, component/Material specification, etc…)
» Procurement (Technical specifications, Material selection and management, etc…)
» Construction (Construction execution, oversight, Material availability, etc…)
• Recent material issue at a construction site “Cable was not available, they used a bigger size cable”??
» Start-up (Training, testing, Material replacement/repair, fuel load, etc…)
» Operation (Maintenance & Material management, outages, etc…)
![Page 47: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/47.jpg)
4747
Summary Summary (continued)(continued) Strategies for SUCCESS
» GET INVOLVED
» Qualified Owners Engineer
» EPC commercial technical requirement
» Integrated DOR
» Integrated project schedule/plan
» Knowledge transfer (Design Basis)
![Page 48: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified](https://reader033.vdocuments.mx/reader033/viewer/2022051720/5a78730c7f8b9aa2448c1b01/html5/thumbnails/48.jpg)
4848
Thank YouFarid M Berry@ sargentlundy.com