presenters: brian francis (environment agency …...management framework (wem) work with us in...

13
Presenters: Brian Francis (Environment Agency Commercial Manager) & Nick Culshaw (VBA Operations Director) Date: 29 th March 2017

Upload: others

Post on 28-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Presenters: Brian Francis (Environment Agency …...MANAGEMENT FRAMEWORK (WEM) Work with us in delivering the £2.5 billion Flood and Coastal Risk Management (FCRM) 6 year programme

Presenters: Brian Francis (Environment Agency Commercial Manager) &

Nick Culshaw (VBA Operations Director)

Date: 29th March 2017

Page 2: Presenters: Brian Francis (Environment Agency …...MANAGEMENT FRAMEWORK (WEM) Work with us in delivering the £2.5 billion Flood and Coastal Risk Management (FCRM) 6 year programme

May

2011

• Government Construction Strategy

Jan

2012

• Sustainable Engineering Procurement Strategy

July

2013

• WEM (4years+2)

Page 3: Presenters: Brian Francis (Environment Agency …...MANAGEMENT FRAMEWORK (WEM) Work with us in delivering the £2.5 billion Flood and Coastal Risk Management (FCRM) 6 year programme
Page 4: Presenters: Brian Francis (Environment Agency …...MANAGEMENT FRAMEWORK (WEM) Work with us in delivering the £2.5 billion Flood and Coastal Risk Management (FCRM) 6 year programme
Page 5: Presenters: Brian Francis (Environment Agency …...MANAGEMENT FRAMEWORK (WEM) Work with us in delivering the £2.5 billion Flood and Coastal Risk Management (FCRM) 6 year programme

Lot 1 Lot 2 Lot 3 Lot 4

NCMF2

Page 6: Presenters: Brian Francis (Environment Agency …...MANAGEMENT FRAMEWORK (WEM) Work with us in delivering the £2.5 billion Flood and Coastal Risk Management (FCRM) 6 year programme
Page 7: Presenters: Brian Francis (Environment Agency …...MANAGEMENT FRAMEWORK (WEM) Work with us in delivering the £2.5 billion Flood and Coastal Risk Management (FCRM) 6 year programme

Risk Management

Authorities (RMAs)

48 User Agreements signed

So far, contracts in excess of £140 million have been placed with WEM

Page 8: Presenters: Brian Francis (Environment Agency …...MANAGEMENT FRAMEWORK (WEM) Work with us in delivering the £2.5 billion Flood and Coastal Risk Management (FCRM) 6 year programme

Evolution of the framework

2021202020192018201720162013

Projects

Packaging

Accelerated Delivery

Next Generation of Supplier

ArrangementProgramme Delivery

Units (PDUs)

Page 9: Presenters: Brian Francis (Environment Agency …...MANAGEMENT FRAMEWORK (WEM) Work with us in delivering the £2.5 billion Flood and Coastal Risk Management (FCRM) 6 year programme
Page 10: Presenters: Brian Francis (Environment Agency …...MANAGEMENT FRAMEWORK (WEM) Work with us in delivering the £2.5 billion Flood and Coastal Risk Management (FCRM) 6 year programme

Morecambe Wave Replacement Wall –

Phase 1

Nick Culshaw – VBA Operations Director

Page 11: Presenters: Brian Francis (Environment Agency …...MANAGEMENT FRAMEWORK (WEM) Work with us in delivering the £2.5 billion Flood and Coastal Risk Management (FCRM) 6 year programme

Project Facts

Lancaster City Council

Replace 1.8km Sea Wall

£4M Construction

728 No. Pre-Cast Concrete Units in Phase 1.

Manufactured by VolkerBrooks in Morecambe

High Quality

New Street Furniture & Lighting

New Surfacing

Page 12: Presenters: Brian Francis (Environment Agency …...MANAGEMENT FRAMEWORK (WEM) Work with us in delivering the £2.5 billion Flood and Coastal Risk Management (FCRM) 6 year programme

WEM Benefits

A faster well established procurement route

Access to top suppliers, with strong regional teams

Appraisal to delivery capabilities

Focus on community benefits

Page 13: Presenters: Brian Francis (Environment Agency …...MANAGEMENT FRAMEWORK (WEM) Work with us in delivering the £2.5 billion Flood and Coastal Risk Management (FCRM) 6 year programme

Presenters: Brian Francis (Environment Agency Commercial Manager) &

Nick Culshaw (VBA Operations Director)

Date: 29th March 2017