presented by: mr. c. cathel robertson and mr. alain...

20
1 Presented by: Mr. C. Cathel Robertson and Mr. Alain Eliat

Upload: vutruc

Post on 07-Sep-2018

216 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Presented by: Mr. C. Cathel Robertson and Mr. Alain Eliatdeveloperresourcegroup.com/assets/GBar_PPT_English__1_161027-S.… · Excavation or NATM Tunneling, Deep Foundation Tunnel

1

Presented by:Mr. C. Cathel Robertson and Mr. Alain Eliat

Page 2: Presented by: Mr. C. Cathel Robertson and Mr. Alain Eliatdeveloperresourcegroup.com/assets/GBar_PPT_English__1_161027-S.… · Excavation or NATM Tunneling, Deep Foundation Tunnel

2

Page 3: Presented by: Mr. C. Cathel Robertson and Mr. Alain Eliatdeveloperresourcegroup.com/assets/GBar_PPT_English__1_161027-S.… · Excavation or NATM Tunneling, Deep Foundation Tunnel

“Oxidation”

Steel expands 10x in volume when it rustscausing concrete to crack and fail.

3

Page 4: Presented by: Mr. C. Cathel Robertson and Mr. Alain Eliatdeveloperresourcegroup.com/assets/GBar_PPT_English__1_161027-S.… · Excavation or NATM Tunneling, Deep Foundation Tunnel

S

4

Page 5: Presented by: Mr. C. Cathel Robertson and Mr. Alain Eliatdeveloperresourcegroup.com/assets/GBar_PPT_English__1_161027-S.… · Excavation or NATM Tunneling, Deep Foundation Tunnel

Epoxy Coated Steel: Corrodes scratches, chips, exposed when cutGalvanized Steel: Corrodes higher cost & contaminates soilStainless Steel: Susceptible cost prohibitive

5

Page 6: Presented by: Mr. C. Cathel Robertson and Mr. Alain Eliatdeveloperresourcegroup.com/assets/GBar_PPT_English__1_161027-S.… · Excavation or NATM Tunneling, Deep Foundation Tunnel

Chemical Plants, Waste Water Treatment Facilities,Swimming Pools, Projects near Salt-Spray or BrackishWater/soils, Floating Docks

6

Page 7: Presented by: Mr. C. Cathel Robertson and Mr. Alain Eliatdeveloperresourcegroup.com/assets/GBar_PPT_English__1_161027-S.… · Excavation or NATM Tunneling, Deep Foundation Tunnel

Excavation or NATM Tunneling, Deep Foundation TunnelBoring Machine “Soft-Eye”. Openings for Launch &Reception, Temporary Reinforcement, Rock Bolts

7

Page 8: Presented by: Mr. C. Cathel Robertson and Mr. Alain Eliatdeveloperresourcegroup.com/assets/GBar_PPT_English__1_161027-S.… · Excavation or NATM Tunneling, Deep Foundation Tunnel

Historic Preservation – Restoration & Pinning of stoneelements, Architecture Concrete Elements, Slabs

8

Page 9: Presented by: Mr. C. Cathel Robertson and Mr. Alain Eliatdeveloperresourcegroup.com/assets/GBar_PPT_English__1_161027-S.… · Excavation or NATM Tunneling, Deep Foundation Tunnel

Bridges & Railing, Median Barriers, Parking Structures,Approach Slabs, Continuously Reinforced ConcretePaving, Architectural Pre-cast & Cast Stone Elements,Salt Storage Facilities

9

Page 10: Presented by: Mr. C. Cathel Robertson and Mr. Alain Eliatdeveloperresourcegroup.com/assets/GBar_PPT_English__1_161027-S.… · Excavation or NATM Tunneling, Deep Foundation Tunnel

Seismic, Wind or Blast Strengthening of un-reinforcedMasonry, increase flexural and sheer strength,Strengthening for “Event Loading” of Clay & ConcreteMasonry

10

Page 11: Presented by: Mr. C. Cathel Robertson and Mr. Alain Eliatdeveloperresourcegroup.com/assets/GBar_PPT_English__1_161027-S.… · Excavation or NATM Tunneling, Deep Foundation Tunnel

Coastal construction exposed to salt spray, Sea Walls,Wharfs & Dry Docks, Desalinization Intakes, and PortAprons

11

Page 12: Presented by: Mr. C. Cathel Robertson and Mr. Alain Eliatdeveloperresourcegroup.com/assets/GBar_PPT_English__1_161027-S.… · Excavation or NATM Tunneling, Deep Foundation Tunnel

Light & Heavy Rail, High Voltage Substations, RadioFrequency Sensitive Areas, Cable Ducts & Banks,Hospital MRI Areas, Aluminum Smelters & Steel Mills,High Speed Highway Tolling Zones, Airport Radio &Compass Calibration Pads, Nuclear Reactors (underresearch), Wind Turbine Foundations, Solar FieldsFootings

12

Page 13: Presented by: Mr. C. Cathel Robertson and Mr. Alain Eliatdeveloperresourcegroup.com/assets/GBar_PPT_English__1_161027-S.… · Excavation or NATM Tunneling, Deep Foundation Tunnel

GBar ™ advanced PultrusionManufacturing Process ofGFRP provides solutions tomeet these challenges.

Holistic life cycle technology to optimize strength &sustainability in infrastructure

GBar ™ GFRP concretereinforcing bars “do notcorrode”.

13

Page 14: Presented by: Mr. C. Cathel Robertson and Mr. Alain Eliatdeveloperresourcegroup.com/assets/GBar_PPT_English__1_161027-S.… · Excavation or NATM Tunneling, Deep Foundation Tunnel

• Competitively priced to steel• Life cycle in excess of 100 years• Non-corrosive• Impervious to chloride ion & low pH chemicals• Transparent to magnetic fields & radar frequencies• Non-conductive• Thermally non-conductive• Tensile strength is greater than that of steel• Weighs < 30% of steel reinforcement• Recyclable & Green

14

Page 15: Presented by: Mr. C. Cathel Robertson and Mr. Alain Eliatdeveloperresourcegroup.com/assets/GBar_PPT_English__1_161027-S.… · Excavation or NATM Tunneling, Deep Foundation Tunnel

15

How much energy does it take (on average) to produce 1 kilogram of thefollowing materials?

Steel (from recycled steel): 6-15MJ (1,665 to 4,170 watt-hours).

Iron (from iron ore): 20-25MJ (5,550 to 6,950 watt-hours)

Steel (from iron): 20-50MJ (5,550 to 13,900 watt-hours)

GBar (Pultrusion): 382 to 2,514 watt-hour

Page 16: Presented by: Mr. C. Cathel Robertson and Mr. Alain Eliatdeveloperresourcegroup.com/assets/GBar_PPT_English__1_161027-S.… · Excavation or NATM Tunneling, Deep Foundation Tunnel

GBar™

GBolt™

GCage

GBendGWall

GMat™

16

Page 17: Presented by: Mr. C. Cathel Robertson and Mr. Alain Eliatdeveloperresourcegroup.com/assets/GBar_PPT_English__1_161027-S.… · Excavation or NATM Tunneling, Deep Foundation Tunnel

Black Steel Stainless Steel GBar®

Price 10x Black Steel ≃ Black Steel≃ Epoxy Coated Steel< Galvanized Steel< Stainless Steel

Corrosion Susceptible Susceptible Non-Susceptible

Weight 1/4 of Steel

Tensile Strength 2x Steel/Stainless

Modulus 200 GPa 200 GPa 40, 60 GPa

Bond Strength 8-11 MPa 8-11 MPa 14 MPa

Thermal Conductivity Yes Yes No

Electrical Conductivity Yes Yes No

Magnetic Yes No No

17

Page 18: Presented by: Mr. C. Cathel Robertson and Mr. Alain Eliatdeveloperresourcegroup.com/assets/GBar_PPT_English__1_161027-S.… · Excavation or NATM Tunneling, Deep Foundation Tunnel

• Fast Installation• Fewer couplers• Less fabrication scrap• Eliminating the need to bend on site with pre-bends• Lower mat & cage weights• Eliminates corrosion inhibiting admixtures• Improved concrete adhesion• Reduces concrete cover• Fewer Concrete Additives• No Concrete Treatments• No Protective Membranes• No Rebar Coating Repairs• Lightweight

Lower Transport CostsLess HandlingLess Injuries (WCB/OSHA)

18

“If you look at the full life cyclecost, GFRP is far more cost-effective than metallicreinforcement”- Dr. Brahim BenmokraneNSERC Industry Research Chair

Page 19: Presented by: Mr. C. Cathel Robertson and Mr. Alain Eliatdeveloperresourcegroup.com/assets/GBar_PPT_English__1_161027-S.… · Excavation or NATM Tunneling, Deep Foundation Tunnel

# 8 GBar™

Savings of 73% to 80%

# 8 Steel rebar

19

33,383 linear feet

20,000 lbs.

33,383 linear feet

80,000 lbs.

Page 20: Presented by: Mr. C. Cathel Robertson and Mr. Alain Eliatdeveloperresourcegroup.com/assets/GBar_PPT_English__1_161027-S.… · Excavation or NATM Tunneling, Deep Foundation Tunnel

Recognize the Opportunity

Be Part of the Solution

Invest in the Future

20

GBar™Holistic life cycle technology to optimizestrength & sustainability in infrastructure

Thank you!