Presented by:

Hanggoro Budi WiryawanDirector of Railways Traffic and Transportation

Bangkok, 13-15 October 2014

DIRECTORATE GENERAL OF RAILWAYSDIRECTORATE GENERAL OF RAILWAYSMINISTRY OF TRANSPORTATIONMINISTRY OF TRANSPORTATION

OF INDONESIAOF INDONESIA

INDONESIAINDONESIA’’s RAILWAY s RAILWAY 

Page 2: Presented by: Director of Railways Traffic and ... · Director of Railways Traffic and Transportation. Bangkok, ... The main line consists of Java south line and north line. ... Single

OUTLINE

2

Page 3: Presented by: Director of Railways Traffic and ... · Director of Railways Traffic and Transportation. Bangkok, ... The main line consists of Java south line and north line. ... Single

3

Page 4: Presented by: Director of Railways Traffic and ... · Director of Railways Traffic and Transportation. Bangkok, ... The main line consists of Java south line and north line. ... Single

REPUBLIC OF INDONESIA

4

Population

2010's census: 237.5 

million•

Population of some big 

cities: Jakarta 9.5 million,  

Surabaya 2.8 million,  

Bandung 2.4 million,  

Medan 2.1 million, 

Makassar 1.3 million, 

Denpasar

800 thousand

Area

Total: 1.9 million

km2

Coastline 54.7 

thousand km•

17.5 thousand islands

Cities

Capital City: Jakarta•

Some big cities: 

Surabaya, Bandung,       

Medan, Denpasar,          

Makassar

Language

Official: 

Indonesia•

580 languages 

and dialects 

across  

countries

Page 5: Presented by: Director of Railways Traffic and ... · Director of Railways Traffic and Transportation. Bangkok, ... The main line consists of Java south line and north line. ... Single

TRANSPORTATION

5

Source: Dikun , 2003

Passenger Transport Market Share:

Haul Transport Market Share:

Page 6: Presented by: Director of Railways Traffic and ... · Director of Railways Traffic and Transportation. Bangkok, ... The main line consists of Java south line and north line. ... Single

6

Page 7: Presented by: Director of Railways Traffic and ... · Director of Railways Traffic and Transportation. Bangkok, ... The main line consists of Java south line and north line. ... Single

EXISTING RAILWAY CONDITON

7

Banda Aceh

MEDAN

PADANG

PALEMBANG

JAMBI

BENGKULU

Nanggroe Aceh Darrussalam

Lampung

Bangka Belitung

Riau

Jambi

Bengkulu

Sumatera Selatan

Sumatera Barat

Sumatera Utara

PangkalPinang

Tanjung Pinang

Kep.RiauPEKANBARU

B. LAMPUNG

Sibolga

Tebing Tinggi

meulaboh

Bireun

Rantau Prapat

Kisaran

P. Siantar

Tarahan

PrabumulihLahat

Lb. Linggau

Simpang

Tj. Api-Api

Banda Aceh

MEDAN

PADANG

PALEMBANG

JAMBI

BENGKULU

Nanggroe Aceh Darrussalam

Lampung

Bangka Belitung

Riau

Jambi

Bengkulu

Sumatera Selatan

Sumatera Barat

Sumatera Utara

PangkalPinang

Tanjung Pinang

Kep.RiauPEKANBARU

B. LAMPUNG

Sibolga

Tebing Tinggi

meulaboh

Bireun

Rantau Prapat

Kisaran

P. Siantar

Tarahan

PrabumulihLahat

Lb. Linggau

Simpang

Tj. Api-Api

Padang 

PanjangSOLO

K

B. Putus

B. Tabal

Tj. Enim

Kota 

Padang

Passenger: 

5,249

million

pass/year

Freight

15,253 million

ton/year

Passenger : 196,681 million

pass/year

Freight

: 3,896 million

ton/ year

1. Mix Traffic between freight and passenger train.

2. Gauge: 1067mm except in Nangroe Aceh Darussalam (1435).

3. Signal: mechanical, semi-mechanical, electrical.

4. The infrastructure areas in Java and Sumatera are divided into 13 areas.

5. Railway share: 7% for passenger and 0,06% for freight transport.

Padang 

PanjangSOLO

K

B. Putus

B. Tabal

Tj. Enim

Kota 

Padang

Page 8: Presented by: Director of Railways Traffic and ... · Director of Railways Traffic and Transportation. Bangkok, ... The main line consists of Java south line and north line. ... Single

EXISTING RAILWAY CONDITON

8

ConstructedUnconstructed 

About ± 2.763 Km’s railway network still needed to be constructed so that the railway connectivity in Sumatera as a whole could be realized

Dry

Port Location

(Not operated)

BANDA ACEH

LAMPUNG

BESITANG

MEDAN

RANTAUPRAPAT

DURI

PEKANBARU

MUARO

JAMBI

PALEMBANG

EXISTING TRACK

EXISTING TRACK

• Partial track KA Aceh 11,35 Km

• Review desain± 483.5 km

±1.974 km

• Design completion

• Land Acquisition

• Construction (start at 2016)

± 516 km

± 663 km

Page 9: Presented by: Director of Railways Traffic and ... · Director of Railways Traffic and Transportation. Bangkok, ... The main line consists of Java south line and north line. ... Single

EXISTING RAILWAY CONDITON

9

BANDUNG

Jawa Barat

JAKARTA

SERANG

SURABAYA

SEMARANG

DKI

Banten

Jawa TengahJawa Timur

YOGYAKARTADIY

Merak

Bogor

Sukabumi

Cikampek

PadalarangCirebon

BanjarKroya

Tegal

Purwokerto

Pekalongan

SoloMadiun Kertosono

Blitar

MalangBangil

Sidoarjo

Bojonegoro

Jember

Banyuwangi

Bojonegoro

Gambringan

Bojonegoro

GundihPrupuk

Kutoarjo

BANDUNG

Jawa Barat

JAKARTA

SERANG

SURABAYA

SEMARANG

DKI

Banten

Jawa TengahJawa Timur

YOGYAKARTADIY

Merak

Bogor

Sukabumi

Cikampek

PadalarangCirebon

BanjarKroya

Tegal

Purwokerto

Pekalongan

SoloMadiun Kertosono

Blitar

MalangBangil

Sidoarjo

Bojonegoro

Jember

Banyuwangi

Bojonegoro

Gambringan

Bojonegoro

GundihPrupuk

Kutoarjo

Railways network in Java Island from Merak to Banyuwangi has been connected. 

The main line consists of Java south line and north line.

Page 10: Presented by: Director of Railways Traffic and ... · Director of Railways Traffic and Transportation. Bangkok, ... The main line consists of Java south line and north line. ... Single

EXISTING RAILWAY CONDITON

10

Operating Double Track 727 km

Brebes

Cirebon - Brebes

Pekalongan - Semarang

Semarang - Bojonegoro Bojonegoro - Surabaya

DoubleTrack

JAKARTA SURABAYACIREBON TEGAL

PEKALONGAN

SEMARANG

BOJONEGOROBREBES

201 Km

63 Km13 Km

31 Km 90 Km 180 Km

103 Km

BEKASI

18 Km

3 Km 25 Km

LARANGAN

PETARUKAN

Dry Port Location

(Operated : Gedebage and Cikarang)

Page 11: Presented by: Director of Railways Traffic and ... · Director of Railways Traffic and Transportation. Bangkok, ... The main line consists of Java south line and north line. ... Single

EXISTING RAILWAY CONDITON

1111

Double TrackSingle Track

Partial double 

track 

construction 

from 2011 to 

2014;

Cost 

Estimation: 

Rp 4,3 T

FINISH 

AND 

OPERATIN

G AT THE 

END OF 

2011 DESAIN AT 20

11

Review Design at 

2011;

Land Acquisition 

(start from 2012);

Construction (start 

from 2012);

Cost: Rp 4.5 T

FINISHED 

/OPERATED

Desain Track, Bridge 

and Signal System 

(2011‐2012);

AMDAL and Land 

Acquisition (2013)

Construction (start 

from 2014);

Cost estimation : Rp 

1,8 T

Desain Track, Bridge and 

Signal System (2011‐

2012);

AMDAL and Land 

Acquisition (2013)

Construction (start from 

2014);

Cost estimation : Rp 5 T

Dry Port Location

(Not operated)

Page 12: Presented by: Director of Railways Traffic and ... · Director of Railways Traffic and Transportation. Bangkok, ... The main line consists of Java south line and north line. ... Single

12

Page 13: Presented by: Director of Railways Traffic and ... · Director of Railways Traffic and Transportation. Bangkok, ... The main line consists of Java south line and north line. ... Single

NATIONAL RAILWAYS DEVELOPMENT PLAN 2030

13

a. 12,100 Km National Railways Network in 2030 (Java-Bali, Sumatera, Kalimantan, Sulawesi and Papua) including 3,800 km urban railway network.

b. Passenger Rollingstock: 2,805 unit locomotive, 27,960 unit passenger coaches.c. Freight Train Rollingstock: 1,995 unit locomotive and 39,655 unit freight wagons.

Railway share 11‐13% for passenger and 15‐17% for freight transport 

10,000 km of railway network, double‐track, electrification of Java main 

lines

Trans Sumatra railway network

as backbone of mass transportation in cities/urban areas

the operation of Argo Cahaya (High Speed Train/ HST)

in Java

railways as the backbone of freight transport in Kalimantan, Sulawesi, 

Papua

integrated, secured, safe, comfortable, reliable, and affordable

services

Page 14: Presented by: Director of Railways Traffic and ... · Director of Railways Traffic and Transportation. Bangkok, ... The main line consists of Java south line and north line. ... Single

14

CPO[KEK]CPO[KEK]

Rubber & 

CPO 

Industry

[KEK]

Rubber & 

CPO 

Industry[KEK]

Oil, Gas and Coal 

Industry

[KEK]

Oil, Gas and Coal 

Industry[KEK]

Target in 2030:• Develope

intercity railway 

network: Aceh, Medan, 

Pekanbaru, Padang, Jambi, 

Palembang, Bandar Lampung.

• Develope

urban railway

network: Medan, Pekanbaru, 

Padang, Palembang,

Bandar 

Lampung

and

Batam.

• Develope

access to airport: 

Kualanamu, Minangkabau, 

Sultan Mahmud  Badarudin Dua

and

Hang Nadim.

• Develope

access to seaport:

Lhokseumawe, Belawan, 

Dumai, Tanjung Api‐api, 

Dumai, 

Teluk Bayur and Panjang.

2,856 Km of Sumatera Railway Network in 2030

1. SUMATERA ISLAND

NATIONAL RAILWAYS DEVELOPMENT PLAN 2030

Page 15: Presented by: Director of Railways Traffic and ... · Director of Railways Traffic and Transportation. Bangkok, ... The main line consists of Java south line and north line. ... Single

15

Steel and Petrochemical 

Industry

Petro 

Chemical 

Industry

Food 

Industry

Shipyard Industry 

(The Biggest in Indonesia)

Jakarta 

Metropolita

n

Surabaya 

Metropolita

n

Target in 2030:1.

Optimization of existing railway network;

2.

Double tracking of Java North line (Jakarta – Cirebon –

Semarang –

Bojonegoro ‐

Surabaya) and Java South line (Cirebon – Kroya 

– Jogjakarta – Solo – Madiun – Surabaya ) and other main lines;

3.

Electrification in the dense lines, including urban area; 

4.

High speed train network connecting: Merak, Jakarta, Cirebon, Semarang, Surabaya and

Banyuwangi;

5.

Urban railway network in Jabodetabek, Bandung, Yogyakarta, Semarang, Surabaya and other cities;

6.

Seaport railway network: Tanjung Priok, Cirebon, Bojonegaro, Tanjung

Mas and Tanjung Perak;

7.

Airport railway network: Soekarno‐Hatta, Kertajati, Adi Sucipto, Ahmad Yani, Adi Sumarmo

and Juanda.

6,324 Km of Java Railway Network Plan in 2030

HST Track Lines (planned)

NATIONAL RAILWAYS DEVELOPMENT PLAN 2030

2. JAVA ISLAND

Page 16: Presented by: Director of Railways Traffic and ... · Director of Railways Traffic and Transportation. Bangkok, ... The main line consists of Java south line and north line. ... Single

16

NATIONAL RAILWAYS DEVELOPMENT PLAN 2030

Bali Tourism Area

Target in 2030 :• Railway network connecting

central economic activity and tourism area, such as: Denpasar, Tabanan, Gianyar, Singaraja, Negara, Bangli and Amlapura;

• Urban railway network (Denpasar);

• Develope airport train (Ngurah Rai);

326 Km of Bali Railway Network Plan in 2030

3. BALI ISLAND

Page 17: Presented by: Director of Railways Traffic and ... · Director of Railways Traffic and Transportation. Bangkok, ... The main line consists of Java south line and north line. ... Single

17

NATIONAL RAILWAYS DEVELOPMENT PLAN 2030

Coal Industry 

Area

Coal Industry 

Area

Steel 

Industry Area

Steel 

Industry Area

Aluminum

Industry 

Area

Aluminum

Industry 

Area

Oil & Gas 

Industry 

Area

Oil & Gas 

Industry 

Area

Target in 2030:• Develope

intercity railway network: 

Banjarmasin‐Balikpapan‐Samarinda‐

Bontang‐Tenggarong‐Kotabangun, 

Banjarmasin‐Palangkaraya, Pontianak‐

Mempawah‐Singkawang;

• Develope

railway network from 

mining area to seaport: Samarinda, 

Balikpapan

and Banjarmasin;

• Railway networks

with coal potency: 

Puruk Cahu – Bangkuang, Bangkuang –

Lupak Dalam, Kudangan – Kumai, 

Muara Wahau –

Lubuk Tutung, 

Bontang –

Sangkulirang – Tanjung 

Redep, Tanjung Barabai –

Martapura –

Banjarmasin, Tanjung – Buntok –

Muara Teweh.

1,400 Km of Kalimantan Railway Network Plan in 2030

Rencana Jalur KA KhususSpecial Railway (Planned)

4. KALIMANTAN ISLAND

Page 18: Presented by: Director of Railways Traffic and ... · Director of Railways Traffic and Transportation. Bangkok, ... The main line consists of Java south line and north line. ... Single

18

NATIONAL RAILWAYS DEVELOPMENT PLAN 2030

Rencana Kebutuhan Sarana Tahun 2030 :• Lokomotif Penumpang : 50 unit• Lokomotif Barang : 120 unit• Kereta : 470 unit• Gerbong : 2.375 unit

Fisheries and 

Marine 

Tourism Area

Fisheries and 

Marine 

Tourism Area

LNG Industry 

Area

LNG Industry 

Area

Nickel 

Industry 

Area

Nickel 

Industry 

Area

MakassarMetropolitanMakassar

Metropolitan

Plantation 

Industry Area

Plantation 

Industry Area Target in 2030:• Develope

intercity railway 

network: Gorontalo, Manado, 

Bitung

(North Sulawesi) also Pare‐

pare, Makasar, Bulukumba

and 

Takalar (South Sulawesi);

• Develope

regional railway 

network:

Makasar, Maros, 

Sungguminasa and Takalar 

(Maminasata);

• Develope

urban railway

network:

Makasar and 

Manado;

• Hasanudin

airport railway;

• Develope

access to seaport:

Bitung and Makasar.

500 Km of Sulawesi Railway Network Plan in 2030

5. SULAWESI ISLAND

Page 19: Presented by: Director of Railways Traffic and ... · Director of Railways Traffic and Transportation. Bangkok, ... The main line consists of Java south line and north line. ... Single

19

NATIONAL RAILWAYS DEVELOPMENT PLAN 2030

Oil & GasIndustryOil & GasIndustry

Mining 

Industry

Mining 

Industry

Fisheries 

Industry

Fisheries 

Industry

Target in 2030:• Develope

intercity railway 

network: Sorong, 

Manokwari, Nabire, Timika, 

Sarmi  and

Jayapura;

• Develope

railway network 

from mining area to the 

Manokwari and Jayapura 

seaports;

• Develope

railway network  

in Northern Papua 

connecting cities: 

Manokwari‐Nabire.

500 Km of Papua Rail Network Plan in 2030

6. PAPUA ISLAND

Page 20: Presented by: Director of Railways Traffic and ... · Director of Railways Traffic and Transportation. Bangkok, ... The main line consists of Java south line and north line. ... Single

20

Page 21: Presented by: Director of Railways Traffic and ... · Director of Railways Traffic and Transportation. Bangkok, ... The main line consists of Java south line and north line. ... Single

21

The Progress of National Railways Development

Indicator UnitMilestone

Total Target

2010 –

2014*  %2010 2011 2012 2013 2014*

The total of the new track development in 

indonesia including Java North line Double 

TrackKm'sp 81  135  103  497  169  985  1.021  97

Track enhancement including track 

reactivation  Km'sp 297  140  79  75  534  1.125  916  123 

Track rehabilitation  Km'sp 11  4  20  ‐ 11 46 77  60

Track’s installation Km'sp 168  100  550  155  1.530  2.503  859  292Turnout installation Unit 163  20  232  420  510  1.345  556  242 

Bridge’s installation and rehabilitation Unit 89  70  140  123  87  509  333  153 

Sinyal and telecomunication Package 27  26  69  65  34  221  210  105 

Electrification installation Package 10  9  14  13  11  57  49  116 

Station installation and rehabilitation Package 11  12  9  10  16 58  58 100 

Railways’

facilitation improvement  Package 10  7  8  5  8  38  67  57 

Level crossing installation Unit 5  4  4  ‐ 4  17  57  30 

Safety improvement Package 1  15  8  3  2  29 28 104

Rolling stock’

facility improvement Package 1  6  17  6  5  35 28 125

Procurement of Economy coach Unit 16  11  55  ‐ 33  115  124  93 

Procurement of Lokomotives, EMU, DMU, 

Tram, Railbus Unit 3  61  20  11  11  106  148  72 

Rolling stock modification Unit ‐ 49 ‐ ‐ ‐ 49 33  148

Page 22: Presented by: Director of Railways Traffic and ... · Director of Railways Traffic and Transportation. Bangkok, ... The main line consists of Java south line and north line. ... Single

22

Page 23: Presented by: Director of Railways Traffic and ... · Director of Railways Traffic and Transportation. Bangkok, ... The main line consists of Java south line and north line. ... Single

23

The Progress of MP3EI until 2014 for Sumatera Corridor

No MP3EI’s ProjectInvestati

on

(IDR 

Miliar)

Programs

2013 2014Start Finish

1 Development of Bandar Tinggi ‐ Kuala Tanjung  line

450 2011 2015

‐Track installation of the Bandar Tinggi‐Kuala Tanjung 

Line (IDR.130

billion)

2 Development of Intercity line Sigli ‐Bireun ‐ Lhokseumawe 

5,175 2011 2020 • Land aquisition for Lhokseumawe‐Bireuen

line

(IDR. 49

Billion)• Review design of Development ot Lhokseumawe –

Bireuen (IDR.1.4

Billion)

Sleeper relocation and track installation of Lhokseumawe –Bireuen line (IDR.

3

billion)

3 The enhancement of railway line        Sei Mangke ‐ Simpang Penalanaan 

150 2011 2013

‐Track improvement of UIC 42 to UIC 52 at Bandar Tinggi –Perlanaan line (IDR 46 billion)

4 Development of Rantau Prapat‐Duri‐Dumai (249,07 Km)

8,429 2016 2020 ‐ ‐

Page 24: Presented by: Director of Railways Traffic and ... · Director of Railways Traffic and Transportation. Bangkok, ... The main line consists of Java south line and north line. ... Single

24

Continued...

No MP3EI’s ProjectInvestati

on

(IDR 

Miliar)

Programs2013 2014

Start Finish

5 The development of Minangkabau International Airport accessibility 4 Km

120 2013 2017

• Track development of     Duku‐

MinangkabauInternasional Airport(IDR.16

billion) • Track installation of 

Duku‐Minangkabau

Internasional Airport (IDR19

billion)

6 Pembangunan Jalur KA Besitang‐Kuala Langsa‐Langsa (82 Km)

2,050 2016 2020

Study on Environment Assessment of Kuala Langsa ‐Langsa ‐

Batas Sumut (IDR 1.2billion)

7 Pembangunan Jalur KA Muaro‐Pekanbaru‐Duri

7,500 2022 2025 ‐ ‐

8 Pembangunan Double Track Medan‐Kualanamu

878 2014 2016

• Double tracking development of Medan ‐Araskabu  (IDR. 152

billion)• ROW preparation of Double tracking line Medan –Kualanamu (IDR.9 billion)

Page 25: Presented by: Director of Railways Traffic and ... · Director of Railways Traffic and Transportation. Bangkok, ... The main line consists of Java south line and north line. ... Single

THANK YOU 

Directorate General of Railways ‐

MOTMedan Merdeka Barat No.8 Jakarta

http://djka.dephub.go.id

Presenter
Presentation Notes
That is all information that I can share during this session Honorable delegates, Ladies and gentlemen Before I`m ending my presentation, I would like to point out some key points, which are: The establishment of our National Railway Masterplan it is reflecting the effort of the government to promote the railway as the mass transportation mode by increasing infrastructure development, that is synergize with the Masterplan for Acceleration and Expansion of Indonesia Economic Development. We need a hardwork to realize it. Private sector has an important role in boosting the economic growth, especially in investment and funding scheme. Cooperation. Even though, it sound simple, I do believe this simple word have a great effect. The good cooperation is absolutely needed to make harmonization in term of strategy and policy. one of the example in railway term is the manufacture (industry). Is about how to build the inter-industry connectivity, in this case ASEAN. Moreover, this meeting, we hope can be a momentum for us to make a better cooperation, a good collaboration to enhance ASEAN role in the role.