    Status of TMT 2

    Warning Systems Pilot Project

    Sint Maarten 18th October 2010

  • 8/4/2019 Presentation on TMT 2 Status

    2/29

    2

    VisionFor A Regional, Standards Based, All Hazard,Early And Public Warning System.

  • 8/4/2019 Presentation on TMT 2 Status

    3/29

    3

    R3I Sub Projects

    TMT1 Hazard & VulnerabilityMapping & Modeling

    TMT2- Early Warning Systems Pilot

    TMT3 Response, Relief andRecovery

    TMT1 Emergency OperationsCapacity Building

    TMT1 Best Practices & Lessons

    Learned

  • 8/4/2019 Presentation on TMT 2 Status

    4/29

    4

    Baseline

  • 8/4/2019 Presentation on TMT 2 Status

    5/29

    5

    Identify the Baseline First

    Extensive Warning Survey performedintegrating:

    OECS B-TOOL, Global Warning Survey,IOC/UNESCO GWS Update, ICG CARIB

    WG3, CDEMA TCHWS, WMO Met Surveyand R3I Components

  • 8/4/2019 Presentation on TMT 2 Status

    6/29

    6

    UN Global Survey

    An assessment ofcapacities, gaps andopportunitiestoward building acomprehensive globalearly warning systemfor all natural hazards over 138 Questions

  • 8/4/2019 Presentation on TMT 2 Status

    7/29

    7

    METEOROLOGICAL SERVICESforCivil Aviation

    Focused on technology and Protocols

  • 8/4/2019 Presentation on TMT 2 Status

    8/29

    8

    2008 UNISDR Joint Early Warning Questionnaire- Infill of Survey Gaps

  • 8/4/2019 Presentation on TMT 2 Status

    9/29

    9

    2008 IOC UNESCOCarib EWS Warning

    Survey

    Focused on technicalresources and capability

    for ongoing systemsustainability

  • 8/4/2019 Presentation on TMT 2 Status

    10/29

    10

    CDEMA TCHEWS Survey

  • 8/4/2019 Presentation on TMT 2 Status

    11/29

    11

    Results

  • 8/4/2019 Presentation on TMT 2 Status

    12/29

    12

    Identify Systems in Place

    Monitoring / Detection Seismic Stations

    Tsunami Buoys

    Tide Gauges

    Flow Gauges

    Rain Gauges

    Radar

    Barometer

    Wind Gauges

    Slope Stability

    Air Monitoring etc.

    Alert / Warning EMWIN/GTS

    Sirens

    RDS SMS

    Email

    Bells

    Flags Telephone Ringdown

    Radio/Cable interrupt

    Public address

    AM/FM Radio etc

  • 8/4/2019 Presentation on TMT 2 Status

    13/29

    13

    Identify Networks in PlaceRecently Mostly Tsunami Focused But Not All

  • 8/4/2019 Presentation on TMT 2 Status

    14/29

    14

    Elements of a Warning System

    Hazard Assessment / Risk Identification

    Monitoring and Detection Technology - Early

    Dissemination Technology Public/1st Responder

    Standard Operating Procedures, Policy, Protocols

    Legislative Framework

    Public Awareness and Education

    Testing/Drills

    Ongoing Maintenance

  • 8/4/2019 Presentation on TMT 2 Status

    15/29

    15

    Pilot Scoping

  • 8/4/2019 Presentation on TMT 2 Status

    16/29

    16

    Localized Requirements

    Thresholds of risk and associated alert levels

    Requires consideration for at risk and multilingual

    Requires Multi-Point and Multi-Media

    Requires Weekly and Monthly Testing

    Requires Buy-In from all sectors and the public

    Needs to be integrated in day to day life

  • 8/4/2019 Presentation on TMT 2 Status

    17/29

    17

    Identify Target Pilots

    Assumptions

    Political Buy In Existing

    Model Legislative Framework Feasibility of adoption during project

    Hazard Assessment primary hazards identified to address

    Monitoring and Detection - Elements and SourcesAvailable/Planned

    Technology Implementation Basis for Warning in place

    Public Awareness and Education Adapt Existing Protocols

    Maintenance Capacity Building and Funding Verification

  • 8/4/2019 Presentation on TMT 2 Status

    18/29

    18

    Identify Pilot/Feasibility Sites

    Pilots Anguilla

    BVI

    Montserrat

    Sint Maarten

    Feasibility Study

    ABC Islands

    Cayman Islands

    Saba

    St Eustatia

    Turk & Cacaos

  • 8/4/2019 Presentation on TMT 2 Status

    19/29

    19

    Select Hazards to Address

    Identify the target Primary hazard

    Identify the additional hazards the System willaddress

    Identify the Issues and Assumptions for thesehazards

    Identify Issues and Assumptions with warning for

    these hazards

  • 8/4/2019 Presentation on TMT 2 Status

    20/29

    20

    Agree Pilot Location Hazard

    Anguilla Montserrat St Maarten BVI

    Hazard focus Hazardous Material Volcano Floods Tsunami / EQ

    Public Warning

    system in

    place

    IT equipment

    Legislation

    Policy (draft)

    Protocols

    NWAC

    - Radio broadcast F/AM

    - Radio Interrupt

    - Mounted vehicle PA

    -RDS Receivers (CAP)

    - Computer Popup (not public)

    (CAP)

    - SMS (CAP)

    - EMAIL Rosters (CAP)

    Legislation

    Policy

    SOP

    Checklists

    Live drills

    NWAC

    - Sirens (not CAP)

    -EAS radio interrupt with RDS

    messaging system

    - DMCA audio and video studio with

    interrupt of local media (needs

    more discussion with IT)

    - VHF (to complete under TMT3

    and TRAC)

    Related Flood hazard maps

    - Sirens (Not CAP)

    - 3 automatic rain gauges (not

    installed)

    Legislation and Policy (linded)

    NWAC

    - Radio AM and FM broadcast

    - Radio Interrupt

    - TV interrupt

    - Cable interrupt

    - Mounted vehicle

    -Sirens ?

    - RDS

    Institutional Gaps

    SOP for Hazmat

    National Warning system

    training

    Education materials

    Public outreach

    Training to maintain sirens

    Maintenance policy or legislation

    SOP for new CAP system

    SOP

    Drills, testing documents

    NWAC (not needed ?)

    SOP and Checklists

    Drills, testing documents

    Technology

    required

    1 CAP server and BamBox

    (for public)

    1 Back Up CAP CONverter

    or radio interrupt

    1 Backup FM radio RDS

    signal encoder

    50 back-up receivers

    1 Backup CAP server

    Hot Button

    1 additional siren (CAP enabled)

    Cap base controller to interface

    with sirens controller

    New siren controller and upgrading

    of 8 existing units

    CAP integration of existing RDS

    including text to speech converter

    1 public CAP server with Bambox

    (pop-up) and email notifications

    (require further discussion with IT)

    Cellular SMS and Text Hot Button

    Cap base controller to

    interface with sirens

    controller

    Bambox (Pop-up)

    Email

    RDS ?

    SMS ?

    Radio interrupt ?

    Via radio ?

    Hot Button ?

    1 public CAP server with

    Bambox (pop-up) and email

    notifications

    1 CAP CONverter or alternate

    radiointerrupt

    1 Backup FM radio RDS signal

    encoder

    CAP Integration of existing

    RDS

    Hot Button ?

  • 8/4/2019 Presentation on TMT 2 Status

    21/29

    21

    Identify Needs of Pilot and Hazard

    Anguilla Hazardous Materials

    Complete Public side of AWS

    Integrate language profiles viaCAP

    BVI Earthquake/Tsunami

    CAP Network, Roster email

    Integrate ATWC/USGSalerts/activation via CAP

    Sint Maarten Flooding

    CAP Network, RDS, Rosters

    Integrate Water Level alertsvia CAP

    Montserrat Eruption

    Replicate Radio System, CAPNetwork, Popups, RDS

    Integrate eruption alter via

    CAP

  • 8/4/2019 Presentation on TMT 2 Status

    22/29

    22

    Initiate Sint Maarten Pilot

    Existing

  • 8/4/2019 Presentation on TMT 2 Status

    23/29

    23

    Changes AboundNew Government Structure, Opportunities ofgreater ownership and responsibility

    Sint Maarten 18th

    October 2010

    Sint Maarten Pilot

  • 8/4/2019 Presentation on TMT 2 Status

    24/29

    24

    Sint Maarten PilotProposed Configuration - E Klute Assessment

    Posting InterfaceDisaster Office

    CAP Server

    RDS Encoder Radio Interrupt Cable Interrupt

    Pop ups

    Email RostersSMS/Email cell

    RDS radio

    RDS ReceiverSensitive Receptor

    USG

    S

    NOAA

    WaterLevelGauges

    TestGenerator

    Other

    CAP

    Me

    t?

    RDS ReceiverMedia

    RDS Receiver1

    stResponser

    RDS ReceiverHome

    Met

    HB

  • 8/4/2019 Presentation on TMT 2 Status

    25/29

    25

    Template SOPs & Checklists

    SOP A: For any potential Flash floodingwhether it is considered local or national:

    SOP B: For an otential Mass floodin .

  • 8/4/2019 Presentation on TMT 2 Status

    26/29

    26

    Develop Guiding Policy

    Will not activate in an intrusive manner between xxpm

    and xx am unless life safety threat/ level 3threat/flashflood/tsunami etc;

    Will/will not remove individuals from the SMSNotification System, to be provided by xxx;

    Will require approval for activation for non Level 3incidents via approved SOPs;

    etc

  • 8/4/2019 Presentation on TMT 2 Status

    27/29

    27

    1. Develop Public Education and Outreach2. Develop/ Refine Activation Protocols and Policy3. Develop Drill and Testing Documents, Schedules

    and Protocols4. Implement technologies5. Perform testing and acceptance6. Develop Maintenance Manuals

    7. Capacity Build Technicians and Activators8. Public Pilot of Activation9. National Testing10.Cross Regional Testing (via Caribe WAVE2011?

    Next Steps for SM Pilot

  • 8/4/2019 Presentation on TMT 2 Status

    28/29

    28

    Next Steps for TMT 2

    Help Identify Expert(s) in IT and CAP; Support developing template policy, plans and

    protocols;

    Recommend scope and schedule of FeasibilityStudies;

    Identify 2nd Pilot Implementation Location;

    Draft Regional R3I Pilot System of Systems

    Diagram; Work with ICG and WMO on identifying synergies

    with other regional initiatives/systems; and

    Support the work of other TMT 2 Partners as

    requested.