( Kindly be judged at the end of the presentation during our conversation and if agreed put to all forums in service carrier)

The first step to implement 5 year A.P put your effort to straggle with ideology. Next to see motivate all to stay to utilize 100 hours a week in Hqrs. Jurisdiction keep touch with heritage culture Development, if

somebody feels he has no work and left the jurisdiction. This is why Govt. recommended offices complies for quick multiple then a wage earner.

The reason of no creation of post or contractual posts due to less effort of full time staffs.Let us come forward to eradicals contractual postings, ensure to strengthen G.P level office machineries, full time staying arrangement to give life to Govt.schemes only by raster staying.

Own statistical assessment: Total, Total state Govt. officials = 6 lakhs needs weekly stay @ 100 hours per week= 600lakhhours. In fact at present the total staying hours with 1.8 lakh hours. The difference causes not to strengthen the Govt. mechanism rather reduce the new employment generation day by day due to ineffectiveness of present mechanism.

Special Officer,TDA,Tumba,Ganjam

Page 4: Presentation on IDP - 2012-17
Page 5: Presentation on IDP - 2012-17

DREAMS ON FIVE YEAR PRELIMINARY INTEGRATED DEVELOPMENT PLAN- 2012-2017 FOLLOWED EXPERIENCE IN IMPLEMENTATIONS OF CCD PLAN: 2007-2012 OF TDA,TUMBA FOR DEVELOPMENT OF

PTGs.----------------------------------------------------------------------------------------------------------------------------------------------

Respected Sirs,Welcome to 5 year preliminary ID Plan presentation:- Before presenting the proposed plan I like to briefing the success in the field of CCD

plan implementation in some sectors with photo, documentation for 2007-12.

2007-12:-1. MEC: We have built-up a well- residual and good looking Architect designed MEC hostel, 2 staff quarters, school building (are in progress) 20 out and 10 inside latrine bath complex. Enhanced the roll strength from 210 to 250. Made supply of solar, inverters, TV, DVD, furnitures, News papers, periodicals, VTC like traditional painting, song, music, Tailoring & Computer with operator etc. for MEC, TDA. Health sub-centre support, annual sports, academic talent search is adopted in our MEC with TDA base ,High schools, Ashram School, UPS and P.S in the month of January & February – 2010&2011 alongwith providing incentives and prizes.

A 5 days long tour traveled programme with 5 buses with 50 Guardians & 250 girls inmates from 24.1.2011 to 28.1.2011 were covered five districts successfully. One Kumari Labanga Sabar, Class-III of MEC, Lokashi was awarded for traditional painting at Adivasi ground on 15.12.2010 from our commissioner & Director. 26 Nos. of students admitted in Cl-VI A/S Gouduni and 5 nos at Tumba High school in this year be provided Bicycle , Umbrella etc. During 6.7.2011 last month 8 inmates of our MEC attended, the children festives at Adamandap, Gusani Nuagaom and presented their inner cultural abilities enjoyed by the prominent Judges and participants .

Tour & Travels on:26.1.11 By MEC girls inmates

Chief justice residence visit

Page 6: Presentation on IDP - 2012-17

2. Connectivity: - We have built around 2000 metre,CC roads, 20,000 metre Gr-I roads, 8 nos of CD work out of CCD plan against total 82 KMs of roads in Map. We have constructed around 1000 metre. CC roads in last year with history of construct, a new 400 metre new road at Batasahi, Bhogibandha in 2009-10 at Rs. 3.30 lakhs lying in local demand since years before and develop the CD work with CC roads which are in progress out of 2010-11 in the road . Another historical road at Thanagaom, 25 IAY houses, Sourabasa , MPSC ,Crop demonstration , NFECs , Banraj chicks, Solar & Water supply at hill top Thanagoam village is under taken. First time in Jan-2011. The Lipica people in Feb-2011 with DFO rush to the hill to in CCD created road.

3. Insurance: Disbursed 3 no.of JBY insurance claims. Since Oct’2010 by the undersigned and last on 21.6.2011 by BDO & Sub-Collector. Earlier no adequate awareness reached people about the benefit. of JBYs . Insurance to male PTGs shall be made in next years for benefit of PTGs women for this type of unfortunate havoc.

Page 7: Presentation on IDP - 2012-17

4. Irrigation: Irrigation was not placed in earlier plan. We insist to spend Rs. 50 lakhs by M.I / LI point Deptt. to renovate existing canals and we can construct the distributary LI points soil conversation Deptt. proposals an exp.of Rs. 1.5 crore. And 50 lakhs for remote 25 No. of checkdams by the villagers.

5. Housing: 200 nos of roofings and 35 IAY provided in the plan during 2010-11.

Page 8: Presentation on IDP - 2012-17

6. Plantation / Crop demonstration: In last June- 2010, we start 40 acres cashew plantation of Rs.1 lakh by ASCO and pay 85000/- to Agrl. Sales store towards cost of seeds supplied to 300 PTG farmers.This Year we have raised 12,000 seedlings & completed distribution covering

Crop demonstration at Gangapur

7.NFECs / Motivators: We have started 8 NFECs and 8 nos of Motivator points to look after 132 left/ drop out in TDA and MADA areas.

8. Awareness Camps: We have conducted around 30 Awareness camps on Insurance, JBY, NFBS, Mokudia, NREGA, FRC, Health camp , Education Anganwadi, Vocational training, Development and other works of TDA .

Page 9: Presentation on IDP - 2012-17

9. Infrastructure support: We have provided mini kitchen centre, Solar lights, inverters, furnitures to health / Education institutions.Tumba High School: Invetor, Solar light , Buratal High School: Generator, Utensils . Gouduni A/S School: Generator. MEC: DVD,TV, Invetor, Solar lamps.

10. Exchange visit: - Insisting my staffs who yet to come –up along with micro credit , skill-upgradation etc. suo- mutto even not implementing directives of the undersigned as per CCD plan. Visiting to Nandankandan, Konark, Mancheswar , Khandagiri,Puri , Barabati stadium etc.

11. Latrine & bath: Assisted 33 families @ Rs. 2.5 thousand in village Gujulingi and Guruda.

12.Culture activities : Organized as many as 5 nos. of proposed school / village level and also grand Adivasi Mahatchob attended by Collector, Sub-Collector, DPC, DIS , Hon’ble MLA, PRIS, SHGs, BDO, TDRS, other official & public. Musical instruments & cash grants also provided to 18 village /Edn. Institutions to preserve and promote traditional music & culture activities and used in Ind.functions.

Page 10: Presentation on IDP - 2012-17

13.Solar Light: We have provided 10 nos of Solar lights to NFECs, hill top villages.

Page 11: Presentation on IDP - 2012-17

14.Animal Husbandry: 1700 no.of Banaraj chicks were supplied in July 2010 & 11,but all the chicks are become failure except Saradhapur.

15. Health Camp: Regular monthly camps are organized till relieve of ex-doctor in Feb- 2011. We propose to start pregnant mother care centre at MPSC , Buratal with Hqrs staying care taken by Anganwadi & ANM out of health camp fund lying with CDMO.Supply filters, Almira to Sub-Centre, Buratal

Page 12: Presentation on IDP - 2012-17

16.SHG : Broom Binding

17. Concurrent Evaluation: To keep records update engage a computer operator and he has print out and made the soft copy for all programmes & doing other activities in office.

2012-17 ID PLAN

Page 13: Presentation on IDP - 2012-17

In response to memo no 12203 /SSD Dt: 4.4.2011. Immediately on receipt on Dt 8.4.2011. I had avail the opportunity for G.B meeting and circulate among all line Department field staffs and officers in personal contact and circulate vide this office LNo. 203 / TDA Dt: 8.4.2011 to furnish us the respective line dept. dream plan for TDA to implement out of own resources, fund, Budget and support needs through TDA year wise form 2012 to 2017. For more convenient village/ visit by all line departments a unique village visit programme drawn up and communicated to attend pallisava from 17.4.2011 to 5.5.2011. Collector, Sub-Collector have also announced the importance of the advance drawl of 5 year plan for PTG Dev. in the G.B meeting held on 15.4.2011 to draw the village plan as per the unique programme drawn by the TDA.

Soon after completion of the process a workshop of all line Departments are held on 25.5.2011 duly in format quite ahead vide TDA LNo. 300/ TDA Dt: 18.5.2011. The Introduction was addressed by the BDO, Other line department officers, PRI members present in the meeting myself being the SO,TDA presented the village wise planning with following modification proposals :

1. EDUCATION: 588 Nos of Boys. 491 of Girls are enrolled in 14 no of. P.S 5 No.of Ups in the age group of 6-14 year. Around 118 Left out students are taken by TDA NFECs since 1.2.2011, I have made TDA level education review to improve in status as the services of NFECs is better than the regular school of SSA, style of functioning at present at gill tops. Beside one MEC, Ashram school functioning in the area and accommodate 600 boys and girls in the hostel.

2. HEALTH: Collector, Ganjam has also during his first visit put emphasis on M.H.U under supervision of TDA Tumba with involvement of NGOs which are expedited vide this office LNo. 292 Dt: 17.5.2011 and LNo. 320 Dt: 25.5.2011,for better Education, Health TDA has provided equipments for Rs. 40 thousand and started new sub-centre at Buratal since 1.9.2010 inaugurated by Sub-Collector , CDMO, chirman, PRIS and PTGs.3. P. D.S:- Door to Door assessment was made last year, 409 nos. of families were detected at that time now reduced to a good extent and a new survey now in process to provide under Rs. 2 rice or Antodaya Yojana . 4. ELECTRICITY: 24 Villages are not electrified so far. Last year TDA had installed 10 nos solars out of CCD funds lying since 2007-08. But many of NGO, MP lad, other fund supplied solars including our supplies after come out defective not duly maintained even call-upon the OREDA technicians. Today the Addl.Director OREDA assured to alert his staffs to the need along with TATA, BP comp field technicians.

This time we made provision for annual maintenance and hope OREDA field staffs shall take the opportunity to provide non-stop- non-conventional solar electricity to PTGs at Non- electrified villages. Discussed with Addl. Director,OREDA in this regard.5. CONNECTIVITY (Communication): B.D.O suggested to curtail CC roads being covered within next 2 years by block agency in all tribal villages. But in last 2/3 years no such CC roads are taken. Hence some CD work with CC roads are placed in the plan.6. DRINKING WATER: In TDA area 32 Tube-well , 19 wells are taken-up till last year. This year the RWSS wing dug 2 no. of Tube-well and agreed to take up 29 nos.of Tube-well as per list submitted there vide LNo. 318 / Dt: 25.5.2011 under joint signature of SO,TDA and B.D.O, Patrapur. Today the digging machine reaches the project to start digging of Tube-wells. Provisions at ghat villages are made for pipe water supply and well in the 5 year plan. Last year we have dug 2 nos of tube-well and 2nos sanitary wells. 7. ANGANWADI CENTRES: Our 58 villages covered with 5 AWC till 2009 and increased to 11nos. of AWC till July – 2010 with 3 AWC buildings. CDPO informed to use our MPSC, Community centre building for AW centre and open new AW centre at Gaida ,Thanagaom, , Ramachandrapur, J.Badagaon & Tadigi/ Marmaria. 8. AGRICULTURE / HORTICULTURE: Crop, NHM plantation by Agrl/Horticulture wing are leaded by them in the area. The District Agriculture officer proposed to continue the crop demonstration and they shall posted one VAW fixing his Hqrs at Tumba to look after Deptt. and

Page 14: Presentation on IDP - 2012-17

TDA sponsored Agriculture activities. Being funds under banana, plantation are not spent under CCD plan, this has not placed in the plan.Horticulturist assured as per area need to post a gardener and the village plan.

However, after waiting last 18 month, now a successful raising of 10,000 seedlings made by TDA at our own experience of drumstick- 1,500 nos., Papaya -2000 nos, Guava- 500 nos, Jack fruit- 2000 nos, cashew- 5000 nos so far and some more other species are also in the way of raising by us. This shall also continue in next years for raising and distribution in between 15th June onwards in next years. 9. SOIL CONSERVATION: The soil conservation Deptt.has planted 3000cashew in 40 Acres land last year in August,September 2010 on expense of Rs 1,00,000/-. They have provided action plan for field bonding, WHS, Misc tree plantation etc. out of which proposals worth 95 lakhs to 1 crore places in the 5 year preliminary ID plan to be born by TDA. This year on expense of Rs 20,000/- we have grown 5,000/- cashew,7,000/- other species ,started such seedling distribution inaugurated by Sub-Collector,Brahmapur,BDO,Patrapur,IIC,Jarada Police Station.Quite before plantation week for lifting to different fields from 21.6.2011. simultaneously on the day of Adivasi Mahotsave, Buratal organized by us on same day on 21.6.2011.10. ANIMAL HUSBANDRY: Similarly far an assured animal care in the area it has been proposed to engage one leading farmer on monthly remuneration preferable among motivators for training at Bhajanagar under direct supervision of the VAS, Patrapur/ CDVO, Ganjam.11. IRRIGATION: (A) Minor irrigation: Asst. engineer, MI presented a plan to take up main canal maintenance by own Deptt. and the 4 nos of distributary be constructed by TDA. Which are incorporated in the 5 year ID Plan to the tune of Rs. 1.02 crores. I requested them to take up one more MI at village Andanda adjoined Dist. Gajapati and accepted by the A.E for a block level action. (B) Lift Irrigation: Since the LI point are not properly functioning in last years I suggest to select a leading farmer to look after the LI Point and do the yearly Nursery work, distribution of seedling to TDA, MADA PTGs on payment of monthly remuneration preferably out of Motivators engaged by TDA.till regular posting of LI wing . The repairing, installment proposal etc. are placed in the AAP accordingly. Besides 12 no. of subsidized diesel pump set are supplied to PTGs this year.12. EMPLOYBILITY, VTC, SKILL-UPGRADATION, INDURSTRIAL: The IPO presented the action plan to take –up by DIC as per eligibility of candidates. Moreover we have sponsored 34 youth in 2010-11 and 19 in 2009-10 under CCD plan also see the dream to call back the migrants from other states and put them with SHGs under TDA/Block/ DIC/ DRDA sponsored vocational, skill -up gradation trainings. This year we started a remote area uneducated youth lady tailoring at Buratal in TDA area engaging our ITI trained women.13. AWARENESS CAMP: Till my joining in this TDA F.R Act Collection of application by TDA was not started . I started camp on FRC, NREGA, Education, Health, PDS, AAY, NHM, SHG, Sanitation, Drinking water,discourage liquor habit involving NGOs awareness campaign. In first of my three months conducted door to door survey and first collected FR applications from all 981 families.14. SPORTS AND CULTURE AMONG EDUCATION /VILLAGE UNITS : Regular sports, talent cultural organization are made in last years and propose to continue till out come of 2/3 no.of ground troups from this area as there is no such possibilities are brought up till now. Effort for Incentive for different sports, cultural activities given through local SGHs accounts. 15. HOUSING (IAY) : B.D.O told to delete all the 300 IAY houses proposals as the block agency shall take-up all IAY houses referring the view of Collector told in G.B meeting in this regard. I propose being the PTG are gladly started all 35 no.of IAY as per our CCD plan at the cost of Rs. 25,000/- and PTGs are expressed their reluctancy with block IAY, the BDO agreed to routed the IAY process through TDA.

Page 15: Presentation on IDP - 2012-17

16. NREGA: We have sponsored applications for 21 Nos – Mopokhari, 14 nos Land Development , 14 – NFBS, 185 nos nos- mokudia / IAY, 409 nos AAY / Rs. 2 rice proposals to the BDO. 17.JBY : We have settled 3 nos of JBY soon after my joining and send another 2 no.of proposals to LIC, India Ltd. BBSR.and placed coverage of JBY for next five years in the preliminary ID plan.18. FOREST : During introduction with Forest range officer action plan of Rs. 12 lakhs for 30 thousand seedlings, 75 acres bamboo plantation, 75 ACs and 40 thousand bamboo clumps operation are to be taken every year along with bamboo cutting in 775 ACs in Singaraj & Tumba RF by own fund. 19. SHG / VTCs We have financed around 34 SHG. But most of the subsidy of some SHGs are paid as interest to the Banks. Hence Good SHGs/Our VTC trainees, Skill-upgraded SHG trainees agreed to deposit 50% or remaining cost for tailoring machine, computer etc. in TDA with quotations and TDA may allow to release maximum Rs.10,000 as subsidy to carry on self employment. Further, I propose to construct a TDA house at nearly Brahmapur town to expedite seeds, broom other business and short stay home for PTGs which can create 10 employments to PTG youth inform of driver, watcher, manager for the stay home. 20. VOCATIONAL FIELD: Our ST/SC skill students in the field of vocational, cultural, Educational, sport fields be attracted to it is, Sangita Nayak kalaparisheds nation wide to better educational institutions like KITT, Ekalabya Model Schools and provide specific camps facilities at Direct, state level to accommodate in town areas and select own place of choices for higher education, technical, other better employments. Training to selected ST/SC youth in the field of plumbering , Electrification, flower, gardening , carpentry, decorative, ideas to science hall, library , dinning , guest rooms, gates of ST/SC dev. institutions be trained by line depts. on recommendation of OWS wings through SCSTRTI to trained and then may be posted to hostels for maintain a neat , clear beautify sphere.21. EXPOSING: Our MEC, organization pay a 5 days tour and travel to 50 prominent places in 5 districts from 24.1.2011 to 28.1.2011 inclusive night halts outside. with 250 girls students and 50 SHG, Guardians.This was need 15 days back through exercise planning not only by informing all collectors, S.P, DWOS, outposts, police stations enroute but also ensure the advance telephonic talk with next police stations who had also provided every logistic support to us.

Since then, I hope the tourism Deptt.be contacted by one wing of Deptt. STSCRTI permanently and Guide, encourage give more inputs for successful beginning of the programmes with pre-annual planning for all MEC/Ekalabya/Other Model residential schools.22. SOCIAL SECURITY TO DISTRESS, DESTITUTE PTGS: Alongwith VTC training to below qualified PTGs, distress destitute in Jurisdiction of all Anganwadi, Primary schools can be provided with assured cooked food pockets at the door step after serving of cooked food to children/ students with 2 Ltr filter boiled water as gratuitous help to help less as a more social work like MDM,SMP implementing and monitoring wing at GP level may be looked after every day and week ending for better monitoring.23. OWS REPRESENTATION IN ALL DEPTS. FOR INITIAL PLANS : Around 20,000 crores for STs and 14000 crores for SC and equivalents budget allocation of minority, OBC out of 85,000 crore budget provision allocated at the increasing rate by State Govt.Deptts. since 2009-10. It has been suggested for a OWS /ST/Sc/OBC/ Minority development wing shall open in all Deptts. to monitor AAP from Ground level of each Deptts. and fund utilization there of and to the extent the ground level officials not know to follow AAP, not pay due attention to the field area be commanded ,guided by OWS wing.

Page 16: Presentation on IDP - 2012-17

Similarly all OWS wings in all Dept. along with Dept. evaluation, monitoring shall strengthen the SHGs by creating 3 clusters in each Block with 100 ST/SC SHGs in each cluster empower them put their presence in state, national level exhibition for respectable identification. Simultaneously develop the economic activities and make it worldwide, famous and make it a plant of economic tourism attraction.

This will also create ample scope wide range of services in OWS cadre in ST & SC Development Department.Till in the field of literature,publication,management,corporate house,innovatives skills come out in large scale, we have to produce eventual

outcomes of tribal domains in different forum, exhibition and by establishing at least permanent, commercial, cultural places in each townships in Odisha with the help of effort of our OWS wings at Districts as a whole.

HURDLES I have putting my views in writing, personal contact to all line Deptt. field staffs, supervising staffs, Administration first to ensure staying of line deptt. staffs 100 hours minimum in a week at the working place. So far TDA CCD plan since 2007-08 no expenditure made under NFECs, Infrastructure, Health planning , Solar light supply to PTG villagers, major connectivity , 3 / 4 wells for drinking water / com.centres at hill tops, Banana, Cashew plantation , Agrl.crop demonstration employment trial . Awareness camps, IAY houses. Engagement of 33 nos of teaching, non-teaching staff to MEC/TDA, skill upgradation etc. are attended in last 18 months. My effort for last 2 month are hardly received advance preparatory implementation as per programme, monthly returns to the effect, calling , collection of UCs from line deptts.and other Dev.work are not executed due to want of official staffs. The reasons may call up on by the Deptt. as no other way with me other than single field and office staff are working here. Hope our effort, coercive major will become helpful for PTG development in future.

Thanking You -

Special Officer, Bhubaneswar TDA,Tumba,Ganjam Dt:

Page 17: Presentation on IDP - 2012-17

INTEGRATED 5 YEARS ( 2012-17) DEVELOPMENT PLAN FOR SAURA PTGs OF TUMBA DEVELOPMENT AGENCY,TUMBA,GANJAM. 1st YEAR: 2012-13

NB:- Line Departments to authorize their field staffs to place estimates and assist TDA to implement the works and to avoid overlapping or doubling on comparison with line department AAPs/ changing AAPs.

SlNo.

Sector wise annual activities works, other than works ( Income generating schemes, enrollment in schools ,food security etc.)

Name of villages/Hamlets where the proposed works to be undertaken

No ofHHs

Quantity with units

FinancialTarget (Rs in lakhs)

No of PTG beneficiariesto be covered

Agency

I II III IV V VI VII VIII1 EDUCATION

1.Improvement to MEC,Lokasahi Lokasahi 1 10.00 250 TDA2.NFECs coaching & guidance Kuranga, Thanagaon, Tadingi,

Marmaria, Sapuakhata,Kuladi, Nuasahi,Gaida

8 1.00 180 TDA

Sub-total 11.002. HEALTH

Health Camps & Life saving medicines All 58 villages of TDA Micro Project

10 1.00 4040 CDMO

Sub-Total 1.003 PDS-Direct4 ELECTRIFICATION-Direct

(See solar column)5 CONNECTIVITY

a) CC ROAD1.Completion of CC Road Gujulingi 32 1 1.00 118 TDA2.CC road with CD from RD road to Parsuramkunda-250 Mtr

Puriasahi 41 1 4.00 165 TDA

3.CC road with support wall-200Mtr Bhogibandaha 21 1 4.00 86 TDA4..CC road with drain at river Ghat Burasahi 16 1 3.00 66 TDA5. Drain with CC road B.gouduni 12 1 1.00 60 TDA6..CC Road (12' wide) road from Sapuakhata (with CD )200Mtr

Tala buratal 30 1 4.00 157 TDA

7. CC road from Dobatia Chhak Tala buratal 30 1 2.008. CC Burasahi to A/S Chhaka-300Mtr Burasahi 16 1 5.00 66 TDASub-Total 24.00b) Gr-1 Metalling:1.Gr-I metalling to proposed play ground behind B.Gouduni

B.Gouduni 12 1 2.00 60 TDA

Sub-Total 2.00c) ROADS1.Road to River 500 Mtr Gujulingi 32 1 0.50 118 TDA2.Road to River 250 Mtr Puriasahi 41 1 0.50 165 TDA3.Road from Batasahi to Sindurabada with CC & CD work 1 Km

Batasahi 10 1 5.00 28 TDA

Page 18: Presentation on IDP - 2012-17

4.Road with CD at Sindurabada slope to Kalinga dala road MADA Linkage

Sindurabada 06 1 5.00 200 TDA

Sub-Total 11.00d) CD WORKS1.CD work-300Mtr Sindurabada 06 1 3.00 24 TDA2.CD work Banuasahi 06 1 2.00 27 TDA3.CD with CC road at Bhalighati-200Mtr Bhaliasahi 06 1 5.00 22 TDASub-Total 10.00e) REP./IMPV. OF ROAD

6 DRINKING WATERa). Well at Dengapathra 05 1 0.50 20 TDA/RWSSb) Tube-well( Direct by RWSS ,only linkage by TDA

0.00

c) Gravity flow/ Pipe water supply:-1. Gravity flow /Pipe water supply with tank

upto H/S & Dudukabada -700mtrsTala buratal 30 1 5.00 157 RWSS/TDA

2. Gravity flow Pipe water supply to village -300mtr

Mahalimba 28 1 3.00 126 RWSS/TDA

3. Gravity flow/Pipe water supply from Mahulabada

Dengapathara 05 1 3.00 20 RWSS/TDA

4.Gravity flow/Pipe water supply from Badagam

Mahulabada 05 1 3.00 23 RWSS/TDA

Sub-Total 14.507 ANGANWADI CENTRES:

Empowerment functioning watch by TDA8 PRIMARY SECTOR

a) Agriculture : 1Crop. Demonstration Gujulingi 32 10 0.05 10 TDA2.Crop Demonstration Puriasahi 41 10 0.05 10 TDA3.Crop Demonstration Sindurabada 06 5 0.025 5 TDA4.Crop Demonstration Bhogibandha 21 10 0.05 10 TDA5.Crop Demonstration Banuasahi 5 0.025 5 TDA6.Crop Demonstration Bhaliasahi 06 5 0.025 5 TDA7.Crop Demonstration Ambasahi 05 5 0.025 5 TDA8.Crop Demonstration Batasahi 10 7 0.025 7 TDA9.Crop Demonstration Burasahi 16 10 0.05 10 TDA10.Crop Demonstration B.Gouduni 12 10 0.05 10 TDA11.Crop Demonstration Tala Buratal 30 10 0.05 157 TDA12.Crop Demonstration Upper Buratal 26 10 0.05 10 TDA13.Crop Demonstration Mahalimba 28 10 0.05 10 TDA14.Crop Demonstration Dengapathar 5 0.025 5 TDASub-Total 0.55

Page 19: Presentation on IDP - 2012-17

b) Horticulture :1.Misc. tree plantation Bhaliasahi 06 18 2.90 22 ASCO/TDA2.Misc tree plantation Banuasahi 06 18 2.90 20 ASCO/TDASub-Total 5.80c) Animal Husbandry :Animal camps, farmers training /Poultry etc. All TDA villages 58 1.80 4040 CDVO/TDASub-Total 1.80

9 IRRIGATION : a) CHECKDAM:1.Check dam with drain at Similinala Gujulingi 32 1 5.00 50 TDA2. Checkdam at Ambanala Burasahi 16 1 2.00 66 TDA3. Check dam at Kumbhinala Tala buratal 30 1 3.00 157 TDA4. Checkdam at Batanala Upper buratal 26 1 2.00 145 TDA5 .Checkdam at Panasbada Mahalimba 28 1 3.00 126 TDA6. Const. of Checkdam from Karanjanala to Baghuabad

Mahalimba 28 1 0.50 126 TDA

7. Checkdam at Jambanala & water supply Mahulabada 05 1 2.00 23 TDA8 .Loose boulder Checkdam Bhogibandha 21 30 3.45 50 ASCO/TDA

Sub-Total 20.95B) Diversion weir :1.Diversion weir Gujulingi 32 1 7.50 118 ASCO/ TDA2.Field bonding Bhogibandha 21 10 1.15 8 ASCO/TDA3.Field Bonding Banuasahi 06 30 3.45 20 ASCO/TDA4.Field Bonding Batasahi 10 30 3.45 28 ASCO/TDA5.Field Bonding Bhaliasahi 06 30 3.45 25 ASCO/TDA6.Tank digging & const. of steps Upper Buratal 26 1 2.00 145 TDA7. Stone wall terracing Upper Buratal 26 2000ft 2.80 5 ASCO/TDA

Sub-Total 23.80c) Canal rep./Impv.Impv.to 4 canal & 8 nos. of Checkdam 21.60 MId) Honorarium to Farmers for maintenance of LI point

0.25 OLIC

Sub-Total 21.8510. EMPLOYBILITY : For project level

training to illiterate youths & rehabilitation with tool kits ( See IEC Column)

11. OTHERS (MISC.)

A) J.B.Y All TDA villages 981 4.905 TDA

Sub-Total 4.905

Page 20: Presentation on IDP - 2012-17

B) Community Centre :1.Com.centre with Latrine & Bath Gujulingi 32 1 2.50 118 TDA2.Com.centre with Latrine & Bath Puriasahi 41 1 2.50 165 TDA3.Com.centre with Latrine & Bath Sindurabada 06 1 2.50 24 TDA4.Com.centre with Latrine & Bath Bhogibandha 21 1 2.50 86 TDA5.Com.centre with latrine & bath Batasahi 10 1 2.50 28 TDA6.Com. Centre with latrine & bath Dengapathar 05 1 4.00 20 TDA7.Com. Centre with latrine & bath Mahulabada 05 1 5.00 23 TDASub-Total 21.50C)HOUSING : TDA housing @ 0.50/fire proof @ 0.15 Lakh1) TDA Housing/Fire proof roofing TDA PTGs 981 50 6.00 50 TDA 2) Fire proof roofing Upper Buratal 26 0.96 8 TDA3) IAY : 2˝ grading CC on 30 old IAY Tala Buratal 30 5 1.20 157 TDASub-Total 8.16D) AWARENESS : Awareness camps & Exchange visit All TDA villages 981 1.00 4040 TDASub-Total 1.00E) I.E.C : a)Vocational Training /Skill up-gradation & raising of seedlings

TDA PTGs 0.50 TDA/Deptt.

Sub-Total 0.50b) Latrine & Bath with RWSS/NGO support 1) Latrine & Bath @ 3000/- Puriasahi 41 10 0.30 10 TDA2) Latrine & Bath @ 3000/- Bhogibandha 21 18 0.54 10 TDA3) Latrine & Bath @ 3000/- Bhaliasahi 06 10 0.304) Latrine & Bath @ 3000/- Batasahi 10 8 0.24 8 TDA5) Latrine & Bath @ 3000/- Burasahi 16 14 0.42 14 TDA6) Latrine & Bath @ 3000/- B.Gouduni 12 12 0.36 12 TDASub-Total 2.16c) SHG1) Micro Credit support to 2 nos of SHG Bhogibandha 21 20 1.00 20 TDA2) Micro Credit support to one SHG Bhaliasahi 06 10 0.50 10 TDASub-Total 1.50d) Sports, Culture & Edu. Activities. Infrastructure

All TDA village 1.00 TDA

Sub-Total 1.00e) Incentive to 8 motivators @ Rs.1500/- 1.50 4040 TDASub-Total: 1.50f) Solar Light1. Solar light & yearly maintainance Non Electrified,Hill top villages. 1.00 OREDA

2. Solar Light Dengapathar 05 2 0.70 TDASub-Total 1.70

Page 21: Presentation on IDP - 2012-17

g) Monitoring & evaluation 0.70 4040 TDASub-Total 0.70h) Mainatence of Community centre & MPSC building

2.00 TDA

i) Colour wash /Water supply/Rep. to MPSC, CC, Quarters/ Drain/ Office, building with maintenance

2.00

a) Rep. of Drain Burasahi 16 1.00 66 TDASub-Total 5.00GRAND TOTAL (Year 2012-13) 197.425

Special Officer,TDA, Tumba,Ganjam

Page 22: Presentation on IDP - 2012-17

INTEGRATED 5 YEARS ( 2012-17) DEVELOPMENT PLAN FOR SAURA PTGs OF TUMBA DEVELOPMENT AGENCY,TUMBA,GANJAM. 2nd YEAR: 2013-14

NB:- Line Departments to authorize their field staffs to place estimates and assist TDA to implement the works and to avoid overlapping or doubling on comparison with line department AAPs/ changing AAPs.

SlNo.

Sector wise annual activities works, other than works ( Income generating schemes, enrollment in schools ,food security etc.)

Name of villages/Hamlets where the proposed works to be undertaken

No ofHHs

Quantity with units

Financialtarget (Rs in lakhs)

No of PTG beneficiariesto be covered

Agency

I II III IV V VI VII VIII1 EDUCATION

1.Improvement to MEC,Lokasahi Lokasahi 1 10.00 250 TDA2.NFECs coaching & guidance Kuranga, Thanagaon,Tadingi

Marmaria, Sapuakhata,Kuladi, Nuasahi,Gaida

8 1.00 180 TDA

Sub-Total 11.002. HEALTH

1.Health Camps & Life saving medicines All 58 villages of TDA Micro Project

10 1.00 4040 CDMO

Sub-Total 1.003 PDS- Direct4 ELECTRIFICATION –Direct

( See solar light column)5 CONNECTIVITY

a) CC ROAD1.CC road up to A/S Chhaka A.Gouduni 23 1 5.00 85 TDA2. RD road to Metusahi Metusahi 08 1 5.00 132 TDA3. Metusahi to RD road -Do- 08 1 5.00 140 TDA4. Lokasahi to A/S Chhaka Lokasahi 11 1 5.00 145 TDA5. Lokasahi to Metusahi -Do- 11 1 5.00 150 TDA6.CC road from RD road to Banapur -300Mtr Banapur 37 1 5.00 132 TDA

7. Banapur to RD road -do- 37 1 5.00 150 TDA8.CC road with CD from Banapur to Kendunala-300Mtr

Banapur 37 1 5.00 132 TDA

9.CC road from Kendunala to Sasan-300Mtr Sasan 05 1 5.00 22 TDA10.CC road 100mtr R.L.Nagar 08 1 1.50 28 TDA11. CC road from Badjhola to Sasan-300Mtr Badjhola 25 1 5.00 90 TDA7.CC road from Fatkasing to Badjhola-300Mtr

Fatkasing 21 1 5.00 82 TDA

8.CC road from Fatkasing to Sankosta-300Mtr Fatkasing 21 1 5.00 82 TDA9. CC road ( Ward Member Sahi-25Mtr) Guruda 26 1 0.60 124 TDA10.CC road from village to school Andanda 28 1 1.00 134 TDA11.CC road at Colony Sapuakhata 14 1 1.00 59 TDASub-Total 64.10

Page 23: Presentation on IDP - 2012-17

b) Gr-1 Metalling1.Gr-I metalling from RD road to Dhepasahi Dhepasahi 20 1 4.00 82 TDA2. Black topping from Metusahi /MEC to RD road

Metusahi 08 5.00 42 TDA

3. Black topping from A/S Gouduni to Chakamba

Chakamba 15 1 5.00 39 TDA

Sub-Total : 14.00c) ROADS:1.Road from Kuladi to Mahendratanaya river Kuladi 31 1 1.00 103 TDA 2.Road from village to nalla Sapuakhata 14 1 0.50 59 TDASub-Total 1.50d) CD WORKSe) REP./IMPV. OF ROAD

6 DRINKING WATERa) Well 1.Well at Kuladi Kuladi 31 1 0.50 103 TDA2. Well at Sasan 1 0.50 22 TDAb) Tube-well( Direct by RWSS,only linkage by TDA)

0.00

c) Gravity flow/ Pipe water supply1. Lift point drinking water from A/S Gouduni to Chakamba & Metusahi with overhead tank at Metusahi

Chakamba 15 1 4.00 39 TDA

2.Pipe water supply with overhead tank Kuladi 31 1 4.00 103 TDA3.Gravity flow/Pipe water supply to Sapuakhata –2 KM

Andanda 28 1 5.00 134 OLIC

4. Gravity flow/Pipe water supply to Talaburatal & Dudukabada

Sapuakhata 14 1 5.00 59 TDA

Sub-Total 19.007 ANGANWADI CENTRES- Empowerment,

functioning watch by TDA8 PRIMARY SECTOR

a) Agriculture : 1.Crop. Demonstration A.gouduni 23 10 0.05 10 TDA2.Crop Demonstration Chakamba 15 10 0.05 10 TDA3.Crop Demonstration Lokasahi 11 10 0.05 10 TDA4.Crop Demonstration Metusahi 08 5 0.05 5 TDA5.Crop Demonstration Dhepasahi 20 10 0.05 5 TDA6.Crop Demonstration Banapur 37 30 0.10 30 TDA7.Crop Demonstration Sasan 05 5 0.025 5 TDA8.Crop Demonstration R.l. Nagar 08 5 0.025 5 TDA9.Crop Demonstration Badhjola 25 10 0.05 10 TDA10.Crop Demonstration Fatkasingh 21 10 0.05 10 TDA11.Crop Demonstration Guruda 26 10 0.05 10 TDA

Page 24: Presentation on IDP - 2012-17

Sub-Total 0.55b) Horticulture :Sub-Total 0.00c) Animal Husbandry :Animal camps, farmers training /Poultry etc. All TDA villages 58 1.80 4040 CDVO/TDASub-Total 1.80

9 IRRIGATION : a) CHECKDAM:1.Loose boulder checkdam Lokasahi 11 30 3.45 50 ASCO/TDA2.Check dam at Buranala Dhepasahi 20 1 2.00 82 TDA3.Check dam with drain Banapur 37 1 3.00 132 TDA4.Check dam at Karanjanalla Guruda 26 1 2.00 124 TDA5.Check dam at pansanalla Andanda 28 1 2.00 134 TDA6.Checkdam at Brahmaninalla Sapuakhata 14 1 2.50 59 TDA Sub-Total 14.95b) Diversion weir :1. Filed bonding Sasan 05 20 3.90 18 ASCO/TDA2. Field bonding A.Gouduni 23 20 2.30 15 ASCO/TDA3. Revival of LI project A.Gouduni 23 1 4.50 85 OLIC

4. WHS Lokasahi 11 1 3.80 36 ASCO/TDA

5. Steps at Tank Dhepasahi 20 1 0.50 82 TDA

6. Diesel LI point Banapur 37 1 2.00 132 TDA

7. New installation of LI project R.L. Nagar 08 1 7.00 28 OLIC8.Revival of LI project Fatkasingh 21 1 4.00 82 OLICSub-Total 28.00c) Canal rep./Impv.Impv.to 4 canal & 4 nos. of Checkdam 25.50 MId) Honorarium to Farmers for maintenance of LI point

0.25 OLIC

Sub-Total 25.7510 EMPLOYBILITY: Project level training to

illiterate youths & rehabilitation. ( see IEC column)

11 OTHERS (MISC.)a) J.B.Y 0.00b) Community Centre :1.Com.centre with Latrine & Bath Chakamba 15 1 2.50 39 TDA2.Com.centre with Latrine & Bath Banapur 37 1 2.50 132 TDA3. Mandap Guruda 26 1 0.50 TDA4. Mandap A.Gouduni 23 1 0.50 85 TDASub-Total 6.00

c)HOUSING : TDA housing @0.50 Lakh

Page 25: Presentation on IDP - 2012-17

/Fire proof roofing @ 0.15 Lakh1) TDA housing/Fire proof roofing TDA PTGs 50 6.00 50 TDASub-Total 6.00d)AWARENESS : Awareness camps & Exchange visit All TDA VILLAGES 981 1.00 4040 TDASub-Total 1.00e)I.E.Ca)Vocational Training /Skill upgradation & raising of seedlings

TDA PTGs 0.50 TDA/Deptt.

b) Latrine & Bath :

1)Const. of Latrine & bath@ 3000/- A.Gouduni 23 23 0.69 85 TDA

2)Const. of Latrine & bath @ 3000/- Chakamba 15 10 0.30 39 TDA

3)Const. ofLatrine & bath @ Rs.3000/- Lokasahi 11 11 0.33 36 TDA

4)Const. of Latrine & bath @ Rs.3000/- Dhepasahi 20 14 0.42 14 TDA

5)Const. of Latrine & bath @ Rs.3000/- Banapur 37 30 0.90 30 TDA

Sub-Total 3.14c)SHG :1)Bamboo basket making & Broom binding

Kuladi 31 2 0.50 31 DIC/SHG

d) Sports, Culture & Edu. Activities 1.00 TDA/Deptt

e) Incentive to 8 motivators @ Rs.1500/- 1.50 4040 TDASub-Total: 3.00f) Solar Light Solar light & yearly maintenance Non Electrified hill top villages 1.00 OREDASub-Total 1.00g) Monitoring & evaluation 0.70 4040 TDASub-Total 0.70h) Maintenance of Community centre & MPSC building

TDA

GRAND TOTAL (Year : 2013-14) 202.49

Special Officer,TDA, Tumba,Ganjam.

INTEGRATED 5 YEARS (2012-17) DEVELOPMENT PLAN FOR SAURA PTGs OF TUMBA DEVELOPMENT AGENCY, TUMBA,GANJAM. 3rd YEAR: 2014-15

Page 26: Presentation on IDP - 2012-17

NB:- Line Departments to authorize their field staffs to place estimates and assist TDA to implement the works and avoid overlapping or doubling on comparision with line department AAPs/ changing AAPs.

SlNo.

Sector wise annual activities works, other than works ( Income generating schemes, enrollment in schools ,food security etc.)

Name of villages/Hamlets where the proposed works to be undertaken

No ofHHs

Quantity with units

FinancialTarget (Rs in lakhs)

No of PTG Beneficiaries to be covered

Agency

I II III IV V VI VII VIII1 EDUCATION

1.Improvement to MEC,Lokasahi Lokasahi 1 10.00 250 TDA2.NFECs coaching & guidance Kuranga, Thanagaon, Tadingi,

Marmaria, Sapuakhata,Kuladi, Nuasahi,Gaida

8 1.00 180 TDA

Sub-Total 11.002. HEALTH

Health Camps & Life saving medicines All 58 villages of TDA Micro Project

10 1.00 4040 CDMO

Sub-Total 1.003 PDS- Direct4 ELECTRIFICATION- Direct

( See Solar Light column)5 CONNECTIVITY

a) CC ROAD1.CC road from Gangapur to Fatkasing- 350Mtr

Gangapur 29 1 5.00 105 TDA

2.CC road from Gangapur to Ramchandrapur -do- 29 1 5.00 105 TDA3.CC road from Ram.Ch.PUR to Limeswari chhak with CD-350 Mtr

Ramachandrapur 24 1 5.00 69 TDA

4.CC road from Limeswari chhak to titigam with CD- 350 Mtr-350

-do- 24 1 5.00 69 TDA

5.CC road from titigaom to RD road with CD work-300Mtr

Titigaom 13 1 5.00 50 TDA

6.CC road from B.Saradhapur to Canal Saradhapur 33 1 5.00 85 TDA7.CC road fromA.Saradhapur to Canal

Phase-I 300Mtr

Saradhapur 33 1 5.00 85 TDA

Phase-II 300Mtr 5.00

8.CC road at Budhamba upper sahi-200Mtr Budhaamba 14 1 2.00 52 TDA9.CC road Dimirikunia to Budhamba-250 mtr Dimirikunia 05 1 3.00 20 TDA10.CC road from with CD Kashikhola to Haripur via Amlabada-300Mtr

Kashikhola 10 1 5.00 33 TDA

11.CC road -200Mtr Nakadandia 14 1 2.50 52 TDA12.CC road from School to Satya sai & to Haripur-300Mtr

Sunaribada 27 1 5.00 113 TDA

13. CC Road 500 -Mtr. Tadingi 27 1 2.50 120 TDA14.CC road of village road -70Mtr Marmaria 22 1 1.30 114 TDA

Page 27: Presentation on IDP - 2012-17

15.CC road from com.centre to village Marmaria 22 1 1.80 114 TDA16.CC road at village 150 mtr Ramachandrapur 24 1 2.00 70 TDA17.CC road at village Badagaon 28 1 2.00 143 TDASub-Total 67.10b) Gr-1 Metalling

c) ROADS1.Road to river Marmaria 22 0.90 TDA2.Road from Haridapatu to Nuasahi Haridapatu 09 1 1.08 39 TDA3. Road with CC -130 mtrs. Nakdandia 14 1 2.00 143 TDA Sub-Total 3.98d) CD WORKSe) REP./IMPV. OF ROAD

6 DRINKING WATERa). Well 0.00b) Tube-well Direct by RWSS,only linkage by TDA

0.00

c) Gravity flow/ Pipe water supply1. Gravity flow/Pipe water supply to S.Pur, H/S Chhak ,Titigaon-3 KMs

Dimirikunia 05 1 5.00 145 TDA

2. Gravity flow/ Pipe water lift borewell Sunaribada 27 1 2.00 113 TDASub-Total 7.00

7 ANGANWADI CENTRES- Empowerment, Functioning watch by TDA

8 PRIMARY SECTOR a) Agriculture : 1. Crop. Demonstration Gangapur 29 10 0.05 10 TDA2.Crop Demonstration Ramachnadrapur 24 10 0.05 10 TDA3.Crop Demonstration Titigaom 13 10 0.05 10 TDA4.Crop Demonstration Saradhapur 33 5 0.025 5 TDA5.Crop Demonstration Budhamba 14 5 0.025 5 TDA6.Crop Demonstration Dimirikunia 05 10 0.05 10 TDA7.Crop Demonstration Kashikhola 10 5 0.025 5 TDA8.Crop Demonstration Nakdandia 14 5 0.025 5 TDA9.Crop Demonstration Sunaribada 27 10 0.05 10 TDA10.Crop Demonstration Tadingi 27 10 0.05 10 TDASub-Total 0.40b) Horticulture :Sub-Totalc) Animal Husbandry :Animal camps, farmers training /Poultry etc. All TDA villages 58 1.80 4040 CDVO/TDASub-Total 1.80

9 IRRIGATION : a) CHECKDAM:

Page 28: Presentation on IDP - 2012-17

1.New check dam at Thuriambanala Sunaribada 27 1 2.50 113 TDA2.Rep. of checkdam at Rajabash-1.5Km -do- 27 1 2.00 113 TDA3.Checkdam at Tumbanalla Tadingi 27 1 2.50 120 TDA4.Checkdam at Panasanala Haridapatu 09 1 2.50 TDASub-Total 9.50

B) Diversion weir :1) Diversion weir Budhaamba 14 1 3.80 52 ASCO/TDA2) WHS Sunaribada 27 1 7.80 113 ASCO/TDASub-Total 11.60c) Canal rep./Impv.Impv.to 4 canal & 8 nos. of Checkdam 25.50 MI

d) Honorarium to Farmers for maintenance of LI point

0.25 OLIC

Sub-Total 25.7510 EMPLOYBILITY : Project level training to

illiterate youths ( See IEC column)Sub-Total 0.00

11. OTHERS (MISC.)A) J.B.YSub-Total 0.00B) Community Centre :1.Com.centre with Latrine & Bath Nakdandia 14 1 2.00 52 TDA2. Mandap at village Sunaribada 27 1 0.50 113 TDA3. Mandap at village Badagaon 28 1 0.50 143 TDASub-Total 3.00C)HOUSING : TDA housing @0.50Lakh /Fire proof @0.15Lakha) Fire proof roofing TDA PTGS 50 6.00 50 TDA Sub-Total 6.00D)AWARENESS : Awareness camps & Exchange visit All TDA villages 981 1.00 4040 TDA

Sub-Total 1.00E)I.E.Ca)Vocational Training /Skill up-gradation & raising of seedlings

TDA PTGs 0.50 TDA/Deptt.

b) Latrine & Bath:1) Latrine & Bath @ 3000/- Haridapatu 09 9 0.33 39 TDA2) Latrine & Bath @ 3000/- Nuasahi 18 18 0.54 71 TDASub-Total 1.37

F) SHG

Page 29: Presentation on IDP - 2012-17

A) SHG 1) Decorative Bamboo work Nakdandia 14 2 0.50 14 DIC/TDA2) Bamboo work & Broom binding Sunaribada 27 27 0.50 113 DIC/TDAB) Sports, Culture & Edu. Activities All TDA village 1.00 TDASub-Total 2.00C) Incentive to 8 motivators @ Rs.1500/- For TDA area 1.50 4040 TDASub-Total: 1.50D) Solar LightSolar light & yearly maintenance Non Electrified hill top villages 1.00 OREDAStreet light Haridapatu 09 1 0.40 39 TDAStreet Light Badagaon 28 1 0.40 143 TDASub-Total 1.80E) Monitoring & evaluation 0.70 4040 TDASub-Total 0.70F) Maintenance of Community centre & MPSC building

-

GRAND TOTAL (2014-15) 156.50

Special officer,TDA,Tumba.Ganjam

INTEGRATED 5 YEARS (2012-17) DEVELOPMENT PLAN FOR SAURA PTGs OF TUMBA DEVELOPMENT

Page 30: Presentation on IDP - 2012-17

AGENCY, TUMBA,GANJAM. 4th YEAR: 2015-16 NB:- Line Departments to authorize their field staffs to place estimates and assist TDA to implement the works and avoid overlapping or doubling on comparision with line department AAPs/ changing AAPs.

SlNo.

Sector wise annual activities works, other than works (Income generating schemes, enrollment in schools ,food security etc.)

Name of villages/Hamlets where the proposed works to be undertaken

No ofHHs

Quantity with units

FinancialTarget (Rs in lakhs)

No of PTG beneficiaries to be covered

Agency

I II III IV V VI VII VIII1 EDUCATION

1.Improvement to MEC,Lokasahi Lokasahi 1 10.00 250 TDA2.NFECs coaching & guidance Kuranga, Thanagaon, Tadingi,

Marmaria, Sapuakhata,Kuladi, Nuasahi,Gaida

8 1.00 180 TDA

Sub-Total 11.002. HEALTH

Health Camps & Life saving medicines All 58 villages of TDA Micro Project

10 1.00 4040 CDMO

Sub-Total 1.003 PDS- Direct4 ELECTRIFICATION- Direct

(See Solar column)5 CONNECTIVITY

a) CC ROAD1. CC road to Sunaribada-300Mtr Daleibila 10 1 5.00 10 TDA2. CC road -300mtr Dhadiamba 23 1 5.00 23 TDA3. CC road -50Mtr Kadaligaom 10 1 0.50 10 TDA4. CC road -30Mtr Badakuranga 14 1 0.50 14 TDA5. CC road 80 mtr Talakuranga 13 1 1.50 13 TDA6. CC road -100Mtr Bhalibada 06 1 2.00 8 TDA7. CC road -100Mtr Labarganda 08 1 2.00 8 TDA8. CC road at village-2 sahi Thanagaom 28 1 3.00 28 TDA9. CC road from Thanagoam to Ranikaitha -do- 28 1 5.00 28 TDA10. CC road Thalibada 13 1 1.00 13 TDA11. CC road Tabalasahi 05 1 2.00 8 TDA12.CC road Tarasing 08 1 2.00 8 TDA13.CC road Haladibada 16 1 2.00 16 TDA14. CC road Jhampurimusa 08 1 2.00 8 TDASub-Total 33.50b) Gr-1 MetallingSub-Total 0.00c) ROADS1.Road to Talapadar Daleibila 10 1 3.00 10 TDA2.Road from Daleibila to Kuranga Bada Kuranga 14 1 2.00 14 TDA3.Road to canal Bhalibada 06 1 5.00 TDA

Page 31: Presentation on IDP - 2012-17

4.Road to Daleibila Labarganda 08 1 2.00 8 TDA Sub-Total 12.00d) CD WORKSe) REP./IMPV. OF ROAD

6 DRINKING WATERa). Well 1. Well at Daleibila 10 1 0.50 10 TDA2. Well Badakuranga 14 1 0.50 14 TDA3. Well T. Kuranga 13 1 0.50 13 TDA4. Well Thalibada 13 1 0.50 13 TDA5. Sanitary Well Tabalasahi 05 1 0.80 8 RWSS6. Sanitary well Tarasing 08 1 0.80 8 RWSS7. Well Sangaom 15 1 0.50 15 TDA8.Well Haladibada 16 1 0.80 16 RWSS9. Sanitary well Gaida 08 1 0.80 8 RWSS10. Well Jhampurimusa 08 1 0.50 8 TDA11. well Dhadiamba 23 1 0.50 23 TDAb) Tube-well- Direct by RWSS,only linkage by TDA

-

Sub-Total 6.70c) Gravity flow/ Pipe water supply1. Gravity flow/Pipe water supply-100Mtr Kadaligaom 10 1 2.50 10 TDA2.Gravity flow/ Pipe water supply Thanagaom 28 1 2.00 28 TDA 3.Gravity flow/Pipe water supply from Mahulabada

Thalibada 13 1 3.00 13 TDA

4.Gravity flow/Water supply from Badagaom Sangaom 15 1 3.00 15 TDA5. Pani Kunda Thalibada 13 1 0.50 13 TDA6. Panikunda Sanagoam 15 1 0.50 15 TDA7. Panikunda Haladibada 16 1 0.50 16 TDA8. Panikunda Jhampurimusa 08 1 0.50 8 TDASub-Total 12.50

7 ANGANWADI CENTRES- Empowerment functioning watch by TDA

8 PRIMARY SECTOR a) Agriculture : 1Crop. Demonstration Daleibila 10 10 0.05 10 TDA2.Crop Demonstration Dhadiamba 23 10 0.05 10 TDA3.Crop Demonstration Kadaligaom 10 5 0.025 5 TDA4.Crop Demonstration Bada Kuranga 14 10 0.05 10 TDA5.Crop Demonstration T. Kuranga 13 10 0.05 10 TDA6.Crop Demonstration Bhaliasahi 06 5 0.025 5 TDA7.Crop Demonstration Thanagaom 28 10 0.05 10 TDA8.Crop Demonstration Tabalasahi 05 5 0.025 5 TDASub-Total 0.325

Page 32: Presentation on IDP - 2012-17

b) Horticulture :Sub-Total 0.00c) Animal Husbandry :1.Animal camps, famers training /Poultry etc. All TDA villages 58 1.80 4040 CDVOSub-Total 1.80

9 IRRIGATION : a) CHECKDAM:1. Checkdam at Nuagada Thanagaom 28 1 2.00 28 TDA2.Checkdam at Gangabada Tabalasahi 10 1 2.00 8 TDA3. Checkdam Tarasing 08 1 2.00 8 TDA4. New Tank(30x30) Bada Kuranga 14 1 2.50 14 TDAb) Diversion weir :1) WHS Dhadiamba 23 1 7.20 23 ASCOSub-Total 15.70c) Canal rep./Impv.Impv.to 4 canal & 7 nos. of Checkdam 16.12 MId) Honorarium to Farmers for maintenance of LI point

0.25 LI

Sub-Total 16.3710 EMPLOYBILITY : Project level training to

illiterate youths ( See IEC column)11. OTHERS (MISC.)

A) J.B.YB) Community Centre :1.Com.centre with Latrine & Bath Dhadiamba 23 1 2.50 23 TDA2. Com.centre with Latrine & Bath Kadaligaom 10 1 1.00 10 TDA3. Com.centre Bada Kuranga 14 1 2.50 14 TDA4. Com.centre with Latrine & Bath Bhalibada 06 1 2.50 8 TDA5. Com.centre with Latrine & Bath Labarganda 08 1 2.00 8 TDA6. Com.centre with Latrine & Bath Thalibada 13 1 2.50 13 TDA7. Com.centre with Latrine & Bath Tabalasahi 05 1 2.50 8 TDA8. Com.centre with Latrine & Bath Tarasing 08 1 2.50 8 TDA9. Com.centre with Latrine & Bath Sangaom 15 1 2.50 15 TDA10. Com.centre with Latrine & Bath Gaida 08 1 2.50 8 TDA11. Com.centre with Latrine & Bath Jhampurimusha 08 1 2.50 8 TDA12. Mandap Dhadiamba 23 0.50 23 TDA13. Mandap Bada Kuranga 14 1 0.50 14 TDA14.Mandap T. Kuranga 13 1 0.50 13 TDASub-Total 27.00C)HOUSING : TDA housing @ 0.50 Lakh/Fire proof @ 0.15 Lakh TDA housing/ Fire proof roofing TDA PTGs 50 6.00 50 TDA Sub-Total 6.00D)AWARENESS :

Page 33: Presentation on IDP - 2012-17

Awareness camps & Exchange visit All TDA villages 981 1.00 4040 TDASub-Total 1.00E)I.E.Ca) Vocational Training /Skill up-gradation & raising of seedlings

TDA PTGs 0.50 TDA/Deptt.

b) Latrine & Bath:1) Latrine & Bath @ 3000/- Dhadiamba 23 23 0.69 23 TDASub-Total 1.19F) SHGa) 1. Bamboo work & Broom binding Dhadiamba 23 2 0.50 23 DIC/SHG 2. SHG Micro credit support Bhaliabada 06 1 0.50 10 TDA3. Bamboo work Labarganda 08 1 0.25 8 DIC/SHGb) Sports, Culture & Edu. Activities All TDA village 1.00 TDASub-Total 2.25c) Incentive to 8 motivators @ Rs.1500/- For TDA area 1.50 4040 TDASub-Total: 1.50d) Solar Light1.Solar light & yearly maintainance Non Electrified , Hill top Vill. 1.00 OREDA2. Solar street Badakuranga 14 1 0.50 14 TDA3. Solar street light T. kuranga 13 1 0.50 13 TDA4. Solar street light Thalibada 13 1 0.50 13 TDA5. Street light Tabalasahi 05 1 0.50 8 TDA6. Street light Tarasing 08 1 0.50 8 TDA7. Solar light Haladibada 16 1 0.50 16 TDA8. Solar light Gaida 08 1 0.50 8 TDA9. Street light Jhampurimusha 08 1 0.50 8 TDASub –Total 5.00e) Monitoring & evaluation 0.70 4040 TDASub-Total 0.70f) Mainatence of Community centre & MPSC building

TDA

GRAND TOTAL: (2015-16) 155.53

Special officer,TDA,Tumba.Ganjam

Page 34: Presentation on IDP - 2012-17

INTEGRATED 5 YEARS (2012-17) DEVELOPMENT PLAN FOR SAURA PTGs OF TUMBA DEVELOPMENT AGENCY, TUMBA,GANJAM. 5th YEAR: 2016-17

NB:- Line Departments to authorize their field staffs to place estimates and assist TDA to implement the works and avoid overlapping or doubling on comparision with line department AAPs/ changing AAPs.

SlNo.

Sectorwise annual activities works, other than works ( Income generating schemes, enrollment in schools ,food security etc.)

Name of villages/Hamlets where the proposed works to be undertaken

No ofHHs

Quantity with units

FinancialTarget (Rs in lakhs)

No of PTG beneficiaries to be covered

Agency

I II III IV V VI VII VIII1 EDUCATION

1.Improvement to MEC,Lokasahi Lokasahi 1 10.00 250 TDA2.NFECs coaching & guidance Kuranga, Thanagaon, Tadingi,

Marmaria, Sapuakhata,Kuladi, Nuasahi,Gaida

8 1.00 180 TDA

Sub-Total 11.002. HEALTH

Health Camps & Life saving medicines All 58 villages of TDA Micro Project

10 1.00 4040 CDMO

Sub-Total 1.003 PDS-Direct4 ELECTRIFICATION-Direct

(See Solar column)5 CONNECTIVITY

a) CC ROAD1.CC Road with drain Gangapur 29 1 1.50 29 TDA2.CC road with drain Badjhola 25 1 2.00 25 TDA3. CC road with drain Kadaligaon 10 1 2.00 10 TDASub-Total 5.50b) Gr-1 Metalling1. Burasahi to Bahukasahi Gr-I metalling 400mtr

Burasahi 16 1 1.00 28 TDA

Sub-Total 1.00c) ROADS1.Road to near by well-300mtr Banapur 37 1 2.00 37 TDA2.Road to Temple -do- 37 1 2.00 37 TDA3.Road to river Sindurabada 14 1 1.50 35 TDA4.Road to Ankuli Mahalimba 28 1 2.00 28 TDA5.Road to Gokhanasai Haridapatu 09 1 1.00 09 TDASub-Total 8.50d) CD WORKSe) REP./IMPV. OF ROAD

Page 35: Presentation on IDP - 2012-17

6 DRINKING WATERa). Well at Banapur 37 1 0.50 TDAb) Tube-well-Direct by RWSS,only linkage by TDA

0.00

c) Gravity flow/ Pipe water supply 0.00Sub-Total 0.50

7 ANGANWADI CENTRES-Empowerment functioning watch by TDA

8 PRIMARY SECTOR a) Agriculture : b) Horticulture :c) Animal Husbandry :Animal camps, farmers training /Poultry etc. All TDA villages 58 1.80 4040 CDVO/TDASub-Total 1.80

9 IRRIGATION : A) CHECKDAM:1.Checkdam at Dimirinala to Mahalimba 28 1 2.50 28 TDA2.Check dam at Jamjhola Bhogibandha 21 1 4.00 21 TDA3.Check dam at Dollynalla U. Buratal 26 1 2.00 26 TDA4.Steps at river ghat Puriasahi 41 1 0.50 41 TDAB) Diversion weir :Sub-Total 9.00C) Canal rep./Impv.Impv.to 4 canal 13.00 MID) Honorarium to Farmers for maintenance of LI point

0.25 OLIC

Sub-Total 13.2510 EMPLOYBILITY : Project level training to

illiterate youths( See IEC column)Sub-Total 0.00

11. OTHERS (MISC.)A) J.B.YB) Community Centre/Mandap :1.Mandap at village B.Gouduni 12 1 0.50 25 TDA2.Mandap at Samsan ghat A.Gouduni 23 1 0.50 23 TDA3.Mandap at village Thanagaon 28 1 0.50 28 TDASub-Total 1.50C)HOUSING : TDA housing @ 0.50Lakh/Fire proof roofing @ 0.15 Lakh a) TDA housing/Fire proof roofing TDA PTGs 50 6.00 50 TDASub-Total 6.00D)AWARENESS : Awareness camps & Exchange visit All TDA villages 981 1.00 4040 TDASub-Total 1.00

Page 36: Presentation on IDP - 2012-17

E)I.E.Ca)Vocational Training /Skill up-gradation & raising of seedlings

TDA PTGs 0.50 TDA/Deptt.

Sub-Total 0.50b) Latrine & Bath:c) SHGa) Micro Credit Support & Bamboo 2 .Micro credit support to 2 SHGs @ Rs. 40,000/-

Banapur 37 2 0.80 20 TDA

Sub-Total 0.80b) Sports, Culture & Edu. Activities All TDA village 1.00 TDASub-Total 1.00

c) Incentive to 8 motivators @ Rs.1500/- 1.50 4040 TDASub-Total: 1.50d) Solar Light Solar light & yearly maintainance Non Electrified ,Hill top villages 1.00 OREDA1.Solar light Mahalimba 28 3 1.20 28 TDA2.Solar light U. Buratal 26 1 0.80 26 TDASub-Total 3.00e) Monitoring & evaluation 0.70 4040 TDA Sub-Total 0.70f) Mainatence of Community centre & MPSC building

2.00 TDA

g) Colour wash /Water supply/Rep. to MPSC, CC, Quarters/ Drain/ Office, building with maintenance

2.00 TDA

Sub-Total 4.00GRAND TOTAL (2016-17) 71.55

Special officer,TDA,Tumba,Ganjam