    PROJECT SEMESTERPROJECT SEMESTERJUNE-DECEMBER 2007JUNE-DECEMBER 2007

    BY GURSHARAN SINGHBY GURSHARAN SINGH

    10552021055202

  • 8/4/2019 Presentation by Gursharan Singh

    2/46

    ERA BUILDING SYSTEMS LTD.,

    NOIDA

    PRE ENGINEEREDSTEEL BUILDINGS

    Concept , Design

    &Construction

  • 8/4/2019 Presentation by Gursharan Singh

    3/46

    ERA GroupERA Group

    Era Infra Engineering Ltd.Era Infra Engineering Ltd.

    Era Building System Ltd.Era Building System Ltd.

    Era E-Zone (India) Ltd.Era E-Zone (India) Ltd.

    Era Landmarks (India) Ltd.Era Landmarks (India) Ltd.

  • 8/4/2019 Presentation by Gursharan Singh

    4/46

    PRE ENGINEERED BUILDINGSPRE ENGINEERED BUILDINGSTailor made building based on

    clients requirement & actualdesign calculations usingtapered sections.

    A combination of built up

    section, hot rolled section,cold formed elements andprofiled sheets

    Designing and casting is done

    in factory Building components are

    brought to site

    Then fixed/jointed at the site

    All connections are bolted.

  • 8/4/2019 Presentation by Gursharan Singh

    5/46

    Steel was very expensive item in USASteel was very expensive item in USA

    The concept of PEB originate from here.The concept of PEB originate from here.The idea was that section should be provided as perThe idea was that section should be provided as per

    B.M.D.B.M.D.

    This lead to the saving in steel and development ofThis lead to the saving in steel and development of

    PEB concept.PEB concept.

    BRIEF HISTORYBRIEF HISTORY

  • 8/4/2019 Presentation by Gursharan Singh

    6/46

    APPLICATIONSAPPLICATIONS

    Industrial BuildingsIndustrial Buildings

    WarehousesWarehouses Commercial ComplexesCommercial Complexes ShowroomsShowrooms OfficesOffices

    SchoolsSchools Indoor StadiumsIndoor Stadiums Outdoor Stadiums with canopiesOutdoor Stadiums with canopies Gas StationsGas Stations Metro Stations, Bus Terminals, Parking LotsMetro Stations, Bus Terminals, Parking Lots Primary Health Centers, Angan wadisPrimary Health Centers, Angan wadis And many moreAnd many more

    P E BP E B

  • 8/4/2019 Presentation by Gursharan Singh

    7/46

    CONT.CONT.

    Industrial BuildingIndustrial Building

    P E BP E B

    Parking lotsParking lots

    Indoor StadiumsIndoor Stadiums

    Railway StationRailway Station

  • 8/4/2019 Presentation by Gursharan Singh

    8/46

    AircraftAircraftHangarsHangars

    P E BP E B

    Metro StationMetro Station

    Wear houseWear house High rise BuildingHigh rise Building

  • 8/4/2019 Presentation by Gursharan Singh

    9/46

    ADVANTAGESADVANTAGES

    Aesthetic AppealAesthetic Appeal Faster CompletionFaster Completion

    EconomicalEconomical

    Seismic ResistanceSeismic Resistance

    Ease of ExpansionEase of Expansion

    Maintenance FreeMaintenance Free

    Large Clear SpansLarge Clear Spans

    Controlled QualityControlled Quality Hassle FreeHassle Free

    P E BP E B

  • 8/4/2019 Presentation by Gursharan Singh

    10/46

    Self weightSelf weight

    30% lighter30% lighter

    Primary Member isPrimary Member istapered sectiontapered section

    Secondary membersSecondary members

    are light weight rolledare light weight rolled

    framed Z and Cframed Z and Csectionsection

    Self weightSelf weight

    More heavyMore heavy

    Primary membersPrimary membersare Hot rolled Iare Hot rolled I

    sectionsection

    Secondary membersSecondary members

    are I or Care I or Csection which aresection which are

    heavy in weight.heavy in weight.

  • 8/4/2019 Presentation by Gursharan Singh

    11/46

    Delivery average 6Delivery average 6

    to 8 weeksto 8 weeks

    Foundation-simpleFoundation-simple

    design, easy todesign, easy to

    construct & light wt.construct & light wt.

    Erection cost andErection cost and

    time- accuratelytime- accurately

    knownknown

    Erection process isErection process is

    easy, fast, step byeasy, fast, step by

    stepstep

    Delivery- average 20Delivery- average 20

    to 26 weeksto 26 weeks

    Foundation-Foundation-

    expensive, heavyexpensive, heavy

    foundation required.foundation required.

    Erection cost andErection cost and

    time- 20% more thantime- 20% more than

    PEBPEB

    Erection process isErection process is

    slow and extensiveslow and extensive

    field labor is required.field labor is required.

  • 8/4/2019 Presentation by Gursharan Singh

    12/46

    Seismic Resistance-Seismic Resistance-

    low weight flexiblelow weight flexible

    frames offer higherframes offer higherresistance to seismicresistance to seismic

    forcesforces

    Overall priceOverall price

    -30%lower-30%lower architecture-achievedarchitecture-achieved

    at low castat low cast

    Seismic Resistance-Seismic Resistance-

    rigid heavy weightrigid heavy weight

    structures do notstructures do notperform well in seismicperform well in seismic

    zoneszones

    Overall price - HigherOverall price - Higher

    Price per square meter.Price per square meter. Architecture- achievedArchitecture- achieved

    at higher costat higher cost

  • 8/4/2019 Presentation by Gursharan Singh

    13/46

    COMPONENTSCOMPONENTS

    Main FrameMain Frame Primary MembersPrimary Members

    ColumnsColumnsRaftersRafters

    SecondarySecondaryMembersMembersPurlinsPurlins

    GirtsGirts

    P E BP E B

    SheetingSheeting RoofRoof WallWall Fascias etcFascias etc

    AccessoriesAccessories VentilatorsVentilators Sky LightsSky Lights

    Misc.Misc.

  • 8/4/2019 Presentation by Gursharan Singh

    14/46

  • 8/4/2019 Presentation by Gursharan Singh

    15/46

    OTHER MAJOR COMPONENTS OFPEB

    RANE BRACKETS &BEAMS MEZZANINEFLOORS

    STRUCTURAL

    PARTIONS

    FASCIAS CANOPIES

  • 8/4/2019 Presentation by Gursharan Singh

    16/46

    Work doneWork done

    DetailDetail Literatrue studyLiteratrue study

    Optimaztion of frameOptimaztion of frame

    J-286, Thermax Limited at VadodaraJ-286, Thermax Limited at Vadodara J-327, Sub Station L & T SuratJ-327, Sub Station L & T Surat

    J-275-302 Hazira, SuratJ-275-302 Hazira, Surat

    J-273 L & T Talegaon, Pune.J-273 L & T Talegaon, Pune. Plant VisitPlant Visit

    Site VisitSite Visit

  • 8/4/2019 Presentation by Gursharan Singh

    17/46

    DESIGN ISSUESDESIGN ISSUES

    STRUCTURAL PLANNINGSTRUCTURAL PLANNING

    FRAME CONFIGURATIONSFRAME CONFIGURATIONS

    TYPES OF LOADS & ASSESSMENTTYPES OF LOADS & ASSESSMENT

    END CONDITIONSEND CONDITIONS

    CRANESCRANES

    MEZANINESMEZANINES

    LOAD COMBINATIONSLOAD COMBINATIONS

  • 8/4/2019 Presentation by Gursharan Singh

    18/46

  • 8/4/2019 Presentation by Gursharan Singh

    19/46

  • 8/4/2019 Presentation by Gursharan Singh

    20/46

    Load 1X

    Y

    Z

    PRE-ENGINEERED BUILDINGS NOMENCLATURE PRE-ENGINEERED BUILDINGS NOMENCLATURE

    STANDARD FRAMING SYSTEMSSTANDARD FRAMING SYSTEMS

    TCCS = TAPERED COLUMN CLEAR SPAN

    Load 1X

    Y

    Z

    TCMS-1 TAPERED COLUMN MULTI-SPAN WITH 1

    INTERMEDIATE COLUMN.

  • 8/4/2019 Presentation by Gursharan Singh

    21/46

    Load 1

    SSCS = SINGLE SLOPE CLEAR SPAN.

    Load 1

    X

    Y

    ZSSMS-1= SINGLE SLOPE MULTI-SPAN WITH 1

    INTERMEDIATE COLUMN

  • 8/4/2019 Presentation by Gursharan Singh

    22/46

    GUIDELINES FOR PEB DESIGN AT PROPOSALSTAGE

    ALL DESIGNS SHALL BE AS PER MBMA AMERICANSTANDARDS UNLESS CLIENT SPECIFIES AS PER ISCODE

    LIVE LOAD AS PER AMERICAN CODE = 0.57

    KN/M^2 AND AS PER IS CODE = 0.75 KN/M^2.(REDUCTION IN LIVE LOAD TO BE INCORPORATEDFOR BUILDINGS HAVING HIGHER SLOPES)

    AS PER AMERICAN CODE :HORIZONTAL

    DEFLECTION = L/180 & VERTICALDEFLECTION=Eh/100 FOR MAIN FRAMES.

    WIND TERRAIN CATEGORY 3 IS TO BE SELECTEDUNLESS MORE DATA IS AVAILABLE.

  • 8/4/2019 Presentation by Gursharan Singh

    23/46

    CONTD

    IN AMERICAN DESIGN , WIND COEFFICIENTS TO BEFOLLOWED AS GIVEN IN MBMA.

    IN IS DESIGN, INTERNAL & EXTERNAL BUILDING WINDCOEFFICIENTS AS PER IS -875 (PART-3).

    GENERALLY BUILDINGS ARE TO BE DESIGNED ASPINNED EXCEPT FOR BUILDING SPAN >30M OR CRANECAPACITY OF MORE THAN 5 TONS OR HEIGHT

    GREATER THAN 9 M STANDARD PURLIN LAPS SHOULD BE 385 mm

  • 8/4/2019 Presentation by Gursharan Singh

    24/46

    Optimisation of frameOptimisation of frame

    Basic FrameBasic Frame Width of the frame = 20 mWidth of the frame = 20 m

    Height of the frame = 6 mHeight of the frame = 6 m

    Length of the frame = 70 mLength of the frame = 70 m

    Bay spacing l = 7 mBay spacing l = 7 m

    Slop of roof i= 1:10Slop of roof i= 1:10

    Wind speed v = 43 m/sWind speed v = 43 m/s

    Seismic zone = 4Seismic zone = 4

  • 8/4/2019 Presentation by Gursharan Singh

    25/46

    Varying of Width of FrameVarying of Width of Frame

    Only Primary FrameDesign Purline 250 X 2.5 mm2

    Spacing-1.57.67 kg/m

    Design Girt 200X1.75 mm2

    Spacing-1.5

    6.09 kg/m

    http://var/www/apps/conversion/current/tmp/scratch19597/output.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/output.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/output.xls
  • 8/4/2019 Presentation by Gursharan Singh

    26/46

    Varying Height and widthVarying Height and width

    Design Purline 250 X 2.5 mm2

    Spacing-1.57.67 kg/mSpacing-1.5

    Design Girt 250X2.0 mm2

    Spacing-1.56.09 kg/mSpacing-1.5

    Only Primary Frame

    http://var/www/apps/conversion/current/tmp/scratch19597/output.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/output.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/output.xls
  • 8/4/2019 Presentation by Gursharan Singh

    27/46

    Varying Bay length with HeightVarying Bay length with HeightHeigth-6 Heigth-8 Heigth-9

    Purline Girt Purline Girt Purline Girt

    6 Z 200X1.75Spacing-1.5

    Z 200X1.75Spacing-1.5

    Z 200X1.75Spacing-1.5

    Z 200X1.75Spacing-1.5

    Z 200X1.75Spacing-1.5

    Z 200X1.75Spacing-1.5

    7 Z 250X 2.0Spacing-1.5

    Z 250X1.75Spacing-1.35

    Z 250X 2.0Spacing-1.5

    Z 250X1.75Spacing-1.35

    Z 250X 2.0Spacing-1.5

    Z 250X1.75Spacing-1.35

    8 Z 250 X 2.5Spacing-1.5

    Z 250 X 2.5Spacing-1.5

    Z 250 X 2.5Spacing-1.5

    Z 250 X 2.5Spacing-1.5

    Z 250 X 2.5Spacing-1.5

    Z 250 X 2.5Spacing-1.5

    9 C250 X 2.5Spacing-1.4 C 250 X 2.5Spacing-1.35 C250 X 2.5Spacing-1.4 C 250 X 2.5Spacing-1.35 C250 X 2.5Spacing-1.4 C 250 X 2.5Spacing-1.35

    10 C 250 X 2.5Spacing-1.0

    C 250 X 2.5Spacing-1.0

    C 250 X 2.5Spacing-1.0

    C 250 X 2.5Spacing-1.0

    C 250 X 2.5Spacing-1.0

    C 250 X 2.5Spacing-1.0

    Total weight of Frame, Purline and Girt

    http://var/www/apps/conversion/current/tmp/scratch19597/output.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/output.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/output.xls
  • 8/4/2019 Presentation by Gursharan Singh

    28/46

    Varying bay length with widthVarying bay length with widthHeigth-6 Heigth-8 Heigth-9

    Purline Girt Purline Girt Purline Girt

    6 Z 200X1.75Spacing-1.5

    Z 200X1.75Spacing-1.5

    Z 200X1.75Spacing-1.5

    Z 200X1.75Spacing-1.5

    Z 200X1.75Spacing-1.5

    Z 200X1.75Spacing-1.5

    7 Z 250X 2.0Spacing-1.5

    Z 250X1.75Spacing-1.35

    Z 250X 2.0Spacing-1.5

    Z 250X1.75Spacing-1.35

    Z 250X 2.0Spacing-1.5

    Z 250X1.75Spacing-1.35

    8 Z 250 X 2.5Spacing-1.5

    Z 250 X 2.5Spacing-1.5

    Z 250 X 2.5Spacing-1.5

    Z 250 X 2.5Spacing-1.5

    Z 250 X 2.5Spacing-1.5

    Z 250 X 2.5Spacing-1.5

    9 C250 X 2.5Spacing-1.4 C 250 X 2.5Spacing-1.35 C250 X 2.5Spacing-1.4 C 250 X 2.5Spacing-1.35 C250 X 2.5Spacing-1.4 C 250 X 2.5Spacing-1.35

    10 C 250 X 2.5Spacing-1.0

    C 250 X 2.5Spacing-1.0

    C 250 X 2.5Spacing-1.0

    C 250 X 2.5Spacing-1.0

    C 250 X 2.5Spacing-1.0

    C 250 X 2.5Spacing-1.0

    Total weight of Frame, Purline and Girt

    V i i d d ith idthV i i d d ith idth

    http://var/www/apps/conversion/current/tmp/scratch19597/output.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/output.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/output.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/output.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/output.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/output.xls
  • 8/4/2019 Presentation by Gursharan Singh

    29/46

    Varying wind speed with widthVarying wind speed with widthwind Width-20m Width-35

    speed Purline Girt Purline Girt

    33 Z 200 X 1.75Spacing-1.5

    Z 200X1.75Spacing-1.5

    Z 200 X 1.75Spacing-1.5

    Z 200X1.75Spacing-1.5

    39 Z 200 X 2.0Spacing-1.5 Z 200X2.0Spacing-1.5 Z 200 X 2.0Spacing-1.5 Z 200X2.0Spacing-1.5

    43 Z 250 X 2Spacing-1.5

    Z 250X2.0Spacing-1.4

    Z 250 X 2Spacing-1.5

    Z 250X2.0Spacing-1.4

    47 Z 250 X 2.5Spacing-1.5

    Z 250X2.0Spacing-1.45

    Z 250 X 2.5Spacing-1.5

    Z 250X2.0Spacing-1.45

    50 Z 250 X 2.5Spacing-1.5

    Z 250 X 2.5Spacing-1.5

    Z 250 X 2.5Spacing-1.5

    Z 250 X 2.5Spacing-1.5

    55 C 250 X 2.5Spacing-1.35

    C 250 X 2.5Spacing-1.5

    C 250 X 2.5Spacing-1.35

    C 250 X 2.5Spacing-1.5

    Total weight of Frame, Purline and Girt

    http://var/www/apps/conversion/current/tmp/scratch19597/output.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/output.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/output.xls
  • 8/4/2019 Presentation by Gursharan Singh

    30/46

    Steps of DesignSteps of Design

    Wind load calculationWind load calculation

    Purline DesignPurline Design

    Girt DesignGirt Design

    Design of Main FrameDesign of Main Frame

    Base PlateBase Plate

    Anchor Bolt design for Moment ConditionAnchor Bolt design for Moment Condition

    Anchor Bolt design for Shear ConditionAnchor Bolt design for Shear Condition

    Gable column designGable column design Design of connection plateDesign of connection plate

    Cranes DesignCranes Design

  • 8/4/2019 Presentation by Gursharan Singh

    31/46

    J-268 Thermax LimitedJ-268 Thermax LimitedVadodaraVadodara

  • 8/4/2019 Presentation by Gursharan Singh

    32/46

    Full PlanFull Plan

  • 8/4/2019 Presentation by Gursharan Singh

    33/46

    Plan of Phase 1Plan of Phase 1

  • 8/4/2019 Presentation by Gursharan Singh

    34/46

    Frame X-sectionFrame X-section

  • 8/4/2019 Presentation by Gursharan Singh

    35/46

    Wind load calculationWind load calculation

    http://var/www/apps/conversion/current/tmp/scratch19597/AMERICAN%20CODE%20-LOAD%20CALCULATION-7.32M.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/AMERICAN%20CODE%20-LOAD%20CALCULATION-7.32M.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/AMERICAN%20CODE%20-LOAD%20CALCULATION-7.32M.xls
  • 8/4/2019 Presentation by Gursharan Singh

    36/46

    PURLIN

    http://var/www/apps/conversion/current/tmp/scratch19597/AMERICAN%20CODE%20-LOAD%20CALCULATION-7.32M.xls
  • 8/4/2019 Presentation by Gursharan Singh

    37/46

    Base plate

    http://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xls
  • 8/4/2019 Presentation by Gursharan Singh

    38/46

    Plant visit

    at

    Pant Nagar

    PROCESSESPROCESSESP E BP E B

    http://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xls
  • 8/4/2019 Presentation by Gursharan Singh

    39/46

    PROCESSESPROCESSES

    PEB

    BUILT UP LINE COLD FORM LINE SHEETING

    PRIMARY

    MEMBERS

    CKD

    C & Z PURLINS

    LINE

    HR SECTIONS

    &

    MISCELLANEOUS

    PARTS

    ROOF & WALL

    SHEETING

    GUTTER,

    FLASHINGS,

    TRIMS, ETC

    CKD CKD CKD ACCESSORIES

    SHIPMENT

    P E BP E B

    http://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xls
  • 8/4/2019 Presentation by Gursharan Singh

    40/46

  • 8/4/2019 Presentation by Gursharan Singh

    41/46

    Site visit

    atPANT NAGAR

    http://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xls
  • 8/4/2019 Presentation by Gursharan Singh

    42/46

    ERECTION SYSTEMERECTION SYSTEM

    UNDERSTANDING THEUNDERSTANDING THEENGINEERING DOCUMENTS.ENGINEERING DOCUMENTS.

    1.1. Anchor Bolt Setting PlanAnchor Bolt Setting Plan

    2.2. Cross sectionCross section

    3.3. Roof framing planRoof framing plan

    4.4. Roof sheeting & framingRoof sheeting & framing

    5.5. Sidewall sheeting & framingSidewall sheeting & framing

    6.6. Other drawingsOther drawings7.7. Bill of materialsBill of materials

    http://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xls
  • 8/4/2019 Presentation by Gursharan Singh

    43/46

    CONTDCONTD

    Preparation for ErectionPreparation for Erection1.1. Pre Erection checksPre Erection checks

    2.2. Receiving Materials at siteReceiving Materials at site

    3.3. Unloading ContainersUnloading Containers

    Erection of the FramingErection of the Framing1.1. Preparation of the First BayPreparation of the First Bay

    2.2. Main framesMain frames

    3.3. Mezzanine floorsMezzanine floors

    4.4. Crane BeamsCrane Beams

    http://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xls
  • 8/4/2019 Presentation by Gursharan Singh

    44/46

    CONTD.CONTD.

    Sheeting & TrimmingSheeting & Trimming Sheeting preparationSheeting preparation

    Sheeting the wallsSheeting the walls

    Sheeting the roofsSheeting the roofs

    Miscellaneous trimmingsMiscellaneous trimmings

    FasciaFascia

    http://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xlshttp://var/www/apps/conversion/current/tmp/scratch19597/BASE%20PLATE%20DESIGN-5.xls
  • 8/4/2019 Presentation by Gursharan Singh

    45/46

  • 8/4/2019 Presentation by Gursharan Singh

    46/46