C&ESS DEPARTMENT CONTRACT WORKS EFP-I S No Name of Work Estimate d Cost Press Advertis ement date Date of Opening Work Done by Parties Target Completion Date Present Status AFE Cost Lowest Cost 1 CONSTRUCTION OF FOUNDATION FOR REBOILER, CONDENSATE POTS & SOFTENING UNITS AT UCH#II, Distt: DheraBugti. 1.773 Millio n 22.08.20 13 At 1130 hrs 30 days Work executed departmental ly. Tender cancelled. 2 Construction of Pre- Drilling Engineering Works for Zin PAB-2 (Zin#06), Distt. Dera Bughti, Balochistan 51.738 Millio ns 27.10.2 013 11.11.20 13 90 Days work is in progress.

Upload: baig-ali

Post on 20-Jun-2015

189 views

Category:

Engineering


3 download

DESCRIPTION

PROGRESS OF CIVIL & MECHANICAL PROJECTS OF C &ESS

TRANSCRIPT

Page 1: Presentation 1

C&ESS DEPARTMENT CONTRACT WORKS EFP-I

S No Name of WorkEstimated

Cost

Press Advertisem

ent dateDate of

Opening

Work Done by PartiesTarget

Completion Date Present StatusAFE Cost Lowest Cost

1

CONSTRUCTION OF FOUNDATION FOR REBOILER, CONDENSATE POTS & SOFTENING UNITS AT UCH#II, Distt: DheraBugti.

1.773 Million

22.08.2013At 1130 hrs 30 days

Work executed departmentally.

Tender cancelled.

2

Construction of Pre-Drilling Engineering Works for Zin PAB-2 (Zin#06), Distt. Dera Bughti, Balochistan

51.738 Millions

27.10.2013 11.11.2013 90 Days

work is in progress.

3

CONSTRUCTION OF PRE DRILLING CIVIL WORK AT LOTI DEEP # 01. DISTRICT DERA BUGHTI, BALUCHISTAN.

59.624 Millions

04.02.2014 21.02.2014 90 days

LOI issued. Contract agreement execution stage

4

CONSTRUCTIONS OF PRE DRILLING CIVIL WORK AT WELL LOCATION ZIN SML #04. DISTRICT DERA BUGTI BALOCHISTAN

54.031 millions

31.05.2014 16.06.2014 60 days

After retender. Bid advertised & opened on 16.06.2014.

Page 2: Presentation 1

S No Name of WorkEstimate

d Cost

Press Advertise

ment date

Date of Opening

Work Done by Parties

Target Completion

Date Present StatusAFE CostLowest

Cost

5

CONSTRUCTIONS OF PRE DRILLING CIVIL WORK AT LOTI WELL #19. DISTRICT DERA BUGHTI, BALUCHISTAN.

41.798 millions 04.04.201421.04.2014 60 days

LOI issued on 03.06.2014 and contract agreement to be executed.

6

CONSTRUCTIONS OF PRE DRILLING CIVIL WORK AT WELL LOCATION PIRKO DEEP #01. DISTRICT DERA BUGTI BALOCHISTAN.

54.406 millions

28.04.14 60 days

LOI issued on 03.06.2014 and contract agreement to be executed.

7

CONSTRUCTIONS OF PRE DRILLING CIVIL WORK AT LOTI#20. DISTRICT DERA BUGT BALOCHISTAN

41.798 millions 31.05.201420.06.2014 60 days

After retender. Bid advertised & opened on 20.06.2014.

9

CONSTRUCTIONS OF PRE DRILLING CIVIL WORK AT WELL LOCATION PIRKO #54. DISTRICT DERA BUGTI BALOCHISTAN.

44.762 millions

23.4.14 7.5.2014 60 days

Press advertised on 23.04.2014.opened on 7.5.14 and is under management approval.

Page 3: Presentation 1

C&ESS DEPARTMENT CONTRACT WORKS EFP-II

S No Name of WorkEstimate

d Cost

Press Advertise

ment date

Date of Opening

Work Done by Parties Target

Completion Date Present StatusAFE Cost

Lowest Cost

1

Engineering works for Sohniwala Well # 1 at Tehsil Ahmedpur Distt. Jhang

Rs.16 million

23.03.2013

07.04.2013 30 day Completed

2

Construction of Metalled Road, Boundary Wall & cement Concrete Stone Paving-additional works for Annxe at Regional Office Multan, District:Muzzafar Gahr. 2.64 M

03.09.2013

2/10/2013 30 days

Work Completed.

3

CONSTRUCTION OF PRE DRILLING CIVIL WORK AT KUP-I (KULCHAS E.L).DISTT: DERA BUGTI BALOCHISTAN

55 Million

31.08.2013

16.09.2013 45 days

Work is in Progress.

Watch Towers, culverts and cause under

progress.

Page 4: Presentation 1

C&ESS DEPARTMENT CONTRACT WORKS EFP-III

S No Name of WorkEstimated

Cost

Press Advertisem

ent dateDate of Opening

Work Done by Parties Target

Completion Date Present StatusAFE Cost Lowest Cost

1

Engineering works for Jand well # 1 Distt. Attock

Rs.20 millions 24.03.2013 09.04.2013 28.05.2013 Completed

2

Construction Of One R.C.C Underground Water Reservior At Water Source Near Mela #1 Water Point.Distt:Kohat 3.742 M 21.08.2013

06-09-2013At 1130 hrs 90 days Completed.

3

Construction of Pre Drilling Engineering Works At Rajian-8 District Chakwal Punjab 27 M 15.07.2013 15.08.2013 45 days Completed.

4

Supply of Utility Water (170,000 liters per day) to Nashpa Oil Plant and Camps including Rig N-2 at Nashpa Field 14.10 M 27.07.2013 22.08.2013 365 days Work in progress

5

Construction of Pre Drilling Engineering Works AT NASHPA-5 District Karak KPK

Rs:116.65 millions

04.02.14 45 days Work in progress

Page 5: Presentation 1

S No Name of Work

Estimated Cost

Press Advertisement date

Date of Opening

Work Done by Parties

Target Completion

Date Present StatusAFE Cost Lowest Cost

6

Construction of internal road at chanda plant, Distt: Kohat KPK.

3.364 Millions

01.11.2013

18.11.2013 45 Days Work in progress

7

Modification in new store shed at Dakhni Plant Well.

1.948 Millions

02.09.2013

26-09-2013 60 days Completed

8

Construction of Engineering Works Required For Workover Job At Rajian#2 District.

20.193 Millions

03.09.2013 16.09.13 30 Days Completed.

9

CONSTRUCTION OF FOUNDATION FOR INSTALLATION OF WEIGH BRIDGE NASHPA OIL FIELD 0.931 M

30.08.2013

19.09.2013 45 days Completed.

10

REPAIR OF (0.8KMS) ROAD AT RATTA MOHRA RAJIAN OIL FIELD, DISTRICT CHAKWAL.

2.232 Million

14.12.2013

30.12.2013 45 days Work in progress

Page 6: Presentation 1

S No Name of Work

Estimated Cost

Press Advertisem

ent dateDate of Opening

Work Done by PartiesTarget

Completion Date Present StatusAFE Cost Lowest Cost

11

CONSTRACTION OF RCC WALL (LENGTH 816.RM) AT NASHPA PLANT. DISTT:KARAK

14.387 Million 23.11.2013

10.12.2013 60 days

60 % Completed. Suspended due to land problem

12

CONSTRACTION OFFOUNDATION FORINSTALLATION OF WEIGHBRIDGE AT RAJIAN OIL FIELD.DISTRICT ATTOCK.

1.5 MILLION 09.01.2014

27.01.2014 45 days 80 % Completed.

13

CONSTRUCTION OF DYKE WALL AND P. C.C HARD STANDING FOR MELA CRUDE STORAGE TANK DISST:KOHAT, KPK.

1.854 Million 13.11.2013

28.11.2013 45 days

Work completed. Final bill payment is under process.

14

Construction of Engineering Works Required For Workover Job At Mela#1 District.Kohat KPK

25 Million 05.12.2013

21.12.2013 30 days

Well started flowing and tender was

annulled after approval for

award of work.

15

Construction of Permanent Wire Woven Mesh Fencing at Nashpa#1 Well.Distt:Karak

2.18 Million 22.3.2014

07.04.2014 30 days

Work order issued on

15.05.14. work in progress.

Page 7: Presentation 1

S No Name of Work

Estimated Cost

Press Advertisement date

Date of Opening

Work Done by PartiesTarget

Completion Date Present StatusAFE Cost Lowest Cost

16

Construction of Permanent Wire Woven Mesh Fencing at Nashpa #4 Well.Distt:Karak

2.62Million 22.03.20

1407.04.2014 30 days

Work order issued on 15.05.14. work in

progress.

17

CONSTRUCTION OF ENGINEERING WORKS REQUIRED FOR WORKOVER JOB AT CHAK NAURANG SOUTH # 1.DISTRICT CHAKWAL

12.23 Million

11.01.2014

23.01.2013 30 days Completed.

18

CONSTRUCTION OF UNDER GROUND WATER STORAGE TANK AT CHANDA PLANT DISST:KOHAT, KPK.

6.988 Million

09.01.2014

28.01.2014 45 days

Tender will be opened on 25-05-2014 at EFP-III. Under management approval.

19

Construction of Pre Drilling Engineering Works at Nashpa -6 District: karak, KPK

Rs:30.12

millions 30 DAYS

Case for contractor scope of work is being initiated for press advertisement from management.

Page 8: Presentation 1

S No Name of Work

Estimated Cost

Press Advertisemen

t dateDate of Opening

Work Done by Parties

Target Completion

Date Present StatusAFE CostLowest

Cost

20

HIRING OF DOZERS (D-8K/D-8N/KOMATTSU 155, MODEL 2000 & ABOVE) FOR NASHPA-6 WELL, DISTRICT KARAK, KPK.

Rs: 2.00 million 3 months

Case approved by management and LOI to be issued.

21

CONSTRUCTIONS OF PRE DRILLING CIVIL WORK AT DAKHNI DEEP WELL NO. 5 DISTRICT ATTOCK.

40.00 millions 03.04.2014 18.04.2014 45 days

Work order issued on 25.05.2014. problem in land acquisition.

22

CONSTRUCTION OF R.C.C HARD STANDING FOR INSTALLATION OF 20000 BPD CAPACITY NEW SEPARATION BATTERY AT NASHPA District: Karak, KPK

Rs:2.855 millions

05.04.2014 24.04.2014 45 days

Work order issued on _______ and work is under progress.

Page 9: Presentation 1

C&ESS DEPARTMENT CONTRACT WORKS EFP-IV

S No Name of WorkEstimated

Cost

Press Advertise

ment date

Date of Opening

Work Done by Parties Target

Completion Date Present StatusAFE Cost

Lowest Cost

1

Engineering works for Qadirpur HRL well # 7 Distt. Ghotki Sindh

Rs.18.00 millions

02.04.2013

18.04.2013

240 days after award Completed

2

Engineering works for Maru East Well # 1 at Distt. Ghotki Sindh

Rs.36.31 millions

30.04.2013

15.05.2013

45 days after award Completed.

3

Engineering works for Qadirpur Well # 50 at Distt. Ghotki Sindh

Rs.34.66 millions

05.06.2013

20.06.2013 30 days Completed

4

Construction of Pre-Drilling Engineering Works at QP-51 District Ghotki, Sindh. 30 Millions

07.09.2013

30.09.2013 30 days Completed

5

Construction of Pre-Drilling Engineering Works at HRL #08 District Ghotki, Sindh. 25 Millions

27.10.2013

12.11.2013 30 days Completed

Page 10: Presentation 1

S No Name of Work

Estimated Cost

Press Advertisem

ent date

Work Done by Parties

Date of Opening

Target Completio

n Date Present StatusAFE Cost Lowest Cost

6

Construction of Pre-Drilling Engineering Works at QP-52 District Ghotki, Sindh.

35.693 Millions 07.09.2013 07.10.2013 30 days Completed.

7

CONSTRUCTION OF CIVIL SYSTEM AT ERW PLATFORM (QP-42,43,44) FOR SCADA SYSTEM. DISTRICT GHOTKI, SINDH.

1.645 Million

17.11.2013 04.12.2013 30 days Completed

8

Construction of Pre Drilling Engineering Works at Well Location Sara West Well # 05.District Ghotk

Rs.63.153 millions

60 days

bids will be opened on 13.06.2014 agaist retendering.

9

Construction of Pre Drilling Engineering Works at Well Location, Reti # 02. District Ghotki.

Rs.42.44 millions

08.03.2014 26.03.2014 45 daysLOI issued on 30.05.14.

10 Construction of Pre Drilling Engineering Works at Qdir Pur Well # 53.. District Ghotki.

Rs.25.727 millions

03.04.2014 21.04.2014 30 days

Work order issued on 30.05.2014 and work in progress.

11

REPAIR / MAINTENANCE OF QADIRPUR INTERNAL ROAD.DISTRICT : GHOTKI, SINDH

Rs 14.231millions

24.05.2014 09.06.2014 90 DAYS

case sent on 10.06.2014 for management approval by EFP-IV.

Page 11: Presentation 1

C&ESS DEPARTMENT CONTRACT WORKS EFP-V

S No Name of WorkEstimated

Cost

Press Advertisem

ent dateDate of Opening

Work Done by Parties Target

Completion Date Present StatusAFE Cost Lowest Cost

1

Engineering works for Jakhro West Well # 1 at Distt. Sanghar Sindh

Rs.25.00 millions 20.04.2013

06.05.2013 120 days Completed

2

CONSTRUCTION OF PRE DRILLING CIVIL WORKS AT WELL KUNNAR DEEP#09.Distt: Hyderabad. 23.00 M 24.07.2013

13.08.2013 45 days Complted.

3

CONSTRUCTION OF PRE DRILLING CIVIL WORK AT WELL CHAK DIM5#3. 32.00 M 24.07.2013

13.08.2013 30 days Completed

4

Construction of Pre Drilling Engineering Works AT CHAK 25C-1, District Sanghar, Sindh. 32 Millions 13.08.2013

30.08.2013 30 Days Completed

5

Construction of Pre-Drilling Engineering works at Manna-1 (Tay X-2), Distt. Hyderabad, Sindh. 24 Millions 29.08.2013

13.09.2013 45 Days Completed

Page 12: Presentation 1

S No Name of WorkEstimated

Cost

Press Advertisem

ent dateDate of Opening

Work Done By PartiesTarget

Completion Date Present StatusAFE Cost

Lowest Cost

6

CONSTRUTION OF 550RFT LONG RCC SLUB CULVERT OVER BOBI & SINJORO PLANTS PIPE LINES DISTRICT SANGHAR SINDH.

3.645 Million 45 Days

Tender cancelled before Press

Advertisement

7

CONSTRUCTION OF WORK OVER JOB CIVI WORKS AT CHAK 66 NORTH EAST # 01, DISTRICT SHANGHER.

12.124 million 07.12.203

23.12.2013 30 days

Work order issued ______. 90 % Completed. Waiting for rig.

8

Construction of Pre Drilling Engineering Works at Goth Patafi Well # 01 (Hanif Siddiqui # 1 District Hyderabad

Rs.22.270 millions

21.12.201307.01.2014 30 days Completed

9

Construction of Pre Drilling Engineering Works at Pasaki Deep Well # 04 District Hyderabad

Rs.23.050 millions

21.12.201309.01.2014 30 days Completed

Page 13: Presentation 1

S No Name of WorkEstimate

d Cost

Press Advertisement date

Date of Opening

Work Done By Parties

Target Completion Date Present StatusAFE Cost

Lowest Cost

10

CONSTRUCTIONS OF PRE DRILLING CIVIL WORK AT WELL LOCATION SOUTH EAST X -01.(Pali Deep # 1) DISTRICT TANDO ALAHYAR, SINDH.

42.913 millions

27.03.2014

11.04.2014 45 days

LOI issued on 02.06.2014.

11

CONSTRUCTION OF PRE DRILLING CIVIL WORK AT WELL LOCATION, SAAND #02 DISTT: TANDO ALLAH YAR. 39.446

12.03.2014 26.03.14 45 days.

Work order issued on _______ work in progress.

12

CONSTRUCTION OF PRE DRILLING CIVIL WORK AT WELL LOCATION,KUNNER #09 DISTRICT : HYDERABAD., SINDH RS.31.205

15.05.2014

30.05.2014 30 days

Bids opened on 30.05.2014 and is under management approval.

Page 14: Presentation 1

C&ESS DEPARTMENT CONTRACT WORKS FGCP-I

S No Name of WorkEstimated

Cost

Press Advertisement date

Date of Opening

Work Done By Parties

Target Completion Date Present StatusAFE Cost

Lowest Cost

1

Hiring Services for Pipeline Construction work for Uch-II Development Project

Rs.68.826 millions

15.03.2013

30.03.2013

17.06.2013 (60 days) Completed

2

Civil & Mechanical Works for Installation of Well Head Assembilies and Flow Line for 09 wells at Uch Gas Field, Near Dera Murad Jamali, Distt. Bughti, Balochistan.

160 Millions

19.08.2013

04.09.2013 180 Days

55% work copmleted.

3

Electrical and Instrumentation Works for Well Head Facilities for 15 wells at Uch Gas Field, Near Dera Murad Jamali, Distt. Bughti, Balochistan.

80 Millions

19.08.2013

04.09.2013 90 Days

Work order is to be used.

Page 15: Presentation 1

C&ESS DEPARTMENT CONTRACT WORKS FGCP-I

S No Name of WorkEstimate

d Cost

Press Advertisement date Date of Opening

Work Done By Parties Target Completion

Date Present StatusAFE CostLowest

Cost

1

Hiring Services for Pipeline Construction work for Uch-II Development Project

Rs.68.826

millions15.03.20

13 30.03.201317.06.2013 (60 days) Completed

2

Civil & Mechanical Works for Installation of Well Head Assembilies and Flow Line for 09 wells at Uch Gas Field, Near Dera Murad Jamali, Distt. Bughti, Balochistan.

160 Millions

19.08.2013 04.09.2013 180 Days

55% work copmleted.

3

Electrical and Instrumentation Works for Well Head Facilities for 15 wells at Uch Gas Field, Near Dera Murad Jamali, Distt. Bughti, Balochistan.

80 Millions

19.08.2013 04.09.2013 90 Days

Work order is to be used.

Page 16: Presentation 1

C&ESS DEPARTMENT CONTRACT WORKS HEAD OFFICES No

Name of Work Estimated Cost

Press Advertisement date

Date of Opening

Work Done By Parties

Target Completion Date

Present Status

AFE CostLowest

Cost1 Construction of

Admin building, warehouses & security office building (Contract C-1), near Kunnar Oil Field Distt. Hyderabad Sindh

Rs.66.70 millions

08.09.2013

08.10.2013 240 days Management approval accorded and LOI issued by SCM department on 28.05.2014 .

2 Construction of workshop offices, MPE&I workshop, safety & Firefighting Building (Contract C-2), Laboratory near Kunnar Oil Field Distt. Hyderabad Sindh

Rs.48.40 millions

08.09.2013

08.10.2013 240 days Contract Agreement Execution Stage.

3 Construction of Officer's Houses (C-1) at Sinjhoro Plant Distt. Sanghar Sindh

Rs.89.619 millions

22.3.2014 26.03.2014 240 days Case deferred by Procurement Committee. Caravan as alternate option suggested by PC.

4 Construction of Assistant's Houses (C-II) at Sinjhoro Plant Distt. Sanghar Sindh

Rs.63.00 millions

11.05.2013

27.06.2013 240 days Case deferred by Procurement Committee. Caravan as alternate option suggested by PC.

Page 17: Presentation 1

S No

Name of Work Estimated Cost

Press Advertisement date

Date of Opening

Work Done By Parties

Target Completion Date

Present Status

AFE CostLowest

Cost5 Construction of

Officer's Houses (C-1) at Uch Gas Field for Uch-II

Rs.87.00 millions

08.09.2013

09.10.2013

365 days Annulled and Case for Caravans to be processed by Admin Deptt.

6 Construction of Boundary wall at Jhal Magsi Distt. Mera Murad Jamali

Rs.28.00 millions

08.08.2013

10.09.2013

120 days Word order issued on 08.04.2014 and contractor is to mobilize yet.

7 Construction of Officer's House & Infrastructure Works at Tando Alam Sindh

Rs.75.00 millions

28.07.2013

28.08.2012

21.07.2013 (365 days)

Annulled and Case for Caravans to be processed by Admin Deptt.

8 Construction of Govt. Rural Dispensary (Social Welfare Scheme), Village Dhayala, Teh. Dina, Distt. Jhelum, Punjab.

Rs.4.765 M

06.06.20113

10.07.2013

240 days Work under construction.

9 Construction of Waste Pit & Skimmer Tank at Kal Oil Field Distt. Chakwal

Rs.3.898 millions

06.06.2013

08.07.2013 60 days

Work order issued on 14.03.2014. Work under construction.

Page 18: Presentation 1

S No

Name of Work Estimated Cost

Press Advertisement date

Date of Opening

Work Done By Parties

Target Completion Date

Present Status

AFE CostLowest

Cost10 Construction of

Assistant's Houses (C-2) at Uch Gas Field Uch-II

Rs.87.00 millions

06.06.2013

09.07.2013

365 days

Annulled and Case for Caravans to be processed by Admin Deptt.

11 Construction of Worker's Houses (C-3) at Uch Gas Field Uch-II

Rs.87.00 millions

06.06.2013

09.07.2013

365 days

Annulled and Case for Caravans to be processed by Admin Deptt.

12 Up-gradation of Pasaki Facility Road from Hyderabad to Mirpur Khas main Road to new constructed Kunnar Plant Road

Rs.59.00 millions

06.06.2013

04.07.2013

180 days

Work order issued on 03.06.2014 Work is under construction.

13 Construction of Foundation for Dehydration Plant at Bobi

Rs.4.22 millions

06.06.2013

04.07.2013

30 days

Work order issued on 10.03.2014 and work is under construction.

14

Renovation of OGTI Hostel I-9 Islamabad

Rs.1.986 millions

27.07.2013

30-08-2013

60 days

After obtaining expenditure approval from ED(Petroserv) case submitted to SCM deptt on 28.01.2014 for further processing.

Page 19: Presentation 1

S No

Name of Work Estimated Cost

Press Advertisement date

Date of Opening

Work Done By Parties

Target Completion Date

Present Status

AFE Cost

Lowest Cost

15 Construction of PCC courtyard & fixing of Fiber Glass shed at Masjid Chanda Plant

Rs.1.26 millions

28.07.2013 27.08.2013 60 days

Sent for annullment on 14.03.14 due to expiry of bid validity.

16 Construction of Prefabricated worker houses at Sinjhoro (C-3) using SCIP

Rs.84.00 millions

28.07.2013

27.082013 240 days Case deferred by Procurement Committee. Caravan as alternate option suggested by PC.

17 Construction of Offices & other allied building at Bahu Well-2

Rs.10.03 millions

15.10.2013 21.11.2013 240 days

Deffered by Procurement Committee due low production life of Bahu.

18 Construction of new workshop shed at Dakhni Plant

Rs.15.51 millions

15.10.2013

25.11.2013 240 days Financial Evaluation done and uploaded on 02.06.2014.

19 Construction of Hard standing bath/wash room & canteen for ATA at Qadirpur

Rs.7.943 millions

15.10.2013

28.11.2013 90 days annulled on 15.04.14 due to no participation by bidders. Fresh case is being prepared.

Page 20: Presentation 1

S No

Name of Work Estimated Cost

Press Advertisement date

Date of Opening

Work Done By Parties

Target Completion Date

Present Status

AFE Cost

Lowest Cost

20 Repair of Road from Sohbatpur to Uch Plant

Rs.16.366 millions

28.07.2013 28.08.2013At 1130 hrs

90 days Work order issued on _______. Work is under construction.

21 Extension of Police Check Post (changla wall Maue Dariya) Near well No 3 at Dakhni field

1.663 M

15.10.2013 18.11.2013

60 days Contract Agreement prepared and submitted to SCM on 13.04.2014.

22 CONSTRUCTION OF REGIONAL COORDINATOR PRE FAB STRUCTURE OFFIC I/C SEWRAGE SYSTEM.DISTT: HYDERABAD.

8.103 M

240 days Pended.

23 Costruction of 12 rooms & 27 bathrooms at Qadir Pur Gas Field.Distt:Ghotki Sindh.

10.86 M 08.08.2013

09.09.2013 240 days

Annulled on 28.04.14 and fresh case to be intiated for re-tendering.

24 Construction of Permanent Wire Woven Mesh Fencing at Nashpa #3 Well.Distt:Karak

1.532 M 08.09.2013

07.10.2013At 1130 hrs 30 days

Annulled due to expiry of bid validity and case for approval through Field Tender is in process.

Page 21: Presentation 1

S No

Name of Work Estimated Cost

Press Advertisement date

Date of Opening

Work Done By Parties

Target Completion Date

Present Status

AFE Cost

Lowest Cost

25 Engineering Works for Bahu Wells #5,6,7 & 8 platform High Rising at Bahu Gas Field, Tehsil ahmad pur sial, Distt: Jhang.

209.713 M

08.09.2013

07.10.2013 365 days

Annulled on 11.04.14 due to expiry of bid validity and case is sent to user deptt to confirm if the requirement still exists.

26 Hiring of vehicles for Field Units of C&ESS department OGDCL, Islamabad

25.68 M 180 days

Case file lost at SCM deptt and sent again on 12.05.14 to SCM deptt for press advertisement.

27 CONSTRUCTION OF FOUNDATION FOR REBOILER, CONDENSATE POTS & SOFTENING UNITS AT UCH#II, Distt: DheraBugti.

1.773 Million

22.08.2013At 1130 hrs

30 days Work executed departmentally. Tender cancelled

28 CONSTRUCTION OF UNDER GROUND ROOM FOR HSD STORAGE TANK AT OGDCL HEAD OFFICE ISLAMABAD.

1.13 Millions

02.08.2013

20.08.2013 30 Days Work order issued on 14.05.14 and contractor mobilized but change in site is under consideration.

29 Construction of RCC water pond at Nashpa Plant

3.861 millions

15.10.2013

27.11.2013 90 Days Contract Agreement prepared and submitted to SCM on 13.04.2014.

Page 22: Presentation 1

S No

Name of Work Estimated Cost

Press Advertisement date

Date of Opening

Work Done By Parties

Target Completion Date

Present Status

AFE Cost

Lowest Cost

30 Supply and fixing of geo membrane sheet 0.50 mm thick at effuluent water pits at Dakhni, Distt. Attock

10.856 Millions

15.10.2013 22.11.2013 30 days

Resubmitted to SCM Departement on 21.o5.2014for Retendering.

31 Construction of Civil Works for 09 Wells for Sinjhoro Gas field, Distt. Sanghar, Sindh.

12.542 Millions

15.10.2013

20.11.2013 90 Days After obtaining expenditure approval from ED(Petroserv) case submitted to M(S & FA) for AFE No.

32 Construction of Internal Road at Nashpa Plant, Distt. Karak, KPK

4.138 millions

04.01.2014

06.02.2014 45 Days Contract Agreement prepared and submitted to SCM on 13.04.2014.

33 Construction of Soldier Room, Toilet, Bath Kitchen For FC Post at Uch Dera Bugti Balochistan.

1.011 Millions

60 days Case returned to SCM on 22.05.2014 for retendering.

34 Hiring of Consultancy Services for Residential Camp at Nashpa

Nil 30.09.2013 75 days.Case returned to SCM on 30.09.2013. with soft copy of TOR

35 Pre-qualification / enlistment of contractors for PDEWs at different zones

Nil Nil Sent to GM (SCM) for on 25.11.2013.

Page 23: Presentation 1

S No Name of Work Estimated Cost

Press Advertisement date

Date of Opening

Work Done By Parties

Target Completion Date

Present Status

AFE Cost

Lowest Cost

36 Construction of BMP Posts in Tribal area Ranjanpur, Distt: Ranjanpur.

2.564 Million

45 days Completed departmental.

37 CONSTRUCTION OF REPAIR OF ROAD FROM JAND TO CHOWK SHAHEEDAN 4.3 KM AT DAKHNI FIELD

27.11.2013

26.12.2013 90 DAYS

Case approved by Procurement Committee on 10.06.2014.

87 Construction of BMP Posts in Trible area Ranjanpur, Distt: Ranjanpur.

Rs.2.564 60 days Completed through party resources.

39 CONSTRACTION/EXTENSION IN EXISTING SOCIAL WELFARE DISPENSERY AT RAJIAN OIL FIELD, Punjab

0.965 Million

26.01.2014

26.02.2014 30 days Financial Evaluation done and uploaded on 06.06.2014.

40 INSTALLATION OF UNDER GROUND POWER SUPPLY SYSTEM AT KOT SARANG Distt: Chakwal, Punjab

3.12 million

60 days Original case file lost. Bid documents prepared and approval is being sought again for execution.

Page 24: Presentation 1

S No

Name of Work Estimated Cost

Press Advertisement date

Date of Opening

Work Done By Parties

Target Completion Date

Present Status

AFE Cost

Lowest Cost

41 CONSTRUCTION OF SOCIAL WELFARE PUBLIC DOSPENSARY LPG PLANT AT BOBI OIL FIELD, DISTRICT SANGHAR SINDH.

12.983 Million

180 days

BOQ prepared and bid documents are under preparation.

42 EXTENSION OF EXISTING SOCIA WELFARE DISPENSARY AT KUUNAR OIL FEILD.

5.4 Million

26.01.2014

04.03.2014 180 days

Technical Evaluation done on 12.05.14 and sent to SCM for Financial opening / annullment.

43 CONSTRUCTION OF PRODUCED WATER PIT, BOUNDARY WALL AND ALLIED CIVIL WORKS OUTSIDE CHANDA PLANT PREMISES.

15.429 Million

26.01.2014

03.03.2014 120 days

Retendered on 07.05.2014 and will be opened on 29.06.14.

44 Raising & Strengthening of OGDC Bund at Qadirpur Gas Field District Ghotki Province Sindh.

171 million

04.01.2014

04.01.2014 120 days

To be presented in P & FC for approval of award on 11.06.2014

45 CONSTRACTION OF 10 NO. NEW ROOMS IN WORKER CAMP AT LOGISTIC CAP KOTSARANG

8.422 million

180 days

Sent to SCM Deptt for Press Advertisement

Page 25: Presentation 1

S No

Name of Work Estimated Cost

Press Advertisement date

Date of Opening

Work Done By Parties

Target Completion Date

Present Status

AFE Cost

Lowest Cost

46 IMPROVEMENT OF WATER SUPPLY SCHEME IN THE AREA OF KAL OIL FIELD.DISTRICT CHAKWAL, PUNJAB

Rs 0.65 millions

15.02.2014

21.03.2014 30 days To be done departmentally on quotation basis within PPRA limits.

47 CONSTRUCTION OF OH WATER TANK AND CAR PARKING AT CHANDA

PLANT.

5.267 Million

75 days Bid opened on 28.05.2014. Case awaited from SCM for Technical Evaluation.

48 CONSTRUCTION OF 02 NO.CLASS ROOMS WITH VERANDAH FOR GOVT.PRIMARY SCHOOL ALWARGI BANDA AT NASHPA .

1.125 Million

90 days Technical Evaluation done on 09.04.14 and sent to SCM for Financial opening.

49 CONSTRUCTION OF METALLED ROAD (45.657 Kms) FROM UCH PLANT TO UPL DERA MURAD JAMALI DISTRICT DERA BUGHTI, PROVINCE BALUCHISTAN.

868.27 million

22.02.2014

24.03.2014 18 months

Annulled due to poor response and case is being sent for press advertisement for retendering.

Page 26: Presentation 1

S No Name of Work Estimated Cost

Press Advertisement date

Date of Opening

Work Done By Parties

Target Completion Date

Present Status

AFE CostLowest

Cost509 CONSTRUCTION OF

REPAIR OF ROAD FROM TANDO MURREE TO TANDO ALAM # 15 BASE CAMP

Rs 2.45 millions

26.01.2014

28.02.2014 30 days Technical Evaluation done on 12.05.14 and sent to SCM for Financial opening.

51 Repair Maintenance of 01 km Road, Mohri Rajgan to Chak Tareda Under Social Welfare. Tehsil Sohawa.

1.297 Million

04.01.2014

10.02.2014 45 days Financial Evaluation done and uploaded on 06.06.2014.

52 SUPPLY & INSTALLATION & COMMISSIONING OF DOUBLE GATE SYSTEM, HYDRAULIC ROAD BLOCKER & HYDRAULIC BARRIER AT NASHPA DISTRICT KARAK KPK.

Rs 4.10millions

27.02.2014

03.04.2014 60 days Technical Evaluation done on 11.04.2014. letter to sent to bidder for withdrawal of exceptions / deviations. Financial opening awaited.

53 CONSTRUCTION OF 03 NOS PICKETS WITH ATTACH BATH, KITCHEN & TOILETS FOR PHASE-II FC PICKETS AT UCH-II GAS FIELD.DISTRICT DERA BUGTI BALUCHISTAN

Rs 2.518millions

45 days Financial Evaluation done on 13.05.14 and case is with SCM for further processing.

Page 27: Presentation 1

S No

Name of Work Estimated Cost

Press Advertisement date

Date of Opening

Work Done By Parties

Target Completion Date

Present Status

AFE Cost

Lowest Cost

48 CONSTRACTION OF P.C.C HARD STANDING FOR STOCK MATERIALS AT NASHPA DISTRICT KARAK,KPK.

Rs 0.716millions

26.01.2014

27.02.2014

30 days Expenditure approval obtianed and AFE No alloted on 13.05.14. Financial evaluation done and uploaded on web 30.05.14.

56 Construction Of Police Picket At Sinjhoro Plant Gate District Sanghar.

Rs 1.602millions

09.04.2014

09.05.2014

45 days Technical Evaluation done and Financial opening is on 16.06.2014.

54 Raising of Sales Gas ROW at Nashpa (1.5 km)\Distric karak, kpk.

Rs 4.45millions

45 days Technical Evaluation done and uploaded on 09.06.2014.

51 EARTH FILLING, CONSTRUCTION OF ONE WAY ROAD AND PARKING SHED AT NASHPA PLANT. DISTT: KARAK, KPK

Rs 19.106millions

15.02.2014

20.03.2014

120 days Received for endorsement of Executive Summary on 11.06.2014.

55 CONSTRUCTION OF COMPUTER ROOM FOR WEIGHING BRIDGE AT NASHPA PLANT. DISTT: KARAK, KPK

Rs 0.934millions

60 days work in progress as an additional work through the same contractor for weigh bridge.

Page 28: Presentation 1

S No

Name of Work Estimated Cost

Press Advertisement date

Date of Opening

Work Done By Parties

Target Completion Date

Present Status

AFE Cost

Lowest Cost

56 CONSTRUCTION OF HARD STANDING FOUNDATION AREA OF LOGISTIC WORKSHOP AT LOGISTIC CAMP KOTSARANG.DIST: CHAKWAL, PUNJAB

Rs 16.06millions

22.02.2014

25.03.2014 30 days Technical Evaluation done on 07.04.2014 and case sent to SCM for Financial Opening.

57 CONSTRUCTION OF WATER TANK FOR DRINKING PURPOSE FOR LOCALS AT TANDO ALAM OIL COMPLEX

Rs 0.816millions

09.04.2014

08.05.2014 60 days Technical Evaluation done on 21.05.2014 and sent to SCM deptt for Financial Evaluation.

58 Feasibility Study Of Existing Ogdcl Office Building Office Building Masood Mansion At F-8 Markaz For Addition Of New Floors For Gymnasium And Design/Consultancy Services For The Improvement Measures And Proposed Gymnasium Thereof millions

16.04.2014

16.05.2014 90 days Received on 28.05.14 for Technical Evaluation.

Page 29: Presentation 1

S No

Name of Work Estimated Cost

Press Advertisement date

Date of Opening

Work Done By Parties

Target Completion Date

Present Status

AFE Cost

Lowest Cost

59 CONSTRUCTION OF ROW 31.05 KM FOR JAKHRO WELL-1 DISTRIC: KHAIRPUR ,SINDH

30.953 million

45 days Press advertised.Bid will be opened on 23.06.2014.

60 CONSTRUCTION OF 02 NOS. PRODUCTION STORAGE SHED & HARD STANDING AT NASHPA PLANT. DISTT: KARAK, KPK

45.68 million

240 days

Sent to PTO (Mech) on 06.06.14 for Budget allocation.

61 CONSTRUCTION OF CIVIL WORKS FOR FIELD DEVELOPMENT AT WELL LOCATION DACHRA PUR # 02 .DISTT: HYDERABAD, SINDH.

2.41 million

30 days Technical Evaluation done on 02.06.2014 and sent for Financial Opening.

62 REPAIR/MAINTENANCE OF ROAD FROM REHMAT GAS FIELD TURN TO ANWAR ABAD. DISTT: GHOTKI

Rs 25.327millions

60 days Sent to SCM Deptt on 08.05.14 for Press Advertisement.

63 CONSTRUCTION OF GEO-MEMBRANE LINING FOR PRODUCED WATER PIT AT QADIR PUR PLANT..

2.445 million

30 days Bid documents are being prepared.

Page 30: Presentation 1

S No

Name of Work Estimated Cost

Press Advertisement date

Date of Opening

Work Done By Parties

Target Completion Date

Present Status

AFE CostLowest

Cost64 RAISING OF APPROACH

ROAD AT QADIRPUR#35.DISTRICT : GHOTKI, SINDH

2.969 45 days Bid documents prepared. Budget allocated by QP JV and file received in (E.O) South Section on 05.05.14. Case is to be sent to SCM for press advertisement.

65 CONSTRUCTION OF RAISED PLATFORM AT HRL-2. DISTRICT GHOTKI, SINDH

27.56 million 90 days

Press advertised. Bids will be opened on 24.06.2014.

66 CONSTRUCTION OF RAISED PLATFORM AT HRL-7. DISTRICT GHOTKI, SINDH

27.55 million 90 days

Bid opened on 10.06.2014 and case awiated from SCM deptt for Technical Evaluation.

67 RAISING OF APPROACH ROAD AT QADIRPUR#48.DISTRICT : GHOTKI, SINDH

5.11 million

45 days Bid documents prepared. Budget allocated by QP JV and file received in (E.O) South Section on 05.05.14. Case is to be sent to SCM for press advertisement.

68 CONSTRUCTION OF ROAD FROM DISPENSARY TO WELL NO.6 (ABOUT 7 KM) AT DAKHNI PLANT WELL.DISTRICT: ATTOCK.

35.088 150 days

Press advertised on 16.05.2014 and bids will opened on 25.06.2014.

Page 31: Presentation 1

S No

Name of Work Estimated Cost

Press Advertisement date

Date of Opening

Work Done By Parties

Target Completion Date

Present Status

AFE CostLowest

Cost69 CONSTRUCTION OF

RAISED PLATFORM AT QADIRPUR#50.DISTRICT : GHOTKI, SINDH

27.56 million

45 days Bid documents prepared. Budget allocated by QP JV and file received in (E.O) South Section on 05.05.14. Case is to be sent to SCM for press advertisement.

70 CONSTRUCTION OF RAISED PLATFORM AT QADIRPUR#45.DISTRICT : GHOTKI, SINDH

27.56 45 days Bid documents prepared. Budget allocated by QP JV and file received in C&ESS on 06.05.14. Case is to be sent to SCM for press advertisement.

71 CONSTRUCTION OF RAISING OF APPROCH ROAD AT QADIRPUR#50.DISTRICT : GHOTKI, SINDH

3.39 million

45 days Bid documents prepared. Case is with (E.O)South Section for budget arrangement.

72 CONSTRUCTION OF RAISING OF APPROACH ROAD AT QADIRPUR#31.DISTRICT : GHOTKI, SINDH

6.10 million

45 days Bid documents prepared. File is with (E.O)South section and is being sent to JV Accounts for budget allocation.

Page 32: Presentation 1

S No

Name of Work Estimated Cost

Press Advertisement date

Date of Opening

Work Done By Parties

Target Completion Date

Present Status

AFE Cost

Lowest Cost

73 CONSTRUCTION OF STORE SHED FROM RETERIEVED MATERIAL OF TOOT AT DAKHNI PLANT DISTRICT ATTOCK, PUNJAB.

4.56 million 90 days

Bids opened on 06.06.2014 and case awaited from SCM deptt for Technical Evaluation.

74 CONSTRUCTION OF METTALED ROAD FROM BASIC HEALTH UNIT TO AYUB LAKHAN TO GOVERNAMENT HIGH SCHOOL AYUB LAKHAN.

1.337 million

60 days Sent to SCM Deptt on 22.05.14 for Press Advertisement.

75 CONSTRACTION OF RAISING OF APPROCH ROAD AT QADIRPUR#41.DISTRICT : GHOTKI, SINDH

4.18 million

45 days Bid documents prepared. File is with (E.O)South section and is being sent to JV Accounts for budget allocation.

76 Construction of Foundation and Dyke Walls for Crude Storage Tanks at Rajian Well # 05

1.25 05.05.2014

02.06.2014 Bids opened on 02.06.2014 and case awaited from SCM deptt for Technical Evaluation.

77 CONSTRACTION OF RAISED PLAT FORM AT QADIRPUR#38/39.DISTRICT : GHOTKI, SINDH

37.67 million

45 days Confirmation of Budget allocation is in Process

Page 33: Presentation 1

S No

Name of Work Estimated Cost

Press Advertisement date

Date of Opening

Work Done By Parties

Target Completion Date

Present Status

AFE Cost

Lowest Cost

78 RAISING OF APPROACH ROAD AT QADIRPUR# 11.DISTRICT : GHOTKI, SINDH

1.55 million

45 days Confirmation of Buget allocation is in Process

79 RAISING OF APPROACH ROAD AT QADIRPUR DEEP#1 .DISTRICT : GHOTKI, SINDH

14.87 million

45 days Sent to SCM deptt on 06.06.2014 for Press advertisement.

80 RAISING OF APPROACH ROAD AT QADIRPUR# 45.DISTRICT : GHOTKI, SINDH

6.19 million

45 days Sent to SCM deptt on 06.06.2014 for Press advertisement.

81 CONSTRACTION OF RAISED PLAT FORM AT QADIRPUR DEEP #01.DISTRICT : GHOTKI, SINDH

27.79 million

45 days Sent to SCM deptt on 06.06.2014 for Press advertisement.

Page 34: Presentation 1

S No Name of Work Estimated Cost

Press Advertisement date

Date of Opening

Work Done By Parties

Target Completion Date

Present Status

AFE Cost

Lowest Cost

86

CONSTRACTION OF RAISED PLAT FORM AT QADIRPUR#48.DISTRICT : GHOTKI, SINDH 27.56

million 45 days

Bid documents prepared. Budget allocated by QP JV and file received in (E.O) South Section on 05.05.14. Case is to be sent to SCM for press advertisement.

87 CONSTRACTION OF RAISED PLAT FORM AT QADIRPUR#46.DISTRICT : GHOTKI, SINDH

Rs 27.56millions

45 days Budget allocated by QP JV department. Case is with (E.O)South Section.

Page 35: Presentation 1

PRE-DRILLING ENGINEERING WORKS AT EFP-3 DURING JUNE 2013 TO JUNE 2014

S.No Description Approved Cost

EFP-3 inputRemarks

Earh Work Water Supply System Misc.Works

Approach

Road

Preparation of Well

location

Mud Pit Additional Mud Pit

Establishmen

t

Water required for

drilling Operation

Electrical

Works

Plumbing &

Sanitary Works

Total amount

MRs MRs MRs MRs MRs MRs MRs MRs MRs MRs

1 PDCW at Jund-1 53.959 2.00 3.50 3.00 4.00 2.00 22.50 0 0 37.00

2 PDCW at Soghari-1 22.557 1.00 2.00 3.00 4.00 1.00 13.50 0.5 0.2 25.20

3 PDCW at Mela-4 39.856 4.00 5.00 4.00 3.00 1.00 22.50 0.5 0.2 40.20

4 PDCW at Rajian-7 23.505 1.50 3.00 4.00 3.00 1.00 13.50 0.5 0.2 26.70

5 PDCW at Rajian-8 60.100 2.00 4.00 4.00 5.00 0.00 18.00 33.00

6

Work over job at Rajian-2 20.193 3.00 0.00 0.00 7.00 10.00

7 PDCW at Nashpa-5 99.850 12.00 24.00 2.00 0.00 0.00 0.00 0 0 38.00

8

PDCW at Surqamar-1 25.00 25.00

9 PDCW at Kurrum-1 28.555 1.00 1.00 3.00 0.00 0.50 13.50 19.00

Page 36: Presentation 1

WATER SUPPLY SYSTEM FOR PLANT/ FIELD OPERATED BY EFP-3 DURING JUNE 2013 TO JUNE 2014

S.No Fields/ Plants Water Source Water required for Operational activities of Plants/ Fields Remarks

Million Rupees

1Chanda Plant/

Mela Plant

Mela Water Point situated in hilly area ≈25 km away from Chanda

Plant 28.640

2Missa Kaswall

Fieldfrom local near by Nallah

4.091 3 Rajian Oil Field from Chohan Nallah 12.274

4 Sadqal Oil FieldSadqal Water Point situated at

Shah pur Dam 10.229

REPAIR/ MAINTANENCE OF APPROACH ROAD FROM PLANT TO WELL LOCATION DURING JUNE2013 TO JUNE 2014

S.No Approach Road Maintenance by EFP-3 Remarks MRs

1From Well

Nashpa-1,2,3,42.50

2From Well Mela-

1,2,3,43.00

3Road near

Tharraly Bridge0.50

Page 37: Presentation 1

EARTH WORK REQUIRED FOR ROW,WASTE PITS AND LEVELING BY EFP-3 DURING JUNE2013 TO JUNE 2014

S.No DESCRIPTIONEarth Work

RemarksMRs

1ROW for SNGPL Gas Pipe line

from Nashpa Plant 1.500

2Restoration of Mud Waste Pit

at Nashpa-21.000

3Restoration of Mud Waste Pit

at Nashpa-31.000

4

Leveling of Hilly area at Plant for Loading Gantry and double

Road

15.00

5Effulent Water Pits (3No) at

Dakhni Plant0.900

6Leveling of Store Area at

Dakhni Plant0.500

Page 38: Presentation 1

PRE-DRILLING ENGINEERING WORKS AT EFP-1 DURING JUNE 2013 TO JUNE 2014

S.No Description Approved Cost

EFP-31inputRemarks

Earh Work Water Supply System Misc.Works

Approach

Road

Preparation of Well

location

Mud Pit Additional Mud Pit

Establishmen

t

Water required for

drilling Operation

Electrical

Works

Plumbing &

Sanitary Works

Total amount

MRs MRs MRs MRs MRs MRs MRs MRs MRs MRs

1

2

3

4

5

6

7

8

9

Page 39: Presentation 1

WATER SUPPLY SYSTEM FOR PLANT/ FIELD OPERATED BY EFP-1 DURING JUNE 2013 TO JUNE 2014

S.No Fields/ Plants Water Source Water required for Operational activities of Plants/ Fields Remarks

Million Rupees

1

2

3

4

REPAIR/ MAINTANENCE OF APPROACH ROAD FROM PLANT TO WELL LOCATION DURING JUNE2013 TO JUNE 2014

S.No Approach Road Maintenance by EFP-1 Remarks MRs

1

2

3

Page 40: Presentation 1

EARTH WORK REQUIRED FOR ROW,WASTE PITS AND LEVELING BY EFP-1 DURING JUNE2013 TO JUNE 2014

S.No DESCRIPTIONEarth Work

RemarksMRs

1

2

3

4

5

6

Page 41: Presentation 1

PRE-DRILLING ENGINEERING WORKS AT EFP-2 DURING JUNE 2013 TO JUNE 2014

S.No Description Approved Cost

EFP-2 inputRemarks

Earh Work Water Supply System Misc.Works

Approach

Road

Preparation of Well

location

Mud Pit Additional Mud Pit

Establishmen

t

Water required for

drilling Operation

Electrical

Works

Plumbing &

Sanitary Works

Total amount

MRs MRs MRs MRs MRs MRs MRs MRs MRs MRs

1

2

3

4

5

6

7

8

9

Page 42: Presentation 1

WATER SUPPLY SYSTEM FOR PLANT/ FIELD OPERATED BY EFP-2 DURING JUNE 2013 TO JUNE 2014

S.No Fields/ Plants Water Source Water required for Operational activities of Plants/ Fields Remarks

Million Rupees

1

2

3

4

REPAIR/ MAINTANENCE OF APPROACH ROAD FROM PLANT TO WELL LOCATION DURING JUNE2013 TO JUNE 2014

S.No Approach Road Maintenance by EFP-2 Remarks MRs

1

2

3

Page 43: Presentation 1

EARTH WORK REQUIRED FOR ROW,WASTE PITS AND LEVELING BY EFP-2 DURING JUNE2013 TO JUNE 2014

S.No DESCRIPTIONEarth Work

RemarksMRs

1

2

3

4

5

6

Page 44: Presentation 1

PRE-DRILLING ENGINEERING WORKS AT EFP-4 DURING JUNE 2013 TO JUNE 2014

S.No Description Approved Cost

EFP-4 inputRemarks

Earh Work Water Supply System Misc.Works

Approach

Road

Preparation of Well

location

Mud Pit Additional Mud Pit

Establishmen

t

Water required for

drilling Operation

Electrical

Works

Plumbing &

Sanitary Works

Total amount

MRs MRs MRs MRs MRs MRs MRs MRs MRs MRs

1

2

3

4

5

6

7

8

9

Page 45: Presentation 1

WATER SUPPLY SYSTEM FOR PLANT/ FIELD OPERATED BY EFP-4 DURING JUNE 2013 TO JUNE 2014

S.No Fields/ Plants Water Source Water required for Operational activities of Plants/ Fields Remarks

Million Rupees

1

2

3

4

REPAIR/ MAINTANENCE OF APPROACH ROAD FROM PLANT TO WELL LOCATION DURING JUNE2013 TO JUNE 2014

S.No Approach Road Maintenance by EFP-4 Remarks MRs

1

2

3

Page 46: Presentation 1

EARTH WORK REQUIRED FOR ROW,WASTE PITS AND LEVELING BY EFP-4 DURING JUNE2013 TO JUNE 2014

S.No DESCRIPTIONEarth Work

RemarksMRs

1

2

3

4

5

6

Page 47: Presentation 1

PRE-DRILLING ENGINEERING WORKS AT EFP-5 DURING JUNE 2013 TO JUNE 2014

S.No Description Approved Cost

EFP-5 inputRemarks

Earh Work Water Supply System Misc.Works

Approach

Road

Preparation of Well

location

Mud Pit Additional Mud Pit

Establishmen

t

Water required for

drilling Operation

Electrical

Works

Plumbing &

Sanitary Works

Total amount

MRs MRs MRs MRs MRs MRs MRs MRs MRs MRs

1

2

3

4

5

6

7

8

9

Page 48: Presentation 1

WATER SUPPLY SYSTEM FOR PLANT/ FIELD OPERATED BY EFP-5 DURING JUNE 2013 TO JUNE 2014

S.No Fields/ Plants Water Source Water required for Operational activities of Plants/ Fields Remarks

Million Rupees

1

2

3

4

REPAIR/ MAINTANENCE OF APPROACH ROAD FROM PLANT TO WELL LOCATION DURING JUNE2013 TO JUNE 2014

S.No Approach Road Maintenance by EFP-5 Remarks MRs

1

2

3

Page 49: Presentation 1

EARTH WORK REQUIRED FOR ROW,WASTE PITS AND LEVELING BY EFP-5 DURING JUNE2013 TO JUNE 2014

S.No DESCRIPTIONEarth Work

RemarksMRs

1

2

3

4

5

6

Page 50: Presentation 1

Financially Highlight of- Total Works Done, EFP’s

FY 2013-14

1 EFP-I

2 EFP-II PAK Rs. 300.o1 Million

3 EFP-III PAK Rs. 347.83 Million

4 EFP-IV

5 EFP-V

6 FGCP-I

7 FGCP-II