1 8-5-2006

LESSONS FROM UTRECHT

Linking Transit with Walking and Biking (The City of Utrecht, NL, 2011/9/27)

Page 2: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

2

The ultimate lesson?

“I think we need to make people

aware that our traffic concepts of

today are not sustainable and will be

of no use for the future of our society

and our planet.”

Dr. Wolfgang Schuster (Mayor of Stuttgart, Germany)

Page 3: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

3

The Netherlands (1)

Page 4: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

4

The Netherlands (2)

Page 5: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

5

Some demographic facts

United States Maryland Washington DC The Netherlands Utrecht

Founded 1776 1788 1790 1579 50 AD

Inhabitants (city)

(region)

308.7 mln 5.8 mln 602,000

5,580,000

16.7 mln 313,000

640,000

Area (sq mi) 3,717,796 12,407 68 16,034 (1) 38

Inhabitants (/sq mi) 8.3 465.3 8848.9 1039.6 8179.9

(1) 1,29x State of Maryland

Page 6: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

6

About the City of Utrecht

Modal split • Motor vehicles: 38.5 % • Public transport: 10.8 % • Bicycles: 28.0 % • Pedestrians: 21.2 % • Others: 01.5 %

Facts • Fourth largest city in the Netherlands. • Over 300,000 inhabitants. • Largest University in the Netherlands. • Busiest railway station of the country (more passengers a year then Schiphol Airport). • Still growing economy (despite global recession).

1885 .

Page 7: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

7

2000 . 1980 .

Development of the city in the 20st century

1940 . 1920 .

Page 8: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

8

61,700

122,000

58,500

Imbalance between incoming & outgoing traffic.

Numbers show incoming traffic during morning rush hours.

Traffic congestion

Page 9: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

9

What to do about this?

4. Improving road network. 3. Improving bicycle facilities

2. New light rail & streetcar lines . 1. New regional railway network

INTEGRATION!

Page 10: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

10

Step 1: New regional railway network

Page 11: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

11

What is Randstadspoor (RSS)?

Facts • Regional network of commuter trains. • Using existing railway corridors. • 10 new stations in region. • Most railway lines widened from 2 to 4 tracks. • 4-6 trains per hour. • Realisation between 2002 and 2015.

Page 12: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

12

Construction started in 2002

Page 13: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

13

Reconstruction of the main railway station

Page 14: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

14

Aerial overview of a construction site

Extra railroad bridge

Rebuilding station + new bicycle tunnel

Two level free crossings

From 2 to 4 tracks

From 4 to 6 tracks

New commuter station

Rebuilding bicycle tunnel

Enlarging several tunnels

Rebuilding main station + adding extra platforms

Page 15: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

15

Animation of the new commuter network

Page 16: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

16

Step 2: New light rail & streetcar lines

Page 17: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

17

The first light rail line (SUNIJ-line)

2010 (second hand cars from Vienna)

17th of December 1983 (opening of new light rail line) 2000 (renovated light rail car)

2007 (low-floor light rail car on loan from Mulhouse)

Page 18: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

18

Then building a network of separated bus lanes

Facts • First complete line opened in 2001. • Linking the main railway station and the university campus. • Line passes through inner city. • Second line to Leidsche Rijn (almost) completed. • All bus lanes can be changed into light rail or streetcar lines.

Page 19: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

19

The next step: light rail & streetcar lines

Such a network ... • Creates a more efficient and flexible public transport system. • Improves the accessibility and livability in the region. • Can transport more passengers then the current bus network. • Creates more and new transfer points.

Page 20: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

20

A regional network of light rail & streetcar lines

Facts • Network of existing & new lines. • Upgrading existing light rail to Nieuwegein and IJsselstein. • Building two new lines to De Uithof. • Building a new line to Leidsche Rijn. • 4-8 trams per hour. • Realisation between 2012 and 2025.

Page 21: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

21

NIEUWEGEIN IJSSELSTEIN

LEIDSCHE RIJN

OVERVECHT

BINNENSTAD ZEIST

DE UITHOF

The planned regional network in 2025

Page 22: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

22

Facts • Growth of university campus by 25%. • Establishment of many health- & knowledge institutions. • Growth of mobility in 2020 by 30%: - employees from 20,000 to 30,000. - students from 50,000 to 60,000. - visitors of hospitals increasing to 1 mln. per year.

Why more public transport to the university campus?

Page 23: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

23

Facts • Overcrowded extra long busses. • Busses stand in traffic jams on separate bus lanes. • High transportation value: 37,000 travelers per day. • Total transportation value of more then 70,000 travelers per day in 2020 (growth of +50%). Long term • Two public transport axes needed. • New light rail line to De Uithof can be built very quickly. • Second line will be built after and passes the inner city (now bus lane). • This second line will partly be a streetcar line.

Why a light rail line to the university campus?

Page 24: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

24

2006: Final decision on route.

2009: Regional vision on network.

2010: Design on implementing lines in

station area completed.

2011: Start building substructure.

2013: Start building tracks and catenary.

2017: Planned opening.

Planning and construction

Page 25: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

25

Map of new the light rail to the university campus

A.

B. C.

D.

E.

Page 26: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

26

A. Implementing light rail in the railway station area

Sub projects a) Linking existing and new light rail

lines. b) New tram stop on eastern side of

the main railway station. c) New bus stop on western side. d) Second crossing of railway tracks. e) Linking new line from Leidsche

Rijn to the network.

Page 27: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

27

B. Impression of the southern city area

Page 28: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

28

C. Impression of the green belt area

Page 29: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

29

D. Impression of the university campus

Page 30: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

30

E. Impression of the new transfer point De Uithof

Page 31: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

31

Animation of the new light rail line

Page 32: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

32

Step 3: Improving bicycle facilities

Page 33: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

33

Facts • 36% of all trips < 7.5 km are done by bicycle. • 91,000 cyclists pass the inner city on working days. • 22,000 bicycle stands around main railway station and in city centre. • 8 secured bicycle parkings around main railway station.

About cycling in the City of Utrecht

Page 34: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

34

Making an extra investment of € 67 mln. ($90 mln.) by: A. Upgrading five busiest routes. B. Building missing links. C. Creating more & better parking. D. Introducing public bicycle program. E. Increasing promotion of the bicycle.

Bicycle Program

Page 35: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

35

A. Upgrading five busiest routes (1)

Facts • The bicycle network has an average distance between routes of 400-500 metres. • Improving traffic lights. • Creating more bi-directional crossings for bicycles.

Page 36: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

36

Foto Hondsrug

A. Upgrading five busiest routes (2)

Page 37: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

37

B. Building missing links

New tunnel in a regional bicycle route .

Page 38: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

38

C. Creating more & better parking

Page 39: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

39

D. Introducing public bicycle program (OV Fiets)

Facts • A public bicycle system for transport hubs like railway stations, light rail stops, bus terminals, Park & Ride, etc. • Over 200 rental locations. • Over 60 self-service bicycle dispensers. • More than 850,000 trips in 2010.

Page 40: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

40

D. Increasing promotion of the bicycle (1)

First stage of Giro d’Italia 2010 . Advertisements & campaigns .

Information panels .

Page 41: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

41

en

D. Increasing promotion of the bicycle (2)

Bicycle maps & routes .

Page 42: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

42

D. Increasing promotion of the bicycle (3)

Promotion of electric bicycles .

Page 43: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

43

The final step: Integration!

Both infrastructure and policy

Page 44: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

44

Utrecht Centraal: Busiest railway station in the country

Facts • Major transport hub in the heart of The Netherlands. • 160,000 daily train and 100,000 bus & light rail passengers on weekdays. • 9 guarded bicycle parking's (total capacity 10.000 bicycles). • Over 7.000 unguarded bicycle parking places.

Page 45: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

45

Bicycle parking at Utrecht Centraal

Street parking . Guarded parking (non-paid) .

Guarded parking (paid) . Guarded parking (paid) .

Page 46: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

46

Facts • On some regional railway stations 60% of all passengers come by bicycle. • The number of train users increased after the improvements. • Dutch Railways improved bicycle parking facilities in cooperation with municipalities. • Temporary bi-level bicycle parking facilities (further improvements in the future). • The bicycle parking is not guarded and in the open air, but well used. • Also Park & Ride facilities for cars were added.

Commuter rail stations

Page 47: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

47

Other modes of public transport

Regional bus . City bus .

Light rail . Light rail .

Page 48: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

48

Other locations

Theatres . Shops .

Schools . Offices .

Page 49: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

49

The OV chip card

Facts • Is an electronic travel pass. • Can be used nationwide in all modes of public transport. • Both personal passes and passes for tourists. • Replaces paper tickets in the entire country.

Page 50: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

50

Facts • 39% of all train users come to the station by bicycle. • Folding bicycles are allowed in both long distance and commuter trains. • For normal bicycles someone has to buy a separate bicycle-ticket. • Normal bicycles usually aren’t allowed during rush hours.

Taking bicycles into trains

Page 51: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

51

Smaller maintenance vehicles .

National website OV9292 .

Regional mobility pass .

Some other aspects

Temporary road signing .

Page 52: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

52

RSS Vaartse Rijn: The ultimate transfer point?

Page 53: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

53

Thank you for your attention!

Ronald Tamse, The City of Utrecht (NL), 2011/09/27

Page 54: Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht version)

54

Lessons from Europe

Linking Transit with Walking and Biking How will the Dutch remake their largest train station? What about current efforts to develop a five-line light rail system in Utrecht? What are their lower-cost strategies for bicycle and pedestrian access to transit, bicycle parking, and traffic safety strategies to safely integrate tracks into roadways? Join a roadway and transit designer for the Cities of Amsterdam and Utrecht, to learn how the Europeans do it -- and what lessons we can learn from their success. Moderator: Catherine Ciarlo, Transportation Director, Office of the Mayor, City of Portland, Oregon Ronald Tamse, Traffic Consultant, City of Utrecht, The Netherlands.