  • 8/16/2019 Prelims-Handout [Compatibility Mode]

    1/2

    3/26/2015

    1

    by

    Prof. Indrawansa Samaratunga PhD, DSc,FRICS, FAIQS, FIQS(SL), FCIArb, FCIOB, FCMI, FIAS, FCABE

    (Chartered Surveyor/Chartered Manager/Chartered Building Engineer/Chartered Construction Manager/Chartered Quantity Surveyor)

     Arbitrator / Mediator - London Court of International Arbitration Arbitrator / Expert - Dubai International Arbitration Centre

    Construction Law & Dispute Resolution Board Member ofthe British University in Dubai

    Ex Middle East Representative - Australian Institute of Quantity Surveyors

    “Preliminaries (GeneralItems / Requirements)

    Revisited”

    When Do We Have to Deal with Preliminaries?Activity

    1. BOQ Preparation - Identify the requirements

    - Identify the Scope,

    - Interim / Final Payments

    2. Pricing the Tender

    4. Post ContractAdministration - Varied Prices in Valuing

    Variations

    Stage

    - Comply with Method of M…

    - find out the resourcesrequirement

    - Calculation ofprolongation costs

    - Complied with Method of M.. ?3. Tender Evaluation

    - Any imbalance in pricing ?

    1. Employer /Consultant

    2. Tenderers

    4. Contractor/ Consultant /

    Employer

    By

    3. Employer /Consultant

    - Is the pricing comprehensive?

    Standard Methods of MeasurementSMM7 Standard Method of

    Measurement of Building Works :Seventh Edition. (NFBTE/RICS)

    Principles of Measurement(International) for Works ofConstruction. (RICS)

    Civil Engineering Standard

    Method of Measurement3rd Edition. (ICE)

    POM(I)

    CESMM3

    - Preliminaries / General Conditions

    - General Items

    - General Requirements   -   S   i   t  e   O  v  e  r   h  e  a   d

      s

    Site Overheads :-

    - Activities/Costs which are not proportional to the

    quantity of an item of the Permanent Works.

    - Activities/Costs which are not related to any oneProject of the Contractor, but are common to all

    Projects.

    Head Office Overheads :-

    - Activities/Costs which are common to more than one

    item of the Permanent Works (or common to whole of

    the Permanent Works / whole Project) .