PREDIMENSIONAMIENTO DE COLUMNAS TIPICAS TIPO C1 Columna P = 1.1 x PG (Primeros pisos) interior n = 0.3 TIPO C1 Columna P = 1.1 x PG (4 últimos pisos superiores) interior n = 0.25 TIPO C2 , C3 Columna P = 1.25 x PG extremas n = 0.25 TIPO C4 Columna P = 1.50 x PG esquina n = 0.20 Columnas C1: 1.- Metrado de Cargas: P. de losa = 280.00 (kg/m2) P. de Tabiq = 100.00 (kg/m2) P. acabad. = 100.00 (kg/m2) P. viga = 100.00 (kg/m2) P. Columna = 60.00 (kg/m2) CM = 640.00 (kg/m2) + CV = 200.00 (kg/m2) CT = 840.00 (kg/m2) Luego: PG = 88,704.00 Kg b*h = 1548.80 cm2 b*h = 0.40 x 0.40 2.- Considerando el efecto de Cortante Basal: Uso = Vivienda Ubicación = Chiclayo Suelo = Flexible y blando Z = 0.40 U = 1.00 C = 2.50 S = 1.40 Area Edificada = 153.62 f ´c (Kg/cm2) = 210.00 fy (Kg/cm2) = 4200.00 y también: Pe = 774,244.80 (Kg) Vc = ### (Kg) h = 39.19 (cm) b*h = 0.40 x 0.40 c f n PG factor h b ´ * * * Pe x ZUCS Vc 3 / 1 2 xb Ec x n x n H x Vc h c

Upload: victor-diaz-yepez

Post on 28-Sep-2015

4 views

Category:

Documents


0 download

DESCRIPTION

Predimencionamiento de vigas, y columnas

TRANSCRIPT

PREDIM.COLUMPREDIMENSIONAMIENTO DE COLUMNAS TIPICAS

TIPO C1ColumnaP = 1.1 x PG(Primeros pisos)interiorn =0.3TIPO C1ColumnaP = 1.1x PG(4 ltimos pisos superiores)interiorn =0.25TIPO C2 , C3ColumnaP = 1.25x PGextremasn =0.25TIPO C4ColumnaP = 1.50x PGesquinan =0.20Columnas C1:

1.- Metrado de Cargas:

P. de losa =280.00(kg/m2)P. de Tabiq =100.00(kg/m2)P. acabad. =100.00(kg/m2)P. viga =100.00(kg/m2)P. Columna =60.00(kg/m2)

CM =640.00(kg/m2)+CV =200.00(kg/m2)CT =840.00(kg/m2)

Luego:PG =88,704.00Kg

b*h =1548.80cm2

b*h =0.40 x 0.40

2.- Considerando el efecto de Cortante Basal:

Uso =ViviendaUbicacin =ChiclayoSuelo =Flexible y blandoZ =0.40U =1.00C =2.50S =1.40Area Edificada = 153.62f c (Kg/cm2) =210.00fy (Kg/cm2) =4200.00

y tambin:

Pe =774,244.80(Kg)

Vc =1,083,942.72(Kg)

h =39.19(cm)

b*h =0.40 x 0.40

Columnas C2:1.- Metrado de Cargas:

P. de losa =280.00(kg/m2)P. de Tabiq =100.00(kg/m2)P. acabad. =100.00(kg/m2)P. viga =100.00(kg/m2)P. Columna =60.00(kg/m2)

CM =640.00(kg/m2)+CV =200.00(kg/m2)CT =840.00(kg/m2)

Luego:PG =31,248.00Kg

b*h =744.00cm2

b*h =0.30 x 0.30

2.- Considerando el efecto de Cortante Basal:

Uso =ViviendaUbicacin =ChiclayoSuelo =Flexible y blandoZ =0.40U =1.00C =2.50S =1.40Area Edificada = 153.62f c (Kg/cm2) =210.00fy (Kg/cm2) =4200.00

y tambin:

Pe =645,204.00(Kg)

Vc =903,285.60(Kg)

h =38.56(cm)

b*h =0.40 x 0.40

Columnas C4:1.- Metrado de Cargas:

P. de losa =280.00(kg/m2)P. de Tabiq =100.00(kg/m2)P. acabad. =100.00(kg/m2)P. viga =100.00(kg/m2)P. Columna =60.00(kg/m2)

CM =640.00(kg/m2)+CV =200.00(kg/m2)CT =840.00(kg/m2)

Luego:PG =26,964.00Kg

b*h =963.00cm2

b*h =0.35 x 0.35

2.- Considerando el efecto de Cortante Basal:

Uso =ViviendaUbicacin =ChiclayoSuelo =Flexible y blandoZ =0.40U =1.00C =2.50S =1.40Area Edificada = 153.62f c (Kg/cm2) =210.00fy (Kg/cm2) =4200.00

y tambin:

Pe =645,204.00(Kg)

Vc =903,285.60(Kg)

h =38.56(cm)

b*h =0.40 x 0.40

PREDIM.VIGAS 1PREDIMENSIONAMIENTO DE VIGAS 1 PISOVIGAS (EJE X-X) :

VP - 101 :b = L/20 = 0.20, pero b mn :0.25cm

Losa :h = L/21 =0.19, entonces asumimos: h =0.20 cm

Por lo tanto :b (cm) =0.2525

1.- Metrado de Cargas:

(h = 0.20 m)P. de losa =300*3.981194.00(kg/m)P. de Tabiq =100*3.98398.00(kg/m)P. acabad. =100*3.98398.00(kg/m)

CM =1990.00(kg/m)

S/C =300*3.981194.00(kg/m)

CV =1194.00(kg/m)

Carga Amplificada =Wu =4815.80(kg/m)

2.- Altura de Viga :

Mo =9535.52(kg x m)

y M =6674.87(kg x m)

d =25.78(cm)

h =32.00

Pero :h = L/10h (cm) =39.80h = L/12h (cm) =33.17

Luego :h (cm) =35.00

Finalmente se asume:Seccin = 0.35 x 0.40

VIGAS (EJE Y-Y) :

VS :b = L/20 = 0.21, pero b mn :0.25cm

Por lo tanto :b (cm) =0.2525

1.- Metrado de Cargas:

P. de losa =300*4.231269.00(kg/m)P. de Tabiq =100*4.23423.00(kg/m)P. acabad. =100*4.23423.00(kg/m)

CM =2115.00(kg/m)

S/C =300*1.451269.00(kg/m)

CV =1269.00(kg/m)

Carga Amplificada =Wu =5118.30(kg/m)

2.- Altura de Viga :

Mo =11447.65(kg x m)

y M =8013.36(kg x m)

d =28.25(cm)

h =34.47

Pero :h = L/10h (cm) =34.00h = L/12h (cm) =28.33

Luego :h (cm) =35.00

Finalmente se asume:Seccin = 0.30 x 0.35

PREDIM.VIGAS MEZANINEPREDIMENSIONAMIENTO DE VIGAS MEZANINEVIGAS (EJE X-X) :

VP - 101 :b = L/20 = 0.20, pero b mn :0.25cm

Losa :h = L/21 =0.19, entonces asumimos: h =0.20 cm

Por lo tanto :b (cm) =0.2525

1.- Metrado de Cargas:

(h = 0.20 m)P. de losa =300*3.981194.00(kg/m)P. de Tabiq =100*3.98398.00(kg/m)P. acabad. =100*3.98398.00(kg/m)

CM =1990.00(kg/m)

S/C =200*3.98796.00(kg/m)

CV =796.00(kg/m)

Carga Amplificada =Wu =4139.20(kg/m)

2.- Altura de Viga :

Mo =8195.82(kg x m)

y M =5737.08(kg x m)

d =23.90(cm)

h =30.12

Pero :h = L/10h (cm) =39.80h = L/12h (cm) =33.17

Luego :h (cm) =35.00

Finalmente se asume: Seccin = 0.35 x 0.40

VIGAS (EJE Y-Y) :

VS :b = L/20 = 0.21, pero b mn :0.25cm

Por lo tanto :b (cm) =0.2525

1.- Metrado de Cargas:

P. de losa =300*4.231269.00(kg/m)P. de Tabiq =100*4.23423.00(kg/m)P. acabad. =100*4.23423.00(kg/m)

CM =2115.00(kg/m)

S/C =200*1.45846.00(kg/m)

CV =846.00(kg/m)

Carga Amplificada =Wu =4399.20(kg/m)

2.- Altura de Viga :

Mo =9839.31(kg x m)

y M =6887.51(kg x m)

d =26.19(cm)

h =32.41

Pero :h = L/10h (cm) =34.00h = L/12h (cm) =28.33

Luego :h (cm) =35.00

Finalmente se asume: Seccin = 0.30 x 0.35

PREDIM.VIGAS 2 AL 5 PISOPREDIMENSIONAMIENTO DE VIGAS 2 al 5 PISOVIGAS (EJE X-X) :

VP - 101 :b = L/20 = 0.20, pero b mn :0.25cm

Losa :h = L/21 =0.19, entonces asumimos: h =0.20 cm

Por lo tanto :b (cm) =0.2525

1.- Metrado de Cargas:

(h = 0.20 m)P. de losa =300*3.981194.00(kg/m)P. de Tabiq =100*3.98398.00(kg/m)P. acabad. =100*3.98398.00(kg/m)

CM =1990.00(kg/m)

S/C =200*3.98796.00(kg/m)

CV =796.00(kg/m)

Carga Amplificada =Wu =4139.20(kg/m)

2.- Altura de Viga :

Mo =8195.82(kg x m)

y M =5737.08(kg x m)

d =23.90(cm)

h =30.12

Pero :h = L/10h (cm) =39.80h = L/12h (cm) =33.17

Luego :h (cm) =35.00

Finalmente se asume:Seccin = 0.35 x 0.40

VIGAS (EJE Y-Y) :

VS :b = L/20 = 0.21, pero b mn :0.25cm

Por lo tanto :b (cm) =0.2525

1.- Metrado de Cargas:

P. de losa =300*4.231269.00(kg/m)P. de Tabiq =100*4.23423.00(kg/m)P. acabad. =100*4.23423.00(kg/m)

CM =2115.00(kg/m)

S/C =200*1.45846.00(kg/m)

CV =846.00(kg/m)

Carga Amplificada =Wu =4399.20(kg/m)

2.- Altura de Viga :

Mo =9839.31(kg x m)

y M =6887.51(kg x m)

d =26.19(cm)

h =32.41

Pero :h = L/10h (cm) =34.00h = L/12h (cm) =28.33

Luego :h (cm) =35.00

Finalmente se asume: Seccin = 0.30 x 0.35