  • Mobilisation Checklist for

    Offshore Survey Operations

    IMCA S 016

    March 2011

    International MarineContractors Association

    www.imca-int.com

    AB

  • AB

    The International Marine Contractors Association

    (IMCA) is the international trade association

    representing offshore, marine and underwater

    engineering companies.

    IMCA promotes improvements in quality, health, safety,

    environmental and technical standards through the publication

    of information notes, codes of practice and by other

    appropriate means.

    Members are self-regulating through the adoption of IMCA

    guidelines as appropriate. They commit to act as responsible

    members by following relevant guidelines and being willing to be

    audited against compliance with them by their clients.

    There are two core activities that relate to all members:

    Competence & Training

    Safety, Environment & Legislation

    The Association is organised through four distinct divisions,

    each covering a specific area of members interests: Diving,

    Marine, Offshore Survey, Remote Systems & ROV.

    There are also five regional sections which facilitate work on

    issues affecting members in their local geographic area

    Asia-Pacific, Central & North America, Europe & Africa, Middle

    East & India and South America.

    IMCA S 016

    www.imca-int.com/survey

    The information contained herein is given for guidance only and endeavours to reflect best industry practice. For the avoidance of doubt no legal liability shall

    attach to any guidance and/or recommendation and/or statement herein contained.

    2011 IMCA International Marine Contractors Association

  • Mobilisation Checklist for Offshore Survey Operations

    IMCA S 016 March 2011

    Introduction ................................................................................................................... 1

    Aim .................................................................................................................................................................................... 1

    Framework ............................................................................................................................................................................ 1

    Glossary ................................................................................................................................................................................. 2

    1 Checklist Details .................................................................................................... 3

    2 Personnel ................................................................................................................ 4

    2.1 Survey Personnel .................................................................................................................................................... 4

    2.2 IMCA Competence Guidelines ........................................................................................................................... 4

    2.3 Personnel Comments ........................................................................................................................................ 4

    3 HSE .......................................................................................................................... 5

    3.1 PPE ............................................................................................................................................................................. 5

    3.2 Housekeeping .......................................................................................................................................................... 5

    3.3 Safety Procedures, Precautions and Practices ................................................................................................ 5

    3.4 HSE Comments ................................................................................................................................................... 5

    4 Scope for Minimal Checklist ................................................................................. 6

    4.1 Specified Survey Systems ...................................................................................................................................... 6

    4.2 Online and Offline Survey Computer Systems ............................................................................................... 6

    4.3 Field Background Data .......................................................................................................................................... 6

    4.4 Positioning Systems ................................................................................................................................................ 6

    4.5 Acoustics .................................................................................................................................................................. 6

    4.6 Procedures and Specifications ............................................................................................................................. 6

    4.7 Reporting and Charts ............................................................................................................................................ 6

    4.8 Scope for Minimal Checklist Comments ...................................................................................................... 6

    5 Survey Systems ...................................................................................................... 7

    5.1 Online Computer Systems................................................................................................................................... 7

    5.2 Offline Computer Systems................................................................................................................................... 7

    5.3 Communications ..................................................................................................................................................... 7

    5.4 Surface Positioning Systems and Vessel Survey Sensors .............................................................................. 8

    5.5 Subsurface Positioning USBL............................................................................................................................ 8

    5.6 Subsurface Positioning LBL ............................................................................................................................... 8

    5.7 Offsets and GPR Calibrations ............................................................................................................................. 9

    5.8 ROV System Sensors Checklist .......................................................................................................................... 9

    5.9 Survey System Comments ................................................................................................................................... 9

    6 Procedures and Reporting .................................................................................. 10

    6.1 Procedures ............................................................................................................................................................ 10

    6.2 Log and Record Keeping ................................................................................................................................... 10

    6.3 Reporting ............................................................................................................................................................... 10

    6.4 Procedures and Reporting Comments ...................................................................................................... 10

    7 References and Further Reading........................................................................ 11

  • IMCA S 016 1

    Introduction

    Aim

    This document is a mobilisation checklist for offshore survey operations, for example, a pipeline

    survey by an ROV.

    Survey contractors, ROV contractors, pipeline installation contractors and clients have a variety of

    in-house checklists. This document seeks to provide a standard framework for such a checklist.

    The intent is that it can be used by the contractors themselves and presented to a client or used by

    the client acting separately. In both cases it seeks to improve efficiency:

    It should act as a prompt to ensure the equipment, personnel and procedures are fit for purpose, able to do the work and ready to deliver the contemplated operation to the satisfaction of all

    parties;

    It should act as a catalyst towards a no surprises situation. Surprises usually mean delays in mobilisation which can be expensive for all parties;

    It should help to deliver safe and efficient operations.

    Framework

    The document provides a framework to build either a brief or detailed mobilisation checklist for

    survey support operations. The document could be expanded to cover any offshore survey

    operation; the extent of the checklist developed depends on the complexity of the survey operations

    which could include:

    Pipeline/subsea architecture condition surveys;

    Pipeline/subsea architecture post installation surveys;

    Pipeline/subsea architecture installation support observations (and installation/construction support).

    For specific LBL acoustic and INS operations additional information may be required to reflect specific

    technical requirements and survey specifications.

    The person completing the checklist may require access to the complete scope of work, survey

    specification, tolerances and procedural documentation required by the survey team to perform the

    tasks required.

    The comments sections 2.3, 3.4, 4.8, 5.9 and 6.4 can be used for additional comments or

    observations not covered by the checklists.

  • 2 IMCA S 016

    Glossary

    CD Compact disc

    CTD Conductivity, temperature and depth

    DPO Dynamic positioning system operator

    DVD Digital versatile disc

    GPR Ground penetrating radar

    HSE Health & Safety Executive (UK)

    INS Inertial navigation system

    LBL Long baseline

    MRU Motion reference unit

    PPE Personal protective equipment

    QC Quality control

    ROV Remotely operated vehicle

    SIMOPS Simultaneous operations

    UPS Uninterruptible power supply

    USBL Ultra-short baseline

    VHF Very high frequency

  • IMCA S 016 3

    1 Checklist Details

    Date:

    Author:

    Role or Position:

    Employer:

    Engaging Company:

    Vessel:

    Vessel Operator:

    Client:

    Survey Party Chief:

    Survey Procedure:

    Survey Scope of

    Work (Tasks):

  • 4 IMCA S 016

    2 Personnel

    Description Yes No Remarks/Signature

    2.1 Survey Personnel

    Is there sufficient survey crew onboard

    to perform the survey tasks according

    to project procedures and specifications

    Are all survey crew trained and

    familiarised with the onboard survey

    operation

    Is the experience level of the survey

    crew sufficient to meet the job

    requirements

    2.2 IMCA Competence Guidelines

    Is there an appropriate way for

    personnel to demonstrate competence,

    for example, a company scheme based

    upon the IMCA competence guidelines

    (IMCA C 004 Guidance document and

    competence tables: Offshore Survey

    Division)

    2.3 Personnel Comments

    http://www.imca-int.com/documents/core/ct/docs/IMCAC004.pdf

  • IMCA S 016 5

    3 HSE

    Description Yes No Remarks/Signature

    3.1 PPE

    Is PPE appropriate, available and worn

    by survey crew as a matter of practice

    3.2 Housekeeping is the general housekeeping in good order

    At online and offline survey stations

    At survey stores and spares

    Are all standard templates (e.g. survey/

    dive log) onboard

    3.3 Safety Procedures, Precautions and Practices

    Is there existing evidence that risk

    assessments are being actively

    undertaken as a normal practice by the

    survey team

    Is there existing evidence that toolbox

    talks are being actively undertaken as a

    normal practice by the survey team

    Have all survey crew been given a vessel

    and project induction

    Are the survey crew aware of the

    electrical isolation procedure and

    process used onboard

    Are adequate and appropriate

    precautions taken when working at

    height (e.g. installing antennas on mast)

    Do the survey crew carry out manual

    handling assessments where relevant

    Does the survey crew participate in

    incident reporting and investigations

    Are the survey crew familiar with the

    permit-to-work system and any site

    standards

    3.4 HSE Comments

  • 6 IMCA S 016

    4 Scope for Minimal Checklist

    Where only a minimal checklist is required, the HSE section (section 3) can be completed and the following

    technical items checked. Any technical concerns should be discussed between the survey party chief and the

    relevant client representatives and appropriate sections of the more detailed checklists in sections 5 and 6

    completed where relevant.

    Description Yes No Remarks/Signature

    4.1 Specified Survey Systems

    Are all survey systems installed,

    interfaced and calibrated

    Is the accuracy of the survey

    instrumentation onboard sufficient to

    meet the project specifications

    Is all hardware and software, including

    sufficient spares, onboard to perform

    the scope of work

    4.2 Online and Offline Survey Computer Systems

    Are online and offline survey computer

    systems installed and operational

    4.3 Field Background Data

    Are field background data as well as any

    proposed route(s) confirmed to be

    latest version

    4.4 Positioning Systems

    Are surface positioning systems

    checked/calibrated

    4.5 Acoustics

    Is there an acoustic management plan in

    place covering any issues such as seabed

    array planning, SIMOPS

    4.6 Procedures and Specifications

    Are survey procedures and

    specifications in place and are survey

    crew briefed

    4.7 Reporting and Charts

    Are survey reporting requirements,

    digital data delivery and chart formats

    agreed

    4.8 Scope for Minimal Checklist Comments

  • IMCA S 016 7

    5 Survey Systems

    Description Yes No Remarks/Signature

    5.1 Online Computer Systems

    Latest software updates and licenses

    installed and tested

    Data logging and (digital) video

    recording set up and tested

    Latest field background and proposed

    route(s) available

    Helmsman displays and spare computer

    systems and monitors available

    Runline computations tested

    Geodetic parameters checked

    Peripheral equipment such as printer/

    copier/scanner with consumables

    available and functional

    Clean power supply available and

    functional

    UPS systems tested

    All equipment and cables secure

    Job parameters stored and hard copies

    filed

    5.2 Offline Computer Systems

    Latest software updates and licenses

    installed and tested

    Spare computer systems and monitors

    and storage devices available

    Printer copier/scanner, plotter, tape

    drive, etc. available with consumables

    (cartridges, CD/DVDs, tapes, etc.)

    Example deliverables available for

    approval

    Data storage and backup facilities

    function tested

    5.3 Communications

    Communication protocol and

    emergency response understood

    Full duplex communication system

    operational for survey/bridge/ROV, etc.

    Helmsman displays set up for bridge/

    DPO/ROV, etc.

    VHF communications operational (e.g.

    bridge/deck/ROV/survey)

    Telephone installed and working at

    survey desk

    Data telemetry to/from other vessel, if

    required

  • 8 IMCA S 016

    Description Yes No Remarks/Signature

    Video telemetry to/from other vessel, if

    required

    5.4 Surface Positioning Systems and Vessel Survey Sensors

    Surface positioning systems fully

    functional and operating per

    specifications

    Antenna/dome locations checked for

    masking and multipath effects

    Antenna offsets measured and checked

    Interfacing to online system tested

    Positioning comparisons and QC checks

    performed

    Most recent installation and health

    check reports available onboard (dates)

    5.5 Subsurface Positioning USBL

    USBL system meets project

    specifications

    Transponders (/responder(s)) and

    charger checked

    Code frequency management in place

    Depth rating of transponders suitable

    USBL hydrophone XYZ offsets

    measured and checked

    Most recent installation and calibration

    report available onboard (date)

    Transponder deployment method

    evaluated and approved

    GPR sensor(s) interfaced to USBL

    system

    Full calibration required or position

    check only

    5.6 Subsurface Positioning LBL

    LBL system meets the project

    specifications

    Array layouts agreed/as per survey

    procedure

    Depth rating transponders and collars

    suitable for working area

    Transponder deployment method

    evaluated and approved

    LBL system function tested, including

    interface to vessel survey sensors

    Transponder status checked and

    correctly configured (e.g. battery status,

    code settings, etc.)

    Anodes, shackles, collars, roping, etc.

    checked on transponders

    LBL software and calibration package

    tested and interfaced to online system

  • IMCA S 016 9

    Description Yes No Remarks/Signature

    LBL installation aids (e.g. frames/gravel

    bags/rope/shackles/acoustic/hydrostatic

    releases) onboard

    5.7 Offsets and GPR Calibrations

    Vessel/ROV/structure sensor XYZ

    offsets measured and checked

    Vessel/ROV/structure gyro calibrations

    completed and comparisons logged

    Latitude and speed settings for gyros

    correct

    Ongoing daily gyrocompass

    comparisons planned and documented

    Gyros and MRUs operational and with

    valid calibrations

    All XYZ vessel/ROV/structure offsets

    and corrections entered and verified in

    the online computer systems

    5.8 ROV System Sensors Checklist ROV system/sensors interfaced/checked (include additional systems/sensors as required); tick off as appropriate

    Altimeter

    Depth sensor

    Swathe profilers/multi-beam

    Doppler velocity log

    INS

    Sound velocity meter

    Gyro, pitch, roll sensor

    Current meter

    Pipe/cable tracker

    Video overlay

    Depth rating ROV survey sensors

    suitable for working area

    Calibration certificates valid for depth

    sensors and sound velocity/CTD probes

    5.9 Survey System Comments

  • 10 IMCA S 016

    6 Procedures and Reporting

    Description Yes No Remarks/Signature

    6.1 Procedures

    Relevant procedures and drawings

    available to survey team

    Equipment operating procedures and

    manuals available

    Management of change system in place

    and understood

    All survey team briefed and aware of

    work scope

    Target and route coordinated available

    and checked

    6.2 Log and Record Keeping

    Detailed survey log maintained

    All results independently checked and

    signed

    Filing system set up for results and

    calibrations

    Mobilisation and calibration report

    prepared

    6.3 Reporting

    Project reporting requirements

    understood

    Chart formats and content agreed

    Provisional reporting and chart schedule

    for checking/review

    6.4 Procedures and Reporting Comments

  • IMCA S 016 11

    7 References and Further Reading

    IMCA C 004 Guidance document and competence tables: Offshore Survey Division

    IMCA M 149 Common Marine Inspection Document

    IMCA M 189/IMCA S 004 Marine inspection checklist for small workboats

    IMCA M 204 Vessel assurance

    IMCA M 205 Guidance on operational communications

    IMCA R 009 ROV mobilisation

    http://www.imca-int.com/documents/core/ct/docs/IMCAC004.pdfhttp://www.imca-int.com/documents/divisions/marine/docs/IMCAM149.pdfhttp://www.imca-int.com/documents/divisions/marine/docs/IMCAM189.pdfhttps://members.imca-int.com/documents/divisions/survey/docs/IMCAS004.pdfhttp://www.imca-int.com/documents/divisions/marine/docs/IMCAM204.pdfhttps://members.imca-int.com/documents/divisions/marine/docs/IMCAM205.pdfhttps://members.imca-int.com/documents/divisions/rov/docs/IMCAR009.pdf