Pre- Feasibility Report Environment Clearance of Proposed Brick Earth Mining project for M/S SHANKAR BRICK FIELD Village-Atrauli,Gaurajamon,Tehsil- Gauriganj,District-Amethi,Uttar Pradesh Page 1 of 12 1. EXECUTIVE SUMMARY Application of mining for soil used in Brick Kiln M/S SHANKAR BRICK FIELD from Khasra/Gata Nos55,325,332, Area-2.41 Hectare at Village-Atrauli,Gaurajamon,Tehsil- Gauriganj,District-Amethi,Uttar Pradesh.The project has been proposed for an annual production of 7424 cubic meter soil by open cast manual mining from allotted Khasra/Gata Nos 55,325,332, Area-2.41 Hectare at Village-Atrauli,Gaurajamon,Tehsil-Gauriganj,District-Amethi,Uttar Pradesh. The order of Hon‟ble Supreme Court dated the 27 th February, 2012 in I.A. No.1213 of 2011 in Special Leave Petition (C) No.19628-19629 of 2009, in the matter of Deepak Kumar etc. Vs. State of Haryana and Others etc., prior environmental clearance has now become mandatory for mining of minor minerals irrespective of the area of mining lease. And whereas, the Hon‟ble National Green Tribunal, vide its order dated the 13 th January, 2015 in the matter regarding sand mining has directed for making a policy on environmental clearance for mining leases in cluster for minor minerals. As per Environment (Protection) Rules, 1986, MoEF & CC making certain amendments in EIA Notification, 2006 vide number S.O. 2588(E), dated 15 th Jan, 2016, the applicant is seeking prior environmental clearance for mining of minor minerals under category „B2‟ for less than and equal to five hectare from DEIAA of concerning District. Table1: Salient Feature of Project Items Details Project name M/S SHANKAR BRICK FIELD of Sri Ashok Kumar Singh S/o Ram Sankar Singh,Village-Harkhpur,Nemuwa,Tehsil-Gauriganj, District-Amethi,Uttar Pradesh. Location of mine Khasra/Gata Nos 55,325,332 Land Use Uncultivated Land Land Ownership Private Land Life of mine 5.0 Years

Upload: others

Post on 30-Jan-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

  • Pre- Feasibility Report

    Environment Clearance of Proposed Brick Earth Mining project for M/S

    SHANKAR BRICK FIELD Village-Atrauli,Gaurajamon,Tehsil-

    Gauriganj,District-Amethi,Uttar Pradesh

    Page 1 of 12

    1. EXECUTIVE SUMMARY

    Application of mining for soil used in Brick Kiln M/S SHANKAR BRICK FIELD from

    Khasra/Gata Nos–55,325,332, Area-2.41 Hectare at Village-Atrauli,Gaurajamon,Tehsil-

    Gauriganj,District-Amethi,Uttar Pradesh.The project has been proposed for an annual production

    of 7424 cubic meter soil by open cast manual mining from allotted Khasra/Gata Nos 55,325,332,

    Area-2.41 Hectare at Village-Atrauli,Gaurajamon,Tehsil-Gauriganj,District-Amethi,Uttar

    Pradesh.

    The order of Hon‟ble Supreme Court dated the 27th

    February, 2012 in I.A. No.1213 of 2011 in

    Special Leave Petition (C) No.19628-19629 of 2009, in the matter of Deepak Kumar etc. Vs.

    State of Haryana and Others etc., prior environmental clearance has now become mandatory for

    mining of minor minerals irrespective of the area of mining lease. And whereas, the Hon‟ble

    National Green Tribunal, vide its order dated the 13th

    January, 2015 in the matter regarding sand

    mining has directed for making a policy on environmental clearance for mining leases in cluster

    for minor minerals.

    As per Environment (Protection) Rules, 1986, MoEF & CC making certain amendments in EIA

    Notification, 2006 vide number S.O. 2588(E), dated 15th

    Jan, 2016, the applicant is seeking prior

    environmental clearance for mining of minor minerals under category „B2‟ for less than and

    equal to five hectare from DEIAA of concerning District.

    Table1: Salient Feature of Project

    Items Details

    Project name M/S SHANKAR BRICK FIELD of Sri Ashok Kumar Singh S/o

    Ram Sankar Singh,Village-Harkhpur,Nemuwa,Tehsil-Gauriganj,

    District-Amethi,Uttar Pradesh.

    Location of mine Khasra/Gata Nos 55,325,332

    Land Use Uncultivated Land

    Land Ownership Private Land

    Life of mine 5.0 Years

  • Pre- Feasibility Report

    Environment Clearance of Proposed Brick Earth Mining project for M/S

    SHANKAR BRICK FIELD Village-Atrauli,Gaurajamon,Tehsil-

    Gauriganj,District-Amethi,Uttar Pradesh

    Page 2 of 12

    Proposed production

    of mine

    Lease period : 5.0 Years

    Proposed Capacity: 7424 cum/Annum (8909TPA)

    Table: Available Minable Reserve

    Latitude

    &Longitude

    Gata No

    &

    Area

    (ha)

    Area

    (sqm)

    Ben

    ch

    Area

    excluding

    bund wall

    (sqm)

    Dep

    th (

    m) Top

    soil

    (cum)

    Minable

    Reserve

    (cum)

    26°19'36.46"

    N 55

    (0.0380) 380

    I 361 1.00 55 306

    81°43'34.93"E

    II 353 1.00 - 353

    26°19'31.86"

    N 325

    (2.0280) 20280

    I 19266 1.00 2936 16330

    81°43'37.05"E

    II 18860 1.00 - 18860

    26°19'32.07"

    N 332

    (0.3440) 3440

    I 3268 1.00 498 2770

    81°43'31.88"E

    II 3199 1.00 - 3199

    Total 2.4100 24100.0 3489 41819

    As per brick kiln capacity (17 Paya), yearly production of bricks are

    24.5 Lac/season for that the required volume of brick clay will be

    7424 cum/ annum @330 bricks in one cubic meter .The total mineable

    reserves of soil of area is 41819 m3 or 50182 ton with proposed rate of

    production 7424 m3 the expected life of mine 5 years.

    Table: Year wise production

    Year Soil Reserve

    (cum/yr)

    Soil Reserve

    (Ton/yr)

    Brick

    prepared

    (lakh/yr)

    Ist 7424 8909 24.5

    IInd 7424 8909 24.5

    IIIrd 7424 8909 24.5

    IVth 7424 8909 24.5

    Vth 7424 8909 24.5

    Total 37120 44544 122.5

  • Pre- Feasibility Report

    Environment Clearance of Proposed Brick Earth Mining project for M/S

    SHANKAR BRICK FIELD Village-Atrauli,Gaurajamon,Tehsil-

    Gauriganj,District-Amethi,Uttar Pradesh

    Page 3 of 12

    Method of mining Open-cast Manual mining

    River •River :13 (N)

    Topography Undeveloped flat with gentle slope

    Minerals of mine Brick Earth

    Estimated cost Rs. 22.0 Lac

    Water demand 5.0 KLD

    Sources of water Drinking water supply will be met by nearby dugwell/ borewells or

    private tankers.

    Ultimate depth of

    Mining

    2 m

    Man power Not More than 20 Labors

    Nearest

    railway station Gauriganj R.St :14 Km (SW)

    Nearest highway NH 56 : 8 Km (N)

    SH 34 : 13 Km (S)

    Nearest Airport Lucknow Airport :100 Km (W)

    Nearest Town /city Gauriganj

    Seismic zone Zone-III (As per 1893:2002)

    * Approximate aerial distances

    2. INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION

    2.1 Identification of Project and Project Proponent

    Application of mining for soil used in Brick kiln of Brick Earth Mining project M/S SHANKAR

    BRICK FIELD from Khasra/Gata Nos–55,325,332, Area-2.41 Hectare at Village-

    Atrauli,Gaurajamon,Tehsil-Gauriganj,District-Amethi,Uttar Pradesh of Sri Ashok Kumar

    Singh S/o Ram Sankar SinghVillage-Harkhpur,Nemuwa,Tehsil-Gauriganj, District-Amethi,Uttar

    Pradesh.

    2.2 Brief description of the nature of the project

  • Pre- Feasibility Report

    Environment Clearance of Proposed Brick Earth Mining project for M/S

    SHANKAR BRICK FIELD Village-Atrauli,Gaurajamon,Tehsil-

    Gauriganj,District-Amethi,Uttar Pradesh

    Page 4 of 12

    Brick kiln are seasonal unit are either in small sector or in cottage sector. Clay brick industry in

    India uses soil as raw material and slack (small size) coal as fuel. Estimate of total mineable

    reserve quantity comes to be 41819 m3 or 50182 ton up to permissible depth of 2 m. As per

    Brick Kiln capacity yearly production of bricks are 24.5 Lac bricks/ season for that the required

    volume of brick clay will be 7424 cum/Annum. .

    2.3 Need for the project and its importance to the country and region

    The production of Brick Earth will benefit to the state in the form of royalty. Apart from this

    project operation will provide employment directly and indirectly to the people residing in

    vicinity, thus improving the Socio-economic status of the area.

    2.4 Demands-Supply Gap

    Bricks are produced in India in small or cottage scale brick kilns and Clamps, operates

    seasonally. The raw materials in the brick kilns include soil, coal, paddy husk, wood & locally

    available agro wastes to some extent. There are large variations in quality of soils available in

    different parts of the country and also in brick manufacturing process.

    Brick are good building material for construction activities but quality of brick differs place to

    place. There are large variations in quality of soil available in different part of the country and

    also brick manufacturing process. Brick kiln are seasonal unit are either in small sector or in

    cottage sector. Clay brick industry in India uses soil as raw material and slack (small size) coal as

    fuel.

    2.5 Import vs. Indigenous:

    Import does not apply in the present case as Brick is indigenously available at number of mines

    under operation in Uttar Pradesh.

    2.6 Export Possibility:

    Export possibility is neither plausible nor there is any such demand.

    2.7 Domestic/ Export Markets

  • Pre- Feasibility Report

    Environment Clearance of Proposed Brick Earth Mining project for M/S

    SHANKAR BRICK FIELD Village-Atrauli,Gaurajamon,Tehsil-

    Gauriganj,District-Amethi,Uttar Pradesh

    Page 5 of 12

    Due to the increased industrial and infrastructural growth of the rural and urban areas demand of

    Brick is very high. Construction companies and local vendors in the nearby town and cities are

    the potential market for the brick made up of brick clay.

    2.8 Employment Generation

    About 20 local labors shall be engaged through project proponent for extraction of soil, molding

    and loading of brick and handling of mineral in mining area, besides, watch and ward and

    plantation activity with proper maintenance.

    3. PROJECT DESCRIPTION

    3.1 Type of project including, interlinked and interdependent projects, if any

    This is a mining project for Brick Earth Excavation and the project shall not involve any

    interlinked and interdependent projects.

    3.2 Location (map showing general location and project boundary and project site) with

    coordinates.

    Soil miming area is located at Village Atrauli,Gaurajamon,Tehsil-Gauriganj,District-

    Amethi,Uttar Pradesh which is connected NH 56 at a distance approx: : 8 Km in North.

    Nearest Railway Station – Gauriganj R.St :14 Km (SW) from the Area and nearest

    Airport is Lucknow Airport :100 Km (W).

    Table: Site Co-ordinates

    Khasra/

    Gata

    No.

    Latitude Longitude

    55 26°19'36.46"N 81°43'34.93"E

    325 26°19'31.86"N 81°43'37.05"E

    332 26°19'32.07"N 81°43'31.88"E

  • Pre- Feasibility Report

    Environment Clearance of Proposed Brick Earth Mining project for M/S

    SHANKAR BRICK FIELD Village-Atrauli,Gaurajamon,Tehsil-

    Gauriganj,District-Amethi,Uttar Pradesh

    Page 6 of 12

    Figure: - District Map

    3.3 Details of alternate sites considered

    Besides this any other alternative other than Brick Earth mining like mining of rock in-situ

    quarry shall result in exorbitant cost, result in comparatively higher land degradation and cause

    more environmental impacts.

    3.4 Size or magnitude of operation

    The proposed mine has lease agreement over an Area - 2.4100 hectare. The project has

    been proposed for an annual production of 7424 cum soil by open cast manual mining

    from the Khasra/Gata Nos – 55,325,332, Area-2.41 Hectare at Village-

    Atrauli,Gaurajamon,Tehsil-Gauriganj,District-Amethi,Uttar Pradesh.

    3.5 Project description with process details (a schematic diagram/ flow chart showing the

    project layout, component of project etc. should be given)

    The proposed project is to mine Brick Clay from plot (s) under agreement sustainably and

    scientifically. Mining will be opencast and manual using hand tools only in the allotted plots

    keeping the nearby plot (s) unaffected. Following geo-scientific methods are proposed to carry

  • Pre- Feasibility Report

    Environment Clearance of Proposed Brick Earth Mining project for M/S

    SHANKAR BRICK FIELD Village-Atrauli,Gaurajamon,Tehsil-

    Gauriganj,District-Amethi,Uttar Pradesh

    Page 7 of 12

    out the activity. Mining will be confined to extraction of Brick Clay in its existing form from the

    allotted plot(s) only. Mining of Brick Clay from the allotted plot(s) will be restricted to a

    maximum depth of 2 m from the surface in proper bench form as per MCR-1960 and MMR

    1961. The width and height of bench will be 1 m x 1 m. Top soil up to 6” depth will be preserved

    to spread it after mining activity is completed to restore the fertility of land

    3.6 Raw material required along with estimated quantity:-

    Table: Available Mineable Reserve:-

    Latitude

    &Longitude

    Gata

    No &

    Area

    (ha)

    Area

    (sqm)

    Ben

    ch

    Area

    excluding

    bund

    wall

    (sqm) Dep

    th (

    m) Top

    soil

    (cum)

    Minable

    Reserve

    (cum)

    26°19'36.46"N 55

    (0.0380) 380

    I 361 1.00 55 306

    81°43'34.93"E II 353 1.00 - 353

    26°19'31.86"N 325

    (2.0280) 20280

    I 19266 1.00 2936 16330

    81°43'37.05"E II 18860 1.00 - 18860

    26°19'32.07"N 332

    (0.3440) 3440

    I 3268 1.00 498 2770

    81°43'31.88"E II 3199 1.00 - 3199

    Total 2.4100 24100.0 3489 41819

    Proposed method of mining:

    Mining shall be carried out from top to downward through the formation of benches. The

    height & width of benches shall be kept 1 m x 1 m with face slope 450.It shall be opencast

    manual mine involves scooping the mineral through use of hand implements like spade, pick

    axe, shovel and crowbar etc. In future top soil shall be scrapped by means manually and shall

    be used for the purpose of plantation and rehabilitation. Indicate quantum of development &

    tonnage & production expected in table below:

  • Pre- Feasibility Report

    Environment Clearance of Proposed Brick Earth Mining project for M/S

    SHANKAR BRICK FIELD Village-Atrauli,Gaurajamon,Tehsil-

    Gauriganj,District-Amethi,Uttar Pradesh

    Page 8 of 12

    Table: Year wise production

    Year

    Soil

    Reserve

    (cum/yr)

    Soil

    Reserve

    (Ton/yr)

    Brick

    prepared

    (lakh/yr)

    Ist 7424 8909 24.5

    IInd 7424 8909 24.5

    IIIrd 7424 8909 24.5

    IVth 7424 8909 24.5

    Vth 7424 8909 24.5

    Total 37120 44544 122.5

    3.7 Resource optimization/recycling and reuse envisaged in the project, if any, should be

    briefly described.

    Not applicable

    3.8 Availability of water its source, energy/ power requirement and source

    Water Requirement: Water requirement for human consumption, plantation and dust

    suppression is 3.0 KLD, which shall be met from ground water resource from the nearby

    village.

    Power: No electrical power shall be required for operations.

    3.9 Quantity of wastes to be generated (liquid and solid) and scheme for their management/

    disposal.

    Solid waste generation & its disposal: No solid waste other than negligible quantity of silt/silty

    clay, which gets deposited as crust material on the bed profile, shall be scrapped and deposited

    into the mine pits or in the upper terraces earmarked for plantation

    Liquid Effluent: There will be no waste water generation from mining activities.

    4. SITE ANALYSIS

    4.1 Connectivity: Soil miming area is located at Village- Atrauli,Gaurajamon,Tehsil-

    Gauriganj,District-Amethi,Uttar Pradesh which is connected NH 56 at a distance approx: :

    8 Km in North. Nearest Railway Station – Gauriganj R.St :14 Km (SW) from the Area

    and nearest Airport is Lucknow Airport :100 Km (W) direction from the area.

  • Pre- Feasibility Report

    Environment Clearance of Proposed Brick Earth Mining project for M/S

    SHANKAR BRICK FIELD Village-Atrauli,Gaurajamon,Tehsil-

    Gauriganj,District-Amethi,Uttar Pradesh

    Page 9 of 12

    4.2 Land form, land use and land ownership: The mine agreement area is agricultural private

    land.

    4.3 Topography (along with map): Agricultural plain

    4.5 Existing infrastructure: The existing land use of mine lease area belongs to landuse

    category “Uncultivated land” and shall continue to be so even after the current mining project is

    over.

    4.6 Geology: The geology of the district exposes nothing beyond Ordinary River borne alluvium

    which is not old. The mineral products are few and unimportant. The minerals of commercial

    value are the nodular limestone conglomerate known as kankar, brick and saltpetre. The soil in

    the district is light sandy or dense clay of yellowish brown colour. The sand found in the rivers is

    medium to coarse grained, greyish white to brownish in colour and is suitable for construction

    purposes.

    4.7 Geographical Structure

    Location and Boundaries

    District Amethi lies at the latitude 26°9‟ north and longitude 81°49‟ east at an average

    elevation of 101 metres(331 feet) from mean sea level. The total geographic area of the

    districts is about 3063 km2. The surface is generally level, being broken only by ravines in

    the neighbourhood of the rivers. The principal river is Gomti, which passes through the

    centre of the district. North side of this district is bounded by Faizabad District; South side

    is bounded by Pratapgarh District. West side is bounded by Bara-Banki District and Rai

    Bareilly District and the East side is bounded by Amethi District.

    The land of Amethi district is generally plane except some regions around the Gomti River

    which drains almost the whole district. It may be called an agrarian area as agriculture is

    the main occupation of the people. Amethi district has a wet and dry cl imate with average

    temperatures ranging between 23 °C to 28 °C. Amethi experiences three distinct seasons:

    summer, monsoon and a mild autumn.

    4.8 Climatic conditions:

  • Pre- Feasibility Report

    Environment Clearance of Proposed Brick Earth Mining project for M/S

    SHANKAR BRICK FIELD Village-Atrauli,Gaurajamon,Tehsil-

    Gauriganj,District-Amethi,Uttar Pradesh

    Page 10 of 12

    The district has four rain-gauge stations with record of three of them extending back to about 100

    years.. The south-west monsoon usually arrives over the district by about the middle of June and

    withdraws by the end of September. The average rainfall of the district is 1393.1 mm. About 87

    percent of the annual rainfall is recorded during the period June to September, July being the

    rainiest. The monsoon in the district generally advances from the south-west to the north-east.

    4.9 Social Infrastructure

    The social infrastructure like educational facilities (primary and higher secondary schools,

    degree college), drinking water supply, post and telegraph, public transportation and hospitals

    are by and large are available in the study area.

    5. PLANNING BRIEF

    5.1 Planning Concept

    The proposed project is to mine brick clay from plot(s) sustainably and scientifically. The minor

    mineral (clay) will be excavated from the plot(s) as per mining rules and casting of raw bricks

    will be done which will be transported to the kiln through horse cart, trolleys etc. through village

    chak roads. Mining will be opencast Manual keeping nearby plot(s) unaffected. Maximum depth

    of mining will be only up to 2 m as per agreement.

    5.2 Population Projection

    There is no projection of population as the mining activity will be carried out during day time

    only.

    5.3 Assessment of Infrastructure Demand (Physical & Social)

    Adequate infrastructure facilities are available in the vicinity of mine lease area and due to the

    mining activities; no extra infrastructure over and above the existing infrastructure is required.

    5.4 Amenities/Facilities

    Rest Shelter: Rest shelter along with first-aid station complying with all the provisions

    of Mines Rules shall be provided by project proponent outside lease area

    Water Supply: Water will be supplied for human consumption, dust suppression and for

    plantation.

  • Pre- Feasibility Report

    Environment Clearance of Proposed Brick Earth Mining project for M/S

    SHANKAR BRICK FIELD Village-Atrauli,Gaurajamon,Tehsil-

    Gauriganj,District-Amethi,Uttar Pradesh

    Page 11 of 12

    Transport of Man and Material: The material from the mine will be transported by

    trucks / tippers / tractor trolleys.

    Security Arrangements: Appropriate security arrangement shall be made.

    6.0 PROPOSED INFRASTRUCTURE:-

    6.1 Industrial area (Processing Area): Temporary arrangements like site office, rest shelters &

    approach roads etc shall be provided. No permanent infrastructure is proposed.

    6.2 Residential Area (Non Processing Area): As the local person shall be employed, no

    residential building / housing are proposed.

    6.3 Green Belt: Plantation of soil binding grasses like Agave nector, Saccharum officinarum

    (Munja), Cassia tora (Charata), Opuntia ficus indica, Aloe vera (Gheekwar), Euphorbia hirta

    across the benches.

    6.4 Connectivity: The lease area is connected to which are connected to rail and road

    6.5 Social Infrastructure: In-line with the Social Responsibility Activities at other operational

    sites, relevant developmental assistance shall be rendered depending on the local needs identified

    through studies.

    6.6 Drinking Water Management: Water requirement for drinking and operations will be 5.0

    KLD, which will be met from underground water resource.

    6.7 Sewerage System: No sewerage system is required as there is no domestic waste water will

    be disposed.

    6.8 Industrial Waste Management: Not applicable, as the mining activity will not be

    generating any overburden or waste materials.

    6.9 Solid Waste management: No solid waste generation is expected from the mining

    operation.

    6.10 Power Requirement & Supply/ Source: No electrical power requirement for mining

    activities.

  • Pre- Feasibility Report

    Environment Clearance of Proposed Brick Earth Mining project for M/S

    SHANKAR BRICK FIELD Village-Atrauli,Gaurajamon,Tehsil-

    Gauriganj,District-Amethi,Uttar Pradesh

    Page 12 of 12

    Rehabilitation and Resettlement (R&R) Plan

    The existing mine lease area is designated as private land and has no human settlements and

    hence, no R & R is envisaged.

    COST ESTIMATES

    The capital cost of proposed project is estimated as Rs. 22.0 Lac.

    CSR Cost- 3% of the project cost.: .66 Lac

    ANALYSIS OF PROPOSAL (FINAL RECOMMENDATION)

    The proposed project is expected to provide employment to local people in different activities

    such as Mining, sizing (sieving), transportation and plantation activities. The project activity will

    not have any major impact on the environment.

    ***********