PRE-FEASIBILITY REPORT
1. SUMARRY
Project Kukur Bhuka Stone Mine for Making Gitti
Name of Company / Mine Owner Santosh Kumar Sahu
Location Khasra No. 2610, 2613 & 2625 in village Kukur Bhuka
Village Kukur Bhuka
Taluka / Tehsil Pathalgaon
District Jashpur.
State Chhattisgarh.
1 Mining Lease area & Types
of Land
Mining Lease area – 3.690 Hectare and Government
Revenue Land.
2 Geographical
Co-ordinates Toposheet No. 64N/10
Boundary
Points
Co-ordinates
Latitude Longitude
BP1 N 22° 30' 48.43" E 083° 43' 37.50"
BP2 N 22° 30' 36.69" E 083° 43' 41.24"
BP3 N 22° 30' 45.00" E 083° 43' 47.18"
BP4 N 22° 30' 42.99" E 083° 43' 45.92"
BP5 N 22° 30' 43.78" E 083° 43' 43.90"
BP6 N 22° 30' 43.32" E 083° 43' 40.05"
BP7 N 22° 30' 39.37" E 083° 43' 41.08"
BP8 N 22° 30' 38.55" E 083° 43' 38.91"
BP9 N 22° 30' 39.19" E 083° 43' 37.43"
BP10 N 22° 30' 40.52" E 083° 43' 38.32"
BP11 N 22° 30' 40.85" E 083° 43' 40.03"
BP12 N 22° 30' 53.81" E 083° 43' 37.60"
BP13 N 22° 30' 46.27" E 083° 43' 35.57"
3 Name of Rivers / Nallahs /
Dam
A Dam is present at a distance of 100m towards south.
4 Name of Reserve Forest,
Wild life / Sanctuary
Nil
5 Topography of the area Rugged.
6 Project Proposal Stone Mine for making Gitti of Santosh Kumar Sahu. The
lease area is 3.690 Hectare. The RL (Reduced Level) of
the area is 426m – 430m above the mean sea level. All
the operations of opencast quarrying will be manual and
help of machineries like crowbar, pickaxe, hoe, shovel,
2
hammer, spade etc. will also be taken. Help of small
mining machineries like J.C.B. and drill compressor will
also be taken. Over burden (soil + highly weathered
granitic rocks) in the area is nearly 1m thick. This will be
removed by manually or with the help of J.C.B. and will
the dumped in the periphery of the mining area.
Salient features of mode of working-
Manufacturing Process Flow Chart:
Raw materials: Boulder → Quarrying of Boulder → A9er
quarrying output of Boulder is depositing together →
process continued – Boulder dumped near machine →
Processing Continued Boulder sent to Machine inside for
Crushing → Finishing product – 10mm, 20mm, 30mm,
40mm, Dust → Through Labour → Dispatch For Marketing
and Supply. ↓
Store
Sr.
No.
Type of mining
operation
Mode of working
1 Overburden
removal
Manual and Semi
mechanized with help of JCB
2 Inclined hole drilling No Drilling is proposed.
3 Blasting In hard zone, blasting will be
done by licensed blasters.
4 Sorting of
weathered rock
Manual
5 Loading Manual or by excavator
6 Transport By Tipper / Tractor.
7 Name of Mineral Stone for Making Gitti (Minor Mineral)[Stone for making Gitti
by Mechanical Crushing
3
8 Rate of Production 2200 m3 /5500 Ton per Annum. 9 Mineral Reserve
The estimated minable reserve is 1,69,172 Tonne.
10 Life of Mine 30 Years. 11 Drilling / Blasting In hard zone, blasting will be done by licensed blasters.
12 Mining Method Salient features of mode of working-
Manufacturing Process Flow Chart:
Raw materials: Boulder → Quarrying of Boulder → A9er
quarrying output of Boulder is depositing together →
process continued – Boulder dumped near machine →
Processing Continued Boulder sent to Machine inside for
Crushing → Finishing product – 10mm, 20mm, 30mm,
40mm, Dust → Through Labour → Dispatch For
Marketing and Supply. ↓
Store
Sr.
No.
Type of mining
operation
Mode of working
1 Overburden
removal
Manual and Semi mechanized
with help of JCB
2 Inclined hole
drilling
No Drilling is proposed.
3 Blasting In hard zone, blasting will be
done by licensed blasters.
4 Sorting of
weathered rock
Manual
5 Loading Manual or by excavator
6 Transport By Tipper / Tractor.
4
13 Ground water table
intersection
No
14 Drainage pattern / water
courses
Nil
15 Break-up of Land
Utilization pattern
Government land
The present land use pattern and land use pattern after
five years and after 10 years of the mine given below:
Particulars Land use pattern after 5
years
(Area in m2)
Land use pattern
after 10 years
(Area in m2)
Barren land (A) 2,436 m2 8,576 m
2
Area under Pit 7989 m2 Nil
Area used for
manual crushing,
shelter of workers
etc. (C)
Nil Nil
Crusher Area (D) Nil Nil
Area blocked in
7.5 m barrier on
which plantation
is proposed (Berm
area) (E)
13,000 m2 13,000 m
2
Area blocked for
dump yard,
benches, ramp
development &
slope
maintenance,
storage of fines
etc.
13,475 m2 15,324 m
2
Total area 36,900 m2 36,900 m
2
16 Water requirement &
source
4 KLD from Bore well.
17 Solid waste / Tailing Nil
18 Cost of Project (Rs.) 15 lacks
19 Any other (specify) Nil
5
Name and address of the company Name:- Santosh Kumar Sahu
Owner is Mr. Santosh Kumar Sahu.
Address:
Niwasi - Pathalgaon, Tehsil- Pathalgaon,
District - Jashpur, State - Chhattisgarh.
Phone No. - 9754755151 / 9300474151.
Registered Office Name:- Santosh Kumar Sahu
Address:
Niwasi - Pathalgaon, Tehsil- Pathalgaon,
District - Jashpur, State - Chhattisgarh.
Phone No. - 9754755151 / 9300474151.
Mine Office Stone Mine for Making Gitti
(of Shri Santosh Kumar Sahu),
Village – Kukur Bhuka, Post – Kukur Bhuka,
Tehsil – Pathalgaon, District- Jashpur,
State- Chhattisgarh, Pin – 496 220.
Email ---------
Prospecting Agency Nil
Type of Activity Nil
Utilities (Power, Water Requirement) Water required 4 KLPD
Manpower Requirement 12
6
2. INTRODUCTION OF THE PROJECT / BACKGROUND INFORMATION
2.1. Identification of Project and Project Proponent.
Name of the Project:
Santosh Kumar Sahu.
Project Proponent: Santosh Kumar Sahu.
The details of the project proponent and project are given below:
Name of Applicant Santosh Kumar Sahu
Mineral Stone for making Gitti
Lease Area (Hectare) 3.690 Hectare
Village Kukur Bhuka
Khasra Number / Compartment No’ 2610, 2613 & 2625
Tehsil Pathalgaon
District Jashpur
State Chhattisgarh
Ownership Government Land
Status of Project Existing
2.2. Brief Description of Nature of the Project.
The project is a very small project of Stone for making Gitti of minor mineral
in area 3.690 Hectare. The mining is proposed in Government land in village
Kukur Bhuka. This project will produce 5500 Ton stone for making Gitti per
7
annum which will be supplied to consumer for civil construction and other
infrastructural development.
2.3. Need for the Project and its importance to the country and region.
The project is of minor mineral Stone for making Gitti used as aggregate for
construction and building structure. It has a local market. Jashpur is a
backward developing district of Chhattisgarh. Kansabel, Tapkara, Kunkuri,
Pathalgaon, Ludeg and Jashpur cities located close to the mine and a lot of
construction and infrastructure development activities are in progress which
requires Crushed Stone. The demand of Crushed Stones is huge and existing
mines are not able to meet the growing demand. This project will narrow
down the demand supply gap of this important building material. Hence the
project will help in the development of the district.
2.4. Demand Supply Gap:
Jashpur is a developing district of Chhattisgarh which is growing
exponentially, lot of industrial and infra work is in progress that requires
crushed stone, presently there is a huge gap between demand and supply.
The existing mines around Jashpur are not capable of meeting this growing
demand due to exponential growth of Jashpur. The demand is expected to
grow more in the years to come with development of Jashpur.
2.5. Demand Supply Analysis:
In Jashpur area for the development of Jashpur, Ludeg, Kunkuri and
Pathalgaon cities for construction work Gitti is required which is brought
from nearby district which is adding extra transportation cost on
construction work i.e demand is more compared to supply. The demand in
the domestic market is huge for Gitti and Stone for making Gitti is available in
abundant quantity in allotted area and can be mined indigenously.
8
2.6. Employment Generation (Direct and Indirect) Due to the Project:
The project will generate direct employment to 01 supervisor, 01 mining
mate and 10 workers and indirect employment to about 10 persons
(transportation, canteen etc.).
3. PROJECT DESCRIPTION
3.1. Type of Project (including interlinked and interdependent project, if
any)
This is a Stone for making Gitti (Minor Mineral) mining project without any
interlinked and interdependent project.
3.2. Location (map showing general location, specific location and project
boundary & project site – specific layout) with co-ordinates.
Location Map:
9
The detail of the area is as under:
District : Jashpur
Tehsil : Pathalgaon
Village : Kukur Bhuka
Area : 3.690 Hectare
The co-ordinates of the area are:
Toposheet No. 64N/10
Boundary Points Co-ordinates
Latitude Longitude
BP1 N 22° 30' 48.43" E 083° 43' 37.50"
BP2 N 22° 30' 36.69" E 083° 43' 41.24"
BP3 N 22° 30' 45.00" E 083° 43' 47.18"
BP4 N 22° 30' 42.99" E 083° 43' 45.92"
BP5 N 22° 30' 43.78" E 083° 43' 43.90"
BP6 N 22° 30' 43.32" E 083° 43' 40.05"
BP7 N 22° 30' 39.37" E 083° 43' 41.08"
BP8 N 22° 30' 38.55" E 083° 43' 38.91"
BP9 N 22° 30' 39.19" E 083° 43' 37.43"
BP10 N 22° 30' 40.52" E 083° 43' 38.32"
BP11 N 22° 30' 40.85" E 083° 43' 40.03"
BP12 N 22° 30' 53.81" E 083° 43' 37.60"
BP13 N 22° 30' 46.27" E 083° 43' 35.57"
3.3. Details of alternate sites considered and the basis of selecting the
proposed site, particularly the environmental considerations gone into
should be highlighted.
Here, no alternate site considered as the present site has sufficient reserve of
Stone for making Gitti and the site is well connected with consuming centers
through road. Further, the environmental conditions are supportive too; no
public place is present in the vicinity of the area and no river in flowing
within 50m distance from this lease area.
10
3.4. Size or Magnitude of operation.
A small project of 3.690 Hectare area with proposed production of 2200 m3
per annum or 5500 Tonne per annum.
3.5. Project description with process details (a schematic diagram /
Flow chart showing the project layout, components of the project etc.
should be given.
It is a small scale Crushed stone mining project. All the operations of
opencast quarrying will be manual and help of machineries like crowbar,
pickaxe, hoe, shovel, hammer, spade etc. will also be taken. Help of small
mining machineries like J.C.B. and drill compressor will also be taken.
Type of Explosive used / to be used – NA in this project.
Storage of explosive (like capacity and type of explosive magazine) –
NA in this project.
The lease area is 3.690 Hectare. The RL (Reduced Level) of the area is 426m –
430m above the mean sea level. All the operations of opencast quarrying will
be manual and help of machineries like crowbar, pickaxe, hoe, shovel,
hammer, spade etc. will also be taken. Help of small mining machineries like
J.C.B. and drill compressor will also be taken. Over burden (soil + highly
weathered granitic rocks) in the area is nearly 1m thick. This will be removed
by manually or with the help of J.C.B. and will the dumped in the periphery of
the mining area.
11
Salient features of mode of working-
Sr. No. Type of mining operation Mode of working
1 Overburden removal Manual and Semi mechanized with help
of JCB
2 Inclined hole drilling No Drilling is proposed.
3 Blasting In hard Zone, blasting will be done by
licensed blasters.
4 Sorting of weathered rock Manual
5 Loading Manual or by excavator
6 Transport By Tipper / Tractor.
Manufacturing Process Flow Chart:
Raw materials: Boulder → Quarrying of Boulder → A9er quarrying output of Boulder
is depositing together → process conJnued – Boulder dumped near machine →
Processing Continued Boulder sent to Machine inside for Crushing → Finishing
product – 10mm, 20mm, 30mm, 40mm, Dust → Through Labour → Dispatch For
Marketing and Supply. ↓
Store
3.6. Raw Material / Consumables Required along with estimated
quantity, likely source, marketing area of final product, mode of
transport of raw material and finished product.
No raw material is required.
12
3.7. Availability of water, its source, Energy / Power requirement and
source should be given.
Requirement of water will be about 04 KLPD (water for dust suspension,
crusher, drinking and sanitation purpose etc) which will be brought from the
bore. Fuel is required for diesel operated machine and electricity is required
for crushing plant.
3.8. Quantity of wastes to be generated (liquid and solid) and scheme
for their management / disposal.
In the entire quarrying operation overburden (soil + very weathered granitic
rocks) will be stacked along periphery and plantation will be done in that
area.
3.9. Selection of Dumping site:
Dump yard area will be 0.200 Hectare near periphery of the lease area.
Otherwise the overburden will be stacked along the periphery.
4. SITE ANALYSIS
Connectivity:
The lease area is located near Kukur Bhuka village. The lease area covers an
area of 3.690 Hectare and is covered by the Survey of India toposheet No.
64N/10. The lease area does not fall under Reserve Forest (RF) / Protected
Forest (PF). The lease area is approachable by a network of metalled and
non - metalled roads from Pathalgaon which is a prominent town on
Raigarh – Pathalgaon – Jashpur – Ranchi highway (NH43/NH78). The railway
station nearest to the quarry lease area is Raigarh, which is at a
distance of about 100 km from the lease area. The Bus stand nearest is
Kukur Bhuka, which is about 3 km from the lease area. The Airport nearest is
Rourkela, which is about 200 km from the lease area.
13
4.1. Land form and Land Ownership
The area of lease (3.690 Hectare land) is Private land and covered by Survey
of India toposheet No. 64N/10. No forest land is involved in the lease area.
4.2. Topography along with maps:
The topography of the lease area is rugged near village Kukur Bhuka. The
lease area is 3.690 Hectare. The RL (Reduced Level) of the area is 426m –
430m above the mean sea level. The lowest point in the lease area lies at a
height of 426m in the southern part while the highest point lies at a height of
430m in the northern part of the lease area. The whole part of the lease area
is hilly land and covered with Granite, which is suitable for crushing. The
topography of lease area and its’ surroundings are given the following
figure from Google Earth:
14
4.3. Climate data from Secondary Sources:
The weathered is tropical. Climate of this region may be considered as
extreme being intensely hot in summer with maximum temperature of 46° C
in May and June, and severe cold winter with minimum temperature of 2° C
to 4° C in the month of December and January. The monsoon lasts for 4
months from June to September and the average annual rainfall is 1400mm.
4.4. Social Infrastructure available
It’s a small scale crusher stone mining project. The area has a rural setup and
connected by roads. The area has electricity connection and drinking water
facility. Schooling and Hospital facilities are also available in the area.
5. PLANNING BRIEF
5.1. Planning Concept (types of industries, facilities, transportation etc)
town and country Planning / Development authority classification:
The mine was granted for mineral Stone for making Gitti. All the operations
of opencast quarrying will be manual and help of machineries like crowbar,
pickaxe, hoe, shovel, hammer, spade etc. will also be taken. Help of small
mining machineries like J.C.B. and drill compressor will also be taken. Over
burden (soil + highly weathered granitic rocks) in the area is nearly 1m thick.
This will be removed by manually or with the help of J.C.B. and will the
dumped in the periphery of the mining area.
Transportation of mineral will be done through road by tractors.
Other facilities like Power, transportation and communication, social
infrastructure facilities are locally available near project site. Nearest town is
Pathalgaon and nearest village is Kukur Bhuka. Facilities like police station,
hospital, post office, rest hose, school area present within 12 km from the
project area.
15
5.2. Population Projection:
The project is a very small mining project of minor mineral Stone for making
gitti and does not require much planning for development of the site like
roads, housing etc. The mining is also very simple and shall be carried out as
per mine plan. Further, the project will employ most of the workers from
nearby areas. Local people from nearby villages will be given preference.
Thus, there will be no chance for increase population due to proposed project
of stone mining in the area.
5.3. Land Use Planning:
This is a small project and do not require much planning for development of the
site. The present land use is nothing and stone mining is proposed.
5.4. Assessment of Infrastructure Demand (Physical & Social):
A very small project and there is no such demand of any physical or social
infrastructure. The road facility is available which shall be used and properly
maintained. Preference will be given to local labour from nearby villages. Other
requite infrastructure as transport of mine labours is available by way of jeep;
two wheelers etc. Medical facility will be available for first aid at project site.
Hospital is available at a distance of 10 km.
6. PROPOSED INFRASTRUCTURE
(i) Industrial Area (Processing Area)-
Facilities like site office, first aid, rest shelter are proposed in the lease area.
(ii) Residential Area (Non Processing Area)-
Not applicable as local persons will be deployed so no residential area is
proposed.
16
(iii) Green Belt-
A 7.5m thick green belt is proposed to be developed around the periphery berm
area. During plantation program, preference will be given to local species of
plants. Proper care will be taken during plantation such as watering and fencing.
(iv) Social Infrastructure-
Socio – economic conditions of area generally improve as mining activities
create additional employment opportunity for local habitants. Socio- economic
status of local populace will improve as a result of social welfare activities
undertaken by the Government. Significant contributions will be made towards
education, medical facilities and cultural aspects. Drinking water facilities has
been provided to villagers. Plantation done will improve environmental
conditions in the area.
(v) Drinking Water Management (Source and Supply of Water)-
Drinking water about 1-2 KLD is required which will be brought from the bore
well.
(vi) Sewerage System:
Not required, no sewerage shall be generated from the project area.
(vii) Industrial Waste Management
No industrial waste will be generated from this project..
(viii) Power Requirement & Supply / Source
Electricity is required. Electricity facility is available in the village area, mining
machinery will be driven by diesel power for which estimated requirement of
diesel will be about 50 liters per day which will be supplied by nearby petrol
pumps.
17
7. REHABILITATION AND RESETTLEMENT (R & R) PLAN
There is no hut present in the lease area, no human being is displaced from the
area so no person will be affected contrary local people will get job opportunity.
It is proposed to backfill the topsoil and overburden removed during quarrying
operation and stacked along the periphery of the lease, where plantation will be
done.
8. PROJECT SCHEDULE AND COST ESTIMATES:
8.1. Likely date of start of mining and likely date of completion.
The project will be started soon after obtaining statutory clearances. Cost of the
project is around 15.0 Lac for making crusher unit, road manpower mainly to meet
recurring expenses and miscellaneous expenses.
8.2. Estimated project cost along with analysis of terms of economic viability of
the project.
Estimated project cost along with analysis in terms of economic viability of the
project is given below:
Construction of Road and maintenance of approach road Rs 1.50 Lakh per annum.
Salary for 01 supervisor, 1 mining mate and 10 Labours Rs 5.00 Lakh per annum.
Plantation and Environment Management Rs 2.50 Lakh per annum.
Royalty for 5500 ton (2200 m3) stone Rs 2.27 Lakh per annum.
Total cost Rs. 11.27 Lakh
Selling of 5500 ton (2200 m3) crushed stone per annum Rs. 44.00 Lakh per annum.
Net profit (Rs 44.00 lakh – 11.27 lakh) Rs. 32.73 Lakh per annum
18
9. RECOMMENDATIONS
The Project will bring economical benefits to the state by way of Royalty for
mineral. Achieving a huge infrastructure as being envisaged by Government of
India particularly in housing sector requires basic building materials. The mining
activities as proposed are backbone of all construction and infrastructure
projects as the raw material for construction is available from such mining.
There is no industry in the area. Crushed stones have a high demand at the local
market for real estate industry. The crushed stone mining in this area will
provide employment to nearby villagers. This employment opportunity will help
in raising the standard of living of the people in the area. Socio-economic
condition of area generally improve as mining activities create additional
employment opportunity for local habitant, social – economic status of local
populace also improves as a result of social welfare activities under taken by
mine owners. Significant contribution will be made towards education medical
facilities and cultural aspects. Drinking water facilities will be provided to
villagers, plantation will improve environmental condition of the area. Thus the
project will bring about socio-economic improvement of the area and will prove
beneficial to the area.
(Project Proponent)
(Santosh Kumar Sahu)
Niwasi - Pathalgaon,
Tehsil – Pathalgaon, District – Jashpur,
Chhattisgarh, Pin – 496 118,
Mob No – 9754755151 / 9300474151.