pre-feasibility reportenvironmentclearance.nic.in/writereaddata/online/tor/0_0_30_nov_… ·...
TRANSCRIPT
PRE-FEASIBILITY REPORT
OF
SILICA SAND & SOAP STONE
MINING PROJECT
(M.L. No.06/1996, ML Area: 4.6083 ha)
Near Village Dantli,
Tehsil & District: Dausa
Rajasthan
PROJECT PROPONENT
M/S Rajasthan Khaniz Agency
Pandey Bhawan, Dausa
(Rajasthan)
Contact Person: Shri Kastoor Chand Jain
INDEX
S. NO. PARTICULARS PAGE NO.
1.0 EXECUTIVE SUMMARY 1
2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 1
i Identification of Project Proponent and Project 3
ii Brief Description of the Nature of Project 3
iii Need for the Project & Its Importance to the Country/ Region 3
iv Demand – Supply Gap 3
v Imports vs. Indigenous Production 3
vi Export Possibility 3
vii Domestic/Export Markets 3
viii Employment Generation (Direct and Indirect) due to the Project 3
3.0 PROJECT DESCRIPTION 2
i Type of Project Including Interlinked And Independent Projects,
If Any
2
ii Location (map showing general location, specific location, and
project boundary & project site layout) with coordinates
3
iii Details of alternative site considered 5
iv Size and magnitude of operation 5
v Project Description with Process Detail 5
4.0 SITE ANALYSIS 9
5.0 PLANNING BRIEF 12
6.0 PROPOSED INFRASTRUCTURE 12
7.0 REHABILITATION AND RESETTLEMENT (R & R) PLAN 13
8.0 PROJECT SCHEDULE & COST ESTIMATES 13
9.0 ANALYSIS OF PROPOSAL 13
Silica Sand & Soap Stone Mining Project, M.L. No. 06/1993, Area 4.6380 ha
at Village: Dantli, Tehsil: & District: Dausa (Rajasthan)
Pre – Feasibility Report
M/s Rajasthan Khaniz Agency 1
PRE – FEASIBILITY REPORT
1.0 EXECUTIVE SUMMARY
This is an existing mine. Proposal for obtaining Environmental Clearance of Silica Sand &
Soap Stone Mining lease with production capacity 69,180 TPA near Village- Dantli, Tehsil
& District: Dausa . The lease area is 4.6380 ha. which is an Private Land.
This mining lease for Silica Sand and Soap Stone Minerals M.L. No. 06/1993 near Village
Dantli, Tehsil & District –Dausa in favor of M/s Rajasthan Khaniz Agency proprietor Shri
Kastoor Chand Jain was renewed for 20 years for 5 ha area vide order dated
26/11/1996. The period of renewal is from 04/06/1995 to 03/06/2015. The mining
plan for 5 ha of M.L. no. 06/1993 was approved vide order 584(4)(3)(252)/95-RCM-AJM
on dated 30/05/1996. The lease applied for surrender a part of 0.3994 ha from the
renewed lease area of 5 ha. The final closure Mine plan for 0.3994 ha area was approved
vide order SME/JP/F.M.C.P./31/2011/2886 on dated 10/10/2011. Surrender part of
0.3994 ha was accepted by superintending Mining Engineer, Jaipur Circle, Jaipur vide
order no. SME/JP/F-3/2001/37 on dated 24/10/2011. The rider agreement for retained
part of 4.6380 ha is made on 02/01/2012.which was attested from Notary public on
04/01/2012.
Table-1
Salient Features of the Project
S. No. Particulars Details
A. Mining Lease Details
1. Name of the Project Silica Sand & Soap stone Mining Project
2. Mineral Silica Sand & Soap Stone
3. Mining Lease Number M.L. No. 06/1993
4. Mining Lease Area 4.6380 ha
5. Lease Holder Shri Kastoor Chand Jain
B Location
6. Village Dantli
7. Tehsil Dausa
8. District Dausa
9. State Rajasthan
10. Latitude & Longitude Geographical Extends – Lattitude- 26°58’32.27” N to 26°58’44.26” N
Longitude- 76°24’26.42’’E to 76°24’32.65’’E
C. Other details
11. Bulk Density 2.1 tonnes/cum
12. Ultimate Working Depth 65 m
13. Cost of the project Rs. 10 Lacs
14. Cost for Environmental
Protection Measures
Rs. 0.50 lac per annum
15. Budget for CSR Rs. 0.50 Lac per annum
Silica Sand & Soap Stone Mining Project, M.L. No. 06/1993, Area 4.6380 ha
at Village: Dantli, Tehsil: & District: Dausa (Rajasthan)
Pre – Feasibility Report
M/s Rajasthan Khaniz Agency 2
ENVIRONMENTAL MANAGEMENT PLAN
AIR POLLUTION CONTROL
���� Plantation will be developed within ML areas and will also be developed outside the
ML area equal to 33% of the lease area.
���� Periodical water spraying on the roads will be done.
���� Proper maintenance of all machines will be carried out that will control emission of
gaseous pollutant.
WATER MANAGEMENT
���� There is no surface water body in and around the mining lease area.
���� The rain water collected in mining pit will be used in plantation and dust
suppression.
NOISE POLLUTION CONTROL
���� Proper maintenance of all machines will be carried out which will reduce noise
generation during operations.
LAND RECLAMATION
At the end of five year from the 4.6380 ha lease area, Out of which 1.50 ha area will
be excavated. 0.16 ha area will be used for dump, 0.25 ha area will be used for
construction, around 0.25 ha area will be used as green belt on around the lease
periphery & 2.178 ha area will be used as undisturbed area.
SOLID WASTE MANAGEMENT
� The waste is un-weathered portion of quartzite. The lessee will sale the waste after
taking STP from department time to time. The waste masy also used after grinding as
low grade silica sand. The waste is proposed to dump.
GREEN BELT DEVELOPMENT
Green Belt/plantation will be developed equal to 33% of total lease area. The trees will
be planted at suitable spacing to encourage proper growth around the lease boundary.
The dead plants will be replaced by fresh plants. Native Plant species will be planted
SOCIO ECONOMIC IMPROVEMENT
���� As the mining activities will increase, better employment opportunity.
���� Semi skilled & unskilled workers will be recruited from the nearby villages.
16. Average Annual Rainfall 300-350 mm
17. Seismic Zone II
Silica Sand & Soap Stone Mining Project, M.L. No. 06/1993, Area 4.6380 ha
at Village: Dantli, Tehsil: & District: Dausa (Rajasthan)
Pre – Feasibility Report
M/s Rajasthan Khaniz Agency 3
���� Adult Education programme are proposed for up-gradation of literacy level.
���� The leesee will associate awarness programe.
HEALTH & SAFETY
���� Protective respiratory devices will be provided to personnel working in dusty areas
with adequate training.
���� The lessee will associate in various health and safety awarness program in nearby
villages.
2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION
(i) Identification of Project and Project Proponent
This is an existing mine. Proposal for obtaining Environmental Clearance of Silica Sand &
Soap Stone Mining lease with production capacity 69,180 TPA near Village- Dantli, Tehsil
& District: Dausa . The lease area is 4.6380 ha. which is an Private Land.
Mining operation will be worked by semi mechanized open cast method. Environmental
Clearance is required As per EIA Notification dated 2006, as amended time to time, this
project is comes under B Category
(ii) Brief Description of the Nature of Project
This is an existing mine. Proposal for obtaining Environmental Clearance of Silica Sand
& Soap Stone Mining lease with production capacity 69,180 TPA near Village- Dantli,
Tehsil & District: Dausa .The Lease area is 4.6380 ha.
(iii) Need for the Project & Its Importance to the Country/ Region
The silica Sand (friable quartzite) uses in foundry industries at Indore and at other
places. This Silica Sand is also uses in silicate industries of Punjab, Haryana, Himachal.
The mining activities will increase better employment opportunities. Average income
level which is the indicator of socio-economic status of house hold is expected that it will
uplift the economic standard. Thus, to improve quantity of life and prosperity.
(iv) Demand – Supply Gap
Considering the demand of mineral sufficient availability of the mineral in the area, it is
essential to have Silica Sand & Soap Stone Mine to sustain the supply of mineral in silicate
industries.
(v) Imports vs. Indigenous Production
The Silica Sand (friable quartzite) uses in foundry industries at Indore and at other places.
After washing it may be used in glass industries. The low grade will be used as Bazari for
construction purpose.
Silica Sand & Soap Stone Mining Project, M.L. No. 06/1993, Area 4.6380 ha
at Village: Dantli, Tehsil: & District: Dausa (Rajasthan)
Pre – Feasibility Report
M/s Rajasthan Khaniz Agency 4
(vi) Export Possibility
This Silica Sand is also uses in silicate industries of Punjab, Haryana, Himachal.
(vii) Domestic/Export Markets
These minerals have only domestic market and will fulfill the requirement of local. After
washing it may be used in glass industries. The low grade will be used as Bazari for
construction purpose.
(viii) Employment Generation (Direct and Indirect) due to the Project
Approx 35 skilled and semiskilled manpower will be needed to run the mine.
3.0 PROJECT DESCRIPTION
(i) Type of Project Including Interlinked And Independent Projects, If Any
There is no interlinked or interdependent project based on mineral produced. The mineral
will be sold directly.
(ii) Location (map showing general location, specific location, and project boundary &
project site layout) with coordinates.
Silica Sand & Soap Stone Mining Project, M.L. No. 06/1993, Area 4.6380 ha
at Village: Dantli, Tehsil: & District: Dausa (Rajasthan)
Pre – Feasibility Report
M/s Rajasthan Khaniz Agency 5
Figure1: Location Map
Silica Sand & Soap Stone Mining Project, M.L. No. 06/1993, Area 4.6380 ha
at Village: Dantli, Tehsil: & District: Dausa (Rajasthan)
Pre – Feasibility Report
M/s Rajasthan Khaniz Agency 6
(iii) Details of Alternate Sites Considered
No alternative site has been taken into consideration due to availability of mineral resources in the
area in question.
(iv) Size and magnitude of operation
Mining lease area is estimated production capacity of Silica Sand Stone-69,180 TPA.
(v) Project Description with Process Detail
1. Salient features along with project vicinity details of the Mining project is given
below:
Table - 2
Salient Features of the Project
S. No. Particulars Details
1. Name of the Project Silica Sand Stone Mining Project
2. Mineral Silica Sand & Soap Stone
3. Mining Lease Number M.L. No. 06/1993
4. Mining Lease Area 4.6380 ha
5. Applicant Shri Kastoor Chand Jain
6. Method of Mining Open cast Semi mechanized
7. Elevation Range 355 mRL to 305 mRL
8. Total geological Reserve 1319810 Tonnes
9. Mineable Reserve 618130 Tonnes
10. General Ground Level 300 mRL
11. Ground Water Table 60 m bgl – 65 m bgl
12. Ultimate Working Depth 25 m bgl
(1) GEOLOGY OF THE AREA
Strategraphic sequence of Regional Geology is given below:
Silica Sand & Soap Stone Mining Project, M.L. No. 06/1993, Area 4.6380 ha
at Village: Dantli, Tehsil: & District: Dausa (Rajasthan)
Pre – Feasibility Report
M/s Rajasthan Khaniz Agency 7
Recent Soil
Post Delhi Granite, intrusive, Quartz veins
Delhi Super Group Ajabgarh Group Gritty quartzite, quartzite with interlayered
Group Phyllite,Carbaceous Phyllite And
Schist.
Alwar Group Quartzite, Gritty quartzite conglomerate and
pebble quartzite.
Railo Group Quartzite with thin bands of conglomerate
Bhilwarae Super
Group
Sand Mata Complex Biotite schist, kynite,Quartzite
(2) LOCAL GEOLOGY
Recent Soil
Intrusive absent
Bhilwara Super Group Hindoli Complex Quartzite, friable Quartzite
(4) Method of Mining
Proposed method of mining will be semi mechanized opencast by forming proper benches.
The mining is proposed as per present situation of the deposit.
Excavation is proposed by blasting. Hydraulic excavator/loader is proposed for removal and
loading of blasted stone.The haul/ approach roads will be provided wide, with 1 in 16 gradient
for easy movement of vehicles and to reduce th enoise from vehicular movement and its
propagation in near by area(outside the mining lease area). The stone and waste are proposed
to be transported by tractor trolley and tippers.
The mining will be carried out by opencast method by developing the bench of height 5-6 m
height and width. Four slices are considered in a bench. The calculations are as per the four
slices of a bench. Thus the end position of the bench is 6 meter height. Width is also proposed
6 meter.
EXTENT OF MECHANIZATION
Table-3
S.No Machinery Number
1. Hydraullic Excavator 01
2. Air Compressor tractor
mounted or wheel mounted
01
3. Tractor Trolley mounted 01
4. Tippers 03
5. PROPOSED YEAR WISE PRODUCTION DETAILS OF THE NEXT FIRST FIVE YEARS
The proposed Year-wise production plan for next five years is mentioned in the table given
below:
Table – 4
Silica Sand & Soap Stone Mining Project, M.L. No. 06/1993, Area 4.6380 ha
at Village: Dantli, Tehsil: & District: Dausa (Rajasthan)
Pre – Feasibility Report
M/s Rajasthan Khaniz Agency 8
Year Wise Production for Next Five Years
Year ROM tonnage
First year 69180
Second year 69180
Third year 69180
Fourth year 69180
Fifth year 69180
6. LOADING & TRANSPORT
Tyre mounted Hydraulic excavator will be deployed from time to time and when required.
Trucks and tracor troley will be deployed for transportation of Masonry stone from working.
7. WASTE GENERATION & DISPOSAL
The waste is un-weathered portion of quartzite. The lessee will sale the waste after taking STP
from department time to time. The waste masy also used after grinding as low grade silica
sand. The waste is proposed to dump.
8. CONCEPTUAL PLAN
The conceptual mining plan considering proposed capacity of mine for the mineral has been
prepared by considering the probable category of reserve. At the end of five year from the
4.6380 ha lease area, Out of which 1.50 ha area will be excavated. 0.16 ha area will be
used for dump, 0.25 ha area will be used for construction, around 0.25 ha area will
be used as green belt on around the lease periphery & 2.178 ha area will be used as
undisturbed area.
2. Raw Material Required Along With Estimated Quantity, Likely Source, Marketing Area
of Final Products, Mode of Transport of Raw Material and Finished Product
The Silica Sand Stone will be transported by Tractors & trolleys. No raw material will be
required.
(vii) Resources Optimization/ Recycling and Reuse Envisaged in the Project, if any, should
be briefly Outlined
� The waste is un-weathered portion of quartzite.The lessee will sale the waste after taking
STP from department time to time. The waste masy also used after grinding as low grade
silica sand. The waste is proposed to dump.
� Domestic sewage water generated from office will be disposed in soak pits via septic tank.
(viii) Availability of Water Its Source, Energy /Power Requirement and Source
A. Water requirement:
Silica Sand & Soap Stone Mining Project, M.L. No. 06/1993, Area 4.6380 ha
at Village: Dantli, Tehsil: & District: Dausa (Rajasthan)
Pre – Feasibility Report
M/s Rajasthan Khaniz Agency 9
Total water requirement for the proposed project will be3 KLD which will be sourced from
nearby villages.
B. Power requirement:
The electric power will not be used in mining. Only HSD Fuel will be required for operating
machineries.
(ix) Quantity of Waste to Be Generated (Liquid and Solid) And Scheme for Their
Management/Disposal:
Domestic sewage water generated from office toilet will be disposed in soak pits via septic
tank. Around 90570 tonnes of waste will come across during the development period of this
modified mining plan and around 270000 tonnes during the life of the mine.
4.0 SITE ANALYSIS
(i) Connectivity
The lease area is 13.0 km away towards in SW direction from mine site. Nearest
Railway Station situated at a Bhan Kari Railway Station at a distance of ~ 2.0 km. in
SE direction from Mine site. The lease area is well connected to roads.
(ii) Land Use Pattern
The total ML area of 4.6380 ha comprises of Pvt Land.
(iii) Topography
The lease area comprises undulated terrains, and falls in private land . The highest
contour is 355 mRL and lowest contour is 305 mRL. General ground level of the area is
300 mRL.
Table – 6
Environmental Settings
S.
No.
Particular Details
1. Nearest Village Village Dantli
2. Nearest city/ town Dausa
3. Nearest Railway Station Bhan Kari, Railway Station ~2.0 km
4. Nearest Airport Jaipur International Airport, Jaipur ~61.0 km.
5.
Archaeological Important Place None, within 10 km radius area of mine site.
Silica Sand & Soap Stone Mining Project, M.L. No. 06/1993, Area 4.6380 ha
at Village: Dantli, Tehsil: & District: Dausa (Rajasthan)
Pre – Feasibility Report
M/s Rajasthan Khaniz Agency 10
6. Ecological Sensitive Areas
(National Park, Wildlife
Sanctuary, Biosphere Reserve
etc.)
There is no National Park, Wild Life Sanctuaries, Biosphere
Reserves, Tiger Reserves, Wildlife Corridors, etc. within 10
km radius
7. Reserved/Protected Forest
within 10 km radius
None
8. Nearest River / water body Sindoli canal (~2.0, km)
Banganga River (~8.0,km)
(IV) Existing Land Use Pattern {Agriculture, Non-Agriculture, Forest, Water Bodies
(Including Area Under CRZ)}, Shortest Distances From The Periphery Of The Project
To Periphery Of The Forests, National Park, Wild Life Sanctuary, Eco Sensitive Areas,
Water Bodies (Distance From The HFL Of The River), CRZ. In Case Of Notified
Industrial Area, A Copy Of The Gazette Notification
Silica Sand & Soap Stone Mining Project, M.L. No. 06/1993, Area 4.6380 ha
at Village: Dantli, Tehsil: & District: Dausa (Rajasthan)
Pre – Feasibility Report
M/s Rajasthan Khaniz Agency 11
Silica Sand & Soap Stone Mining Project, M.L. No. 06/1993, Area 4.6380 ha
at Village: Dantli, Tehsil: & District: Dausa (Rajasthan)
Pre – Feasibility Report
M/s Rajasthan Khaniz Agency 12
(iii) Existing Infrastructure:
There is no building & structure within mining lease area except some vegetations
existing on the lease area which will be cleared as and when required.
5.0 PLANNING BRIEF
(i) Planning Concept (Type of Industries, Facilities, and Transportation etc.) Town
and Country Planning/Development Authority Classification
Uses: This is a mining Project
(ii) Population Projection
Manpower required will be engaged from nearby Villages. No significant influx of
people is anticipated in the area.
(iii) Land Use Planning
The area extent of proposed mining lease is 4.6380 ha. The area comprises of Pvt. Land
(iv) Assessment of Infrastructure Demand (Physical & Social)
Lessee will assess the demand of infrastructure (Physical & Social) in nearby area of the
proposed mine site and same will be developed under social work
(v) Amenities/Facilities
Lessee will develop the Amenities/Facilities in the nearby area of the proposed mine
site as per requirement of local people of the nearby area under corporate social
responsibility programs.
6.0 PROPOSED INFRASTRUCTURE
(i) Residential Area (Non Processing Area)
This is not required as mine workers will come from nearby villages. Rest shelter to the
workers will be provided outside the lease area.
(ii) Green Belt
Green Belt/plantation will be developed equal to 33% of total lease area. The trees will
be planted at suitable spacing to encourage proper growth around the lease boundary.
The dead plants will be replaced by fresh plants. Native Plant species will be planted.
(iii) Connectivity
The lease area is 13.0 km away towards in SW direction from mine site. Nearest
Railway Station situated at a Bhan Kari Railway Station at a distance of ~ 2.0 km. in
SE direction from Mine site. The lease area is well connected to roads.
(iv) Water Management (Source & Supply of water)
Total water requirement for the project will be 3.0 KLD which will be used for domestic
plantation as well as dust supression purpose and sourced from nearby village.
(v) Sewerage System
Domestic sewage water generated from office toilet will be disposed in soak pits via
septic tank. Outside discharge is not envisaged.
(vi) Industrial Waste Management
No industrial waste water will be generated from mining operation.
(vii) Solid Waste Management
The waste is un-weathered portion of quartzite. The lessee will sale the waste after
taking STP from department time to time. The waste masy also used after grinding as
low grade silica sand. The waste is proposed to dump.
Silica Sand & Soap Stone Mining Project, M.L. No. 06/1993, Area 4.6380 ha
at Village: Dantli, Tehsil: & District: Dausa (Rajasthan)
Pre – Feasibility Report
M/s Rajasthan Khaniz Agency 13
(viii) Power Requirement & Supply/Source
Electric power will not be required in mining operations.
7.0 REHABILITATION AND RESETTLEMENT (R & R) PLAN
(i) Policy To Be Adopted (Central/State) In Respect Of The Project Affected Persons
Including Home Oustees, Land Oustees And Landless Laborers (Brief Outline To
Be Given)
Not Applicable as the lease area falls in Pvt. Land and is already in possession of the
lessee.
8.0 PROJECT SCHEDULE & COST ESTIMATES
(i) Likely Date Of Start Of Construction And Likely Date Of Completion (Time
Schedule For The Project To Be Given)
The mining activity is done in the area and enhancement in production will be done
after Environmental Clearance from MoEF, Rajasthan and consent to establish and
operate from RSPCB.
(ii) Estimated Project Cost Along With Analysis In Terms Of Economic Viability of the
Project
� Total Project Cost : 10.0 Lacs
� Environment Protection Cost : 0.50 Lacs Per annum
9.0 ANALYSIS OF PROPOSAL
���� Proposed Silica Sand & Soap Stone Mining Lease will result in growth of the
surrounding areas by increasing direct and indirect employment opportunities in the
region including ancillary development and supporting infrastructure. Special emphasis
on Financial and Social benefits will be given to the local people including tribal
population, if any, in the area.
���� Development of social amenities will be in the form of medical facilities, education to
underprivileged and creation of self help groups.
���� No major adverse effect on environment is envisaged as the required mitigation
measures are inbuilt in the project.