PRE-FEASIBILITY REPORT

OF

SILICA SAND & SOAP STONE

MINING PROJECT

(M.L. No.06/1996, ML Area: 4.6083 ha)

Near Village Dantli,

Tehsil & District: Dausa

Rajasthan

PROJECT PROPONENT

M/S Rajasthan Khaniz Agency

Pandey Bhawan, Dausa

(Rajasthan)

Contact Person: Shri Kastoor Chand Jain

Page 2: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_30_Nov_… · PRE-FEASIBILITY REPORT OF SILICA SAND & SOAP STONE MINING PROJECT (M.L. No.06/1996, ML

INDEX

S. NO. PARTICULARS PAGE NO.

1.0 EXECUTIVE SUMMARY 1

2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 1

i Identification of Project Proponent and Project 3

ii Brief Description of the Nature of Project 3

iii Need for the Project & Its Importance to the Country/ Region 3

iv Demand – Supply Gap 3

v Imports vs. Indigenous Production 3

vi Export Possibility 3

vii Domestic/Export Markets 3

viii Employment Generation (Direct and Indirect) due to the Project 3

3.0 PROJECT DESCRIPTION 2

i Type of Project Including Interlinked And Independent Projects,

If Any

2

ii Location (map showing general location, specific location, and

project boundary & project site layout) with coordinates

3

iii Details of alternative site considered 5

iv Size and magnitude of operation 5

v Project Description with Process Detail 5

4.0 SITE ANALYSIS 9

5.0 PLANNING BRIEF 12

6.0 PROPOSED INFRASTRUCTURE 12

7.0 REHABILITATION AND RESETTLEMENT (R & R) PLAN 13

8.0 PROJECT SCHEDULE & COST ESTIMATES 13

9.0 ANALYSIS OF PROPOSAL 13

Page 3: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_30_Nov_… · PRE-FEASIBILITY REPORT OF SILICA SAND & SOAP STONE MINING PROJECT (M.L. No.06/1996, ML

Silica Sand & Soap Stone Mining Project, M.L. No. 06/1993, Area 4.6380 ha

at Village: Dantli, Tehsil: & District: Dausa (Rajasthan)

Pre – Feasibility Report

M/s Rajasthan Khaniz Agency 1

PRE – FEASIBILITY REPORT

1.0 EXECUTIVE SUMMARY

This is an existing mine. Proposal for obtaining Environmental Clearance of Silica Sand &

Soap Stone Mining lease with production capacity 69,180 TPA near Village- Dantli, Tehsil

& District: Dausa . The lease area is 4.6380 ha. which is an Private Land.

This mining lease for Silica Sand and Soap Stone Minerals M.L. No. 06/1993 near Village

Dantli, Tehsil & District –Dausa in favor of M/s Rajasthan Khaniz Agency proprietor Shri

Kastoor Chand Jain was renewed for 20 years for 5 ha area vide order dated

26/11/1996. The period of renewal is from 04/06/1995 to 03/06/2015. The mining

plan for 5 ha of M.L. no. 06/1993 was approved vide order 584(4)(3)(252)/95-RCM-AJM

on dated 30/05/1996. The lease applied for surrender a part of 0.3994 ha from the

renewed lease area of 5 ha. The final closure Mine plan for 0.3994 ha area was approved

vide order SME/JP/F.M.C.P./31/2011/2886 on dated 10/10/2011. Surrender part of

0.3994 ha was accepted by superintending Mining Engineer, Jaipur Circle, Jaipur vide

order no. SME/JP/F-3/2001/37 on dated 24/10/2011. The rider agreement for retained

part of 4.6380 ha is made on 02/01/2012.which was attested from Notary public on

04/01/2012.

Table-1

Salient Features of the Project

S. No. Particulars Details

A. Mining Lease Details

1. Name of the Project Silica Sand & Soap stone Mining Project

2. Mineral Silica Sand & Soap Stone

3. Mining Lease Number M.L. No. 06/1993

4. Mining Lease Area 4.6380 ha

5. Lease Holder Shri Kastoor Chand Jain

B Location

6. Village Dantli

7. Tehsil Dausa

8. District Dausa

9. State Rajasthan

10. Latitude & Longitude Geographical Extends – Lattitude- 26°58’32.27” N to 26°58’44.26” N

Longitude- 76°24’26.42’’E to 76°24’32.65’’E

C. Other details

11. Bulk Density 2.1 tonnes/cum

12. Ultimate Working Depth 65 m

13. Cost of the project Rs. 10 Lacs

14. Cost for Environmental

Protection Measures

Rs. 0.50 lac per annum

15. Budget for CSR Rs. 0.50 Lac per annum

Page 4: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_30_Nov_… · PRE-FEASIBILITY REPORT OF SILICA SAND & SOAP STONE MINING PROJECT (M.L. No.06/1996, ML

Silica Sand & Soap Stone Mining Project, M.L. No. 06/1993, Area 4.6380 ha

at Village: Dantli, Tehsil: & District: Dausa (Rajasthan)

Pre – Feasibility Report

M/s Rajasthan Khaniz Agency 2

ENVIRONMENTAL MANAGEMENT PLAN

AIR POLLUTION CONTROL

���� Plantation will be developed within ML areas and will also be developed outside the

ML area equal to 33% of the lease area.

���� Periodical water spraying on the roads will be done.

���� Proper maintenance of all machines will be carried out that will control emission of

gaseous pollutant.

WATER MANAGEMENT

���� There is no surface water body in and around the mining lease area.

���� The rain water collected in mining pit will be used in plantation and dust

suppression.

NOISE POLLUTION CONTROL

���� Proper maintenance of all machines will be carried out which will reduce noise

generation during operations.

LAND RECLAMATION

At the end of five year from the 4.6380 ha lease area, Out of which 1.50 ha area will

be excavated. 0.16 ha area will be used for dump, 0.25 ha area will be used for

construction, around 0.25 ha area will be used as green belt on around the lease

periphery & 2.178 ha area will be used as undisturbed area.

SOLID WASTE MANAGEMENT

� The waste is un-weathered portion of quartzite. The lessee will sale the waste after

taking STP from department time to time. The waste masy also used after grinding as

low grade silica sand. The waste is proposed to dump.

GREEN BELT DEVELOPMENT

Green Belt/plantation will be developed equal to 33% of total lease area. The trees will

be planted at suitable spacing to encourage proper growth around the lease boundary.

The dead plants will be replaced by fresh plants. Native Plant species will be planted

SOCIO ECONOMIC IMPROVEMENT

���� As the mining activities will increase, better employment opportunity.

���� Semi skilled & unskilled workers will be recruited from the nearby villages.

16. Average Annual Rainfall 300-350 mm

17. Seismic Zone II

Page 5: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_30_Nov_… · PRE-FEASIBILITY REPORT OF SILICA SAND & SOAP STONE MINING PROJECT (M.L. No.06/1996, ML

Silica Sand & Soap Stone Mining Project, M.L. No. 06/1993, Area 4.6380 ha

at Village: Dantli, Tehsil: & District: Dausa (Rajasthan)

Pre – Feasibility Report

M/s Rajasthan Khaniz Agency 3

���� Adult Education programme are proposed for up-gradation of literacy level.

���� The leesee will associate awarness programe.

HEALTH & SAFETY

���� Protective respiratory devices will be provided to personnel working in dusty areas

with adequate training.

���� The lessee will associate in various health and safety awarness program in nearby

villages.

2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION

(i) Identification of Project and Project Proponent

This is an existing mine. Proposal for obtaining Environmental Clearance of Silica Sand &

Soap Stone Mining lease with production capacity 69,180 TPA near Village- Dantli, Tehsil

& District: Dausa . The lease area is 4.6380 ha. which is an Private Land.

Mining operation will be worked by semi mechanized open cast method. Environmental

Clearance is required As per EIA Notification dated 2006, as amended time to time, this

project is comes under B Category

(ii) Brief Description of the Nature of Project

This is an existing mine. Proposal for obtaining Environmental Clearance of Silica Sand

& Soap Stone Mining lease with production capacity 69,180 TPA near Village- Dantli,

Tehsil & District: Dausa .The Lease area is 4.6380 ha.

(iii) Need for the Project & Its Importance to the Country/ Region

The silica Sand (friable quartzite) uses in foundry industries at Indore and at other

places. This Silica Sand is also uses in silicate industries of Punjab, Haryana, Himachal.

The mining activities will increase better employment opportunities. Average income

level which is the indicator of socio-economic status of house hold is expected that it will

uplift the economic standard. Thus, to improve quantity of life and prosperity.

(iv) Demand – Supply Gap

Considering the demand of mineral sufficient availability of the mineral in the area, it is

essential to have Silica Sand & Soap Stone Mine to sustain the supply of mineral in silicate

industries.

(v) Imports vs. Indigenous Production

The Silica Sand (friable quartzite) uses in foundry industries at Indore and at other places.

After washing it may be used in glass industries. The low grade will be used as Bazari for

construction purpose.

Page 6: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_30_Nov_… · PRE-FEASIBILITY REPORT OF SILICA SAND & SOAP STONE MINING PROJECT (M.L. No.06/1996, ML

Silica Sand & Soap Stone Mining Project, M.L. No. 06/1993, Area 4.6380 ha

at Village: Dantli, Tehsil: & District: Dausa (Rajasthan)

Pre – Feasibility Report

M/s Rajasthan Khaniz Agency 4

(vi) Export Possibility

This Silica Sand is also uses in silicate industries of Punjab, Haryana, Himachal.

(vii) Domestic/Export Markets

These minerals have only domestic market and will fulfill the requirement of local. After

washing it may be used in glass industries. The low grade will be used as Bazari for

construction purpose.

(viii) Employment Generation (Direct and Indirect) due to the Project

Approx 35 skilled and semiskilled manpower will be needed to run the mine.

3.0 PROJECT DESCRIPTION

(i) Type of Project Including Interlinked And Independent Projects, If Any

There is no interlinked or interdependent project based on mineral produced. The mineral

will be sold directly.

(ii) Location (map showing general location, specific location, and project boundary &

project site layout) with coordinates.

Page 7: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_30_Nov_… · PRE-FEASIBILITY REPORT OF SILICA SAND & SOAP STONE MINING PROJECT (M.L. No.06/1996, ML

Silica Sand & Soap Stone Mining Project, M.L. No. 06/1993, Area 4.6380 ha

at Village: Dantli, Tehsil: & District: Dausa (Rajasthan)

Pre – Feasibility Report

M/s Rajasthan Khaniz Agency 5

Figure1: Location Map

Page 8: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_30_Nov_… · PRE-FEASIBILITY REPORT OF SILICA SAND & SOAP STONE MINING PROJECT (M.L. No.06/1996, ML

Silica Sand & Soap Stone Mining Project, M.L. No. 06/1993, Area 4.6380 ha

at Village: Dantli, Tehsil: & District: Dausa (Rajasthan)

Pre – Feasibility Report

M/s Rajasthan Khaniz Agency 6

(iii) Details of Alternate Sites Considered

No alternative site has been taken into consideration due to availability of mineral resources in the

area in question.

(iv) Size and magnitude of operation

Mining lease area is estimated production capacity of Silica Sand Stone-69,180 TPA.

(v) Project Description with Process Detail

1. Salient features along with project vicinity details of the Mining project is given

below:

Table - 2

Salient Features of the Project

S. No. Particulars Details

1. Name of the Project Silica Sand Stone Mining Project

2. Mineral Silica Sand & Soap Stone

3. Mining Lease Number M.L. No. 06/1993

4. Mining Lease Area 4.6380 ha

5. Applicant Shri Kastoor Chand Jain

6. Method of Mining Open cast Semi mechanized

7. Elevation Range 355 mRL to 305 mRL

8. Total geological Reserve 1319810 Tonnes

9. Mineable Reserve 618130 Tonnes

10. General Ground Level 300 mRL

11. Ground Water Table 60 m bgl – 65 m bgl

12. Ultimate Working Depth 25 m bgl

(1) GEOLOGY OF THE AREA

Strategraphic sequence of Regional Geology is given below:

Page 9: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_30_Nov_… · PRE-FEASIBILITY REPORT OF SILICA SAND & SOAP STONE MINING PROJECT (M.L. No.06/1996, ML

Silica Sand & Soap Stone Mining Project, M.L. No. 06/1993, Area 4.6380 ha

at Village: Dantli, Tehsil: & District: Dausa (Rajasthan)

Pre – Feasibility Report

M/s Rajasthan Khaniz Agency 7

Recent Soil

Post Delhi Granite, intrusive, Quartz veins

Delhi Super Group Ajabgarh Group Gritty quartzite, quartzite with interlayered

Group Phyllite,Carbaceous Phyllite And

Schist.

Alwar Group Quartzite, Gritty quartzite conglomerate and

pebble quartzite.

Railo Group Quartzite with thin bands of conglomerate

Bhilwarae Super

Group

Sand Mata Complex Biotite schist, kynite,Quartzite

(2) LOCAL GEOLOGY

Recent Soil

Intrusive absent

Bhilwara Super Group Hindoli Complex Quartzite, friable Quartzite

(4) Method of Mining

Proposed method of mining will be semi mechanized opencast by forming proper benches.

The mining is proposed as per present situation of the deposit.

Excavation is proposed by blasting. Hydraulic excavator/loader is proposed for removal and

loading of blasted stone.The haul/ approach roads will be provided wide, with 1 in 16 gradient

for easy movement of vehicles and to reduce th enoise from vehicular movement and its

propagation in near by area(outside the mining lease area). The stone and waste are proposed

to be transported by tractor trolley and tippers.

The mining will be carried out by opencast method by developing the bench of height 5-6 m

height and width. Four slices are considered in a bench. The calculations are as per the four

slices of a bench. Thus the end position of the bench is 6 meter height. Width is also proposed

6 meter.

EXTENT OF MECHANIZATION

Table-3

S.No Machinery Number

1. Hydraullic Excavator 01

2. Air Compressor tractor

mounted or wheel mounted

01

3. Tractor Trolley mounted 01

4. Tippers 03

5. PROPOSED YEAR WISE PRODUCTION DETAILS OF THE NEXT FIRST FIVE YEARS

The proposed Year-wise production plan for next five years is mentioned in the table given

below:

Table – 4

Page 10: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_30_Nov_… · PRE-FEASIBILITY REPORT OF SILICA SAND & SOAP STONE MINING PROJECT (M.L. No.06/1996, ML

Silica Sand & Soap Stone Mining Project, M.L. No. 06/1993, Area 4.6380 ha

at Village: Dantli, Tehsil: & District: Dausa (Rajasthan)

Pre – Feasibility Report

M/s Rajasthan Khaniz Agency 8

Year Wise Production for Next Five Years

Year ROM tonnage

First year 69180

Second year 69180

Third year 69180

Fourth year 69180

Fifth year 69180

6. LOADING & TRANSPORT

Tyre mounted Hydraulic excavator will be deployed from time to time and when required.

Trucks and tracor troley will be deployed for transportation of Masonry stone from working.

7. WASTE GENERATION & DISPOSAL

The waste is un-weathered portion of quartzite. The lessee will sale the waste after taking STP

from department time to time. The waste masy also used after grinding as low grade silica

sand. The waste is proposed to dump.

8. CONCEPTUAL PLAN

The conceptual mining plan considering proposed capacity of mine for the mineral has been

prepared by considering the probable category of reserve. At the end of five year from the

4.6380 ha lease area, Out of which 1.50 ha area will be excavated. 0.16 ha area will be

used for dump, 0.25 ha area will be used for construction, around 0.25 ha area will

be used as green belt on around the lease periphery & 2.178 ha area will be used as

undisturbed area.

2. Raw Material Required Along With Estimated Quantity, Likely Source, Marketing Area

of Final Products, Mode of Transport of Raw Material and Finished Product

The Silica Sand Stone will be transported by Tractors & trolleys. No raw material will be

required.

(vii) Resources Optimization/ Recycling and Reuse Envisaged in the Project, if any, should

be briefly Outlined

� The waste is un-weathered portion of quartzite.The lessee will sale the waste after taking

STP from department time to time. The waste masy also used after grinding as low grade

silica sand. The waste is proposed to dump.

� Domestic sewage water generated from office will be disposed in soak pits via septic tank.

(viii) Availability of Water Its Source, Energy /Power Requirement and Source

A. Water requirement:

Page 11: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_30_Nov_… · PRE-FEASIBILITY REPORT OF SILICA SAND & SOAP STONE MINING PROJECT (M.L. No.06/1996, ML

Silica Sand & Soap Stone Mining Project, M.L. No. 06/1993, Area 4.6380 ha

at Village: Dantli, Tehsil: & District: Dausa (Rajasthan)

Pre – Feasibility Report

M/s Rajasthan Khaniz Agency 9

Total water requirement for the proposed project will be3 KLD which will be sourced from

nearby villages.

B. Power requirement:

The electric power will not be used in mining. Only HSD Fuel will be required for operating

machineries.

(ix) Quantity of Waste to Be Generated (Liquid and Solid) And Scheme for Their

Management/Disposal:

Domestic sewage water generated from office toilet will be disposed in soak pits via septic

tank. Around 90570 tonnes of waste will come across during the development period of this

modified mining plan and around 270000 tonnes during the life of the mine.

4.0 SITE ANALYSIS

(i) Connectivity

The lease area is 13.0 km away towards in SW direction from mine site. Nearest

Railway Station situated at a Bhan Kari Railway Station at a distance of ~ 2.0 km. in

SE direction from Mine site. The lease area is well connected to roads.

(ii) Land Use Pattern

The total ML area of 4.6380 ha comprises of Pvt Land.

(iii) Topography

The lease area comprises undulated terrains, and falls in private land . The highest

contour is 355 mRL and lowest contour is 305 mRL. General ground level of the area is

300 mRL.

Table – 6

Environmental Settings

S.

No.

Particular Details

1. Nearest Village Village Dantli

2. Nearest city/ town Dausa

3. Nearest Railway Station Bhan Kari, Railway Station ~2.0 km

4. Nearest Airport Jaipur International Airport, Jaipur ~61.0 km.

5.

Archaeological Important Place None, within 10 km radius area of mine site.

Page 12: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_30_Nov_… · PRE-FEASIBILITY REPORT OF SILICA SAND & SOAP STONE MINING PROJECT (M.L. No.06/1996, ML

Silica Sand & Soap Stone Mining Project, M.L. No. 06/1993, Area 4.6380 ha

at Village: Dantli, Tehsil: & District: Dausa (Rajasthan)

Pre – Feasibility Report

M/s Rajasthan Khaniz Agency 10

6. Ecological Sensitive Areas

(National Park, Wildlife

Sanctuary, Biosphere Reserve

etc.)

There is no National Park, Wild Life Sanctuaries, Biosphere

Reserves, Tiger Reserves, Wildlife Corridors, etc. within 10

km radius

7. Reserved/Protected Forest

within 10 km radius

None

8. Nearest River / water body Sindoli canal (~2.0, km)

Banganga River (~8.0,km)

(IV) Existing Land Use Pattern {Agriculture, Non-Agriculture, Forest, Water Bodies

(Including Area Under CRZ)}, Shortest Distances From The Periphery Of The Project

To Periphery Of The Forests, National Park, Wild Life Sanctuary, Eco Sensitive Areas,

Water Bodies (Distance From The HFL Of The River), CRZ. In Case Of Notified

Industrial Area, A Copy Of The Gazette Notification

Page 13: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_30_Nov_… · PRE-FEASIBILITY REPORT OF SILICA SAND & SOAP STONE MINING PROJECT (M.L. No.06/1996, ML

Silica Sand & Soap Stone Mining Project, M.L. No. 06/1993, Area 4.6380 ha

at Village: Dantli, Tehsil: & District: Dausa (Rajasthan)

Pre – Feasibility Report

M/s Rajasthan Khaniz Agency 11

Page 14: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_30_Nov_… · PRE-FEASIBILITY REPORT OF SILICA SAND & SOAP STONE MINING PROJECT (M.L. No.06/1996, ML

Silica Sand & Soap Stone Mining Project, M.L. No. 06/1993, Area 4.6380 ha

at Village: Dantli, Tehsil: & District: Dausa (Rajasthan)

Pre – Feasibility Report

M/s Rajasthan Khaniz Agency 12

(iii) Existing Infrastructure:

There is no building & structure within mining lease area except some vegetations

existing on the lease area which will be cleared as and when required.

5.0 PLANNING BRIEF

(i) Planning Concept (Type of Industries, Facilities, and Transportation etc.) Town

and Country Planning/Development Authority Classification

Uses: This is a mining Project

(ii) Population Projection

Manpower required will be engaged from nearby Villages. No significant influx of

people is anticipated in the area.

(iii) Land Use Planning

The area extent of proposed mining lease is 4.6380 ha. The area comprises of Pvt. Land

(iv) Assessment of Infrastructure Demand (Physical & Social)

Lessee will assess the demand of infrastructure (Physical & Social) in nearby area of the

proposed mine site and same will be developed under social work

(v) Amenities/Facilities

Lessee will develop the Amenities/Facilities in the nearby area of the proposed mine

site as per requirement of local people of the nearby area under corporate social

responsibility programs.

6.0 PROPOSED INFRASTRUCTURE

(i) Residential Area (Non Processing Area)

This is not required as mine workers will come from nearby villages. Rest shelter to the

workers will be provided outside the lease area.

(ii) Green Belt

Green Belt/plantation will be developed equal to 33% of total lease area. The trees will

be planted at suitable spacing to encourage proper growth around the lease boundary.

The dead plants will be replaced by fresh plants. Native Plant species will be planted.

(iii) Connectivity

The lease area is 13.0 km away towards in SW direction from mine site. Nearest

Railway Station situated at a Bhan Kari Railway Station at a distance of ~ 2.0 km. in

SE direction from Mine site. The lease area is well connected to roads.

(iv) Water Management (Source & Supply of water)

Total water requirement for the project will be 3.0 KLD which will be used for domestic

plantation as well as dust supression purpose and sourced from nearby village.

(v) Sewerage System

Domestic sewage water generated from office toilet will be disposed in soak pits via

septic tank. Outside discharge is not envisaged.

(vi) Industrial Waste Management

No industrial waste water will be generated from mining operation.

(vii) Solid Waste Management

The waste is un-weathered portion of quartzite. The lessee will sale the waste after

taking STP from department time to time. The waste masy also used after grinding as

low grade silica sand. The waste is proposed to dump.

Page 15: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_30_Nov_… · PRE-FEASIBILITY REPORT OF SILICA SAND & SOAP STONE MINING PROJECT (M.L. No.06/1996, ML

Silica Sand & Soap Stone Mining Project, M.L. No. 06/1993, Area 4.6380 ha

at Village: Dantli, Tehsil: & District: Dausa (Rajasthan)

Pre – Feasibility Report

M/s Rajasthan Khaniz Agency 13

(viii) Power Requirement & Supply/Source

Electric power will not be required in mining operations.

7.0 REHABILITATION AND RESETTLEMENT (R & R) PLAN

(i) Policy To Be Adopted (Central/State) In Respect Of The Project Affected Persons

Including Home Oustees, Land Oustees And Landless Laborers (Brief Outline To

Be Given)

Not Applicable as the lease area falls in Pvt. Land and is already in possession of the

lessee.

8.0 PROJECT SCHEDULE & COST ESTIMATES

(i) Likely Date Of Start Of Construction And Likely Date Of Completion (Time

Schedule For The Project To Be Given)

The mining activity is done in the area and enhancement in production will be done

after Environmental Clearance from MoEF, Rajasthan and consent to establish and

operate from RSPCB.

(ii) Estimated Project Cost Along With Analysis In Terms Of Economic Viability of the

Project

� Total Project Cost : 10.0 Lacs

� Environment Protection Cost : 0.50 Lacs Per annum

9.0 ANALYSIS OF PROPOSAL

���� Proposed Silica Sand & Soap Stone Mining Lease will result in growth of the

surrounding areas by increasing direct and indirect employment opportunities in the

region including ancillary development and supporting infrastructure. Special emphasis

on Financial and Social benefits will be given to the local people including tribal

population, if any, in the area.

���� Development of social amenities will be in the form of medical facilities, education to

underprivileged and creation of self help groups.

���� No major adverse effect on environment is envisaged as the required mitigation

measures are inbuilt in the project.

Page 16: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_30_Nov_… · PRE-FEASIBILITY REPORT OF SILICA SAND & SOAP STONE MINING PROJECT (M.L. No.06/1996, ML
Page 17: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_30_Nov_… · PRE-FEASIBILITY REPORT OF SILICA SAND & SOAP STONE MINING PROJECT (M.L. No.06/1996, ML
Page 18: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_30_Nov_… · PRE-FEASIBILITY REPORT OF SILICA SAND & SOAP STONE MINING PROJECT (M.L. No.06/1996, ML
Page 19: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_30_Nov_… · PRE-FEASIBILITY REPORT OF SILICA SAND & SOAP STONE MINING PROJECT (M.L. No.06/1996, ML
Page 20: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_30_Nov_… · PRE-FEASIBILITY REPORT OF SILICA SAND & SOAP STONE MINING PROJECT (M.L. No.06/1996, ML
Page 21: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_30_Nov_… · PRE-FEASIBILITY REPORT OF SILICA SAND & SOAP STONE MINING PROJECT (M.L. No.06/1996, ML