pre feasibility report of sand...

27
PRE FEASIBILITY REPORT KULITHALAI SAND QUARRY Under EIA Notification 2006 THE EXECUTIVE ENGINEER PRE FEASIBILITY REPORT OF SAND QUARRY (Under the Guidelines of Ministry of Environment and Forest in terms of the provisions of EIA notification 2006 and specifically in circular No J-11013/41/2006-IA.II (I) dated 30 th December, 2010) IN S.F.No. 1 (P), Kulithalai Village, Kulithalai Taluk, Karur District, Extent: 11.00.0Ha -B2 Project APPLICANT The Executive Engineer, Public Works Department, River Conservation Division, Tiruchirappalli-1 1. EXECUTIVE SUMMERY

Upload: hamien

Post on 07-Apr-2018

221 views

Category:

Documents


1 download

TRANSCRIPT

PRE FEASIBILITY REPORT KULITHALAI SAND QUARRY

Under EIA Notification 2006 THE EXECUTIVE ENGINEER

PRE FEASIBILITY REPORT

OF

SAND QUARRY (Under the Guidelines of Ministry of Environment and Forest

in terms of the provisions of EIA notification 2006 and specifically in circular

No J-11013/41/2006-IA.II (I) dated 30th

December, 2010)

IN

S.F.No. 1 (P), Kulithalai Village,

Kulithalai Taluk, Karur District,

Extent: 11.00.0Ha -B2 Project

APPLICANT

The Executive Engineer,

Public Works Department,

River Conservation Division,

Tiruchirappalli-1

1. EXECUTIVE SUMMERY

PRE FEASIBILITY REPORT KULITHALAI SAND QUARRY

Under EIA Notification 2006 THE EXECUTIVE ENGINEER

The Executive Engineer has been obtained permission from District collector Karur to

quarry Sand over an extent of 11.00.0Ha in Survey No: 1 (P), Kulithalai Village,

Kulithalai Taluk, Karur District, Tamilnadu state by District Collector Karur Rc.No.

938/Mines/2016 dated 30.11.2016, for a period of two years subjected to submission of

Environmental clearance from MoEF / SEIAA, consent for Establishment and Consent

for operation from TNPCB.

SALIENT FEATURES OF THE PROJECT

S.NO PARTICULAR DETAILS

1. Name of the Proponent The Executive Engineer

2. Type of Project Sand quarry

3. Location Survey No. 1 (P)

Kulithalai Village,

Kulithalai Taluk,

Karur District,

Tamilnadu State.

4. Mining lease area 11.00.0 Ha

5. Type of land

Patta/forest/PWD

It is a Government poramboke land maintained by

Public Works Department, Karur District- Non

forest

6. Life of period Two years

7. Production capacity The Proposed quantity of sand (including shoals) is

401500m3

(or) 66917 Lorry Loads of Sand up to a

depth for 1m below the river bed for a period of two

years.

Description Sand (including

shoals) in m3

Geological Resources 621500

Available Mineable reserves 401500

proposed quantity of reserves 401500

8. Method of Mining Opencast method of shallow Quarrying is proposed,

Machineries like excavators are proposed for

quarrying this sand up to an average depth of 1m.

No drilling or blasting is proposed for this type of

sand quarrying, it is a conventional eco friendly

PRE FEASIBILITY REPORT KULITHALAI SAND QUARRY

Under EIA Notification 2006 THE EXECUTIVE ENGINEER

quarrying operation.

9. Ultimate depth of Mining The total depth of sand below the river bed is about

3m out of which only 1m of sand in river bed is

proposed. The proposed depth of sand quarry is 1m

below the river bed.

10. Precise area communication

approved by the District

collector

The Precise area communication letter was received

from the District Collector, Karur Vide Rc.No.

938/Mines/2016 dated 30.11.2016

11. Mining plan approved by the

Deputy/Assistant Director of

the District

The mining plan was got approved by the Assistant

Director, Karur vide Rc.No. 938/Mines/2016 dated

14.12.2016 (Annexure No: I)

12. Latitude 10°56'00.96''N to 10°56'18.56''N

13. Longitude 78°26'08.16''E to 78°26'21.28''E

14. Topo sheet No. 58 J/05

15. Topography of MSL area 5m from MSL

16. Land use classification It is a fresh quarry lease

17. Ground water level The Ground water is found below 4-5mt (Avg)

depth below ground level.

18. Climatic condition Rainfall – 900/annum

Temperature -42ºC - 25ºC

19. Land use pattern Road – 2%

Stream/River– 65%

Habitations – 5%

Agricultural Land – 25%

Barren Land /Trees – 03%

20. Nearest habitation Kulithalai – 2km –Southwestern side

21. Nearest Town Kulithalai – 2km –Southwestern side

22. Nearest Railway station Kulithalai – 1.70km –Southwestern side

23. Nearest Airport Trichy Airport - 36km- SE

24. Nearest National Highways &

State Highways

NH67 – Tiruchirapalli – Karur -300m- Southern side

SH71 - Musiri – Manapparai – 3km – western side

25. Nearest Hospital Kulithalai – 2km –Southwestern side

PRE FEASIBILITY REPORT KULITHALAI SAND QUARRY

Under EIA Notification 2006 THE EXECUTIVE ENGINEER

26. Aerial distance to the nearest

Eco sensitive areas, CRZ,

forest, wild life sanctuary,

Interstate boundary, critically

polluted area if the quarry site

is within 500m of these areas.

More than 500m from Eco sensitive areas, CRZ,

forest, wild life sanctuary, Interstate boundary,

critically polluted area.

27. Details of other quarries for a

radius of 500m around the

quarry site

No quarries within 500m radius.

28. Man power About 9 employees

29. Water requirement & source Total water requirement for 1.0KLD

Purpose Quantity

KLD

Source

Drinking 0.3KLD Water vendors

Domestic purpose 0.3KLD Nearby tank

Dust suppression

and afforestation

0.4KLD Nearby tank

30. Overburden/Waste There is no overburden or waste

31. Cost of the project The Project cost:

A. Cost of the Project = Rs. 27,68,000/-

B. EMP cost = Rs. 2,65,000/-

Total cost = Rs. 30,33,000/-

The Prefeasibility report preparing for following condition of Government of India Ministry of

Environment and Forests (No.L-11011/47/2011 –IA-II (M) Dated: 24th June, 2013)

The lease applied area lies in the Cauvery River.

There is no forest within the radius of 15km in the lease area.

The project area does not fall in ‘HACA’ region.

There is no interstate boundary within the radius of 15km

There is no Western Ghats within the radius of 15km

There is no CRZ within the radius of 15km.

There is no Bird sanctuary, wild life sanctuaries as per Wild Life Production Act 1972, within

the radius of 15km.

There is no quarry within the radius of 500m.

PRE FEASIBILITY REPORT KULITHALAI SAND QUARRY

Under EIA Notification 2006 THE EXECUTIVE ENGINEER

The following information provided by the applicant

We have applied for Environmental Clearance to SEIAA, Tamil Nadu for quarry lease

for quarrying of Sand quarry in S. F. No. 1 (Part) for over an extent of 11.00.0Hectares in

Kulithalai Village, Kulithalai Taluk and Karur District.

We swear to state and confirm that within 10km area of the quarry site, I have applied for

environmental clearance; none of the following is situated.

Protected areas notified under the wild life (protection) Act, 1972.

Critically polluted areas as notified by the central pollution control board constituted under water

(prevention and control of pollution) Act1974. Eco-Sensitive areas as notified.

Interstate boundaries and international boundaries within 5km radius from the boundary of the

proposed site.

No quarries are located within radius of 500m & 1km radius from the Periphery of proposed

quarry.

There will not be hindrance or disturbance to the people living no enroute / nearby our quarry

site while transporting the mineral our material and due to quarrying activities.

There is few habitations are located within 500m radius from the periphery of our quarry.

We swear that Afforestation will be carried out during the course of quarrying operation and

maintained.

The required insurance will be taken in the name of the laborers working in our quarry site.

Approach road belongs to local panchayat only and no other private patta roads encountered.

We will not engage any child labour in our quarry site and we aware that engaging child labour

is punishable under the law.

All type of safety/ protective equipment will be provided to all the Laborers working in our

quarry.

No permanent Structures, temple etc., are located within 500m radius from the periphery of our

quarry.

The quarry activity has not yet commenced and it will be carried out only after obtaining

environmental clearance.

PRE FEASIBILITY REPORT KULITHALAI SAND QUARRY

Under EIA Notification 2006 THE EXECUTIVE ENGINEER

2.0 INTRODUCTION OF THE PROJECT OR BACKGROUND INFORMATION

(i) Identification of project and project proponent: In case of mining project, a copy of mining

lease/letter of intent should be given

Identification of Project

Name of the Project Kulithalai Sand Quarry

Lease area 11.00.0Ha (Government land maintained by PWD)-Non forest

Location Survey No. 1 (P),

Kulithalai Village,

Kulithalai Taluk,

Karur District, Tamilnadu State.

Topo sheet No. 58 J/05

Project Proponent Name with Address

The Executive Engineer,

Public Works Department,

River Conservation Division,

Tiruchirappalli-1

Phone No: 04312462639

Email id: [email protected]

In case of mining project, a copy of mining lease/letter of intent should be given

I. The Precise area communication letter was received from the District Collector, Karur

Vide Rc.No. 938/Mines/2016 dated 30.11.2016

II. The mining plan was got approved by the Assistant Director, Geology and mining Karur

vide Rc.No. 938/Mines/2016 dated 14.12.2016 (Annexure No: I)

PRE FEASIBILITY REPORT KULITHALAI SAND QUARRY

Under EIA Notification 2006 THE EXECUTIVE ENGINEER

(ii) Brief description of nature of the project

The Sand quarrying is proposed to carry out by opencast Semi mechanized method. Sand

is composed of consolidated felsic compound Silica and Feldspar the sand is formed by the

action of water due to transportation and erosion of Rocks sand has become a very important

mineral for the expansion of society. Sand is a naturally occurring granular material composed of

finely divided rock and mineral particles. River sand is one of the world’s most plentiful

resources (perhaps as much as 20% of the Earth’s crust is sand) and has the ability to replenish

itself. River sand is vital for human well-being& for sustenance of rivers. The Sand is mainly

used for building construction purpose.

Machineries like excavator are proposed for quarrying for a short period of this Sand up

to 1m depth below the river bed. No drilling and blasting is proposed. There is no formation of

bench; the total depth of sand below the river bed is about 3m. Total depth of availability of sand

is about 3m below the river bed. The proposed depth of sand quarry: 1m below the river bed.

The entire Sand is excavated and utilized. It is proposed to exploit Sand (including shoals) is

about 401500m3

for a period of Two years only.

The sand is specifically used for construction purpose besides the Removal of the sand

may also called as desilting will increase the functional efficiencies of the river during the flood

season because protecting the Dwellers and vegetation on the bank of the river.

(iii) Need for the project and its importance to the country and or region

The Sand quarrying project falls in the area of Karur District, Tamilnadu where scanty

agricultural activities are been carried out and the new industries are springing up in the district.

Sand is an important commercial product, with a number of applications. The applicant intends

to use this Sand specifically used for construction work in and around Karur district.

This project will give employment opportunities to 9members directly. Mineral Industries

of the state of Tamilnadu provides employment opportunities for the people of the state as well

as in the specific project area. Mining and Quarrying is one among the major core sector

industries which plays a vital process of country’s economic development.

PRE FEASIBILITY REPORT KULITHALAI SAND QUARRY

Under EIA Notification 2006 THE EXECUTIVE ENGINEER

(iv) Demand and supply gap

There is a huge demand of Sand in and around the District for this a huge quantity of

Sand is required for building construction purpose. Besides there is also huge demand of Sand

for public and private sector projects also. This is significant for the development of the country

which enhances the Indian citizen.

(v) Imports vs indigenous production

There is no import of Sand at present in India. India especially the peninsular India

(southern India) has good resource of Sand.

(vi)Export Possibility

There is no possibility for export of this Sand.

(vii) Domestic/Export Markets

The sand is specifically used for construction purpose besides the Removal of the sand

may also called as desilting will increase the functional efficiencies of the river during the flood

season because protecting the Dwellers and vegetation on the bank of the river.

(viii) Employment Generation (Direct and Indirect) due to the project

About 9 employees labors directly and engaged in this proposed quarry project and the

tentative man power required for the proposed Sand quarry shall be as follows.

Skilled:

1. Mines foreman - 1

2. PWD Engineer - 1

Semi –skilled:

1. Excavators Operators - 2

2. Co-Operator - 2

Un-skilled:

1. Watchman - 1

2. Helper - 2

Total 9Nos

The above man power is adequate to meet out the production schedule and the machinery

strength envisaged in the mining plan and also to comply with the stationary provisions of mine

safety regulation.

It is been ensured that the labors will not be deployed less than 18 years, No Child

labors will engaged or entertained for any kind of quarrying operations. All the labors

engaged for quarrying operations will be insured till the end of life of quarry.

PRE FEASIBILITY REPORT KULITHALAI SAND QUARRY

Under EIA Notification 2006 THE EXECUTIVE ENGINEER

3.0. PROJECT DESCRIPTION

(i) Type of project including interlinked and interdependent projects, if any

The Kulithalai sand quarry, it is an opencast semi mechanized quarry. There is no

interlinked & interdependent project.

(ii) Location (map showing general location, specific location, and project boundary & project

site layout) with coordinates

� The project is proposed for the quarrying of Sand at proposed capacity (including

shoals) is about 401500m3

of Sand quarrying is about 11.00.0Ha in Kulithalai

Village, Kulithalai Taluk, Karur District.

� It is a Government poramboke land maintained by Public Works Department, Karur

District.

� The area is falls in GSI Topo sheet no. 58-J/05

� The Latitude between of 10°56'00.96''N to 10°56'18.56''N

� The Longitude between of 78°26'08.16''E to 78°26'21.28''E on WGS 1984

datum.

PRE FEASIBILITY REPORT KULITHALAI SAND QUARRY

Under EIA Notification 2006 THE EXECUTIVE ENGINEER

LOCATION MAP OF THE PROJECT AREA WITH CO ORDINATES

Location:

Village: Kulithalai

Taluk: Kulithalai

District: Karur

Topo sheet No: 58-J/05

Latitude: 10°56'00.96''N to 10°56'18.56''N

Longitude: 78°26'08.16''E to 78°26'21.28''E

PRE FEASIBILITY REPORT KULITHALAI SAND QUARRY

Under EIA Notification 2006 THE EXECUTIVE ENGINEER

(iii) Details of alternate sites considered and the basis of selecting the proposed site, particularly

the environmental considerations gone into should be highlighted

The conventional open cast quarrying is proposed in the area for excavation of Sand up to

depth 1m below the river bed and there is no topsoil in the lease area. The quarrying operation is

proposed in the Government land (Cauvery River) and there is no any alternative site for this

project is not considered, the project is site specific.

(iv) Size or magnitude of operation

The total area of Kulithalai Village project is about 11.00.0Ha. It is proposed to exploit

Sand is about 401500m3 by conventional open cast semi mechanized quarry by deploying

excavate directly for a period of Two years only.

(v) Project description with process details (a schematic diagram/flow chart showing the

project layout, components of the project etc. should be given)

Topography & General Geology

The Cauvery River has a gentle sloping towards eastern side, the area covered with sand, the

geology of the sand is very simple. The maximum altitude of the area is 5m (Maximum). The sand

is derived by erosion of weathered rocks and transported by the water stream and deposited on the

bed during the interface.

Details of Exploration

No exploration was carried out. The sand is found right from the surface of the River and

proposed to excavate up to depth of 1m below river bed.

Proposed Study to be carried out

As the quarrying operation is proposed to be carried out for a period of Two years only

to a depth of 1m below river bed further exploration or proposed study is redundant.

Method of Estimation of Reserves

The Geological plan demarcating the commercially viable sand has been prepared in

1:10,000 scale (Plate No. II).

The River Levels (RL) taken for the reserve calculation,

Totally ten sections have been drawn one along the length wise of the area (X-Y) and

another nine sections (A-B), (C-D), (E-F), (G-H) (I-J), (K-L), (M-N), (O-P) and (Q-R), section

along the width wise of the area in 100m grid interval to cover the area consider for lease in the

scale of Horizontal: 1:5000 & Vertical 1: 500 please refer (Plate No. II).

PRE FEASIBILITY REPORT KULITHALAI SAND QUARRY

Under EIA Notification 2006 THE EXECUTIVE ENGINEER

The cross sectional area for the proved depth persistence of 1.0m has been worked out for

the section. The cross sectional area multiplied by its length of influence on the longer axis gives the

volume (insitu) in the cross sectional area. The sum total of the insitu reserves available within the

individual cross sectional area gives the geological reserves of the lease applied area.

As the Mineable reserves of sand is in the terms of cubic meter. The geological resource,

mineable reserves are given only in terms of Cubic meter. The details of estimation of geological

resource and Mineable reserves with reference to the Topography, Geological Plan & Sections

(Plate No. II).

OPEN CAST WORKING

Opencast method of shallow mining is proposed, heavy Earth moving machineries like

excavator are proposed for quarrying this Sand up to a depth of 1m below the river bed. No

drilling and blasting is proposed, it is a Conventional Eco-Friendly quarrying operation.

The Sand will be loaded directly to the trucks/ Lorries for transportation to the needy

customers. The depth of quarry is proposed to be restricted up to 1.0m below the river bed only.

Mineable reserves of sand MINEABLE RESERVES

SL

NO CS @ m Area

Mean

Area

Distance

in m Qty in m

3

1 0 631.00 0 0

2 50 721.94 676.47 50 33823.44

3 100 732.94 727.44 50 36371.94

4 150 741.85 737.40 50 36869.75

5 200 753.13 747.49 50 37374.50

6 250 748.28 750.71 50 37535.25

7 300 781.25 764.77 50 38238.25

8 350 745.31 763.28 50 38164.00

9 400 576.50 660.91 50 33045.25

Shoals Over Bed Strata 2,91,422.38

Mineable Reserves of Sand - 400m X 275AvgX 1.0m 1,10,000

Add extra un covered by Levels 77.62

Total Quantity 4,01,500

PRE FEASIBILITY REPORT KULITHALAI SAND QUARRY

Under EIA Notification 2006 THE EXECUTIVE ENGINEER

Mineable Reserves of Shoals = 2,91,422.38m3

Mineable Reserves of Sand = 1,10,000m3

Extra sand quantity un covered by levels = 77.62m3

Mineable Reserves of sand including shoals = 4,01,500m3

Total Mineable Reserves of sand including shoals is about 4,01,500m3 of Sand up to an average

depth of 1m below the river bed for a period of two years only.

Process details:

Overburden:

There is no overburden the Sand is exploited right from the surface to a depth of 1m

below the river bed for a period of Two years only.

(vi) Raw material required along with estimated quantity, likely source, marketing area of final

products, Mode of transport of raw Material and Finished Products

This is a quarrying project for excavating Sand hence there is no requirement for raw material.

Uses:

The sand is specifically used for construction purpose besides the Removal of the sand

may also called as desilting will increase the functional efficiencies of the river during the flood

season because protecting the Dwellers and vegetation on the bank of the river.

(vii) Resource optimization/recycling and reuse envisaged in the project, if any, should be

briefly outlined

No optimization/ Recycling and Reuse envisaged in the proposed Sand quarry project.

Excavating the Sand by excavators

Loading the sand into tippers by excavator to the

needy construction purpose

PRE FEASIBILITY REPORT KULITHALAI SAND QUARRY

Under EIA Notification 2006 THE EXECUTIVE ENGINEER

(viii) Availability of water its source, Energy/power requirement and source should be given

This Sand quarry project does not require huge water for the project. The total water

requirement in the quarry will be around 1KLD for drinking, domestic usage and dust

suppression sprinkling. The water will be brought from local suppliers.

Purpose Quantity Sources

Drinking &

Domestic purpose 0.3 KLD

Water Purchase from Approved water vendors

available in Kulithalai (2km – SW)

Dust suppression 0.3 KLD Nearby tank after obtaining permission from local

Panchayat Authorities.

Green belt 0.4 KLD Nearby tank after obtaining permission from local

Panchayat Authorities.

Energy

No electricity is required for quarry operation; the quarry working is restricted on day

time only (between 9Am to 5Pm).

Diesel (HSD) will be used for quarrying machineries around 66920 liters of HSD will be used

for the entire projects. Diesel will be brought from nearby diesel pumps.

No power is required for the project. Lightings on the Night will be taken from nearby electric

poles after obtaining permission from concerned authorities.

Per hour Excavator will consume = 10 liters / hour

Per hour Excavator will excavate = 60m3

Per401500 = 401500/60

= 6692 hours

Diesel consume 6692 working hours = 6692 hours x 10 liters

= 66920 liters of HSD for entire project life

(ix) Quantity of wastes to be generated (liquid and solid) and scheme for their

management/disposal

There is no wastage is encountered during the quarrying operation the entire Sand is

utilized for construction purpose besides the Removal of the sand may also called as desilting

will increase the functional efficiencies of the river during the flood season because protecting

the Dwellers and vegetation on the bank of the river.

There is no toxic effluent expected to generate in the form of solid liquid and gases and

the no requirement of treatment of waste. There is no top soil available in the lease applied area.

PRE FEASIBILITY REPORT KULITHALAI SAND QUARRY

Under EIA Notification 2006 THE EXECUTIVE ENGINEER

(x) Schematic representations of the feasibility drawing which give information of EIA purpose

4.0 SITE ANALYSIS

(i) Connectivity

Mode Description

Road connectivity

1. There is an existing road from the area connecting in to

karur - Tiruchirapalli road is on the southern side.

2. Nearest National Highway (NH-67) Tiruchirapalli –

Karur - 300m -Southern side.

3. Nearest State Highway (SH-71) Musiri – Manapparai –

3km- Westren side.

Railway station &

Railway line

1. Kulithalai Railway station – 1.70km –SW side

2. Railway line is Karur – Tiruchirapalli – 1.20km-South

side

Air port 1. Trichy Airport - 36km- South eastern side

(ii) Land Form, Land use and Land ownership

The quarry lease applied area is 11.00.0Ha. The area falls in GSI topo sheet No. 58-J/05.

It is a Government poramboke land maintained by Public Works Department, Karur District.

The area covered mostly by Sand which does not sustain any type of vegetation. No agricultural

activities either seasonal or annual are inferred in and around the area.

To Submit SEIAA

Final Presentation

FORM-I

ALONG WITH PREFEASIBILITY REPORT &

APPROVED MINING PLAN

PRE FEASIBILITY REPORT KULITHALAI SAND QUARRY

Under EIA Notification 2006 THE EXECUTIVE ENGINEER

(iii) Topography (along with map)

The Cauvery River has a gentle sloping towards eastern side, the area covered with sand, the

geology of the sand is very simple. The maximum altitude of the area is 5m (Maximum). The sand

is derived by erosion of weathered rocks and transported by the water stream and deposited on the

bed during the interface.

Google image showing the Lease area

Lease area

PRE FEASIBILITY REPORT KULITHALAI SAND QUARRY

Under EIA Notification 2006 THE EXECUTIVE ENGINEER

GOOGLE IMAGE SHOWING THE LEASE BOUNDARY AREA

FOR KULITHALAI SAND QUARRY

Lease area

Location:

Village: Kulithalai

Taluk: Kulithalai

District: Karur

Topo sheet No: 58-J/05

Latitude: 10°56'00.96''N to 10°56'18.56''N

Longitude: 78°26'08.16''E to 78°26'21.28''E

PRE FEASIBILITY REPORT KULITHALAI SAND QUARRY

Under EIA Notification 2006 THE EXECUTIVE ENGINEER

(iv) Existing land use pattern (agriculture, non-agriculture, forest, water bodies (including area

under CRZ)), shortest distances from the periphery of the project to periphery of the forests,

national park, wild life sanctuary, eco sensitive areas, water bodies (distance from the HFL of

the river), CRZ. In case of notified industrial area, a copy of the Gazette notification should be

given.

� There is no forest within the radius of 15km in the lease area.

� The project area does not fall in ‘HACA’ region.

� There is no interstate boundary within the radius of 15km

� There is no Western Ghats within the radius of 15km

� There is no CRZ within the radius of 15km.

� There is no Bird sanctuary, wild life sanctuaries as per Wild Life Production Act 1972,

within the radius of 15km.

� There is no quarry within the radius of 500m.

(v) Existing Infrastructure

There is no existing infrastructure in the proposed quarry lease applied area.

(vi) Soil Classification

No top soil. The area is mostly covered with Sand formation; this land does not sustain

any type of vegetation or Agriculture.

(vii) Climatic data form secondary sources

Both the North East and South West monsoon occurs here and the summer are hot and

winter is cool. During April and May the temperature may shoot up to 42°C and during winter

the temperature does not fall below 25°C. The annual rainfall is around 900mm.

(viii) Social infrastructure available

There is no social infrastructures like Government Buildings, worship in the 1Km

vicinity of the quarry lease applied area.

PRE FEASIBILITY REPORT KULITHALAI SAND QUARRY

Under EIA Notification 2006 THE EXECUTIVE ENGINEER

5.0 PLANNING BRIEF

(i) Planning Concept (type of industries, facilities, transportation etc.) Town and Country

Planning/Development authority Classification.

The total area of the project is about 11.00.0 Ha. The proposed production of Sand is

about 401500m3

for a period of Two years only. This quarrying project is to excavate Sand by

conventional open cast semi mechanized method. Hydraulic excavator will be deployed for

production. Transportation of Sand shall be done by tippers on roads.

The project land is devoid of vegetation and lies in the backward town of Karur District.

There are no specific industries or factories in and around the project area.

Transportation

Hired Tippers of 10/20Ts capacity will be utilized for Transportation of Sand from the

quarry to needy to customer site by Tarpaulin cover to prevent spillage. During the transportation

along the village roads and populated areas the vehicle should not exceed the 20Km speed limit.

(ii) Population projection

There are few villages located in 5km radius from the lease applied area the details of the

areas are given below.

S.No Name of the Village Distance & Direction

from lease applied area

Approximate

population

1. Umaiyalpuram 2.0km – NE 400

2. Musiri 2.0km – NW 800

3. Kulithalai 2.0km – SW 1500

4. Rajendiram 2.0km – SE 700

(iii) Land use planning (breakup along with green belt etc.,)

The Sand quarrying operation is proposed for a period of Two years up to depth of 1m

below the river bed. The project area extent is 11.00.0 Ha. The entire area is proposed to be

quarried.

PRE FEASIBILITY REPORT KULITHALAI SAND QUARRY

Under EIA Notification 2006 THE EXECUTIVE ENGINEER

(iv) Assessment of Infrastructure Demand (Physical & Social)

The existing road facilities are already available which shall be used and maintained.

Medical facilities is available for the project sites, Government and private hospitals and other

basic infrastructure facilities like communication center, school supermarket, bus stand are also

available in Kulithalai which is at a distance of 2km on the South western side of the area. This

quarry project will provide employment for about 9persons directly.

(v) Amenities/Facilities

The simple methods adopted and the limited scale of activities involved in Sand

quarrying does not require High Tension Electric Power supply or huge worship facilities. The

quarrying work is restricted to one general shift during day time only. Major Machinery repair

works are attended at Kulithalai (2km–SW). Packaged drinking water will be brought from

approved water vendors.

All the facilities are available in Karur district which is at a distance about 39km on the Western

side of the area.

6.0. PROPOSED INFRASTRUCTURE

(i) Industrial Area (Processing area)

There is no processing area proposed within the lease applied area.

(ii) Residential area (Non processing area)

There is no residential area within 500mts of the lease applied area.

(iii) Green Belt

After completion of quarrying operation, the land will be facilitating the functional

efficiency of the river. The area applied is a Cauvery river hence Afforestation cannot be done

inside the lease area. The applicant ensures to carry out Afforestation by planting native species

like pungam, neem, causirina in the nearby villages and village roads after consultation with

Panchyat Authorities. The budget for Afforestation will be around Rs. 20,000/-

(iv) Social infrastructure

About 9 employees will be directly benefited and 5 persons will be indirectly benefited,

the lease ensure to share all responsible for special benefits like water, health care, Education

benefits, and promotion of socio cultural activities of the nearby villages.

PRE FEASIBILITY REPORT KULITHALAI SAND QUARRY

Under EIA Notification 2006 THE EXECUTIVE ENGINEER

(v) Connectivity (traffic and transportation road/ Rail/ Metro/ Water ways etc.)

Mode Description

Road connectivity

1. There is an existing road from the area connecting in to

karur - Tiruchirapalli road is on the southern side.

2. Nearest National Highway (NH-67) Tiruchirapalli –

Karur - 300m -Southern side.

3. Nearest State Highway (SH-71) Musiri – Manapparai –

3km- Westren side.

Railway station &

Railway line

1. Kulithalai Railway station – 1.70km –SW side

2. Railway line is Karur – Tiruchirapalli – 1.20km-South

side

Air port 1. Trichy Airport - 36km- South eastern side

(vi) Drinking Water management (Source & Supply of water)

This proposed Sand quarry project does not require huge water either for beneficiation or

processing. Drinking Water will be brought from approved water vendors in Kulithalai which is

about 2Km on the South western side of the area.

(vii) Sewerage System

Toilets will be constructed on semi-permanent structure and sewage will be discharged

once in two months. The sewage waste will be collected in soak pit and discharged as manure.

(viii) Industrial Waste Management

No industrial waste will be generated from the project.

(ix) Solid Waste Management

The Sand quarrying does not produce any waste. The entire Sand is excavated and

utilized. This waste may not produce any toxic effluent in the form of solid liquid or gas.

(x) Power Requirement & Supply / source

The proposed Sand quarrying does not required any power supply the quarrying

operation which is proposed to operate in day time only for 9 Am to 7Pm with 1 Hour lunch

interval between 1Pm to 2Pm.

PRE FEASIBILITY REPORT KULITHALAI SAND QUARRY

Under EIA Notification 2006 THE EXECUTIVE ENGINEER

7.0 REHABILITATION AND RESETTLEMENT (R & R PLAN)

(i) Policy to be adopted (Central/State) in respect of the project affectedpersons including home

oustees, land oustees and landless laborers(a brief outline to be given)

The project area lies in Cauvery River, the land is specifically used for collecting the

water during the rainy season, there is no habitation located within the radius of 500m hence

there is no rehabilitation and resettlement involved in this Sand quarrying project.

It is a Government poramboke land maintained by Public Works Department, Karur

District at Kulithalai village accounts, Kulithalai Taluk and Karur District. Hence there is no

Rehabilitation and resettlement is involved.

8.0 PROJECT SCHEDULE & COST ESTIMATES

(i) Likely date of start of construction and likely date of completion (Time schedule for the

project to be given)

The Sand quarrying project is likely to get commenced after the execution of quarrying

lease. The proposed quantity of sand (including shoals) is about 401500m3.

The life of the quarry

project is Two years only.

PRE FEASIBILITY REPORT KULITHALAI SAND QUARRY

Under EIA Notification 2006 THE EXECUTIVE ENGINEER

(ii) Estimated project cost along with analysis in terms of economic viability of the project

A. Cost of the project For Excavation = Rs.25, 00,000/-

Temporary rest shelter = Rs. 1, 00,000/-

Sanitary facilities = Rs. 1, 00,000/-

Drinking water = Rs. 24,000/-

Safety kits = Rs. 20,000/-

Sanitary maintenance = Rs. 24,000/-

Total Cost of the project = Rs. 27, 68,000/-

B. EMP cost:

Air Quality Sampling = Rs. 50,000/-

Water Quality Sampling = Rs. 25,000/-

Noise Monitoring = Rs. 25,000/-

Ground vibration test = Rs. 25,000/-

Water Sprinkling = Rs.1, 20,000/-

Afforestation = Rs. 20,000/-

Total EMP cost = Rs. 2,65,000/-

Cost towards CSR (Socio economic development for Panchayat)

The CSR cost is around 28.33% of the sand cost

The Project cost:

A. Cost of the Project = Rs. 27,68,000/-

B. EMP cost = Rs. 2,65,000/-

Total cost = Rs. 30,33,000/-

� The total project cost including EMP cost (A+B) is about Rs. 30,33,000/- (Rupees Thirty

lakhs thirty three thousand only).

� The EMP cost is about Rs. 2,65,000/- (Rupees Two lakhs sixty five thousand only).

Population Benefit

The applicant ensures to take social responsibilities like providing School Note books,

Uniforms to the Students below poverty level beside if the villages require any borehole for

public use the applicant ensure to do so. The applicant will also take part and contribute the

native cultural activities in the nearby villages. During summer seasons packaged drinking water

will be kept in the village for public and for tress passers.

The applicant will involve and contribute all the socio cultural allocation in and around

the area.

Government Revenue

The state Government will get revenue as Royalty, sale tax, surface rent, dead rent/ VAT/

income tax etc.

PRE FEASIBILITY REPORT KULITHALAI SAND QUARRY

Under EIA Notification 2006 THE EXECUTIVE ENGINEER

9.0 ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS)

(i) Financial and social benefits with special emphasis on the benefit to the local people

including tribal population, if any, in the area

The end use of the sand is specifically used for construction purpose besides the Removal

of the sand may also called as desilting will increase the functional efficiencies of the river

during the flood season because protecting the Dwellers and vegetation on the bank of the river.

Due to this project many of the infrastructure development will be carried out in and around the

district on time, nearly 9employees directly get employment opportunity through this project.

The detail furnished in this mining plan is based on information provided by the state

Government and lessee. By considering the merit of the project the permission may be granted.

Place: Karur

Date: 21.02.2017

1. Signature of the Applicant

The Executive Engineer,

2. Signature of the Recognized qualified person

M. Ifthikhar Ahmed, M.Sc., F.G.S, M.B.A., M.M.E.A.,

RQP/MAS/183/2004/A

BASE LINE STUDIES

The base line study is prepared for Kulithalai Sand quarry project. Base line studies

provide a base data for regular Environmental Monitoring and Environmental Impact

Assessment (EIA).

The baseline study is provides bench mark for carrying out environmental Impact

assessment due to the course of quarrying and mining activities. The purpose of these studies is

to evaluate the benefited and adverse effect of developing activities on the neighborhood

environment and the area where the quarrying is proposed to carry out.

The Executive Engineer applied for Sand quarry project lease for over an extent of

11.00.0Ha located in S.F.No: 1 (P) of Kulithalai Village in Kulithalai Taluk, Karur District, and

Tamilnadu.

The comprehensive base line studies and standards constitute of collecting data on Flora

and Fauna list.

Flora and fauna in and around the area

A detail study related to flora and fauna was carefully observed physically by

environmental engineers, Botanist and zoologist. The following table shows the flora and Fauna

available at the region.

S.No Common Name Botanical name Pictures

1. Neem Azadirachata indica

2. Karuvelam Tree Acsia nilotica

3. Palm tree Borassus falabellifer

4. Morning Glory Ipomoea carnea

5. Naru netti Hemidesmus indicus

6. Kundumani Abrus precatorius

7. Mudakattan

Cardiospermum

halicacabum

8. Kovakka Coccinea grandis

9. Kanthal Gloriosa superba

10. Nuraipeerku Luffa cylindrica

11. Vaeliparuthi Pergularia daemia

12. Erukku Calotropis gigantea

List of Faunas

S.No Common Name Scientific name 1. Frog Ranal hexadactylus

2. Dog Canius familairis

3. Goat Capra hircus

4. Crow Corvus splenders

5. Rabbit Oryctolagus cuniculus

6. Squirrel Rodentia scrurus,

7. Ant Hymenopterous formicida,

8. Cat Felsis catus

Conclusion

The base line studies relents no hazardous levels of dust and noise and prevailing at the

project area. A well implemented environmental Management plan as discussed in the mining

plan will help in mitigation the adverse effects due to quarrying activities.

The movement of vehicles is very minimal. The entire vehicle used will be periodically

maintained by well experienced mechanic and kept under TNPCB standards, emission testing

will be carried out periodically and water will be sprinkled periodically to prevent dust into air.

Environmental care and attitude of preventing environment is inducted to the proponent and

advice to carry out and mitigate the minor impacts due to quarrying. Appropriate persons are

advice to get employed to protect the Environment and Ecology of the area.

Date : 21.02.2017

Place : Karur

1. Signature of the applicant

Executive Engineer

2. Signature of the Recognized qualified person

M. Ifthikhar Ahmed, M.Sc., F.G.S, M.B.A M.M.E.A.,

RQP/MAS/183/2004/A