Project Name: Dattani (M.L. No. 79/05) Masonary Stone Mine PFR PRE- FEASIBILITY REPORT

Upload: others

Post on 15-Mar-2020

10 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PRE- FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Dattani, Tehsil- Reodar, District- Sirohi, and State- Rajasthan over an area of 1 ha. The mine lease

Project Name: Dattani (M.L. No. 79/05) Masonary Stone Mine PFR

PRE- FEASIBILITY

REPORT

Page 2: PRE- FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Dattani, Tehsil- Reodar, District- Sirohi, and State- Rajasthan over an area of 1 ha. The mine lease

Project Name: Dattani (M.L. No. 79/05) Masonary Stone Mine PFR

1 Applicant: Sh Gitender Singh Yadav

1.0 EXECUTIVE SUMMARY

1.1 Executive Summary

The proposed mining project falls under Category “A” Project or activity

1(a) as per EIA Notifications 2006 and amended thereof due to the

presence of Interstate Boundary between Rajasthan and Gujarat within

5km.

Summarized Tabular Representation

Project Name Dattani (M.L. No. 79/05) Masonary Stone Mine

Applicant Sh. Gitender Singh Yadav

Area of the lease area 1 ha

Location of mine Village - Dattani Tehsil -Reodar

District - Sirohi State - Rajasthan

Latitude 24°31'57.16" to 24°32'1.69" N

Longitude 72°34'25.89" to 72°34'30.83"E

Topo sheet number GT Sheet No. 45 D/10

Minerals of mine Masonary Stone

Total Mineable reserves

11,20,150 Tonnes

Life of mine 10 years

Project Cost 40 lakh

Proposed production of mine

1,12,450 MTPA

Method of mining Opencast Semi-Mechanized

No of working days 300 days

Water demand & Source

Total water requirement is about 5.5 KLD = 1.5 KLD (Drinking & Domestic Uses) + 1 KLD (Plantation) + 3 KLD (Dust Suppression).Water

will be procured from nearby villages

Man power 34

Nearest railway station

Abu road railway station about 22 km in SE direction

Nearest State highway/national highway

SH-11 about 2 km away in E direction

Nearest airport Maharana Pratap airport (about 130 km in E direction)

Seismic zone Zone III as per IS 1893 (Part I): 2002

Page 3: PRE- FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Dattani, Tehsil- Reodar, District- Sirohi, and State- Rajasthan over an area of 1 ha. The mine lease

Project Name: Dattani (M.L. No. 79/05) Masonary Stone Mine PFR

2 Applicant: Sh Gitender Singh Yadav

2.0 INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION

2.1 Identification of Project and Project Proponent

Dattani (M.L. No. 79/05) Masonary Stone Mine is situated at Village -

Dattani, Tehsil- Reodar, District- Sirohi, and State- Rajasthan over an

area of 1 ha. The mine lease was initially granted in favour of Sh. Amit

Sharma S/o Vimal Sharma, R/o Morthala Abu Road, Sirohi, Rajasthan,

later on the lease has been transferred in favour of Sh. Gitender Singh

Yadav, S/o Mahendra Yadav, R/o H.No. ward no-4, Alwar Road,Sohana,

Distt. Gurgaon Harayana, vide order no. KHA/Sirohi/Apr/ML-

79/05/1658 dated 31/03/2015.

2.2 Brief description of nature of Project

The project has been proposed for mining of Mineral Masonary Stone by

adopting opencast Semi-Mechanized mining method.

2.3 Need for the Project and Its Importance to the Country or Region

Masonary stone is most commonly used as building material. Masonry

Stone finds extensive use in the construction and infrastructural works.

The basic objective of the project is the effective utilization of Material in

the country or region. Masonry Stone is the world's most commonly used

material in construction of road, railway track construction etc. Masonry

Stone will help in the economic growth of the country or region.

2.4 Demands-Supply Gap

The demand for Masonary Stone is ever growing with the growth of the

infrastructure sector in our country. The mineral is used in the

construction activities like buildings, road construction etc. The

requirement for the mineral is always high in the nearby cities and

towns. Therefore there is always a good demand of the mineral in the

domestic market.

2.5 Imports vs. Indigenous Production

Development needs will be met only through indigenously produced

Masonary stone against the high cost of imported material.

2.6 Export Possibility

There is no proposal to export the mineral. However, Masonary stone

produced from the mine will fulfill the needs of the region and surplus if

Page 4: PRE- FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Dattani, Tehsil- Reodar, District- Sirohi, and State- Rajasthan over an area of 1 ha. The mine lease

Project Name: Dattani (M.L. No. 79/05) Masonary Stone Mine PFR

3 Applicant: Sh Gitender Singh Yadav

any, will be considered for export.

2.7 Domestic/ Export Markets

Domestic Market

Being a building stone, the principal use of this Masonary stone is in

construction of buildings and roads.

Export Market

The proposed mining activity is for indigenous consumption only for real

state, decorative accessories etc.

2.8 Employment Generation (Direct and Indirect)

The proposed mining activity for the excavation of masonary stone will

provide both direct and indirect employment in form of labors for mining

process and through transport etc respectively.

3.0 PROJECT DESCRIPTION

3.1 Type of Project Including Interlinked and Interdependent

Projects, If Any.

The project falls under Category “A” Project or activity 1(a) as per EIA

Notifications 2006. It is for Mining of Masonary stone. It is an opencast

Semi-Mechanized mining. The project dose not includes any interlinked

or interdependent project. There are no interlinked projects involved.

3.2 Location

The mining lease area is located in Village - Dattani, Tehsil- Reodar,

District- Sirohi, and State- Rajasthan. The mining lease area falls in G.T

sheet No. 45 D/10

Coordinates:

Latitude 24°31'57.16" to 24°32'1.69" N

Longitude 72°34'25.89" to 72°34'30.83"E

Page 5: PRE- FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Dattani, Tehsil- Reodar, District- Sirohi, and State- Rajasthan over an area of 1 ha. The mine lease

Project Name: Dattani (M.L. No. 79/05) Masonary Stone Mine PFR

4 Applicant: Sh Gitender Singh Yadav

Fig 1: Location Map of proposed Project site

Project Area Project Site

Page 6: PRE- FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Dattani, Tehsil- Reodar, District- Sirohi, and State- Rajasthan over an area of 1 ha. The mine lease

Project Name: Dattani (M.L. No. 79/05) Masonary Stone Mine PFR

5 Applicant: Sh Gitender Singh Yadav

3.3 Details of Alternate Sites

Mining is site specific so no alternative site is proposed.

3.4 Size or magnitude of operation

The mining lease has been granted over an area of 1 ha. During five year

total production of mineral shall be approximately 5,48,210 Tonnes.

3.5 Geology

Regional Geology

Page 7: PRE- FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Dattani, Tehsil- Reodar, District- Sirohi, and State- Rajasthan over an area of 1 ha. The mine lease

Project Name: Dattani (M.L. No. 79/05) Masonary Stone Mine PFR

6 Applicant: Sh Gitender Singh Yadav

3.6 Reserve Estimation

The following parameters have been considered while estimating the

Reserve:

Average 1m cover has been considered as soil

Proved Reserve

Average thickness is considered 40m from the exposed surface. The area

having the masonary stone has been multiplied with the thickness of 40 m.

Probable Reserve

Average thickness is considered 40m from the exposed surface. The area

having the masonary stone has been multiplied with the thickness of 5 m

below the limit of proved reserve.

Possible Reserve

Average thickness is considered 40m from the exposed surface. The area

having the masonary stone has been multiplied with the thickness of 5 m

below the limit of probable reserve.

Bulk density has been taken 2.6 tonnes/m3.

Total mineable reserve has been calculated as 1,120,150 Tonns

Project Description with Process Details

3.6.1 Method of Mining

The method of mining of the proposed project will be opencast Semi-

Mechanized method. The mining shall be started from the existing pit.

Excavation of the mineral will be done by simple hand tools as well as by

hydraulic machineries. The mining activity will be done by bench formation.

Hydraulic machinery will be deployed time to time as and when required.

The bench height and width is proposed to be 1-5 mts and width will be

more than 1-5mts.

1 • Site prepration (demarcation by pillars)

2 •Excavation of mineral

3 • Loading of Mineral

4 •Transportation

Page 8: PRE- FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Dattani, Tehsil- Reodar, District- Sirohi, and State- Rajasthan over an area of 1 ha. The mine lease

Project Name: Dattani (M.L. No. 79/05) Masonary Stone Mine PFR

7 Applicant: Sh Gitender Singh Yadav

Blasting will be done. Blasting will be done during day time only. Muffle

blasting will be done by an authorized person on contractual basis. Deep

hole blasting after getting DGMS permission.

Blasting parameters:

Depth of shot holes: 0.8 mt – 3.3m

Diameter shot holes: 32mm

Spacing: 1m

Stemming: 30%

Burden: 0.8 mt

Type of explosives: Special gelatin, delay detonator, R-Cord

No secondary blasting will be done. The excavated mineral will be directly

loaded into trucks and will be transported to the local market and end

users.

The details of machinery, to be used

Production details

The Proposed year wise excavation:

Years Total saleable Minerals in tonnes

1st Year 106990

2nd Year 108550

3rd Year 109590

4th Year 110630

5th Year 112450

Total 5,48,210

3.7 Raw Material Required Along With Estimated Quantity, Likely

Source, Marketing

Area of Final Product/s, Mode of Transport of Raw Material and

Finished Product

No raw material will be required for production of Masonary Stone. The

mine mineral shall be collected and sorted manually before its final

dispatch to various industries through trucks. No waste will be generated

Machines Nos.

Jack hammer 2

Compressor 1

Hydraulic Backhoe 1

Page 9: PRE- FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Dattani, Tehsil- Reodar, District- Sirohi, and State- Rajasthan over an area of 1 ha. The mine lease

Project Name: Dattani (M.L. No. 79/05) Masonary Stone Mine PFR

8 Applicant: Sh Gitender Singh Yadav

in the process.

3.8 Resource Optimization/ Recycling and Reuse

Not envisaged.

3.9 Availability of Water Its Source, Energy/ Power Requirement and

Source

3.9.1 Water Requirement

Water for domestic, dust suppression and plantation is required to be 5.5

KLD.

3.9.2 Power

The operation will be done only from sun rise to sun set hence there is no

power requirement for the project at site. All the vehicles and machinery

will run on diesel, there is no requirement of electricity. If needed

connection will be taken from the nearby village after taking proper

permission.

3.10 Quantity of wastes to be generated (Liquid and Solid) and Scheme

for their

Management/Disposal

3.10.1 Solid Waste Generation& its Disposal

No solid waste will be generated. Top soil collected will be used for

plantation at the end of the lease period.

3.10.2 Liquid Effluent

Not applicable.

4.0 SITE ANALYSIS

4.1 Connectivity

The proposed lease area is easily approachable through SH 11. The

nearest Railway station is Abu road Railway Station which is 22 km away

from the site. Nearest Airport is Maharana Pratap airport about 130 km

in E direction.

4.2 Landform, Land use and Land ownership

4.2.1Landform

The applied lease area is a part of a hillock which is a Govt. Land.

4.2.2 Land use

Page 10: PRE- FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Dattani, Tehsil- Reodar, District- Sirohi, and State- Rajasthan over an area of 1 ha. The mine lease

Project Name: Dattani (M.L. No. 79/05) Masonary Stone Mine PFR

9 Applicant: Sh Gitender Singh Yadav

The applied lease area is a Govt. land. The lease area comprises of

undulated terrains. There is no village or human settlement in the lease

area. Permanent vegetation in the area is very less prominent.

4.2.3 Land Ownership

The proposed lease area is Govt. land.

4.3Topography

The lease area comprises of undulated terrains. The highest contour is

120m with lowest of 100m. Maximum part of the lease area is covered by

Masonary Stone.

4.4 Existing land Use Pattern

The lease area is a Govt. Land. In general the area is hilly. There is no

village or human settlement in the lease area. Permanent vegetation in

the area is also very less prominent. There is no forest land involved in

the lease area. Also there is no eco sensitive area present near the lease

area.

4.5 Existing Infrastructure

No existing infrastructure within lease area.

4.6 Soil Classification

The soils of the district fall under the following broad categories:

Mattiyar (Stiff Clay):- Black coloured soil found in Pindwara and parts of

Sheoganj blocks. This soil is more suitable for growing Wheat, Barley and

Cotton. Gorat or Bhuri (Sandy):- Light brown coloured soil found in Reodar,

some parts of Sirohi and Sheoganj tehsils. It is fertile and suitable for

growing Bajra.

Reti (sand):- It occurs in river beds and is suitable for growing Tomatoes and

watermelon.

Kankari (hard and stony mixed with sand):- It occurs around the base of the

hills.

Khari (saline soil):- Unsuitable for crops occurring in western parts of the

district

Page 11: PRE- FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Dattani, Tehsil- Reodar, District- Sirohi, and State- Rajasthan over an area of 1 ha. The mine lease

Project Name: Dattani (M.L. No. 79/05) Masonary Stone Mine PFR

10 Applicant: Sh Gitender Singh Yadav

4.7 Climate data from Secondary Sources:

Average annual rainfall (1991-2011) of the district is 760.02 mm.

However, normal rainfall for the period 1901 to 1970 is 606.3mm. The

annual rainfall gradually decreases from southern part to northern part.

The maximum average rainfall is 1488.6mm at Mt.Abu and minimum

average rainfall is 542.2 mm at Sheoganj. The district experiences either

mild or normal drought once in two years. Severe type of droughts have

been recorded very rarely. The most severe type of drought had occurred

in the district at Pindwara (2000) and Reodar (1987).

4.8 Social Infrastructure available:

1) The applied mine is not facilitated with power line.

2) The state transport buses and private buses are available up to village

Dattani and mine site.

3) The nearest police station applicable is at Reodar.

4) Permanent offices and other buildings at mine proposed.

5) Mobile Phone connectivity is available at mine site.

6) Medical facility is available at Dattani.

7) No National Park/sanctuary falls within 10 km of the lease area.

5.0 PLANNING BRIEF

5.1 Planning Concept

The proposed project is for the mining of Masonary stone. Mining is

proposed to be done through Semi-Mechanized method. Rajasthan

Minor Mineral Rules & MCDR will be followed in the mining. Mining will

be done in benches and will not intersect the ground water table.

5.2 Assessment of Infrastructure demand (Physical & Social)

On the basis of the preliminary site visit, the infrastructure demand in

the village was assessed on the basis of need and priority.

The health infrastructure of the study area requires improvement. The

lack of medical facilities needs improvement.

5.3 Amenities/Facilities

Workshop

Page 12: PRE- FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Dattani, Tehsil- Reodar, District- Sirohi, and State- Rajasthan over an area of 1 ha. The mine lease

Project Name: Dattani (M.L. No. 79/05) Masonary Stone Mine PFR

11 Applicant: Sh Gitender Singh Yadav

For maintenance of machinery it is proposed to establish a workshop

nearby to mine site welding, puncture etc.

Power supply

Electric power supply does not exist at mine site and it is proposed to take

connection.

Water Supply

A tractor mounted tanker is proposed for supply of water to mining work,

spraying, watering the plants and drinking purposes.

First Aid

A first aid facility is proposed at Mines office

Rest Shelter

Rest shelter is proposed near mine site.

Latrines and Urinals

At the mine site urinal and Bath is proposed for staff and labours.

5.4.1Budget for facilities provided to Labours

Sl.

No.

Scheme Annual Recurring

Cost (in Rs)

1 Drinking water facility 10,000

2 Shelter 15,000

3 Health and sanitation facility

20,000

Total 45,000

6.0 Proposed Infrastructure

6.1 Industrial Area (Processing Area)

No infrastructure is proposed.

6.2 Residential Area (Non Processing Area)

As local workers from nearby areas will be engaged for the mining

activity, no residential area/ housing are proposed.

6.3 Green Belt

Plantation will be carried out under restoration works. 33% of the total

lease area will be planted. Plantation will be done:

Nearby area of school

At the Dump

Page 13: PRE- FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Dattani, Tehsil- Reodar, District- Sirohi, and State- Rajasthan over an area of 1 ha. The mine lease

Project Name: Dattani (M.L. No. 79/05) Masonary Stone Mine PFR

12 Applicant: Sh Gitender Singh Yadav

At the Govt. waste land provided by the Govt.

At own private land

Nearby roads

6.4 Social Infrastructure

No social Infrastructure is proposed however 2% of the project cost will

be utilized for the development of the existing social infrastructure of

area as per the needs of the local people/residents.

Budget for Corporate Social Responsibility (CSR)

6.5 Sewerage System

Domestic waste water will be treated into septic tank followed by soak pit

6.6 Industrial Waste Management

Not applicable

6.7 Solid Waste management

The waste overburden in the area is only intermixed soil. The waste rock

produced will be loaded by excavators & dumpers for its transportation to

the reject dump yard & when require will be used for making road. The

waste material shall be dumped outside the mine lease area.

6.8Power Requirement & Supply/Source

The operation will be done only from sun rise to sun set hence there is

no power requirement for the project at site. The electricity line passes

out side near the Lease area. The electricity facility is not available at

mining lease area. Only diesel equipment will be used.

7.0 REHABILITATION AND RESETTLEMENT (R&R) PLAN

As no personnel are expected to be migrated due to mining in the lease

area and the adjoining region is also having a good mineral potential, the

rehabilitation of the employees is not going to be a problem. The workers

and other staff can get job in the neighboring areas after the end of life of

mine. The applicant shall also try for employment of the workers.

SI. No.

Activity 1st year (In Rs.)

1 Construction of public toilet for the village

80,000

TOTAL (Annual) 80,000

Page 14: PRE- FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Dattani, Tehsil- Reodar, District- Sirohi, and State- Rajasthan over an area of 1 ha. The mine lease

Project Name: Dattani (M.L. No. 79/05) Masonary Stone Mine PFR

13 Applicant: Sh Gitender Singh Yadav

8.0 PROJECT SCHEDULE & COST ESTIMATES

8.1 Likely Date of Start of Construction and Likely Date of Completion

No construction activities are proposed. The mining activity will

commence only after receiving environmental clearance and other

statutory clearance.

8.2 Estimated Project Cost along with analysis in Terms of Economic

Viability of the

Project

Estimated project cost is Rs. 40 Lakh. The lessee has all the mining

equipments used for the scientific mining. The mine is Eco-Friendly.

Economically the ore is mineable as compared to overburden thickness.

The entire mineable reserve as estimated is categorized as 121.

Environmental Management Plan

The environmental management plan consists of the set of mitigation,

management, monitoring and institutional measures to be taken during

the implementation and operation of the project, to eliminate adverse

environmental impacts or reduce them to acceptable levels. The present

environmental management plan addresses the components of

environment, which are likely to be affected by the different operations

in the mine area.

Budget Allotted for the EMP

SI. No.

Measures Capital cost (in

Rs.)

Annual recurring cost

(in Rs.)

1

Pollution Control

i) Dust Suppression ii) Garland drain & ground dump

--

15,000 /-

15,000 /-

2 Pollution Monitoring i) Air pollution

ii) Water pollution

--

25,000 /-

25,000 /-

3 Green Belt 50,000 /- 20,000 /-

Total 50,000 /- 1,00,000 /-

Page 15: PRE- FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Dattani, Tehsil- Reodar, District- Sirohi, and State- Rajasthan over an area of 1 ha. The mine lease

Project Name: Dattani (M.L. No. 79/05) Masonary Stone Mine PFR

14 Applicant: Sh Gitender Singh Yadav

9.0 ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS)

The proposed mine will bring economical benefits to the state by the way

of Royalty for mineral and to the local people by way of direct and

secondary employment opportunities. Masonary stone is used for a

variety of structural and decorative purposes. The material is in high

demand at the local market for real estate industry.

The project will bring about socio-economic improvement of the area and

will prove beneficial to the area.

****************