PRE-FEASIBILITY REPORT OF QUARTZITE (MASONRY STONE) MINING PROJECT (ML Area: 1.0 ha, M.L. No. 447/2003, Production Capacity-1, 52,570 TPA) Near Village: Dunga Ki Nangal, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan) PROJECT PROPONENT Shri Amit Kumar Sharma R/o Village- Dabla Tehsil- Neem Ka Thana District- Sikar (Raj.) Contact Person: Amit Kumar Contact No. +919783068123

Upload: ngonhi

Post on 08-May-2018

215 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · Shri Amit Kumar Sharma ... source, marketing area of final products, mode

PRE-FEASIBILITY REPORT

OF

QUARTZITE (MASONRY STONE) MINING

PROJECT

(ML Area: 1.0 ha, M.L. No. 447/2003, Production

Capacity-1, 52,570 TPA)

Near Village: Dunga Ki Nangal,

Tehsil: Neem Ka Thana,

District: Sikar (Rajasthan)

PROJECT PROPONENT

Shri Amit Kumar Sharma

R/o Village- Dabla Tehsil- Neem Ka Thana District- Sikar (Raj.)

Contact Person: Amit Kumar

Contact No. +919783068123

Page 2: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · Shri Amit Kumar Sharma ... source, marketing area of final products, mode

INDEX

S. NO. PARTICULARS PAGE NO.

1.0 EXECUTIVE SUMMARY 1

2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 2

I Identification of Project and Project Proponent 2

II Brief Description of the Nature of Project 2

III Need for the Project & Its Importance to the Country/ Region 2

IV Demand – Supply Gap 2

V Imports vs. Indigenous Production 2

VI Export Possibility 2

VII Domestic/Export Markets 3

VIII Employment Generation (Direct and Indirect) due to the Project 3

3.0 PROJECT DESCRIPTION 3

1. Type of Project Including Interlinked And Independent Projects,

If Any

3

II Location (map showing general location, specific location, and

project boundary & project site layout) with coordinates 3

III Details of alternative site considered 5

IV Size and magnitude of operation 5

V Project Description with Process Detail 5

2. Geology of the area 6

3. Estimation Of Reserves 6

4. Mineable Reserves And Anticipated Life Of The Mine 6

5. Method of Mining 6

Page 3: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · Shri Amit Kumar Sharma ... source, marketing area of final products, mode

S. NO. PARTICULARS PAGE NO.

6. Proposed Year Wise Production Details Of The Next First Five

Years

7

7. Details of Blasting Parameters 7

8. Loading & Transport 8

9. Waste Generation & Disposal 8

10. Conceptual Plan 8

VI

Raw material required along with estimated quantity, likely

source, marketing area of final products, mode of transport of

raw material and finished product.

8

VII Resources optimization/recycling and reuse envisaged in the

project, if any should be briefly outlined 8

VIII Availability of water its source, energy/power requirement and

source 8

IX Quantity of waste be generated (liquid and solid) and scheme for

their management/disposal 8

4.0 SITE ANALYSIS 9

(I) Connectivity 9

(II) Land form, land use and land ownership 9

(III) Topography 9

(IV)

Existing land use pattern {agriculture, non-agriculture, forest,

water bodies (including area under CRZ), shortest distances

from the periphery of the project to periphery of the forests,

national park, wild life sanctuary, eco sensitive areas, water

bodies (distance from the HFL of the river), CRZ. In case of

notified industrial area, a copy of the gazette notification should

be given.

9

(V) Existing infrastructure 12

Page 4: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · Shri Amit Kumar Sharma ... source, marketing area of final products, mode

S. NO. PARTICULARS PAGE NO.

5.0 PLANNING BRIEF 12

(I)

Planning concept (type of industries, facilities, and

transportation etc.) Town and country planning/development

authority classification.

12

(II) Population projection 12

(III) Land use planning 12

(IV) Assessment of infrastructure demand (physical & social) 12

(V) Amenities/facilities 12

6.0 PROPOSED INFRASTRUCTURE 12

(I) Residential area (Non Processing Area) 12

(II) Green belt development 13

(III) Connectivity 13

(IV) Water Management (Source & Supply of water) 13

(V) Sewerage system 13

(VI) Industrial waste management 13

(VII) Solid Waste Management 14

(VIII) Power Requirement & Supply/ Source 13

7.0 REHABILITATION AND RESETTLEMENT (R & R) PLAN 13

(I)

Policy to be adopted (central/state)in respect of the project

affected persons including home oustees, land oustees and

landless labourers

13

8.0 PROJECT SCHEDULE & COST ESTIMATES 13

(I) Likely date of start of construction and likely date of completion 13

Page 5: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · Shri Amit Kumar Sharma ... source, marketing area of final products, mode

S. NO. PARTICULARS PAGE NO.

(II) Estimated project cost along with analysis in terms of economic

viability of the project

14

9.0 ANALYSIS OF PROPOSAL 14

10.0 ENVIRONMENTAL MANAGEMENT PLAN 14

10.1.1 AIR POLLUTION CONTROL 14

10.1.2 WATER MANAGEMENT 14

10.1.3 NOISE POLLUTION CONTROL 15

10.1.4 LAND RECLAMATION 15

10.1.5 SOLID WASTE MANAGEMENT 15

10.1.6 GREEN BELT DEVELOPMENT 15

LIST OF TABLES

TABLE NO. NAME OF TABLE PAGE NO.

1. Salient feature of the project 1

2. Salient feature of the project 5

3. Extent of Mechanization 7

4. Year wise production for next five year 7

5. Environmental settings 10

LIST OF FIGURES

FIGURE NO. NAME OF FIGURE PAGE NO.

1. Location map 4

2. Key plan 11

Page 6: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · Shri Amit Kumar Sharma ... source, marketing area of final products, mode

Quartzite (Masonry Stone) Mining Project, M.L. No. 447/2003, ML Area 1.0 ha. Near Village: Dunga Ki

Nangal, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan)

Pre-feasibility

Shri Amit Kumar Page no.1

PRE – FEASIBILITY REPORT

1.0 EXECUTIVE SUMMARY

The proposal for Quartzite (Masonry Stone) Mining Project (Production Capacity-1, 52,570

TPA), M.L. No. 447/2003, ML Area 1.0 ha. Near Village: Dunga Ki Nangal, Tehsil: Neem Ka

Thana, District: Sikar (Rajasthan).

This is an existing mining lease and Simplified Mining scheme has been approved by

Superintendent Mining Engineer Jaipur Circle, Jaipur vide letter no. SME/JAI/Mining plan/ P-

1229/ 13/1597 dated 02.06.2014 and Environmental Clearance is required from the Ministry

of Environment, Forest & climate change, New Delhi / SEIAA, Raj.

Table-1

Salient features of the Project

S. No. Particulars Details

A. Mining Lease Details

1. Name of the Project Quartzite (Masonry Stone) Mining Project (Production

Capacity-1, 52,570 TPA), M.L. No. 447/2003, ML Area 1.0 ha

2. Mineral Quartzite(Masonry Stone)

3. Mining Lease Number M.L. No. 447/2003

4. Mining Lease Area 1.0 ha

5. Lease Holder Shri Amit Kumar

6. Lease Validity 20 years

B Location

7. Village Dunga Ki Nangal

8. Tehsil Neem Ka Thana

9. District Sikar

10. State Rajasthan

11. Latitude & Longitude Latitude - 27°50'43.86"N to 27°50'50.41"N,

Longitude 75°58'13.00"E, to 75°58'15.21"E.

C. Other details

12. Cost of the project Rs. 50 Lakh

13. Cost for Environmental

Protection Measures

Rs. 0.50 lakh per annum

14. Seismic Zone II

Page 7: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · Shri Amit Kumar Sharma ... source, marketing area of final products, mode

Quartzite (Masonry Stone) Mining Project, M.L. No. 447/2003, ML Area 1.0 ha. Near Village: Dunga Ki

Nangal, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan)

Pre-feasibility

Shri Amit Kumar Page no.2

2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION

(i) Identification of Project and Project Proponent

This proposal for Quartzite (Masonry Stone) Mining Project (Production

Capacity-1, 52,570 TPA), M.L. No. 447/2003, ML Area 1.0 ha. Near Village:

Dunga Ki Nangal, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan).

The project proponent is a private individual involve in mining with this

mining lease.

(ii) Brief Description of the Nature of Project

This proposal for Quartzite (Masonry Stone) Mining Project (Production

Capacity-1, 52,570 TPA), M.L. No. 447/2003, ML Area 1.0 ha. Near Village:

Dunga Ki Nangal, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan).

This is an existing mining lease and Simplified Mining scheme has been

approved by Superintendent Mining Engineer Jaipur Circle, Jaipur vide letter

no. SME/JAI/Mining plan/ P-1229/ 13/1597 dated 02.06.2014 and

Environmental Clearance is required from the Ministry of Environment, Forest

& climate change, New Delhi / SEIAA, Raj. As per MoEF Office Memorandum

No. J-13012/12/2013-IA-II (I) dated 24.12.2013 the project comes under B2

Category.

(iii) Need for the Project & Its Importance to the Country/ Region

The mineral Quartzite (Masonry stone) is used in various construction

activities and will be sold to nearby markets to fulfill the requirements of the

local people.

(iv) Demand – Supply Gap

Considering the demand of mineral sufficient availability of the mineral in the

area, it is essential to have quartzite (Masonry stone) mine to sustain the

supply of mineral for construction purpose.

(v) Imports vs. Indigenous Production

It is a cheap mineral used in construction activities in rural areas therefore

export is not possible

(vi) Export Possibility

There is no export possibility as these mineral is quite cheap and locally

available in abundance and used in rural areas.

Page 8: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · Shri Amit Kumar Sharma ... source, marketing area of final products, mode

Quartzite (Masonry Stone) Mining Project, M.L. No. 447/2003, ML Area 1.0 ha. Near Village: Dunga Ki

Nangal, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan)

Pre-feasibility

Shri Amit Kumar Page no.3

(vii) Domestic/Export Markets

These minerals have only domestic market and will fulfill the requirement of

local. The stone may also be supplied to stone crusher proposed to be installed

outside the lease area.

(viii) Employment Generation (Direct and Indirect) due to the Project

The total 29 skilled and unskilled manpower needed to run the mine

3.0 PROJECT DESCRIPTION

(i) Type of Project Including Interlinked And Independent Projects, If Any

This is opencast semi-mechanized mining project. There is no interlinked or

interdependent project based on mineral produced. The mineral will be sold

directly.

(ii) Location (map showing general location, specific location, and project

boundary & project site layout) with coordinates

Page 9: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · Shri Amit Kumar Sharma ... source, marketing area of final products, mode

Quartzite (Masonry Stone) Mining Project, M.L. No. 447/2003, ML Area 1.0 ha. Near Village: Dunga Ki

Nangal, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan)

Pre-feasibility

Shri Amit Kumar Page no.4

Figure1: Location Map

Page 10: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · Shri Amit Kumar Sharma ... source, marketing area of final products, mode

Quartzite (Masonry Stone) Mining Project, M.L. No. 447/2003, ML Area 1.0 ha. Near Village: Dunga Ki

Nangal, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan)

Pre-feasibility

Shri Amit Kumar Page no.5

(iii) Details of Alternate Sites Considered

No alternative site has been taken into consideration due to availability of

mineral resources in the area and.

(iv) Size and magnitude of operation

The Production of Quartzite (Masonry Stone) 1, 52,570 TPA from the mine

located near Village: Dunga Ki Nangal, Tehsil- Neem Ka Thana District- Sikar

(Rajasthan)

(v) Project Description with Process Detail

(1) Salient features along with project vicinity details of the Mining

project is given below:

Table - 2

Salient Features of the Project

S. No. Particulars Details

1. Name of the Project Quartzite (Masonry Stone) Mining Project, M.L. No.

447/2003, ML Area 1.0 ha

2. Mineral Quartzite (Masonry Stone)

3. Mining Lease Number M.L. No. 447/2003

4. Mining Lease Area 1.0 ha

5. Lease Holder Shri Amit Kumar

6. Lease Period 20 years

7. Method of mining Opencast Semi-Mechanized

8. Geological reserve 1282690 tonnes

9. Mineable Reserves 1035690 Tonnes

10. Life of the Mine 7.0 Years

11. Bench Height & Width 6 m.

12. Ultimate Pit Slope angle 45°

13. Elevation Range 401 mRL to 387 mRL

14. General Ground Level 380 mRL

15. Ground Water table 80 meter bgl

16. Total excavated area at the

conceptual stage

0.85 ha

17. Total area converted into

water reservoir at the

conceptual stage

0.85 ha

Page 11: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · Shri Amit Kumar Sharma ... source, marketing area of final products, mode

Quartzite (Masonry Stone) Mining Project, M.L. No. 447/2003, ML Area 1.0 ha. Near Village: Dunga Ki

Nangal, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan)

Pre-feasibility

Shri Amit Kumar Page no.6

(2) GEOLOGY OF THE AREA

Regional Geology

The regional stratigraphic succession of rocks is as follows

REGIONAL STRATIGRAPHIC SUCCESSION

Recent Soil

Post Delhi Pegmatite, Granite, Albetite

Delhi Super group Ajabgarh Group Brecciated quartzite, quartzite,

Ortho Quartzite, phyllite,

Impure marble, amphibolites,

Carbonaceous phyllite,

quartzite, calc silicate

Alwar group Massive quartzite, schist,

conglomerate, quartzite, calc-

silicate

Local Geology

Recent Soil

Post delhi Absent

Delhi

Super

Group

Ajabgarh Group Quartzite

(3) ESTIMATION OF RESERVES

Proved reserves : 418190 tonnes

Probable reserves : 617500 tonnes

Mineable Reserves : 247000 tonnes

(4) MINEABLE RESERVES AND ANTICIPATED LIFE OF THE MINE

The Mineable reserves of Quartzite (Masonry Stone) have been calculated by taking

into account the reserves in proved and probable category only. The mineable

reserves are 1035690 tonnes and life of mine is 7 years.

(5) Method of Mining

The mining will be done by semi-mechanized opencast method. The height & width

of bench will be 6 meters at a time . For the systematic working of opencast mines,

benching will be done. The main work will be systematic benching. This benching

will also give the desired production of the mineral. Hydraulic excavator/loader and

tippers are proposed for removal and loading of mineral in tippers/trucks.

The haul/ approach roads will be provided up to the proposed working, site

services, site of dump and site of stock from the nearest tar road.

Page 12: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · Shri Amit Kumar Sharma ... source, marketing area of final products, mode

Quartzite (Masonry Stone) Mining Project, M.L. No. 447/2003, ML Area 1.0 ha. Near Village: Dunga Ki

Nangal, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan)

Pre-feasibility

Shri Amit Kumar Page no.7

The mineral is proposed to transport by tractor trolley and tippers.

Table-3

EXTENT OF MECHANIZATION

S. Machinery Number

1. Hydraulic Excavator/Loader with rock breaker

arrangement

1

2. Air compressor tractor mounted or wheel

mounted

1

3. Jack hammer 2

4. Drill roads as required

5. Water tank trroley munted 1

6. Tippers 2

7. Hand tools as required

Source: Approved Mining Scheme

(6) PROPOSED YEAR WISE PRODUCTION DETAILS OF THE NEXT FIRST FIVE YEARS

The proposed Year-wise production plan for next five years is mentioned in the

table given below:

Table – 4

Year Wise Production for Next Five Years

Year Quartzite (Masonry Stone)

(tones)

I 1,52,000

II 1,52,470

III 1,52,380

IV 1,52,470

V 1,52,570

Source: Approved Mining Scheme

(7) Details of Blasting Parameters

Board blasting parameters

Dril, road- 3 meters effective lengh

Diameter of hole – 54 mm

Spacing- 2.0 meters

Hole per blasting round-8

Blasting pattern – The blasting pattern entirly depends on situator of joints present

in the rock.

Page 13: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · Shri Amit Kumar Sharma ... source, marketing area of final products, mode

Quartzite (Masonry Stone) Mining Project, M.L. No. 447/2003, ML Area 1.0 ha. Near Village: Dunga Ki

Nangal, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan)

Pre-feasibility

Shri Amit Kumar Page no.8

(8) LOADING & TRANSPORT

Tyre mounted Hydraulic machinaries will be deployed from time to time as

and when required. Trucks and tracor troley will be deployed for

transportation of masonry stone from working to consumer.

(9) WASTE GENERATION & DISPOSAL

Waste will be used as a second grade mineral and sold out by the lessee as well

as used for maintenance of roads and top will be used for plantation purpose.

(10) CONCEPTUAL PLAN

At the end of the five years of mine 7, 61,890 tonnes of Quartzite (Masonry

stone) mineral will be excavated from the lease area. At the end of the life of

mine some area will be backfilled and remaining area will be used as water

reservoir.

At the five year of life of mine, total excavated area will be about 0.85 ha, which

will be converted in to water reservoir and 0.15 ha will be covered by

plantation.

(vi) Raw Material Required Along With Estimated Quantity, Likely Source,

Marketing Area of Final Products, Mode of Transport of Raw Material and

Finished Product

This is Quartzite (masonry stone) Mining Lease. The mineral will be used for

construction purposes. No raw material will be required to dependent

industries.

(vii) Resources Optimization/ Recycling and Reuse Envisaged in the Project, if

any, should be briefly Outlined

� No waste water will be generated from mining operation

� Domestic sewage water generated from office toilet will be disposed in soak

pits via septic tank.

(viii) Availability of Water Its Source, Energy /Power Requirement and Source

A. Water requirement:

Total water requirement for the project will be 3.0 KLD which will be sourced

from nearby villages.

B. Power requirement:

The electric power will not be use for the process of mining. Only HSD Fuel will

be required for operating machineries.

(ix) Quantity of Waste to Be Generated (Liquid and Solid) And Scheme for

Their Management/Disposal:

Domestic sewage water generated from office toilet will be disposed in soak

pits via septic tank.

Page 14: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · Shri Amit Kumar Sharma ... source, marketing area of final products, mode

Quartzite (Masonry Stone) Mining Project, M.L. No. 447/2003, ML Area 1.0 ha. Near Village: Dunga Ki

Nangal, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan)

Pre-feasibility

Shri Amit Kumar Page no.9

4.0 SITE ANALYSIS

(i) Connectivity

The lease area about ~ 19.0 km. from Neem Ka Thana. Dispensary, hospital and

educational facilities are available in Dabla. Railway station is available in Dabla which

is at a distance of ~5.0 km NW direction from the Mine site.

(ii) Land Form, Land Use and Land Ownership

Existing Land Use Pattern

The total ML area of 1.0 ha comprises of Gair Mumkin Pahar Sawai Chak..

(iii) Topography

The lease area comprises undulated terrains. The highest contour is 401 mRL and

lowest is 387 mRL. General ground level is 380 mRL.

(iv) Existing Land Use Pattern {Agriculture, Non-Agriculture, Forest, Water Bodies

(Including Area Under CRZ)}, Shortest Distances From The Periphery Of The

Project To Periphery Of The Forests, National Park, Wild Life Sanctuary, Eco

Sensitive Areas, Water Bodies (Distance From The HFL Of The River), CRZ. In

Case Of Notified Industrial Area, A Copy Of The Gazette Notification

Table – 5

Environmental Settings

S. No. Particular Details

1. Nearest Village Village Dunga Ki Nangal at distance of ~2.0 km. in SE

direction from the Mining lease area

2. Nearest city/ town Neem Ka Thana at distance of ~19.0 km. in SW direction

from the Mining lease area.

3. National Highway/State Highway SH-37B is approx ~5.0 km in South direction from the

mine site.

4. Nearest Railway Station Dabla Railway Station at a distance of ~5.0 km. in NW

direction from Mining Lease area.

5. Nearest Airport Sanganer Air Port, Jaipur at a distance of around ~115

km. in South direction from Mining Lease area.

6. Archaeological Important Place None, within 10 km radius area of mine site.

7. Ecological Sensitive Areas

(National Park, Wildlife

Sanctuary, Biosphere Reserve

etc.)

There is no National Park, Wild Life Sanctuaries,

Biosphere Reserves, Tiger Reserves, Wildlife Corridors,

etc. within 10 km radius

8. Reserved/Protected Forest

within 10 km radius

� Dokan Protected forest at a distance of ~2.0 km

in SW direction.

� Patan Protected forest at a distance of ~3.0 km in

South direction

Page 15: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · Shri Amit Kumar Sharma ... source, marketing area of final products, mode

Quartzite (Masonry Stone) Mining Project, M.L. No. 447/2003, ML Area 1.0 ha. Near Village: Dunga Ki

Nangal, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan)

Pre-feasibility

Shri Amit Kumar Page no.10

� Kharjo Protected forest at a distance of ~2.0 km

in SE direction.

� Protected forest at a distance of ~4.0 km in

North direction.

� Protected forest at a distance of ~8.0 km in SE

direction.

� Mina Ka Nangal Protected forest at a distance of

~7.0 km in SE in direction.

� Balupur Protected forest at a distance of ~7.5 km

in SE direction.

9. Nearest River / water body � Chandravati River at a distance of ~1.0 km in NE

direction.

� Raipur dam at a distance of around ~9.0 km. in

South direction from Mining Lease area.

� Dokan Dam at a distance of around ~8.5 km. in

SW direction from Mining Lease area.

� Jhilo Dam at a distance of around ~8.0 km. in SW

direction from Mining Lease area

Source: preliminary site visit

Page 16: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · Shri Amit Kumar Sharma ... source, marketing area of final products, mode

Quartzite (Masonry Stone) Mining Project, M.L. No. 447/2003, ML Area 1.0 ha. Near Village: Dunga Ki Nangal, Tehsil: Neem Ka Thana, District:

Sikar (Rajasthan)

Form - 1 / Appendix – I

Shri Amit Kumar page no 11

Figure 2: Key plan

Page 17: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · Shri Amit Kumar Sharma ... source, marketing area of final products, mode

Quartzite (Masonry Stone) Mining Project, M.L. No. 447/2003, ML Area 1.0 ha. Near Village: Dunga Ki

Nangal, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan)

Form - 1 / Appendix – I

Shri Amit Kumar page no 12

(v) Existing Infrastructure:

There is no building & structure within mining lease area except some

vegetations existing on the lease area which will be cleared when required.

Total lease area is Gair Mumkin Pahar Sawai chock.

The lease area about ~19.0 km from Neem Ka Thana. Post and Telegraph,

Hospital, Bank, Education and all market facilities are available at this place.

Nearest Airport is Sanganer Air Port, Jaipur is (~115 km.) from the mine site.

Railway station is available in Dabla which is at a distance of ~5.0 km NW

direction from the Mine site.

5.0 PLANNING BRIEF

(i) Planning Concept (Type of Industries, Facilities, and Transportation etc.)

Town and Country Planning/Development Authority Classification

This is a mining Project

(ii) Population Projection

Manpower required will be engaged from nearby areas. No significant influx of

people is anticipated in the area.

(iii) Land Use Planning

The extent of proposed mining lease area is 1.0 ha. The area comprises of Gair

Mumkin Pahar Sawai Chok . At the five year of life of mine, total excavated area

will be about 0.85 ha, which will be converted in to water reservoir and 0.15

ha will be covered by plantation.

(iv) Assessment of Infrastructure Demand (Physical & Social)

Lessee will assess the demand of infrastructure (Physical & Social) in nearby

area of the mine site and same will be developed under social work

(v) Amenities/Facilities

Mining Management will develop the Amenities/Facilities in the nearby area of

the mine site as per requirement of local people of the nearby area under

corporate social responsibility programs.

6.0 PROPOSED INFRASTRUCTURE

(i) Residential Area (Non Processing Area)

This is not required as mine workers comes from nearby villages. Rest

shelter to the workers will be provided outside the lease area.

Page 18: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · Shri Amit Kumar Sharma ... source, marketing area of final products, mode

Quartzite (Masonry Stone) Mining Project, M.L. No. 447/2003, ML Area 1.0 ha. Near Village: Dunga Ki

Nangal, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan)

Form - 1 / Appendix – I

Shri Amit Kumar page no 13

(ii) Green Belt

Green Belt/plantation will be developed equal to 33% of total Mining lease

area. The dead plants will be replaced by fresh plants. Native Plant species

will be planted.

(iii) Connectivity

The lease area about ~19.0 km from Neem Ka Thana. Post and Telegraph,

Hospital, Bank, Education and all market facilities are available at this place.

Nearest Airport is Sanganer Air Port, Jaipur is (~115 km.) from the mine site.

Railway station is available in Dabla which is at a distance of ~5.0 km NW

direction from the Mine site.

(iv) Water Management (Source & Supply of water)

Total water requirement for the project will be 3.0 KLD which will be used

for domestic as well as dust supression purpose and sourced from nearby

village .

(v) Sewerage System

Domestic sewage water generated from office toilet will be disposed in soak

pits via septic tank. Outside discharge is not envisaged.

(vi) Industrial Waste Management

No industrial waste water will be generated from this mine during mining

operation.

(vii) Solid Waste Management

Waste will be used as a second grade mineral and sold out by the lessee as

well as used for maintenance of roads and top soil will be used for plantation

purpose.

(viii) Power Requirement & Supply/Source

Electric power will not be required in mining operations.

7.0 REHABILITATION AND RESETTLEMENT (R & R) PLAN

(i) Policy To Be Adopted (Central/State) In Respect Of The Project Affected

Persons Including Home Oustees, Land Oustees And Landless Laborers

(Brief Outline To Be Given)

Not Applicable as the lease area falls in government.

8.0 PROJECT SCHEDULE & COST ESTIMATES

(i) Likely Date Of Start Of Construction And Likely Date Of Completion (Time

Schedule For The Project To Be Given)

Page 19: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · Shri Amit Kumar Sharma ... source, marketing area of final products, mode

Quartzite (Masonry Stone) Mining Project, M.L. No. 447/2003, ML Area 1.0 ha. Near Village: Dunga Ki

Nangal, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan)

Form - 1 / Appendix – I

Shri Amit Kumar page no 14

The mining activity will be started after obtaining Environmental Clearance

from MoEF, New Delhi and acquiring the valid mining lease from Mines and

Geology Department of the State Government.

(ii) Estimated Project Cost Along With Analysis In Terms Of Economic

Viability of the Project

Cost of the project : Rs. 50 lakh

Cost for Environmental Protection Measures : Rs. 0.5 lakhs

9.0 ANALYSIS OF PROPOSAL

���� The Masonry Mining Lease will result in growth of the surrounding areas by

increasing direct and indirect employment opportunities in the region

including ancillary development and supporting infrastructure. Special

emphasis on Financial and Social benefits will be given to the local people

including tribal population, if any, in the area.

���� Development of social amenities will be in the form of medical facilities,

education to underprivileged and creation of self help groups.

���� No major adverse effect on environment is envisaged as the required

mitigation measures are inbuilt in the project.

10.0 ENVIRONMENTAL MANAGEMENT PLAN

10.1.1 AIR POLLUTION CONTROL

���� Wet drilling with sharp drill bits will be done for drilling to reduce generation

of dust.

���� Green Belt will be developed on periphery of the lease boundary and haul

roads,

���� Periodical water spraying on the haul roads will be done.

10.1.2 WATER MANAGEMENT

���� There is no surface water body in and around the mining lease area.

���� The rain water collected in mining pit will be diverted in the abandoned

existing and the area used in spraying.

���� Domestic waste water generated from office toilet will be disposed in soak pits

via septic tank.

10.1.3 NOISE POLLUTION CONTROL

���� Proper maintenance of all machines will be carried out which will reduce noise

generation during operations.

Page 20: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · Shri Amit Kumar Sharma ... source, marketing area of final products, mode

Quartzite (Masonry Stone) Mining Project, M.L. No. 447/2003, ML Area 1.0 ha. Near Village: Dunga Ki

Nangal, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan)

Form - 1 / Appendix – I

Shri Amit Kumar page no 15

���� Workers exposed to high noise levels will be provided with ear defenders.

10.1.4 LAND RECLAMATION

���� Total mining lease area is 1.0 hectares.

� At the five year of life of mine, total excavated area will be about 0.85 ha, which

will be converted in to water reservoir and 0.15 ha will be covered by

plantation.

10.1.5 SOLID WASTE MANAGEMENT

Waste will be used as a second grade mineral and sold out by the lessee as well as

used for maintenance of roads and top soil will be used for plantation purpose.

10.1.6 GREEN BELT DEVELOPMENT

���� Local species will be preferred for plantation

���� Tree guards will be provided for production

���� Green Belt/plantation will be developed equal to 33% of total Mining lease

area. The dead plants will be replaced by fresh plants. Native Plant species will

be planted.

Page 21: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · Shri Amit Kumar Sharma ... source, marketing area of final products, mode
Page 22: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · Shri Amit Kumar Sharma ... source, marketing area of final products, mode
Page 23: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · Shri Amit Kumar Sharma ... source, marketing area of final products, mode
Page 24: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · Shri Amit Kumar Sharma ... source, marketing area of final products, mode
Page 25: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · Shri Amit Kumar Sharma ... source, marketing area of final products, mode
Page 26: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · Shri Amit Kumar Sharma ... source, marketing area of final products, mode
Page 27: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · Shri Amit Kumar Sharma ... source, marketing area of final products, mode
Page 28: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · Shri Amit Kumar Sharma ... source, marketing area of final products, mode
Page 29: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · Shri Amit Kumar Sharma ... source, marketing area of final products, mode
Page 30: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · Shri Amit Kumar Sharma ... source, marketing area of final products, mode
Page 31: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · Shri Amit Kumar Sharma ... source, marketing area of final products, mode
Page 32: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · Shri Amit Kumar Sharma ... source, marketing area of final products, mode
Page 33: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · Shri Amit Kumar Sharma ... source, marketing area of final products, mode
Page 34: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · Shri Amit Kumar Sharma ... source, marketing area of final products, mode
Page 35: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · Shri Amit Kumar Sharma ... source, marketing area of final products, mode
Page 36: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · Shri Amit Kumar Sharma ... source, marketing area of final products, mode