Page 1: PRBs in Germanyrtdf.clu-in.org/PUBLIC/PERMBARR/MINUTES/110702/birke-1.pdf · reactive materials for cVOCs/chlorobenzenes/PAHs “RUBIN“ (4-5 Mio $) ... Overview of the drain-and-gate
Page 2: PRBs in Germanyrtdf.clu-in.org/PUBLIC/PERMBARR/MINUTES/110702/birke-1.pdf · reactive materials for cVOCs/chlorobenzenes/PAHs “RUBIN“ (4-5 Mio $) ... Overview of the drain-and-gate

PRBs in Germany■ Two R&D networks

(funded by the Federal Government)

“SAFIRA“ (6 Mio $) Basic R&D, semi-technical scalereactive materials for cVOCs/chlorobenzenes/PAHs

“RUBIN“ (4-5 Mio $) R&D and technical implementation of PRBs at different sites across the country

■ Public funds spent ≈ 14 Mio $ ■ Different private sites ≈ 6 Mio $

Page 3: PRBs in Germanyrtdf.clu-in.org/PUBLIC/PERMBARR/MINUTES/110702/birke-1.pdf · reactive materials for cVOCs/chlorobenzenes/PAHs “RUBIN“ (4-5 Mio $) ... Overview of the drain-and-gate

■ RUBIN project, volume: appr. 1.5 Mio $ (50 % public funds)

Bernau■ High contamination of cVOCs affecting two

aquifers (TCE up to around 100 mg/L)

■ Special reactor design capturing both aquifers by pumping GW and injecting itinto a collecting zone and additional tanks

■ Closed funnel = containment for the source and serving as a collecting/mixingzone for accumulating lifted GW before itenters the gate

■ RUBIN project, volume: appr. 1.5 Mio $ (50 % public funds)

Page 4: PRBs in Germanyrtdf.clu-in.org/PUBLIC/PERMBARR/MINUTES/110702/birke-1.pdf · reactive materials for cVOCs/chlorobenzenes/PAHs “RUBIN“ (4-5 Mio $) ... Overview of the drain-and-gate

Cut-off wallCut-off wall

Bracing Bracing

NE SW

Surface level

“Containment”

Inflow

Inflow

Reactor elements (modules) Drain

GWMS

Cut-off wall

18.30 m

2.30 m below s.l

4.50 m below s.l 5.50 m below s.l

8.0 m below s.l.

Re­infil­tra­tion

Bernau Elevation of the gate system

0 10 20 0 0 50 m

Top view of the funnel-and-gate

system 3 4

Page 5: PRBs in Germanyrtdf.clu-in.org/PUBLIC/PERMBARR/MINUTES/110702/birke-1.pdf · reactive materials for cVOCs/chlorobenzenes/PAHs “RUBIN“ (4-5 Mio $) ... Overview of the drain-and-gate

Bernau – PerformanceDecay of TCE

120000 Half life time of TCE according to column testing

100 mg/L

80000

50

0

40000

c(o) = 100 mg/L

Iron sponge (GG 0,3-2 mm)

0 280 min. 400 800 1200

Average retention time V/Vo: 8 V/Vo: 21 V/Vo: 34 V/Vo: 48 V/Vo: 64 V/Vo: 94 V/Vo: 114

Page 6: PRBs in Germanyrtdf.clu-in.org/PUBLIC/PERMBARR/MINUTES/110702/birke-1.pdf · reactive materials for cVOCs/chlorobenzenes/PAHs “RUBIN“ (4-5 Mio $) ... Overview of the drain-and-gate

Bernau – PerformanceTCE-Decay in the PRB

c(o)= 96,5 mg/L

0

25

50

75

100

R1 R2 R3 R4 R5 R6 R7 R8 R9 R10

[mg/

L]

Decay of cis-DCE and VC in the PRB; c(o)= 96,5 mg/L

0,00

0,05

0,10

0,15

0,20

0,25

R1 R2 R3 R4 R5 R6 R7 R8 R9 R10

[mg/

L]

c-DCE VC

0

1

100

R1 R2 R3 R4 R5 R6 R7 R8 R9 R10

[µm

ol/L

]

TCE c-DCE VC PCE

Concentration profiles of single components

- semi-logarithmic display -Field results (appr. after one

pore volume has been

exchanged)

Page 7: PRBs in Germanyrtdf.clu-in.org/PUBLIC/PERMBARR/MINUTES/110702/birke-1.pdf · reactive materials for cVOCs/chlorobenzenes/PAHs “RUBIN“ (4-5 Mio $) ... Overview of the drain-and-gate

Bitterfeld (“SAFIRA“) ■ Semi-technical test site for new PRB materials; five shafts(30 m deep, 3.50 m Ø)containing diff. steel reactors,loaded with different media: ■ Microaerophilic, anaerobicreactors (aquifer material) ■ Combined media, e.g.,GAC/microbiol.; ZVI/ORC) ■ Membrane- and zeolite-supported Palladium (Pd)■ Catalytic oxidation usingmetal catalysts; ultrasound

Page 8: PRBs in Germanyrtdf.clu-in.org/PUBLIC/PERMBARR/MINUTES/110702/birke-1.pdf · reactive materials for cVOCs/chlorobenzenes/PAHs “RUBIN“ (4-5 Mio $) ... Overview of the drain-and-gate

http://safira.ufz.de

Membrane-supported Pd/H2 rapidly dehaloge­nates monochlorobenzene (MCB) to benzene

Page 9: PRBs in Germanyrtdf.clu-in.org/PUBLIC/PERMBARR/MINUTES/110702/birke-1.pdf · reactive materials for cVOCs/chlorobenzenes/PAHs “RUBIN“ (4-5 Mio $) ... Overview of the drain-and-gate

Denkendorf

■ cVOC contamination (TCE, PCE, cis-DCE, 1,1,1-TCA, VC) is treated with GAC

■ “Drain-and-Gate” PRB to meet the low hydraulic gradient of 2%:

90 m long and 6 m deep gravel drainage directing the flow right towards a single GAC reactor

■ GAC reactor was placed inside a shaft (6 m deep)

Page 10: PRBs in Germanyrtdf.clu-in.org/PUBLIC/PERMBARR/MINUTES/110702/birke-1.pdf · reactive materials for cVOCs/chlorobenzenes/PAHs “RUBIN“ (4-5 Mio $) ... Overview of the drain-and-gate

Denkendorf

REWE-Mar kt

ESA Eppinger GmbH

Fa. Goldmann-Nörenberg

Körsch (

GWM12

0

Drainage

Reactor (shaft)

Rewe-Supermarkt

Areas of cVOC contamina

M2M3

M6

M8

BGW12 BGW11

GWM8

BGW 8

well

BGW 10

GWM13

BGW9

GWM2

GW M4 GWM3 BGW3

BGW 4

GWM10 GWM9 Spülschacht

GWM11

GW M7 GWM6

BGW13

BGW 7

GWM5

BGW5

UVB GW flow direction

street

creek

(creek)

Overview of the drain-and-gate system

West East South North

Aquitard

app. 90 m app. 60 m

Cohesive material

Filter gravel

Drainage tube (DN100)

Water table

Palladium on zeolite

3 m

Activated carbon

Outlet tube (DN150) Receiving water (Körsch)

Pump Water table

6 m

)

Page 11: PRBs in Germanyrtdf.clu-in.org/PUBLIC/PERMBARR/MINUTES/110702/birke-1.pdf · reactive materials for cVOCs/chlorobenzenes/PAHs “RUBIN“ (4-5 Mio $) ... Overview of the drain-and-gate

Denkendorf

RUBIN project: ■ Bypass: hydrogenation catalysts

like palladium on zeolite are tested

■ Addition of hydrogen gas:

fast and complete degradation of cVOCs (first, small column experiments in the first quarter of 2002: especially VC is effectively degraded, too)

Page 12: PRBs in Germanyrtdf.clu-in.org/PUBLIC/PERMBARR/MINUTES/110702/birke-1.pdf · reactive materials for cVOCs/chlorobenzenes/PAHs “RUBIN“ (4-5 Mio $) ... Overview of the drain-and-gate

Edenkoben

■ cVOCs (20% TCE, 50% cis-DCE, 30% 1,1,1-TCA)

■ 1998: pilot-scale F&G 2000: expanded to a full-scale F&G

■ Gates designed for a diverted, vertical flow inside Groundwater is passively lifted by avertical drainage (gravel columns) andthus directed through the ZVI bed

Page 13: PRBs in Germanyrtdf.clu-in.org/PUBLIC/PERMBARR/MINUTES/110702/birke-1.pdf · reactive materials for cVOCs/chlorobenzenes/PAHs “RUBIN“ (4-5 Mio $) ... Overview of the drain-and-gate

Edenkoben

■ Six identical gates, each constructed as a sheet pile caisson (open at its bottom)

■ Funnel: continuous sheet pile wall, 430 m long, 14 m deep

■ Funnel also runs through every gate, thus separating each of them into two chambers

■ Inside the gates the sheet pile wall was buried down to 1 m below the lowest groundwater level anticipated = overflow weir between the chambers

Page 14: PRBs in Germanyrtdf.clu-in.org/PUBLIC/PERMBARR/MINUTES/110702/birke-1.pdf · reactive materials for cVOCs/chlorobenzenes/PAHs “RUBIN“ (4-5 Mio $) ... Overview of the drain-and-gate
Page 15: PRBs in Germanyrtdf.clu-in.org/PUBLIC/PERMBARR/MINUTES/110702/birke-1.pdf · reactive materials for cVOCs/chlorobenzenes/PAHs “RUBIN“ (4-5 Mio $) ... Overview of the drain-and-gate
Page 16: PRBs in Germanyrtdf.clu-in.org/PUBLIC/PERMBARR/MINUTES/110702/birke-1.pdf · reactive materials for cVOCs/chlorobenzenes/PAHs “RUBIN“ (4-5 Mio $) ... Overview of the drain-and-gate

Karlsruhe

■ 2000/2001: full-scale F&G packed with granular activated carbon (GAC, 150 tons) to treat PAHs and BTEX

■ Funnel consists of sheet piles (200 m long, 17 m deep)

■ Eight gates consisting of specifically perforated steel; cylindrical steel tubes were lowered into previously set up, large diameter boreholes (2.5 m)

Page 17: PRBs in Germanyrtdf.clu-in.org/PUBLIC/PERMBARR/MINUTES/110702/birke-1.pdf · reactive materials for cVOCs/chlorobenzenes/PAHs “RUBIN“ (4-5 Mio $) ... Overview of the drain-and-gate

Karlsruhe

Overview of the full-scale F&G PRB

Former gas works plant

Page 18: PRBs in Germanyrtdf.clu-in.org/PUBLIC/PERMBARR/MINUTES/110702/birke-1.pdf · reactive materials for cVOCs/chlorobenzenes/PAHs “RUBIN“ (4-5 Mio $) ... Overview of the drain-and-gate

Karlsruhe

■ Pea gravel, serving as a filtermedium and for homogenizingthe flow through the gates,was packed at the inflow andoutflow zone

■ Free space left betweenthe steel tubes and the adjacent funnelsegments was sealedoff using clay

Clay seal

Pea gravel

Sheet pile wall Activated

carboninflow

outflowPerforated steel sheets

Page 19: PRBs in Germanyrtdf.clu-in.org/PUBLIC/PERMBARR/MINUTES/110702/birke-1.pdf · reactive materials for cVOCs/chlorobenzenes/PAHs “RUBIN“ (4-5 Mio $) ... Overview of the drain-and-gate

Karlsruhe

Sheet piles were pressed into the ground using the “silent piler”-technique

Packing the gate with granular activated carbon

Page 20: PRBs in Germanyrtdf.clu-in.org/PUBLIC/PERMBARR/MINUTES/110702/birke-1.pdf · reactive materials for cVOCs/chlorobenzenes/PAHs “RUBIN“ (4-5 Mio $) ... Overview of the drain-and-gate

Oberursel■ cVOC contamination treated with ZVI at

the BOSTIK site (TOTALFINAELF) ■ L-shaped F&G equipped with one gate ■ Gate shaped like a wide annulus:

◆ Diameter 3.3 m, 13 m deep ◆ Overlapping boreholes cast with

concrete forming the annulus(at the inflow/outflow zone, permeableconcrete was cast)

■ Funnel (slurry wall): 175 m long, 4-19 mdeep, 0.6 m thick

Page 21: PRBs in Germanyrtdf.clu-in.org/PUBLIC/PERMBARR/MINUTES/110702/birke-1.pdf · reactive materials for cVOCs/chlorobenzenes/PAHs “RUBIN“ (4-5 Mio $) ... Overview of the drain-and-gate

OberurselGate construction

Page 22: PRBs in Germanyrtdf.clu-in.org/PUBLIC/PERMBARR/MINUTES/110702/birke-1.pdf · reactive materials for cVOCs/chlorobenzenes/PAHs “RUBIN“ (4-5 Mio $) ... Overview of the drain-and-gate

Oberursel Gate construction, shape of the F&G