1 Pradhan Mantri Gram Sadak Yojana (PMGSY) A Presentation of PMGSY Sanctioned Projects & Proposals for PMGSY Phase-IX Programme Presented by Manipur State Rural Roads Dev. Agency (MSRRDA) 12 th February 2013 2 Bharat Nirman Rural roads – a major component of Bharat Nirman for augmenting rural infrastructure launched in Feb 2005. Aims to provide connectivity to habitations of population of 1000+. Eligibility for Hill States, Tribal (Schedule-V) areas being above 500. To cover designated unconnected habitations of 250+ in North East. To upgrade/renew Through Routes to ensure farm to market connectivity. Funding & Allocation : At least 80% on the basis of road length required for providing connectivity to Unconnected Habitations and upto 20% on the basis of road length requiring Upgradation under the PMGSY.

Upload: others

Post on 14-Jul-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Pradhan Mantri Gram Sadak Yojana (PMGSY)planningmanipur.gov.in/pdf/Hills/UNC Meeting 12Feb2013/Final PPT … · Pradhan Mantri Gram Sadak Yojana (PMGSY) A Presentation of PMGSY Sanctioned

1

Pradhan Mantri Gram Sadak Yojana (PMGSY)

A Presentation of

PMGSY Sanctioned Projects&

Proposals for PMGSY Phase-IX Programme Presented by

Manipur State Rural Roads Dev. Agency (MSRRDA)

12th February 2013

2

Bharat Nirman

Rural roads – a major component of Bharat Nirman for augmentingrural infrastructure launched in Feb 2005.

Aims to provide connectivity to habitations of population of 1000+.Eligibility for Hill States, Tribal (Schedule-V) areas being above500.

To cover designated unconnected habitations of 250+ in North East.

To upgrade/renew Through Routes to ensure farm to marketconnectivity.

Funding & Allocation : At least 80% on the basis of road lengthrequired for providing connectivity to Unconnected Habitationsand upto 20% on the basis of road length requiring Upgradationunder the PMGSY.

Page 2: Pradhan Mantri Gram Sadak Yojana (PMGSY)planningmanipur.gov.in/pdf/Hills/UNC Meeting 12Feb2013/Final PPT … · Pradhan Mantri Gram Sadak Yojana (PMGSY) A Presentation of PMGSY Sanctioned

2

3

WORKS SANCTIONED UNDER PMGSY (Ph-II to Ph-VIII )

PhaseNos of Roads Habitation Length (Km) Approved Cost (Rs Crore)

Hills Valley Total Hills Valley Total Hills Valley Total Hills Valley Total

II 49 81 130 58 10 68 395 315 710.6 43.44 37.27 80.72

V 36 26 62 75 18 93 405 151 556.2 100.23 52.10 152.33

VI 62 81 143 161 23 184 853 304 1157 251.29 112.37 363.66

VII 65 4 69 149 6 155 723 14 736.6 224.03 7.65 231.68

VIII 50 0 50 112 0 112 502 0 502 254.25 0.00 254.25

Total 262 192 454 555 57 612 2879 784 3663 873.24 209.39 1082.6

Particular Roads Length Cost

Hills 262 58% 2879 79% 873.24 81%

Valley 192 42% 784 21% 209.39 19%

Manipur 454 100% 3663 100% 1082.6 100%

District-wise Details of Roads in Manipur under PMGSY:Ph-II to-VIII

District

No. of Roads Roads Length in Km Cost Rs in Crores

Sanctd Comptd % Sanctd Comptd % ApprovedExpenditure (wrt

Appvd)**

Imphal West 40 38 95% 156 152.56 98% 33.03 30 91%Bishnupur 38 37 97% 162 161.19 99% 38.18 32.91 86%

Imphal East 53 50 94% 203 201.98 100% 62.8 60.28 96%Thoubal 42 42 100% 263 263.08 100% 75.38 71.02 94%

Sub Total 173 167 97% 784 778.81 99% 209.39 194.2 93%

Tamenglong 42 15 36% 458 420.18 92% 123.55 65.66 53%Chandel 59 41 69% 512 396.23 77% 141.78 74.60 53%

CCPur 55 44 80% 579 512.8 89% 163.59 118.00 72%

Ukhrul 51 21 41% 617 447.68 73% 186.74 92.55 50%Senapati 74 34 46% 712 552.03 77% 207.25 120.15 58%

Sub Total 281 155 71% 2879 2328.92 85% 822.91 470.96 64%

Grand Total 454 322 71% 3663 3107.73 85% 1032.30 665.17 64%

Page 3: Pradhan Mantri Gram Sadak Yojana (PMGSY)planningmanipur.gov.in/pdf/Hills/UNC Meeting 12Feb2013/Final PPT … · Pradhan Mantri Gram Sadak Yojana (PMGSY) A Presentation of PMGSY Sanctioned

3

Sanctioned Roads in Manipur (Hills & Valley) under PMGSY:Ph-II to-VIII

District

No. of Roads Roads Length in Km Cost Rs in Crores

Sanctd Comptd % Sanctd Comptd % ApprovedExpenditure

(wrt Appvd)**

Hills 281 155 71% 2878.68 2328.92 85% 822.91 470.96 64%

Valley 173 167 97% 784.11 778.81 99% 209.39 194.21 93%

Manipur 454 322 71% 3662.79 3107.73 85% 1032.30 665.17 64%

281

2878.68

822.91

173.00

784.11

209.39

1 2 3

Share of PMGSY Works in Hills & Valley (1. Roads, 2. Length & 3. Cost)

Hills Valley

No of Roads Road Length (Km) Cost (Rs Crores)

District Roads No Road Length in Km Cost (Rs in crores)

Sanctd Comptd % Sanctd Comptd % Appvd Expdr wrt Appvd**

TML 42 15 36% 457.7 420.2 92% 124 66 53%

Chandel 59 41 69% 512.4 396.2 77% 142 75 53%

CCPur 55 44 80% 578.7 512.8 89% 164 118 72%Ukhrul 51 21 41% 617.5 447.7 73% 187 93 50%

Senapati 74 34 46% 712.4 552 77% 207 120 58%

(Hills) 281 155 55% 2879 2329 81% 823 471 57%

Status of Roads in 5 Hills Districtsunder PMGSY upto Ph-VIII

Progress & Expenditure inclusive of Phase-VIII works : 6 BB & 46 Roads works with length of 500 Kms and cost of Rs 200Crores in Hills which are being awarded soon.

0

50

100

150

200

250

TML Chandel CCPur Ukhrul Senapati

Amount sanctioned (Rs Crores)

396.23 420.18447.68

512.8552.03

0

100

200

300

400

500

600

Chandel TML Ukhrul CCPur Senapati

Length completed (Km)

65.6674.6

92.55

118 120.15

0

20

40

60

80

100

120

140

TML Chandel Ukhrul CCPur Senapati

Expenditure (Rs in Crores)

Page 4: Pradhan Mantri Gram Sadak Yojana (PMGSY)planningmanipur.gov.in/pdf/Hills/UNC Meeting 12Feb2013/Final PPT … · Pradhan Mantri Gram Sadak Yojana (PMGSY) A Presentation of PMGSY Sanctioned

4

7

District No of DPRs (Length in Km & cost in Rs Crore)

St-I* St-II* Upgtn* BB* Total Length CostBishnupur 2 - 35 - 37 130.88 95.55Imp East 8 8 32 - 48 211.28 104.17Imp West 1 - 44 - 45 215.07 118.31Thoubal 1 3 56 - 60 266.95 171.41

Sub-Total 12 11 167 0 190 824.18 489.44HillsChandel 10 31 - 2 43 323.74 175.04CCpur 42 21 3 - 66 514.14 292.77Senapati 85 43 7 10 145 1217.8 722.55TML 22 23 5 7 57 620.59 294.32Ukhrul 50 21 1 4 76 725.64 366.91

Sub-Total 209 139 16 23 387 3401.91 1851.59Manipur 221 150 183 23 577 4226.09 2341.03* St-I : Stage-I & St-II : Stage-II, Upgtn : Upgradation & BB for Bailey brdige

New Proposals of Roadsunder PMGSY Phase-IX

Particulars Manipur Hills Valley

Length 4226.09 3401.91 80% 824.18 20%Cost 2341.03 1851.59 79% 489.44 21%

Click mouse to go to program details

0

1000

2000

3000

4000

Length Cost

Hills

Valley

Proposals Ph-IX (Length in Km & Cost in Rs Cr)

8

PROPOSED WORKS PROGRAMME FOR PMGSY PHASE-IX Valley Districts (Block wise & District wise)

(Length in Km & Cost in Rs Lakhs)

Sl. District / BlockStage-I Stage-II Upgradation New (Stage-I+II) Bridge Total Length

Length Cost Length Cost Length Cost Length Cost Length

(m)Cost Road (Km) Bridge (m) Cost

Moirang 54.21 2922.02 1.46 184.89 55.67 3106.911 Bishnupur 71.86 5979.02 3.35 469.00 75.21 6448.02

Bishnupur (Dist) 0.00 0.00 0.00 0.00 126.07 8901.04 4.81 653.89 0 0 130.88 9554.93

2 Jiribam 16.01 672.86 5.11 255.25 12.84 642.00 33.96 1570.11Keirao Bitra 55.4 2659.92 11.80 681.32 67.20 3341.24Sawombung 87.87 4393.5 22.25 1112.50 110.12 5506.00

Imphal East (Dist) 0.00 0.00 16.01 672.86 148.38 7308.67 46.89 2435.82 0 0 211.28 10417.35

3 Wangoi. 82.51 4539.55 82.51 4539.55

Haorangsabal 129.26 7110.4 3.30 182.00 132.56 7292.40

Imphal West (Dist) 0.00 0.00 0.00 0.00 211.77 11650 3.30 182.00 0 0 215.07 11831.95

4 Kakching 112.15 7116.7 112.15 7116.70

Thoubal 3.00 180.00 13.00 819.00 138.8 9025.4 154.80 10024.40

Thoubal (Dist) 3.00 180.00 13.00 819.00 250.95 16142.1 0.00 0.00 0 0 266.95 17141.10

Total (Valley) 3.00 180.00 29.01 1491.86 737.17 44001.8 55.00 3271.71 0 0 824.18 48945.33

Page 5: Pradhan Mantri Gram Sadak Yojana (PMGSY)planningmanipur.gov.in/pdf/Hills/UNC Meeting 12Feb2013/Final PPT … · Pradhan Mantri Gram Sadak Yojana (PMGSY) A Presentation of PMGSY Sanctioned

5

9

PROPOSED WORKS PROGRAMME FOR PMGSY PHASE-IX [Hill Districts : Block wise & District wise - 1]

(Length in Km & Cost in Rs Lakhs)

Sl. District / Block

Stage-I Stage-II Upgradation New (Stage-I+II) Bridge Total

Length Cost Length Cost Length Cost Length Cost Length

(m)Cost Length

Bridge length

( m )Cost

5 Chandel. 22.00 1110.00 13.50 680.28 35.50 1790.28Machi. 45.64 2108.50 37.41 1944.60 350.00 83.05 4403.10Tengnoupal. 87.67 5110.65 87.67 5110.65Chakpikarong. 40 2040 77.52 4160.19 117.52 6200.19

Chandel Dist 107.64 5258.50 216.10 11895.72 0.00 0.00 0.00 0.00 0.00 350.00 323.74 17504.226 Singhat 18.64 838.8 29.37 1709.25 48.01 2548.05

Tipaimukh 35.94 2696.2 35.94 2696.20Thanlon 22 1309 48.5 3637 70.5 4946.00Henglep 71.23 4017 21.1 1582 92.33 5599.00Samulamlan 105.58 5285.1 6.65 388.32 112.23 5673.39Churchandpur 108.32 5576.1 26.75 1317.09 20.06 921.53 155.13 7814.76

CCPur Dist 325.77 17026.01 168.31 11329.86 20.06 921.53 0.00 0.00 0.00 0.00 514.14 29277.40

10

PROPOSED WORKS PROGRAMME FOR PMGSY PHASE-IX [Hill Districts : Block wise & District wise - 2]

(Length in Km & Cost in Rs Lakhs)

Sl. District / Block

Stage-I Roads Stage-II Roads Up-gradation Roads New (Stage-I+II) Bridge Total

Length Cost Length Cost Length Cost Length Cost Length

(m)Cost Length

Bridge length ( m )

Cost

7 Kangpokpi 96.10 4324.50 17.04 825.92 113.14 5150.42Saitu 67.00 4860.00 29.40 1481.80 96.40 6341.80Paomata 59.00 3304.00 29.55 1654.80 23.96 1341.76 3199.00 112.51 9499.56Saikul 60.00 5247.00 94.30 4495.50 154.30 9742.50Purul 208.59 11681.04 64.97 3638.32 15.50 868.00 289.06 16187.36Tadubi 305.20 17091.20 147.19 8242.64 452.39 25333.84

Senapati Dist 795.89 46507.74 382.45 20338.98 39.46 2209.76 0.00 0.00 0.00 3199.00 1217.80 72255.488 Tamenglong 0.00 0.00 120.43 5419.35 120.43 5419.35

Tamei 101.50 4567.50 52.10 2344.50 153.60 6912.00Nungba 152.25 6851.25 28.21 1269.45 180.46 8120.70Tousem 95.00 4275.00 18.10 814.50 53.00 2385.00 1505.00 166.10 8979.50

Tamenglong Dist 348.75 15693.75 218.84 9847.80 53.00 2385.00 0.00 0.00 0.00 1505.00 620.59 29431.55

Page 6: Pradhan Mantri Gram Sadak Yojana (PMGSY)planningmanipur.gov.in/pdf/Hills/UNC Meeting 12Feb2013/Final PPT … · Pradhan Mantri Gram Sadak Yojana (PMGSY) A Presentation of PMGSY Sanctioned

6

11

PROPOSED WORKS PROGRAMME FOR PMGSY PHASE-IX [Hill Districts : Block wise & District wise - 3](Length in Km & Cost in Rs Lakhs)

Sl. District /

Block

Stage-I Stage-II Upgradation New (Stage-I+II) Bridge Total

Length Cost Length Cost Length Cost Length Cost Length

(m)Cost Length

Bridge length

( m )Cost

8 Tamei 101.50 4567.50 52.10 2344.50 153.60 6912.00Tousem 95.00 4275.00 18.10 814.50 53.00 2385.00 1505 166.10 8979.50Tamenglong 120.43 5419.35 120.43 5419.35Nungba 152.25 6851.25 28.21 1269.45 180.46 8120.70

Tamenglong Dist 348.75 15693.75 218.84 9847.80 53.00 2385.00 0.00 0.00 0.00 1505 620.59 29431.559 Ukhrul. 211.40 9678.74 35.31 1839.58 9.00 540.00 630 255.71 12688.32

Phungyar. 117.72 5297.40 39.25 2106.60 156.97 7404.00KasomKhullen 27.50 1237.50 21.43 1260.30 48.93 2497.80Chingai. 34.00 1656.18 96.73 6049.04 210 130.73 7915.22Kamjong. 106.00 4770.00 27.30 1415.48 133.30 6185.48

Ukhrul Dist 496.62 22639.82 220.02 12671.00 9.00 540.00 0.00 0.00 0.00 840 725.64 36690.82Total (Hills) 2074.67 107125.82 1205.72 66083.36 121.52 6056.29 0.00 0.00 0.00 5894 3401.91 185159.47

PHOTOGRAPHS OF WORKS TAKEN-UP UNDER PMGSY

IN CHANDEL DISTRICT, MANIPUR

12

Page 7: Pradhan Mantri Gram Sadak Yojana (PMGSY)planningmanipur.gov.in/pdf/Hills/UNC Meeting 12Feb2013/Final PPT … · Pradhan Mantri Gram Sadak Yojana (PMGSY) A Presentation of PMGSY Sanctioned

7

PMGSY – PHOTOS

13

Inspection of Road from Komlathabi to Lamkang KhunyaiBy NQM, SK Gupta

Road from Komlathabi to Lamkang Khunyai (3.00 Km)Chandel Block, Chandel District, MN0219 (Ph-VI)

PMGSY – PHOTOS

14

ROAD FROM Road from Sajik Tampak to Heikha L. (12.00 Km)Chakpikarong Block, Chandel District, MN0212 (Ph-VI)Inspection of road by NQM : Shri SK Gupta

Page 8: Pradhan Mantri Gram Sadak Yojana (PMGSY)planningmanipur.gov.in/pdf/Hills/UNC Meeting 12Feb2013/Final PPT … · Pradhan Mantri Gram Sadak Yojana (PMGSY) A Presentation of PMGSY Sanctioned

8

PMGSY – PHOTOS

15Road from Machi Gate to Kangoi Khullen, Machi Block, Chandel District, MN0222 (Ph-VI)

PMGSY – PHOTOS

16

Road from Khudengthabi to Ruilam Centre (35.00 Km)Tengnoupal Block, Chandel District, MN0205 (Ph-V), MN0216 & MN0224 (Ph-VI)

Inspection of road by ACS & MSRRDA Engineers

Page 9: Pradhan Mantri Gram Sadak Yojana (PMGSY)planningmanipur.gov.in/pdf/Hills/UNC Meeting 12Feb2013/Final PPT … · Pradhan Mantri Gram Sadak Yojana (PMGSY) A Presentation of PMGSY Sanctioned

9

PHOTOGRAPHS OF WORKS TAKEN-UP UNDER PMGSY

IN CHURACHANDPUR DISTRICT, MANIPUR

17

18

Road from Sangaikot to Khongkhai, (Black topped, Phase-VI, MN0328)Churachandpur Block, Churachandpur District.

Page 10: Pradhan Mantri Gram Sadak Yojana (PMGSY)planningmanipur.gov.in/pdf/Hills/UNC Meeting 12Feb2013/Final PPT … · Pradhan Mantri Gram Sadak Yojana (PMGSY) A Presentation of PMGSY Sanctioned

10

19Road from NH-150 to Tokpa Khul(12.27 Km)Henglep Block, Churachandpur District, MN0315 (Ph-V)

20Road from Singngat to Alusingtam (17.40 Km)Singngat Block, Churachandpur District, MN0350 (Ph-VII)

Page 11: Pradhan Mantri Gram Sadak Yojana (PMGSY)planningmanipur.gov.in/pdf/Hills/UNC Meeting 12Feb2013/Final PPT … · Pradhan Mantri Gram Sadak Yojana (PMGSY) A Presentation of PMGSY Sanctioned

11

21Road from NH150/Bukpi to Bungpilon : 14.28 KmThanlon Block, Churachandpur District, MN0353 (Ph-VII)

22

Road from Pherzawl to Leisen : 23.00 KmTipaimukh Block, Churachandpur District, MN0306 (Ph-V), MN0319 & MN0332 : 23.00 Km (Ph-VI)

Page 12: Pradhan Mantri Gram Sadak Yojana (PMGSY)planningmanipur.gov.in/pdf/Hills/UNC Meeting 12Feb2013/Final PPT … · Pradhan Mantri Gram Sadak Yojana (PMGSY) A Presentation of PMGSY Sanctioned

12

PHOTOGRAPHS OF WORKS TAKEN-UP UNDER PMGSY

IN SENAPATI DISTRICT, MANIPUR

23

24Road from NH-39 to Saikotjang (6.71 Km)Kangpokpi Block, Senapati District, MN0671 (Ph-VI)

Page 13: Pradhan Mantri Gram Sadak Yojana (PMGSY)planningmanipur.gov.in/pdf/Hills/UNC Meeting 12Feb2013/Final PPT … · Pradhan Mantri Gram Sadak Yojana (PMGSY) A Presentation of PMGSY Sanctioned

13

25Road from Yangnoi to Phaibung Khunou (15.07 Km)Saikul Block, Senapati District, MN0648 (Ph-VI)

26Road from NH-39 to Makhan Khuman(6.13 Km)Saitu Block, Senapati District, MN0626 (Ph-VI)

Page 14: Pradhan Mantri Gram Sadak Yojana (PMGSY)planningmanipur.gov.in/pdf/Hills/UNC Meeting 12Feb2013/Final PPT … · Pradhan Mantri Gram Sadak Yojana (PMGSY) A Presentation of PMGSY Sanctioned

14

27Road from Laii to Phutsero Phek 9.60 KmPaomata Block, Senapati District, MN0609 (Ph-V)

28

Koide Beso to Thingba Khunou (0.00 to 16.128 km) Purul Block, Senapati District, MN0620 (Ph-VI)

Page 15: Pradhan Mantri Gram Sadak Yojana (PMGSY)planningmanipur.gov.in/pdf/Hills/UNC Meeting 12Feb2013/Final PPT … · Pradhan Mantri Gram Sadak Yojana (PMGSY) A Presentation of PMGSY Sanctioned

15

29Road from Senapati to Thonglan 17 885 km, Tadubi Block, Senapati District, MN0606 (Ph-V) & MN0630 (Ph-VI)

PHOTOGRAPHS OF WORKS TAKEN-UP UNDER PMGSY

IN TAMENGLONG DISTRICT, MANIPUR

30

Page 16: Pradhan Mantri Gram Sadak Yojana (PMGSY)planningmanipur.gov.in/pdf/Hills/UNC Meeting 12Feb2013/Final PPT … · Pradhan Mantri Gram Sadak Yojana (PMGSY) A Presentation of PMGSY Sanctioned

16

31

Road from Chingkao to T01 to Mongjarong Khullen No. MN0720Nungba Block, Tamenglong District, (Ph-VI)

Inspection of road by SQM, Shri W. Chaoba, EE, PWD (Retd)

32

Road from NH-53/Tupul - Charoi Chagatlong - 0.0 to 13.0 Km, PMGSY Package No. MN0732Nungba Block, Tamenglong District, (Ph-VII)

Inspection of road by SQM, Shri W. Chaoba, EE, PWD (Retd)

Page 17: Pradhan Mantri Gram Sadak Yojana (PMGSY)planningmanipur.gov.in/pdf/Hills/UNC Meeting 12Feb2013/Final PPT … · Pradhan Mantri Gram Sadak Yojana (PMGSY) A Presentation of PMGSY Sanctioned

17

33

Road from Elleng – Dunong - 0.0 to 10.0 Km, PMGSYPackage No. MN0746

Tamei Block, Tamenglong District, (Ph-VII)

PMGSY – COMPLETED / ONGOING WORKS

34

ROAD FROM OKTAN TO KHUNDONG KHAIBA (6.00 Km) (MN0726, TAMEI BLOCK, TAMENGLONG DISTRICT PMGSY PH-VII)

Page 18: Pradhan Mantri Gram Sadak Yojana (PMGSY)planningmanipur.gov.in/pdf/Hills/UNC Meeting 12Feb2013/Final PPT … · Pradhan Mantri Gram Sadak Yojana (PMGSY) A Presentation of PMGSY Sanctioned

18

35

Road from Chingkao - Thiulon-BPMGSY Package No. MN0743Tousem Block, Tamenglong District, (Ph-VII)

PHOTOGRAPHS OF WORKS TAKEN-UP UNDER PMGSY

IN UKHRUL DISTRICT, MANIPUR

36

Page 19: Pradhan Mantri Gram Sadak Yojana (PMGSY)planningmanipur.gov.in/pdf/Hills/UNC Meeting 12Feb2013/Final PPT … · Pradhan Mantri Gram Sadak Yojana (PMGSY) A Presentation of PMGSY Sanctioned

19

Road from Kharasom to New Tusom, Chingai Block, Ukhrul District, MN0911 & MN0917 (Ph-VI)

Inspection of Road from Kharasom to New Tusom (MN0911), Chingai Block, Ukhrul District, by SQM, Kh. Ibochouba

38Road from Litan to Lungphu : 9.30 KmPhungyar Block, Ukhrul District, MN0930 (Ph-VII)

Page 20: Pradhan Mantri Gram Sadak Yojana (PMGSY)planningmanipur.gov.in/pdf/Hills/UNC Meeting 12Feb2013/Final PPT … · Pradhan Mantri Gram Sadak Yojana (PMGSY) A Presentation of PMGSY Sanctioned

20

39

Road from Sanakeithel to LeisanUkhrul Block, Ukhrul District, MN0915 (Pphase-VI) MN0919 & MN0921 (Ph-VII)

Inspection by NQM

40

Road from BRTF road to Bungpa KhullenKamjong Block, Ukhrul District, MN0914(Ph-VI)

Road from BRTF road to Bungpa KhullenStone Masonry Retaining Wall MN0914(Ph-VI)

Page 21: Pradhan Mantri Gram Sadak Yojana (PMGSY)planningmanipur.gov.in/pdf/Hills/UNC Meeting 12Feb2013/Final PPT … · Pradhan Mantri Gram Sadak Yojana (PMGSY) A Presentation of PMGSY Sanctioned

21

Road from BRTF Road to Lairam Khullen No. MN0927Kasom Khullen BlockUkhrul District, (Ph-VII)

42

Inspection of Road from NH-150 to Choithar, PMGSY Package No. MN0916, Ukhrul Block, Ukhrul District, by SQM, Kh. Ibochouba

Page 22: Pradhan Mantri Gram Sadak Yojana (PMGSY)planningmanipur.gov.in/pdf/Hills/UNC Meeting 12Feb2013/Final PPT … · Pradhan Mantri Gram Sadak Yojana (PMGSY) A Presentation of PMGSY Sanctioned

22

44

PMGSY

Click mouse to go to previous

slide

Click mouse to go to previous slide

Page 23: Pradhan Mantri Gram Sadak Yojana (PMGSY)planningmanipur.gov.in/pdf/Hills/UNC Meeting 12Feb2013/Final PPT … · Pradhan Mantri Gram Sadak Yojana (PMGSY) A Presentation of PMGSY Sanctioned

23

45

Physical Status of Roads under PMGSY upto Phase- II to VIII

Length in Km

Sl Phase

Nos of Roads Length

Sanctioned Completed / Connected Sanctioned

Completed

Roads Habitation Roads %age Habtn %age Km %

1 II 130 68 127 98% 60 88% 710.64 710.64 100%

2 V 62 93 61 98% 90 97% 556.19 556.16 100%

3 VI 143 184 118 83% 133 72% 1157.37 1151.1 99%

4 VII 69 155 16 23% 36 23% 736.57 661.28 90%

5 VIII 50 112 * * 501.98 *

Total 454 612 322 70% 319 52% 3662.75 3079.2 84%

Institutional Architecture

Minister, Rural Development & Panchayati Raj

Chief Secy. to Govt. of Manipur.

Addl. C.S. (R.D & P.R.) / CEO (MSRRDA)

Chief Engr./EO MSRRDA

14 PIUs

MSRRDA: Manipur State Rural Roads Development AgencySQC: State Quality Co-ordinator, SQM: State Quality Monitor, PIU: Programme Implementation Unit

SQMs

46

FC 3 S.Es/SQC

Page 24: Pradhan Mantri Gram Sadak Yojana (PMGSY)planningmanipur.gov.in/pdf/Hills/UNC Meeting 12Feb2013/Final PPT … · Pradhan Mantri Gram Sadak Yojana (PMGSY) A Presentation of PMGSY Sanctioned

24

47

Financial Status of Roads under PMGSY upto Phase-VIII

Sl Phase Nos of Roads Cost (Rs in Crores)

Sanctioned Approved Released Expenditure

1 II 130 80.72 64.33 80% 80.72 83.48 103%

2 V 62 152.33 154.3 101% 152.33 145.10 95%

3 VI 143 363.66 296.9 82% 363.66 294.05 81%

4 VII 69 231.68 231.7 100% 231.68 142.56 62%

5 VIII 50 254.25 * * 254.25 * *

Total 1078 1082.64 747.24 70% 1082.64 665.19 62%

Click mouse to go to previous slide Completed Works (Ph-V)

Page 25: Pradhan Mantri Gram Sadak Yojana (PMGSY)planningmanipur.gov.in/pdf/Hills/UNC Meeting 12Feb2013/Final PPT … · Pradhan Mantri Gram Sadak Yojana (PMGSY) A Presentation of PMGSY Sanctioned

25

Completed Works (Ph-V, VI & VII)Chandel District

Click mouse to go to previous slide

Chakpikarong Block

Chandel & Machi Blocks

Tengnoupal Block

Completed Works (Ph-V, VI & VII)Churachandpur District

Click mouse to go to previous slide

Churachandpur & Henglep BlockSamulamlan Singngat Blocks

Thanlon Block

Tipaimukh Block

Page 26: Pradhan Mantri Gram Sadak Yojana (PMGSY)planningmanipur.gov.in/pdf/Hills/UNC Meeting 12Feb2013/Final PPT … · Pradhan Mantri Gram Sadak Yojana (PMGSY) A Presentation of PMGSY Sanctioned

26

Completed Works (Ph-V, VI & VII)Senapati District

Click mouse to go to previous slide

Kangpokpi Block

Saikul Blocks

Saitu Block

Paomata Block

Purul Block

Tadubi Block

Completed Works (Ph-V, VI & VII)Tamenglong District

Click mouse to go to previous slide

Nungba & Tamei BlockTamenglong Block

Tousem Block

Page 27: Pradhan Mantri Gram Sadak Yojana (PMGSY)planningmanipur.gov.in/pdf/Hills/UNC Meeting 12Feb2013/Final PPT … · Pradhan Mantri Gram Sadak Yojana (PMGSY) A Presentation of PMGSY Sanctioned

27

Completed Works (Ph-V, VI & VII)Ukhrul District

Click mouse to go to previous slide

Chingai Block

Kamjong & Ukhrul Blocks

Phungyar & Ukhrul Blocks

List of PMGSY works under Chandel DistrictClick mouse to go to previous slide

Page 28: Pradhan Mantri Gram Sadak Yojana (PMGSY)planningmanipur.gov.in/pdf/Hills/UNC Meeting 12Feb2013/Final PPT … · Pradhan Mantri Gram Sadak Yojana (PMGSY) A Presentation of PMGSY Sanctioned

28

Blo

ckName of Work

Package No. Ph

ase Length (in

Km)

Estimated Cost

(Rs. in Lac)

Remark/ Status as on

Dec'12Ch

akpi

karo

ngChekjang to B.R.T.F. MN0203 II 5.00 59.59 CompletedChakpikarong to Rungchang

MN0202 II1.91 25.87 Completed

Sugnu Chapikarong to Charongching 8.01 24.43 CompletedChakpikarong to Khengjoy MN0204

V

14.00 252.93 CompletedCKG to Khubung Khunou via Thorcham MN0208 7.00 135.71 CompletedCKG to Shajik Tampak MN0206 12.00 186.12 CompletedShajik Tampak to Kholmunlen via Aisi MN0207 15.00 357.71 CompletedChakpikarong to Khengjoy MN0210

VI

17.99 430.48 CompletedChakpikarong to Khengjoy MN0223 14.46 385.56 CompletedToupokpi (Sugnu Chakpikarong Road at 6 km) - to Beru Khudam (Chandel Block)

MN0211 8.50 222.00 Completed

Sajik Tampak to Heikha(L) MN0212 12.00 314.00 CompletedLongja to K. Phoilen MN0213 12.00 314.00 CompletedRungchang to Kanakangbung MN0214 5.00 130.00 CompletedBRTF/TO5 - Molcham MN0229

VII

10.00 268.04 CompletedBRTF Road - P. Chehjang MN0230 5.00 263.09 In ProgressBRTF Road/T05 - K. Sabompha (BADP) MN0231 13.00 470.72 In ProgressBRTF Road - Molngat via Toitung (BADP) MN0232 5.00 284.45 In ProgressKhullen Khailet - Phoilen (BADP) MN0233 15.00 541.81 In ProgressSugnu - Uttangpokpi/Thungcheng (BADP) MN0234 2.40 121.16 In ProgressChakpikarong - Challong Lamkhai/Phiranmachet - Part I MN0242

VIII

13.20 582.74

Tender under Process

Chakpikarong - Challong Lamkhai/Phiranmachet Part-II MN0243 12.80 490.51Sajik Tampak - Khumunllen via Aishe/14.76 Km MN0244 14.76 539.42Sajik Tampak - Molphei/12.21 Km MN0245 12.21 485.62Moltuk - Gamphajol via Tuidam - T. Monglen/Phase-II MN0246 10.00 458.28Chakpikarong - Thorcham/Phase-II MN0247 8.20 326.51

Click mouse to go to previous slide

Back to Chandel District

Blo

ck

Name of Work Package No.

Phas

e Length (in Km)

Estimated Cost

Remark/ Status as on

Dec'12(Rs. in Lac)

Chan

del

Purumchumbang to HeikrutampakMN0202 II

3.55 21.74 Completed

Khudei Khunou to Purum Tampak 1.05 99.61 Completed

Komlathabi to Thamlapokpi MN0209 V 5.00 107.44 Completed

Japhou Bazar to Phunchong MN0217

VI

4.20 110 Completed

Lambung to Lamphou Pasana MN0218 4.95 130 Completed

Komlathabi to Lamkang Khunyai MN0219 2.55 69 Completed

Khudei Khunou - Phunan Sanbum MN0225 VII 6.00 176.33 Completed

Mac

hi

Sora Chingjil to Langol

MN0201 II

7.47 66.3 Completed

Laiching Khullen Lamkhai to Laiching Maipou 6.56 81.77 Completed

Kangching to Laiching Minou 5.04 89.61 Completed

Kangoi Khullen to Phungchong 3.14 31.4 Completed

Tuisimi to Samanphai MN0220

VI

19.00 495 Completed

L030 (KM Rd-Blk Bdry) to Lamlong Khullen MN0221 4.50 117 Completed

Machi Gate at 19 Km to Kangoi Khullen MN0222 9.50 248 Completed

Click mouse to go to previous slide

Back to Churachdnpur District

Page 29: Pradhan Mantri Gram Sadak Yojana (PMGSY)planningmanipur.gov.in/pdf/Hills/UNC Meeting 12Feb2013/Final PPT … · Pradhan Mantri Gram Sadak Yojana (PMGSY) A Presentation of PMGSY Sanctioned

29

Blo

ck

Name of WorkPackage

No. Phas

e Length (in Km)

Estimated Cost

(Rs. in Lac)

Remark/ Status as on

Dec'12Te

ngno

upal

B.R.T.F. to Chelep

MN0203 II

4.00 28.36 CompletedJoupi Khengjoi to Sehao 2.03 24.73 CompletedLeitan to Khong khang 4.00 26.72 CompletedLamjing to Narum 8.00 59.28 CompletedLeitan to Leibi 5.00 36.56 CompletedSaivom to Molnom 11.24 86.08 CompletedRingkhudam to Molnom 2.28 39.07 CompletedRilam Centre to Dungshiphai. 15.00 111.12 CompletedKhudengthabi to R/Centre MN0205 V 10.00 241.43 CompletedBRTF Road to Khudei Khullen MN0215

VI6.00 156.00 Completed

N.H.39 (Khudengthabi) to R/Center MN0216 15.03 356.84 CompletedN.H.39 (Khudengthabi) to R/Center MN0224 9.97 272.99 CompletedNH-39 - Aimol Khullen/Aimol Tampak i.e. 0.00 to 6.00 (BADP)

MN0238VII

6.00 260.09 In Progress

NH-39 - M. Maipi (BADP) MN0239 8.50 363.58 CompletedRuilam Centre - Lamlong Khunou (BADP) MN0240 17.00 452.58 In ProgressRuilam Centre - Sairen Shaichin via Narum -Yongkhul/Part-I

MN0248

VIII

8.00 368.17

Tender under Process

Ruilam Centre - Sairen Shaichin via Narum -Yongkhul/Part-II

MN0249 7.00 328.96

Moreh/BRTF Road - Maojang MN0250 15.00 557.78Moreh/NH-39 - Woksu/Part-I MN0251 7.00 414.54Moreh/NH-39 - Woksu/Part-II MN0252 8.00 322.93

Total:- 417.80 11964.76

Click mouse to go to previous slide

Back to Churachandpur District

List of PMGSY works under ChURACHANDPUR District

Click mouse to go to previous slide

Page 30: Pradhan Mantri Gram Sadak Yojana (PMGSY)planningmanipur.gov.in/pdf/Hills/UNC Meeting 12Feb2013/Final PPT … · Pradhan Mantri Gram Sadak Yojana (PMGSY) A Presentation of PMGSY Sanctioned

30

Blo

ck Name of Work Package No.

Ph

ase

Length (in Km)

Estimated Cost(Rs. in Lac)

Remark/ Status as on Dec'12

Ccpu

rBethel to Mini Secretariat & Molnom

MN0301 II

6.14 74.66 Completed

Bijang Co-operative Office to Tuibong & Teiseng. 6.48 69.23 Completed

Zomi Colony to Zellang Veng 3.44 54.91 Completed

Salbung to Tuinaum MN0307V

5.89 212.02 Completed

Buangmual (T01) to Songpi MN0308 2.98 100.99 Completed

Koite to K. Paolen MN0326 11.00 407.00 Inprogress

Telsing Bazar (T01) to Songpikholui MN0327 4.00 148.00 Completed

Sangaikot to Khongkhai MN0328 28.00 940.00 Completed

Sangaikot to Khongkhai MN0331 28.00 940.00 Completed

Hen

glep

Phaibung to Khengjang Rd.MN0302 II

5.00 60.29 Completed

Nabil to Nalon Rd. 5.00 59.88 Completed

NH-150 to Tokpa Khul MN0315

V

12.27 269.79 In Progress

Thinkew to Henglep (Vungbuk & KamkeilonMN0316 11.16 236.51 Completed

S. Nabil to Nalon MN0329VI

5.00 185.00 Completed

Henglep toSongphu Mollen MN0330 2.20 82.00 Completed

Click mouse to go to previous slide

Back to Churachandpur District

Blo

ck

Name of Work Package No.

Phas

e Length (in Km)

Estimated Cost

(Rs. in Lac)

Remark/ Status as on

Dec'12

Sam

ulam

lan Sagang to Tuining MN0303 II 8.00 106.12 Completed

T01 (Wairok) to Ngaryan MN0317VI

8.00 223.00 Completed

Thenjang to Keirap Khunthak MN0318 5.00 140.00 Completed

Sing

ngat

Songtal to Kangkap MN0304 II 8.50 100.12 Completed

Behiang to Ngalzang MN0309V

11.88 239.26 Completed

Mongkot to G. Monglen MN0310 13.02 307.57 Completed

Behiang to Tongzang MN0323VI

15.00 420.00 Completed

Lungchin to Tuikui Muallum MN0324 10.00 280.00 Completed

Guite Road - Tonglun_K (BADP) MN0347

VII

18.75 483.27 Completed

T02/Guite Road - Lungthul - E (BADP) MN0348 10.20 358.35 Inprogress

Singhat - Hiangtam (BADP) MN0349 18.00 471.25 Inprogress

Singhat - Allusingtam (BADP) MN0350 17.40 410.19 Completed

Singhat to Tonglon(T) MN0360

VIII

10.18 366.23

Tender under

Process

Singhat to Songkong MN0361 15.27 547.36

Tiddim Road (Zezaw) to T. Khajang MN0362 9.20 334.26

1 BB(3 nos) MN0363 94.52 373.06

Click mouse to go to previous slide

Back to Churachandpur District

Page 31: Pradhan Mantri Gram Sadak Yojana (PMGSY)planningmanipur.gov.in/pdf/Hills/UNC Meeting 12Feb2013/Final PPT … · Pradhan Mantri Gram Sadak Yojana (PMGSY) A Presentation of PMGSY Sanctioned

31

Blo

ck Name of Work Package No.

Phas

e Length (in Km)

Estimated Cost

(Rs. in Lac)

Remark/ Status as on

Dec'12

Tha

nlon

Bukpi to Aibulon

MN0305 II6.00 70.46 Completed

Thanlon to Mongkon 4.00 47.13 Completed

Songtal to Kangkap & T01 (Bukpi) to AibulonMN0311 V 24.10 470.13 Completed

Galkapot to Gamhui MN0325 VI 6.50 180.00 Completed

T02/Mualnuam - Kaihlam (BADP) MN0352

VII

15.09 433.15 Completed

NH-150 / Bukpi - Bungpilon (BADP) MN0353 14.28 432.72 Completed

NH-150/ Sainoujang - Phaipeng (BADP) MN0354 10.65 364.38 Inprogress

NH-150(Thanlon) to New Muntha (Pt-I: 20.00-35.00 km)

MN0358

VIII

15.00 521.47 Tender under

ProcessNH-150(Thanlon) to New Muntha (Pt-I: 35.00-48.72 km)

MN0359 13.72 481.00

Click mouse to go to previous slide

Back to Churachandpur District

Blo

ck

Name of Work Package No.

Phas

e Length (in Km)

Estimated Cost

(Rs. in Lac)

Remark/ Status as on Dec'12

Tip

aim

ukh

Pherzawl to DailonMN0306 II

10.00 119.98 Completed

Pherzawl to Leisen 5.50 69.57 Completed

T01 (NH-150) to J.T. Road (17-35.47 Km)MN0314

V

18.47 427.92 Completed

T01 (NH-150) to J.T. Road (0-17 Km) MN0313 17.00 441.80 Completed

NH-150 (T01 Lungthulien) to Parvachom.MN0312 12.00 354.12 Completed

T01 (Pherzawl) to Leisen MN0319

VI

23.00 640.00 Completed

T01 (Pherzawl) to Leisen MN0332 23.00 640.00 Inprogress

T01(Lungthulien) to Parvachom MN0320 19.00 700.00 Inprogress

MB Rd (Jiribam) to Henchang Punjee MN0321 10.00 280.00 Inprogress

T01 (Damdei) to Tuolbung MN0322 15.00 420.00 Completed

Patpuihmun - Sartuinek - 0.0 to 10.0 Km MN0345

VII

10.00 352.83 Inprogress

Patpuihmun - Kangreng - 0.00 to 15.00 Km MN0355 15.00 403.82 Inprogress

Patpuihmun - Kangreng - 15.00 to 30.00 Km MN0356 15.00 400.33 Inprogress

J.T. Road - Saiuinek - 0.0 12.37 Km MN0357 12.37 374.04 Inprogress

Total:- 205.34 5624.41

Back to Churachandpur District

Page 32: Pradhan Mantri Gram Sadak Yojana (PMGSY)planningmanipur.gov.in/pdf/Hills/UNC Meeting 12Feb2013/Final PPT … · Pradhan Mantri Gram Sadak Yojana (PMGSY) A Presentation of PMGSY Sanctioned

32

List of PMGSY works under SENAPATI District

Blo

ck Name of Work Package No.

Phas

e

Length (in Km)Estimated Cost

(Rs. in Lac)Remark/ Status as on

Dec'12

Kan

gpok

pi

I.T Rd. to Lanka MN0601 II 16.62 158.62 Completed

IT Rd. to Makuli via Songtun(J) MN0608 V 3.11 97.07 Completed

Bendramei to Yangkhullen MNO633

VI

4.12 111.19 Completed

T. Waichong to Gorkha Tapon MNO634 16.00 389.38 Completed

NH-39 to Santalabari MNO635 7.30 162.29 Completed

NH-39 to Saikotjang(Part - II) MN0671

VII

7.60 342.94 Completed

Gurkha Tapon to Timsina MN0653 7.05 268.61 Completed

Dalthri to Tahar basti MN0655 5.00 202.90 In Progress

Manedera to Doring Hare MN0654 5.27 172.01 In Progress

NH-39 to Bileijang MN0 674

VIII

5.19 180.86

Tender under ProcessGurkha tapon to makui Ashang MN0 675 9.20 307.63

Lamchok to Gimthari MN0 676 6.24 228.79

Haipi to Mahavir MN0 677 9.22 305.31

Click mouse to go to previous slide

Back to Senapati District

Page 33: Pradhan Mantri Gram Sadak Yojana (PMGSY)planningmanipur.gov.in/pdf/Hills/UNC Meeting 12Feb2013/Final PPT … · Pradhan Mantri Gram Sadak Yojana (PMGSY) A Presentation of PMGSY Sanctioned

33

Blo

ckName of Work Package No.

Phas

e Length (in Km)

Estimated Cost

(Rs. in Lac)

Remark/ Status as on

Dec'12Sa

ikul

Saikul to Ichaigoyang MN0601 II 3.00 46.39 Completed

Saikul (SH-7) to Simol (NH-150) MN0610

V

10.00 242.85 Completed

Molkon(T04) to Phaibung (Yangnoi) MN0613 8.50 195.40 Completed

Bungte Chiru to Charoi Pandongba Kabui MN0611 10.79 266.73 Completed

Saikul(SH-7) to Simol (NH-150) (10.00 to 20.50 km) MNO614

VI

10.50 286.57 Completed

T02 to Sailen MNO636 6.14 144.77 CompletedPhunalmaring to Sandangsemba Maring MNO615 12.00 429.72 In Progress

T03 (New Keithelmanbi) to Kamuching MN0660

VII

5.38 297.77 In Progress

Yongnoi to Phaibung Khunou MN0648 15.07 416.45 Completed

To3 to Kamu Saichang MN0659 16.52 409.16 In Progress

Ngarong Chingjin to Irong Tangkhul MN0 678

VIII

16.23 519.38

Tender under

Process

Thingsat to Ekpam Khullen MN0 679 11.52 439.11

Thingsat to Mapao Christain MN0 680 15.00 518.72

T01( Simol) to Tuichin MN0 681 7.92 280.26

Makokching to Sadang Kuki Pt-I(0-12.00km) MN0 682 12.00 456.42

Makokching to Sadang Kuki Pt-I(12-24.00km) MN0 683 12.00 439.71

Nurathel to Mongbung MN0 684 6.51 259.19

Click mouse to go to previous slide

Back to Senapati District

Blo

ck

Name of Work Package No.

Phas

e Length (in Km)

Estimated Cost(Rs. in Lac)

Remark/ Status as on

Dec'12

Sait

u

Orphanage Koubru Hill via HeijangMN0601 II 10.93 127.22 Completed

Chini Ingkhol to Doaong Khunou Rd. MN0607 V 8.50 191.82 Completed

New Keithelmanbi to Charoipandongba ChiruMNO625

VI

11.00 319.46 Completed

NH-39 to Makhan KhumanMNO626 6.13 176.68 Completed

Leilon Vaiphei to Khunkhu KukiMNO627 9.30 273.60 Completed

Kangchup Chingkhong to Irang Naga MN0666

VII

6.75 337.42 In Progress

Bungte chiru Charoi Pangdongba MN0664 19.30 480.80 In Progress

MH-39 to Pheijang MN0665 3.50 168.01 Completed

Kangchup Tuikhun to khokenMN0 672

VIII

17.46 570.99Tender under

ProcessCharai pandongbachiru to Tingkaikhunou

MN0 673 9.45 358.93

Click mouse to go to previous slide

Back to Senapati District

Page 34: Pradhan Mantri Gram Sadak Yojana (PMGSY)planningmanipur.gov.in/pdf/Hills/UNC Meeting 12Feb2013/Final PPT … · Pradhan Mantri Gram Sadak Yojana (PMGSY) A Presentation of PMGSY Sanctioned

34

Blo

ck

Name of Work Package No.

Phas

e Length (in Km)

Estimated Cost

(Rs. in Lac)

Remark/ Status as on

Dec'12

Paom

ata

Lakhamei - Khongjei via Purul, Phuba & LiyaiMN0602 II 20.00 220.58 Completed

Thungam Affi to Phuba Khuman MN0604V

9.93 215.22 Completed

Laii to Phutsero Phek MN0609 9.60 229.55 Completed

Tungam Affii to Phuba Khuman (9.33 to 18.044 km) MNO622

VI

8.12 289.24 Completed

Liyai Khullen to Purul Rosoffii MNO623 13.23 296.75 Completed

T.T Laii Rd. on 36 Km to Chingmeikhullen MNO624 6.00 246.36 Completed

Tungjoy to Makhufii MN-0638

VII

9.10 281.60 In Progress

Waychishu to Kataphumei MN-0640 3.50 192.24 In Progress

T₀₁ to Chingmai Khunou MN-0641 3.87 213.22 In Progress

Click mouse to go to previous slide

Back to Senapati District

Blo

ck

Name of Work Package No.

Phas

e Length (in Km)

Estimated Cost

(Rs. in Lac)

Remark/ Status as on

Dec'12

Puru

l

Ngamju to Paotheiju Nepali (Laila)

MN0602 II3.42 28.78 Completed

Lakhamei to Ngarilishang11.00 111.42 Completed

Purul Atongba to Thingba Khullen MN0605 V 10.03 219.42 Completed

Purul Atongba to Thingba KhullenMNO616

VI

7.30 227.00 Completed

Lakhamei to Thiwa via Ngari LishangMNO617 10.49 354.43 Completed

U.T Junction to Phaibung KhullenMNO618 4.17 103.57 Completed

Lakhamei to Khongdei ShimphungMNO619 16.66 361.98 Completed

Koide Beso to Thingba Khunou (0.00 to 16.128 km)MNO620 16.13 401.14 Completed

Oinam to NgamjuMNO621 15.69 435.93 Completed

Click mouse to go to previous slide

Back to Senapati District

Page 35: Pradhan Mantri Gram Sadak Yojana (PMGSY)planningmanipur.gov.in/pdf/Hills/UNC Meeting 12Feb2013/Final PPT … · Pradhan Mantri Gram Sadak Yojana (PMGSY) A Presentation of PMGSY Sanctioned

35

Blo

ck

Name of Work Package No.

Phas

e Length (in Km)

Estimated Cost

(Rs. in Lac)

Remark/ Status as on

Dec'12

Tadu

bi

Karong to Khabung

MN0603 II

15.00 149.84 Completed

Senapati to Taphou-Phymei 1.29 10.83 Completed

NH-39 to Chakumei 9.51 99.03 Completed

Senapati to Thonglan MN0606V

10.00 189.98 Completed

Wilong Khunou to Chakha via Rajamei MN0612 10.33 248.49 Completed

Rural Hospital to Chawainu MNO628

VI

9.69 539.40 Completed

Maram to Maram Khullen MNO629 7.96 276.79 Completed

Senapati to Thonglan (10.00 to 17 885 km) MNO630 7.89 240.19 Completed

Khamsom to Kachai (UKL District) MNO631 14.71 381.97 Completed

Willong Khunou to Rajamei (10.00 to 17.00 km)MNO632 6.67 192.84 Completed

Senapati Oklong to Makui Longdi MN0642

VII

16.50 422.02 In Progress

Katomei to sadimnaga MN0643 16.09 397.93 In Progress

Maram Khullel to Emeffiithumei MN0646 7.00 234.30 In Progress

Willong khunou to Chakha(Pt-II : 16.67-25.17km))MN0 685

VIII8.50 457.34 Tender

under ProcessWillong khunou to Chakha(Pt-III : 25.17-

34.87km))MN0 686 9.70 486.06

Total:- 592.25 16465.57

Click mouse to go to previous slide

Back to Senapati District

List of PMGSY works under TAMENGLONG District

Click mouse to go to previous slide

Page 36: Pradhan Mantri Gram Sadak Yojana (PMGSY)planningmanipur.gov.in/pdf/Hills/UNC Meeting 12Feb2013/Final PPT … · Pradhan Mantri Gram Sadak Yojana (PMGSY) A Presentation of PMGSY Sanctioned

36

Blo

ck

Name of Work Package No.

Phas

e Length (in Km)

Estimated Cost

(Rs. in Lac)

Remark/ Status as on

Dec'12

Nun

gba

Kekru to Mukti Khullen MN0704 II 15.21 217.29 Completed

Soukhapteng to Nungnang-I MN0709 V 25.28 469.82 In Progress

T02 to Khoupum-II MN0719VI

10.00 300.00 Completed

T01 to Mongjarong Khullen MN0720 15.00 450.00 In Progress

T02/Old Cashar Road - Nungadang Naga - 0.00 to 5.00 Km MN0730VII

5.00 299.42 In Progress

NH-53/Tupul - Charoi Chagatlong - 0.0 to 13.0 Km MN0732 13.00 397.09 In Progress

Tam

ei

Chaton to Kuilong MN0701 II 16.00 203.00 Completed

Tamei to Kuilong-I & II (14.00 to 26.237 Km) MN0706 V 12.24 369.82 Completed

Kuilong (I + II) to Old Lemta MN0716

VI

30.00 890.00In Progress

Kuilong (I + II) to Old Lemta MN0721 In Progress

I.T Rd. (Gelnel) to Kadi (A&B) MN071725.00 735.00

In Progress

I.T Rd. (Gelnel) to Kadi (A&B) MN0722 In Progress

Lenglong (A+B) to Elleng MN0718 22.00 650.00 In Progress

Block Boundary/Oktan - K. Khaiba i.e. 0.00 - 6.00 Km MN0726

VII

6.00 271.26 In Progress

Nallong - Old Lemta and New Lemta i.e. 30-40 Km MN0727 10.00 264.46 In Progress

Tamei - Langmei i.e. 0.00 to 3.30 Km MN0729 3.30 151.89 In Progress

Elleng - Dunong MN0746 10.00 304.09 In Progress

Click mouse to go to previous slide

Back to Tamenglong District

Blo

ck

Name of Work Package No.

Phas

e Length (in Km)

Estimated Cost

(Rs. in Lac)

Remark/ Status as on

Dec'12

Tam

engl

ong

Nungtek to Marang Ching

MN0702

II

10.00 132.80 CompletedNew Lakhambi to Old Lamkhambi 4.83 63.36 Completed

Lower Naga Ching to Upper Naga Ching 4.50 33.20 Completed

Langkhong(Bhalok) to I.T Rd.

MN07036.60 72.86 Completed

Lower Songpram to Upper Songpram 7.23 35.25 Completed

Tamei to Kuilong-I & II (26.237 - 52.00 Km) MN0707V

9.76 264.28 Completed

T03 Nungtek to Marangching (A) Ph-I MN0708 12.24 325.65 Completed

T03 (Thingra) to Kajinglong MN0712

VI

19.00 570.00 In Progress

T03 to Lukhambi MN0713 3.83 110.00 Completed

Tharon to L. Pabram MN071420.00 600.00

In Progress

Tharon to L. Pabram MN0724 In Progress

T01 (NH-53) to Awang Khul © MN0715 5.00 150.00 In Progress

T04 to Nagaching MN0723 3.00 90.00 In Progress

T03/ODR - Kabui Khullen MN0736 VII 7.50 221.04 In Progress

T02 to Kahulong Pt- I (0-9km) MN0747VIII

9.000 350.27 Tender under ProcessT02 to Kahulong Pt- II (9-18km) MN0748 9.000 350.10

Click mouse to go to previous slide

Back to Tamenglong District

Page 37: Pradhan Mantri Gram Sadak Yojana (PMGSY)planningmanipur.gov.in/pdf/Hills/UNC Meeting 12Feb2013/Final PPT … · Pradhan Mantri Gram Sadak Yojana (PMGSY) A Presentation of PMGSY Sanctioned

37

Blo

ckName of Work Package No.

Phas

e Length (in Km)

Estimated Cost(Rs. in Lac)

Remark/ Status as on

Dec'12

Tous

em

NH-53 to SibilongMN0705 II

8.10 114.23 CompletedNH-53 to Nungkao 7.85 109.75 CompletedT04(ODR) to T01(NH-53)

MN0710

VI

14.15 425.00 In Progress

T04 to ImpahMN0711

18.00 540.00

In Progress

T04 to ImpahMN0725 In Progress

T04 - Tainingjam MN0741

VII

19.50 469.11 In Progress

Katang - Magulong MN0742 11.60 373.39 In Progress

Chingkao - Thuilon-B MN0743 19.20 387.89 In Progress

NH-53 - Phaitol MN0744 10.13 339.13 In Progress

Total:- 374.55 9966.83

Click mouse to go to previous slide

Back to Tamenglong District

List of PMGSY works under UKHRUL District

Click mouse to go to previous slide

Page 38: Pradhan Mantri Gram Sadak Yojana (PMGSY)planningmanipur.gov.in/pdf/Hills/UNC Meeting 12Feb2013/Final PPT … · Pradhan Mantri Gram Sadak Yojana (PMGSY) A Presentation of PMGSY Sanctioned

38

Blo

ck

Name of Work Package No.

Phas

e Length (in Km)

Estimated Cost

(Rs. in Lac)

Remark/ Status as on

Dec'12

Chin

gai

Chingai to Tusom MN0901 II 11.01 123.06 CompletedChingai to Challou MN0908

V12.27 303.62 Completed

Halong to Paoyi MN0907 13.00 332.64 CompletedHalang to Paoyi MN0909

VI

32.30 920.00Completed

Halang to Paoyi MN0918 CompletedChingai to Huisu MN0910 20.00 550.00 CompletedKharasom to New Tusom MN0911

32.00 940.00Completed

Kharasom to New Tusom MN0917 CompletedPhungcham to Varangarai MN0912 25.00 720.00 Completed

Tuinem to Champhung MN0932

VII

14.00 420.95 In Progress

Kharasom to Soraphung MN0936 15.00 399.75 In Progress

Chingai to Huishu MN0922 15.00 505.41 In Progress

Rachai Khunou to Chingjaroi (CV) MN0925 16.00 409.53 In Progress

Siroi to Chingsui(15 to 30km) MN0929 15.00 370.63 In Progress

Siroi to Chingsui(0 to 15 km) MN0928 15.00 391.20 In Progress

T01 ( Rachai khunou) to Rachai Khullen) MN0940

VIII

8.00 351.69Tender under

ProcessHuishu to Khamasom Phungrei-I MN0941 12.50 550.38

Huishu to Khamasom Phungrei-II MN0942 9.50 476.39

Click mouse to go to previous slide

Back to Ukhrul District

Blo

ck

Name of Work Package No.

Phas

e Length (in Km)

Estimated Cost

(Rs. in Lac)

Remark/ Status as on

Dec'12

Kam

jong

Kamjong to Chatric Khullen MN0904 V 13.00 382.97 Completed

Kamjong to Chatric Khullen MN0913VI

13.00 380.00 In Progress

T02 (BRTF Rd) to Bungpa Khullen MN0914 5.00 145.00 Completed

Chassad Kamjong to Molvai Lup MNO933

VII

14.00 375.35 In Progress

T-02 to Ningthi MN0926 14.00 423.35 In Progress

kamjong to Chatric Khullen MN0920 14.00 441.50 In Progress

Nampisha to Phaikot MN0945

VIII

16.00 592.53

Tender under

Process

BRTF Rd to Chahong Khullen -I MN0946 10.00 395.57

BRTF Rd to Chahong Khullen -II MN0947 10.00 367.48

BRTF to Maku MN0948 10.00 385.31Chatrik Khullen to Maokot MN0949 10.00 399.87T02 ( BRTF Rd) to Shingcha MN0950 10.00 381.14

Kas

om K

hulle

n

Hengjol Lamkhai to Thangkhul Hungdung. MN0903 II 26.50 262.70 Completed

L-029 to Nongdam(T) MN0924

VII

15.66 469.19 In Progress

BRTF Rd to Lairam Khullen MN0927 16.25 462.49 Completed

BRTF Rd to Kangkum MN0935 8.67 242.72 In Progress

T01 ( BRTF Rd/Hongbai) to Kangoi MN0951

VIII

15.65 499.10 Tender under

ProcessT01 ( BRTF Rd) to Khamlang MN0952 8.00 285.69

L021 (Kangkum) to K.Ashangkhullen MN0953 14.10 483.98

Click mouse to go to previous slide

Back to Ukhrul District

Page 39: Pradhan Mantri Gram Sadak Yojana (PMGSY)planningmanipur.gov.in/pdf/Hills/UNC Meeting 12Feb2013/Final PPT … · Pradhan Mantri Gram Sadak Yojana (PMGSY) A Presentation of PMGSY Sanctioned

39

Blo

ckName of Work Package No.

Phas

e Length (in Km)

Estimated Cost

(Rs. in Lac)

Remark/ Status as on

Dec'12Ph

ungy

ar

Thangkhul Hundung to Honbai (at B.R.T.F Rd.) MN0902 II 20.85 276.64 Completed

Hengzol Lamkhai to Tangkhul Hungdung (LambuiRd.)

MN0905 V 12.00 236.70 Completed

Litan to Lungphu MN0930VII

9.73 305.66 In Progress

Gwaltabi to Thawai MN0923 5.35 189.48 In Progress

Ukh

rul

Lamlang Gate to Tongou MN0906 V 13.00 318.49 CompletedSanakeithel to Leisan MN0915

VI26.00 730.00

CompletedSanakeithel to Leisan MN0919 CompletedT01 (NH-150) to Choither MN0916 10.00 290.00 CompletedNungka to Mollen MN0937

VII

6.50 195.53 Completed

Lamlang gate to Sekhore MN0931 8.50 455.29 In Progress

Sanakheithel to Leisan MN0921 12.50 342.61 In Progress

BRTF Rd. to Khangkhui khunou MN0954 VIII 14.55 519.93Tender under

Process633.84 18481.60

Click mouse to go to previous slide

Back to Ukhrul District

END OF COMPLETED / ONGOING WORKS LIST