prac project phase ii: sour service evaluation of iso tr 10400 fad equation

9
PRAC Project Phase II: Sour Service Evaluation of ISO TR 10400 FAD Equation API Production Research Advisory Committee Pete Moore – API PRAC Chairman Anand Venkatesh, Peter Ellis – Program Managers Jan 23, 2012 Final Report Technical Session I – 3:45pm

Upload: venice

Post on 17-Jan-2016

61 views

Category:

Documents


0 download

DESCRIPTION

PRAC Project Phase II: Sour Service Evaluation of ISO TR 10400 FAD Equation. API Production Research Advisory Committee Pete Moore – API PRAC Chairman Anand Venkatesh, Peter Ellis – Program Managers. Jan 23, 2012 Final Report Technical Session I – 3:45pm. Characterization Testing. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: PRAC Project Phase II:  Sour Service Evaluation of  ISO TR 10400 FAD Equation

PRAC Project Phase II: Sour Service Evaluation of ISO TR 10400 FAD Equation

API Production Research Advisory CommitteePete Moore – API PRAC Chairman

Anand Venkatesh, Peter Ellis – Program Managers

Jan 23, 2012Final Report

Technical Session I – 3:45pm

Page 2: PRAC Project Phase II:  Sour Service Evaluation of  ISO TR 10400 FAD Equation

Mini-Pipe Testing (4)Mini-Pipe Testing (4)

TensileTensile NACE ANACE A DCB & HRCDCB & HRC CTODCTOD

Characterization TestingCharacterization Testing

Full Size Pipe (1)Full Size Pipe (1)

ALL TESTINGIS COMPLETE

FEA ReportComplete

CommitteeReportcomplete

ALL TESTINGIS COMPLETE

FEA ReportComplete

CommitteeReportcomplete

Page 3: PRAC Project Phase II:  Sour Service Evaluation of  ISO TR 10400 FAD Equation

 

API PRAC PROJECT 2006-102475Final Report (123 pages)

 

API PRAC PROJECT 2006-102475Final Report (123 pages)

Page 4: PRAC Project Phase II:  Sour Service Evaluation of  ISO TR 10400 FAD Equation

 

API PRAC PROJECT 2006-102475Final Report (123 pages)

 

API PRAC PROJECT 2006-102475Final Report (123 pages)

http://mycommittees.api.org/standards/ecs/sc5/Technical%20Papers/Forms/AllItems.aspxhttp://mycommittees.api.org/standards/ecs/sc5/Technical%20Papers/Forms/AllItems.aspx

 

Will be posted soon tothe API Website

 

Will be posted soon tothe API Website

Page 5: PRAC Project Phase II:  Sour Service Evaluation of  ISO TR 10400 FAD Equation

PRAC Project Phase III: Sour Service Evaluation of ISO TR 10400 FAD Equation

API Production Research Advisory CommitteePete Moore – API PRAC Chairman

Anand Venkatesh – Program Manager

January 23, 2012

Page 6: PRAC Project Phase II:  Sour Service Evaluation of  ISO TR 10400 FAD Equation

PRAC III C110 Test Pipe Were Donated and Shipped to Honeywell by Tenaris

Detailed Mill Test ReportDocumenting the Pipe

Characterization Attributes

Page 7: PRAC Project Phase II:  Sour Service Evaluation of  ISO TR 10400 FAD Equation

7

PRAC III – Phase 3 Details

• Testing Details:

NACE Standard TM0177 Method A – Tensile tests complete

NACE Standard TM0177 Method D – DCB tests complete

Mini/Tiny-Pipe SSC Tests – Machining Complete

– EDM Notch cutting to start in February – Testing to begin late April

Full Scale Tests with Man-made OD Surface Imperfections• ID/OD and OD only or ID only H2S Exposure – Pressurized ID

environment and OD exposure with replenishment/purging of 7% H2S in solution held in annular volume between plastic sleeve and OD of sample.

– Testing to begin late 2012

Page 8: PRAC Project Phase II:  Sour Service Evaluation of  ISO TR 10400 FAD Equation

Machining of Tiny Pipe Complete EDM Notching to start in February

EDM OD NotchEDM OD Notch

~ 4 inches~ 4 inches

Page 9: PRAC Project Phase II:  Sour Service Evaluation of  ISO TR 10400 FAD Equation

Testing of Full Size Pipelate 2012