J. Gutleber1
PR-111001-a-JGU, October 3rd, 2011
WP CO Progress and Status Q2-Q3 2011
October 3rd, 2011Johannes Gutleber
J. Gutleber2
Summary
• RMS became operational!• Baseline release carried out manually• T-2 software development lags behind• Continuous integration has highest priority
PR-111001-a-JGU, October 3rd, 2011
2011 – The year in which we conclude!Core functionality by end of year
J. Gutleber4
Roadmap Towards Commissioning
PR-111001-a-JGU, October 3rd, 2011
2012 2013 20142010
12/2011 Auto Column
06/2012 Controls Container
12/2012 Functional release
12/2010Column demo
03/2013 Commissioning
09/2011 ITS intermediary release
2011
07/2012 Start IT installation
10/2012 Start CO installation
J. Gutleber5
High-Level Goals
• End 2011 – Functional Column• MTS-PCC-FED + Configuration + SCADA + ProShell• Ion Source integrated, iLLRF in 01/2012
• June 2011 - Control system functionally complete• MTS-PCC-FED final hardware configuration at CERN running• Configuration chain complete (device specs, cycle generator)• All SCADA software complete• ProShell procedure templates and manuals delivered• iLLRF integration demonstrated• SADS, sLLRF, beam stoppers, spec. mag. Positioning as mock ups
• March 2013 - Integrated control system• Control system operational at facility site• Integrated with all existing front-end equipment
PR-111001-a-JGU, October 3rd, 2011
J. Gutleber6
Milestones
• M1 First release of control system software in week 39, 2011• M2 Control System VM + ion source control system delivered
on November 14, 2011 (week 46)• M3 Operate column autonomously in week 50, 2011• M4 Control system core in daily operation end January 2012• M5 Controls Container operational end May 2012
• Full control system in container at CERN
• M6 Transition release delivered in December 2012• All software and systems ready for controls commissioning
• M7 BEACOM control system commissioning on site 2013• January to March 2013 integration and testing on site• System ready for beam commissioning end March 2013
PR-111001-a-JGU, October 3rd, 2011
J. Gutleber7
M1 – First Manual Release
• September 26 – 29, 2011• All software needed for ITS packaged• Documented for manual installation• Baselined in SVN• VM with SCADA and associated tools to be given to ITS• FECOS frozen (apart from 2 CRs affecting states/modes/user)• RMS and database operational (ready to be filled)
• Elements, cables, racks
• RMS tools for viewing data available• ProShell can perform a “run” with timing system emulator
PR-111001-a-JGU, October 3rd, 2011
J. Gutleber8
M2 – Ion Source Controls
• November 14-25, 2011• Ion source control system operational for continuous wave• System configuration for ITS in RMS (VAcc, WS)• Ion source configuration in RMS• Tier 2 automatically configured for operation
• WinCC OA, VAA, MAPS
• Faraday cup readout and data sent via MAPS displayed• Data may be emulated if no FCN available
PR-111001-a-JGU, October 3rd, 2011
J. Gutleber9
M3 – Column Operation
• December 12-16, 2011• CERN team operates entire column autonomously• Components:
• RMS and tools (importers, exporters, viewer)• Cycle generator provides timing sequences and waveforms• WinCC OA and associated scripts and panels• Final MTS with generator and receiver on PXI target system• Final PCC on PXI target system, FlexRIO, FED• VAA with all logic completed• ProShell performs the run
PR-111001-a-JGU, October 3rd, 2011
J. Gutleber10
M4 – Control System Functional
• January 16-20, 2012• The following developments are concluded:
• MTS, PCC, FlexRIO (ordered), FED (ordered), baseboard (ordered)• Ion Source FEC tested at CERN, iLLRF FEC tested at CERN
• The following components are in routine operation:• RMS with initial data and all magnets+PCOs filled (not all data)• RMS importer/exporter, RMS viewing tools• Cycle generator (MAD-X integrated for tuning, standalone operation)• ProShell (spectrum measurement tested)
PR-111001-a-JGU, October 3rd, 2011
J. Gutleber11
Next Project Milestones
• October 2011• Control system setup ready for source tests November 14-25
• December 2011• Entire PCC chain functioning for autonomous operation December 12
PR-111001-a-JGU, October 3rd, 2011
J. Gutleber14
Current Phase (End Of Elaboration)
PR-111001-a-JGU, October 3rd, 2011
• Focus on implementation, system setup and CM (releases)• Core functionality available in 3 months• Elaborate deployment scenarios (computers, cables, IT)
Inception Elaboration Construction Transition Production Retirement
I1 In I1 In I1 In I1 In I1 In I1 In
Business Modeling
Requirements
Analyses & Design
Implementation
Test
Deployment
Configuration Management
Project Management
Environment
Operations & Support
Phases
Iterations
Disciplines
J. Gutleber15
Project Organisation
PR-111001-a-JGU, October 3rd, 2011
Source(s)
Linac
Radio-
Frequenc
y Beam
D
iagnostics V
acuum
Pow
er
Controls/
IT Magnets
Special
Magnets
Radiation
Protectio
n IntegrationO
ptics/D
ynamic
s
W. RupprechtT. HauserF. LuizD. GabrieleP. LandrotS. MarinicsS. PelletierS. BaillyJ. HeimannG. Magrin
A. BeuretI. De CesarisP. FrabouletM. Veenstra
M. JimenezG. HullaJ. Wallner
F. OsmicA. GyorgyS. SchwarzA. KerschbaumM. RepovzS. EngelhardtJ. Bosser
W. PirklE. SargsyanH. GrillB. Lutzer (10/11)
N. Chatzigeorgiou (9/11)
L. Penescu
Accelerator ManagementM. Benedikt, A. WrulichInjector Coordination
W. PirklSynchrotron/HEBT Coordination
U. DordaIBTS Coordination
R. Mayer, S. Vatnitsky, A. WrulichProject Planning and Tracking
A. Fabich
W. PirklG. KotzianJ. S.-Quesada
Administrative Support J. Schueler
work packages
ConsultantEBG employeeStudentWork package leaderJunior partner
J. GutleberR. MoserM. MarchhartA. BrettC. T. De MatosM. ThonkeM. HagerH. PavetitsJ. JunuzovicS. Kent (IT)
H. VinckeFeldbaumerJaegerhofer
Interception D
evices
O. AberleK.
Asvestas
D. Grenier
T. ZicklerM. StocknerC. SiedlerA. Beaumont P. Schwarz (8/11)
B. LangenbeckT. Tortschanoff
Purchasing OfficerS. Mitchell
Risk Management
Technical Safety Officer
Jan BorburghT. KramerT. StadlbauerF. Mueller (???)
O. NairzP. Trnkova
O. NairzM. SchokkerS. TrovatiM. Palm
S. VatnitskyO. NairzP. TrnkovaF. Coreth
A. KoschikU. DordaP. BryantH. SchönauerF. Moser
BD
S
PA
S
MS
S
Gantry
Ion Beam Therapy System
(IBTS)
J. Gutleber16
Cooperations With Organisations
PR-111001-a-JGU, October 3rd, 2011
• radArt department of Paracelsus Medical University• Collaboration in Medical Software Systems and provisioning of
Treatment Control System development
• collaboration be intensified in the future• Common developments in the area of control systems and
beam delivery system
Architecture Overview
PR-111001-a-JGU, October 3rd, 2011 J. Gutleber17
Navigator Operation Panels FrontPanel Procedure GUIs Status Displays Annunciator Panel
Audible Alarms SADS Visualization Video Panels Reports Authentication Devices
SCADA BIS Rule Base Device Specifications Supervisory Scripts Configuration Server
RMS Apps VAA
VAcc Status Display
Logging Server Report Engine Data Relay Service
RMS ProShell Procedures Web data provision Authentication Manager
SADS FECOS REDNet
iLLRF FEC Source FEC PCO FEC
Vacuum FECs
BDI FECs B-Train FEC
RF Cavity FEC
Temp./Flow Switches
BIS
Source FEDs Vacuum FEDs BID FEDs
Synchrotron RF
PCO FED BDI FEDs
B-train probes
Spec. Mag. FEC
Spec. Mag. Pos. FED Spec. Mag. Cool. FED
Technical Network
Technical NetworkSlow Control
Technical NetworkFast Control
Fieldbus Links
Tier
1Ti
er 2
Tier
3Ti
er 4
Injector LLRF
Stripper Foil FEC Beam Stopper FEC
FEC Configurator
iAmplifier FECs
RMS Importer/Exporter
Injector Amplifiers
PCS/XCS
Stripper Foil FED PCS/XCS Sensors
PCS/XCS Consoles BIS Console
Cycle Conf. Generator
Plan until Q4 2011
PR-111001-a-JGU, October 3rd, 2011 J. Gutleber18
Navigator Operation Panels FrontPanel Procedure GUIs Status Displays Annunciator Panel
Audible Alarms SADS Visualization Video Panels Reports Authentication Devices
SCADA BIS Rule Base Device Specifications Supervisory Scripts Configuration Server
RMS Apps VAA
VAcc Status Display
Logging Server Report Engine Data Relay Service
RMS ProShell Procedures Web data provision Authentication Manager
SADS FECOS REDNet
iLLRF FEC Source FEC PCO FEC
Vacuum FECs
BDI FECs B-Train FEC
RF Cavity FEC
Temp./Flow Switches
BIS
Source FEDs Vacuum FEDs BID FEDs
Synchrotron RF
PCO FED BDI FEDs
B-train probes
Spec. Mag. FEC
Spec. Mag. Pos. FED Spec. Mag. Cool. FED
Technical Network
Technical NetworkSlow Control
Technical NetworkFast Control
Fieldbus Links
Tier
1Ti
er 2
Tier
3Ti
er 4
Injector LLRF
Stripper Foil FEC Beam Stopper FEC
FEC Configurator
iAmplifier FECs
RMS Importer/Exporter
Injector Amplifiers
PCS/XCS
Stripper Foil FED PCS/XCS Sensors
PCS/XCS Consoles BIS Console
Cycle Conf. Generator
Status June 2011
PR-111001-a-JGU, October 3rd, 2011 J. Gutleber19
Navigator Operation Panels FrontPanel Procedure GUIs Status Displays Annunciator Panel
Audible Alarms SADS Visualization Video Panels Reports Authentication Devices
SCADA BIS Rule Base Device Specifications Supervisory Scripts Configuration Server
RMS Apps VAA
VAcc Status Display
Logging Server Report Engine Data Relay Service
RMS ProShell Procedures Web data provision Authentication Manager
SADS FECOS REDNet
iLLRF FEC Source FEC PCO FEC
Vacuum FECs
BDI FECs B-Train FEC
RF Cavity FEC
Temp./Flow Switches
BIS
Source FEDs Vacuum FEDs BID FEDs
Synchrotron RF
PCO FED BDI FEDs
B-train probes
Spec. Mag. FEC
Spec. Mag. Pos. FED Spec. Mag. Cool. FED
Technical Network
Technical NetworkSlow Control
Technical NetworkFast Control
Fieldbus Links
Tier
1Ti
er 2
Tier
3Ti
er 4
Injector LLRF
Stripper Foil FEC Beam Stopper FEC
FEC Configurator
iAmplifier FECs
RMS Importer/Exporter
Injector Amplifiers
PCS/XCS
Stripper Foil FED PCS/XCS Sensors
PCS/XCS Consoles BIS Console
Cycle Conf. Generator
Current Status
PR-111001-a-JGU, October 3rd, 2011 J. Gutleber20
Navigator Operation Panels FrontPanel Procedure GUIs Status Displays Annunciator Panel
Audible Alarms SADS Visualization Video Panels Reports Authentication Devices
SCADA BIS Rule Base Device Specifications Supervisory Scripts Configuration Server
RMS Apps VAA
VAcc Status Display
Logging Server Report Engine Data Relay Service
ProShell Procedures Web data provision Authentication Manager
SADS FECOS REDNet
iLLRF FEC Source FEC PCO FEC
Vacuum FECs
BDI FECs B-Train FEC
RF Cavity FEC
Temp./Flow Switches
BIS
Source FEDs Vacuum FEDs BID FEDs
Synchrotron RF
PCO FED BDI FEDs
B-train probes
Spec. Mag. FEC
Spec. Mag. Pos. FED Spec. Mag. Cool. FED
Technical Network
Technical NetworkSlow Control
Technical NetworkFast Control
Fieldbus Links
Tier
1Ti
er 2
Tier
3Ti
er 4
Injector LLRF
Stripper Foil FEC Beam Stopper FEC
FEC Configurator
iAmplifier FECs
RMS Importer/Exporter
Injector Amplifiers
PCS/XCS
Stripper Foil FED PCS/XCS Sensors
PCS/XCS Consoles BIS Console
Cycle Conf. Generator
RMS
Source Display
J. Gutleber21
Integration Weeks (iWeek)
• Validate components and concepts continuously!• Learn using our system!• Identify gaps!• Run the system!
PR-111001-a-JGU, October 3rd, 2011
Test PilotBig Success!
To be continued…
J. Gutleber22
Organization of iWeeks
• One week at distance of about five weeks• Step-by-step integrate all available components• Operate vertical column (tier 1 to tier 3)
• Planning and Execution• Plan prepared and communicated to entire team• Integration carried out by core team at CERN• Results are documented in a record and communicated • Results must be be taken into consideration for developments
PR-111001-a-JGU, October 3rd, 2011
J. Gutleber23
iWeek Schedule 2011
PR-111001-a-JGU, October 3rd, 2011 PR-110328-a-JGU, March 28th, 2011 J. Gutleber23
ICA
LEP
CS
20
11 (
Gre
nobl
e)
SO Ostersonntag
BIS Workshop
BIS Workshop
BIS Workshop
SA
SO
MO
MI
FR
SA
SO
DI
MO
MI
DO
FR
SA
SO
DI
MO
MI
DO
FR
SA
SO
MO
DI
MI
DO
FR
SA
SO
DI
MO
DO
FR
SA
SO
MO
MI
DO
FR
SA
SO
MO
DI
DO
FR
SA
SO
DI
MO
DO
FR
SA
DI
MO
MI
DO
FR
SA
DI
MI
DO
FR
SA
DI
MI
DO
FR
SA
DI
MI
DO
FR
SA
DI
MO
MI
DO
FR
DI
MO
MI
DO
FR
SA
DI
MI
FR
SA
SO
DI
MO
MI
FR
MI
FR
SA
SO
DI
MO
MI
FR
SA
DI
MI
DO
SA
SO
MO
SA DI
MI
FR
SA
SO
DI
MO
MI
DO
FR
SA
SO
DI
MO
MI
DO
FR
SA
SO
DI
MO
MI
DO
DI
MO
MI
SA
MI
DO
FR
SO
DI
MI
DO
FR
SA
DO
FR
SA
SO
DI
MO
MI
DO
FR
SA
SO
DI
MO
MI
DO
FR
SO
MO
SO
DI
MI
DOFR
SA
MO
DI
DO
FR
SA
SO
DI
MO
MI
DO
FR
SA
SO
DI
MO
MI
DO
FR
MO
MI
DO
FR
SA
SO
DI
MO
MI
DO
FR
SA
SO
DI
MO
MI
FR
SA
SA
SO
MO
MI
FR
SA
SO
DI
MO
FR
SO
MI
MI
SA
DOSA
SO
MO
DI
SO
DO
FR
DI
SA
SO
SA
DI SO MI
FR MI
MO
DO
SO
MO
DI FR MI MO DO DI
DI
FR SA DO
DI
FR SA DO
SO
DO
MOSO
MO
SO
MO
SO
MI
MI
MI
SA
DO
FR
DO
FR
SA SA
DI
SO
MO
DI
MI
DO
FR
SA
SO
MO
SA DI
DI
MI
DO
DO
FR
SA
SO
FR
SO
MO
DI
MI
FR
SA
FR
SO
MI
DOSA
MO
DO
MO
DI
MO
DIDO
FR
DI
MI
DO
SO
MO
MI
DO DI
SA
SO
DI
MI MO
SO
MO
SA
MI
DO
DO
FR
DI
MI FR
SA
MO
MI Nationalfeiertag
DI
DO Mariä Empfängnis
SA
MO Mariä Himmelfahrt
DI
DO Hl. 3 Könige
FR
SO Staatsfeiertag
SO
DI Allerheiligen
SA
MO Stefanitag
FR
SO Christtag
MI
MI Aschermittwoch
SO
BIS Workshop
MO
MO Ostermontag
SO
SO Palmsonntag
DO
DO Christi Hf.
DO
DO Fronleichnam
MO
MO Pfingstmontag
SO
SO Pfingstsonntag
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
26
27
28
29
30
31
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
25
24
Jänner Februar März April Mai Juni Juli November DezemberOktoberSeptemberAugust
IPA
C 2
011
(S
. Seb
ast
ian
,Spa
in)
PT
CO
G5
0 (
Ph
ilad
elp
hia
, U
S)
IEE
E/N
SS
(V
ale
ncia
, Spa
in)
23
2
13
4
5
6
7You are here!
J. Gutleber24
Column
PR-111001-a-JGU, October 3rd, 2011
RepositoryManagement
SoftwareRMS Exporter
XML DeviceDescription
Oracle
PCC
PVSS
MTG Panel
OpticalRT Link
MAPS
VAA
FECOS
MTG
EVG
Tier-1
Tier-2
Tier-3
Tier-4
RMS Importer
VAA PanelPCC
ScratchPadFront Panel
SystemManagement
Panel
ProShell
ConfigurationWeb Server
FED Family APCO
FECOS
PCC
OpticalRT Link
FEDCRB
FECOS
J. Gutleber26
Operations Concepts
• Ion Source FEC • Design settled, implementation close to completion• Hickups in alignment between CSLab & Pantechnik
• Initiated specifications on how to operate individual devices• UDO compiles use-cases – where are we after June MACS week?
• Cycle Configuration Generator• MHA elaborated design, started implementation• RMS extended accordingly• Software is advancing at a good pace• Timing sequences and dipole waveforms already working
PR-111001-a-JGU, October 3rd, 2011
J. Gutleber27
Status of Work with Other WPs
PR-111001-a-JGU, October 3rd, 2011
WP/Subsystem Requirements Design Implementation Integration
Power
Spec. Mag. (BTS)
Vacuum
Injector RF
Synchrotron RF
BDI
BID
Magnets
Sources
MSS
IBTS (TCS,BDS)
Building
IT
CRB Protocol
Trigger, EFE,
Positioning
LLRF AdaptationSchedule
Integrate PT Soft
Requirements Requirements
J. Gutleber28
What We Have Today
PR-111001-a-JGU, October 3rd, 2011
• Completed and frozen frozen design• MTS real-time event distribution• PCC real-time links, custom hardware, Fam. A PCO, EMC Tests• FECOS core and documentation (RT programming framework)• PVSS/C# integrated, additional tools (STEP viewer, libs) done• Virtual Accelerator Allocator• GUIs (FrontPanel, ScratchPad, VAcc/WSE, source)• PVSS script libraries for state-driven devices• ProShell architecture and code skeleton• RMS adapted (missing bug fixes, small functional corrections)• RMS importers/exporters for PVSS, OPC, FECOS, PCC
J. Gutleber29
Planning 2011
• Cosylab• CWO-4 opted, running until February 2012 – goal is complete column• Acceptance of CWO-3 was delayed by about 2 months
• Schedule agreements with WPs for 2011 • SRC, VAC, PO, INJ/RF done• Building infrastructure – final design started now• IT tendering stage 1 concluded – negotiation ongoing• Cabling, racks implemented and data entry started• SADS requirements under review• Synchrotron RF requirements finding started• PCS requirements and design started• Run File description ongoing – radArt cooperation for MSS/TCS• Beam stopper interface first iteration performed
PR-111001-a-JGU, October 3rd, 2011
J. Gutleber31
Conclusions
• Development slowed down since last MACS week• Continuous integration ongoing (iWeeks)• Good progress made in completing requirements
• Sources, injector RF, SADS
• ITS software baseline released• System to be delivered in the coming days
• NEXT STEP – FULLY FUNCTIONAL COLUMN • 12/2011-01/2012• MTS, PCC, RMS, GUIs, ProShell, VAA