ppv west gate tunnel project iac timetable ... - amazon s3

17
1 Spring Street Melbourne Victoria 3000 GPO Box 2392 Melbourne, Victoria 3001 Telephone (03) 8392 5115 Facsimile (03) 8392 5110 Privacy Statement Any personal information about you or a third party in your correspondence will be protected under the provisions of the Privacy and Data Protection Act 2014. It will only be used or disclosed to appropriate Ministerial, Statutory Authority, or departmental staff in regard to the purpose for which it was provided, unless required or authorised by law. Enquiries about access to information about you held by the Department should be directed to the Privacy Coordinator, Department of Environment, Land, Water and Planning, PO Box 500, East Melbourne, Victoria 8002 12 September 2017 As addressed Dear Submitter, West Gate Tunnel Project Inquiry and Advisory Committee (IAC) – Version 14 Timetable Please find attached the version 14 timetable in relation to the above matter. If you have any queries regarding the timetable please contact Ms Greta Grivas on (03) 8392 5121 or at [email protected]. Yours sincerely, Nick Wimbush IAC Chair

Upload: others

Post on 03-May-2022

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PPV West Gate Tunnel Project IAC Timetable ... - Amazon S3

1 Spring Street

Melbourne Victoria 3000

GPO Box 2392

Melbourne, Victoria 3001

Telephone (03) 8392 5115

Facsimile (03) 8392 5110

Privacy Statement

Any personal information about you or a third party in your correspondence will be protected under the provisions of the Privacy and Data

Protection Act 2014. It will only be used or disclosed to appropriate Ministerial, Statutory Authority, or departmental staff in regard to the purpose

for which it was provided, unless required or authorised by law. Enquiries about access to information about you held by the Department should be

directed to the Privacy Coordinator, Department of Environment, Land, Water and Planning, PO Box 500, East Melbourne, Victoria 8002

12 September 2017

As addressed

Dear Submitter,

West Gate Tunnel Project Inquiry and Advisory Committee (IAC) – Version 14 Timetable

Please find attached the version 14 timetable in relation to the above matter.

If you have any queries regarding the timetable please contact Ms Greta Grivas on (03) 8392 5121 or

at [email protected].

Yours sincerely,

Nick Wimbush

IAC Chair

Page 2: PPV West Gate Tunnel Project IAC Timetable ... - Amazon S3

Hearing Timetable: Version 14 (12 September 2017) West Gate Tunnel Project Inquiry and Advisory Committee (IAC) – Version 14 Timetable

Privacy Statement

Any personal information about you or a third party in your correspondence will be protected under the provisions of the Privacy and Data

Protection Act 2014. It will only be used or disclosed to appropriate Ministerial, Statutory Authority, or departmental staff in regard to the purpose

for which it was provided, unless required or authorised by law. Enquiries about access to information about you held by the Department should be

directed to the Privacy Coordinator, Department of Environment, Land, Water and Planning, PO Box 500, East Melbourne, Victoria 8002

Day 1: Monday 14 August 2017

Venue: Footscray Community Arts Centre, 45 Moreland Street, Footscray

Time Party Sub No Allocated

10.00am IAC - Preliminary matters 30 mins

10.30am Minister for Planning represented by Susan Brennan

SC with Barnaby Chessell 10 mins

10.40am Western Distributor Authority (WDA) represented by

Stuart Morris QC and Chris Townshend QC, with Emily

Porter and Rupert Watters, instructed by Clayton Utz

– opening submission

1 hour

11.40am City of Melbourne represented by Nicholas Tweedie

SC with Peter O’Farrell instructed by Jane Hall of

Ashurst – opening submission

184 30 mins

12.10pm Maribyrnong City Council represented by Ragu

Appudurai of Counsel instructed by Maddocks

Lawyers – opening submission

158 30 mins

12.40pm Hobsons Bay City Council represented by Greg Tobin

and Kate Morris of Harwood Andrews – opening

submission

378 30 mins

1.10pm Lunch Break

2.00pm EPA Victoria represented by Peter Van Eps of Counsel

instructed by Mae Olmstead with the following EPA

representatives in attendance at various stages of the

hearing:

- Bert Zebst (noise)

- Paul Torre and/or Gavin Fisher (air quality)

- Victor Kabay (health)

368 1 hour

3.00pm Western Distributor Authority (WDA) represented by

Stuart Morris QC, Chris Townshend QC, with Emily

Porter and Rupert Watters, instructed by Clayton Utz

– opening statements

Day 1 of 8

5.00pm Day 1 close

Page 3: PPV West Gate Tunnel Project IAC Timetable ... - Amazon S3

West Gate Tunnel Project Inquiry and Advisory Committee (IAC) – Version 14 Timetable | 12 September 2017

Page 2

Day 2: Tuesday 15 August 2017

Venue: Footscray Community Arts Centre, 45 Moreland Street, Footscray

Time Party Sub No Allocated

10.00am Roads Corporation (VicRoads) represented by Paul

Connor QC with Roshan Chaile of Counsel instructed

by Rory O’Connor of Norton Rose – in camera

component of submission (note: this session will be

closed to the public)

473 30 mins

10.30am Tea Break

10.40am Preliminary matters 15 mins

10.55am Western Distributor Authority (WDA) represented by

Stuart Morris QC, Chris Townshend QC, with Emily

Porter and Rupert Watters, instructed by Clayton Utz

and calling expert evidence in the following:

Planning and Urban Design

- Michael Barlow in strategic planning

Day 2 of 8

1.00pm Lunch Break

2.00pm WDA cont’d

4.30pm Day 2 close

Day 3: Wednesday 16 August 2017

Venue: Footscray Community Arts Centre, 45 Moreland Street, Footscray

Time Party Sub No Allocated

10.00am Preliminary matters 15 mins

10.15am WDA cont’d calling expert evidence from the

following:

Planning and Urban Design cont’d

Historical Heritage

- Roger Wood in urban design

- Deiter Lim in landscape

- Kate Gray in historical heritage

Day 3 of 8

1.00pm Lunch Break

2.00pm WDA cont’d

4.30pm Day 3 close

Page 4: PPV West Gate Tunnel Project IAC Timetable ... - Amazon S3

West Gate Tunnel Project Inquiry and Advisory Committee (IAC) – Version 14 Timetable | 12 September 2017

Page 3

Day 4: Thursday 17 August 2017

Venue: Footscray Community Arts Centre, 45 Moreland Street, Footscray

Time Party Sub No Allocated

10.00am Preliminary matters 15 mins

10.15am WDA cont’d calling expert evidence in the following:

Constructability and Engineering

- Trevor O’Shannessy in ground movement

- Andrew Kalitsis in contaminated spoil

- Jonathan Medd in groundwater

- Melanie Collett in surface water

- Cameron Miller in ecology

Day 4 of 8

1.00pm Lunch Break

2.00pm WDA cont’d

4.30pm Day 4 close

Day 5: Friday 18 August 2017

Venue: Footscray Community Arts Centre, 45 Moreland Street, Footscray

Time Party Sub No Allocated

10.00am Preliminary matters 15 mins

10.15am WDA cont’d calling expert evidence in the following:

Constructability and Engineering cont’d

Noise and vibration

- Dr John Heilig in vibration and regeneration

noise (tunnel)

- Natalie Lawlor in business (if required)

Day 5 of 8

1.00pm Lunch Break

2.00pm WDA cont’d

4.30pm Day 5 close

Day 6: Monday 21 August 2017

Venue: Footscray Community Arts Centre, 45 Moreland Street, Footscray

Time Party Sub No Allocated

10.00am Preliminary matters 15 mins

10.15am WDA cont’d calling expert evidence in the following:

Traffic and Transport

- Tim Veitch in transport modelling

- John Kiriakidis in transport

Day 6 of 8

Page 5: PPV West Gate Tunnel Project IAC Timetable ... - Amazon S3

West Gate Tunnel Project Inquiry and Advisory Committee (IAC) – Version 14 Timetable | 12 September 2017

Page 4

1.00pm Lunch Break

2.00pm WDA cont’d

4.30pm Day 6 close

Day 7: Tuesday 22 August 2017

Venue: Footscray Community Arts Centre, 45 Moreland Street, Footscray

Time Party Sub No Allocated

10.00am Preliminary matters 15 mins

10.15am WDA cont’d Day 7 of 8

1.00pm Lunch Break

2.00pm WDA cont’d

4.30pm Day 7 close

Day 8: Wednesday 23 August 2017

Venue: Footscray Community Arts Centre, 45 Moreland Street, Footscray

Time Party Sub No Allocated

9.00am Preliminary matters 15 mins

9.15am WDA cont’d calling expert evidence in the following:

Noise and Vibration cont’d

- Matthew Stead in resonate acoustics/airborne

noise

Day 8 of 8

1.00pm Lunch Break

2.00pm WDA cont’d

4.30pm Day 8 close

Day 9: Thursday 24 August 2017

Venue: Footscray Community Arts Centre, 45 Moreland Street, Footscray

Time Party Sub No Allocated

9.00am Preliminary matters 15 mins

9.15am WDA cont’d calling expert evidence in the following:

Air Quality

- Frank Fleer in air quality

Human Health, Social and Business

- Jackie Wright in human health

- Dr Pallavi Mandke in social

Day 8 of 8

12.30pm Lunch Break

Page 6: PPV West Gate Tunnel Project IAC Timetable ... - Amazon S3

West Gate Tunnel Project Inquiry and Advisory Committee (IAC) – Version 14 Timetable | 12 September 2017

Page 5

1.30pm WDA cont’d

4.30pm Day 9 close

Day 10: Friday 25 August 2017

Venue: Footscray Community Arts Centre, 45 Moreland Street, Footscray

Time Party Sub No Allocated

9.30am Preliminary matters 15 mins

9.45am WDA cont’d

11.30am Roads Corporation (VicRoads) represented by Paul

Connor QC with Roshan Chaile of Counsel instructed

by Rory O’Connor Norton Rose – public component of

submission

Day 1 of 1

1.00pm Lunch Break

2.00pm Roads Corporation (VicRoads) cont’d

4.30pm Day 10 close

Day 11: Monday 28 August 2017

Venue: Footscray Community Arts Centre, 45 Moreland Street, Footscray

Time Party Sub No Allocated

10.00am Preliminary matters 15 mins

10.15am City of Melbourne represented by Nicholas Tweedie

SC with Peter O’Farrell instructed by Jane Hall of

Ashurst and calling expert evidence in the following

(TBC):

- Stephen Hunt in traffic engineering

- Marco Lucioni in freeway design

184 Day 1 of 4

1.00pm Lunch Break

2.00pm City of Melbourne cont’d

4.30pm Day 11 close

Day 12: Tuesday 29 August 2017

Venue: Footscray Community Arts Centre, 45 Moreland Street, Footscray

Time Party Sub No Allocated

10.00am Preliminary matters 15 mins

10.15am City of Melbourne cont’d calling expert evidence in the Day 2 of 4

Page 7: PPV West Gate Tunnel Project IAC Timetable ... - Amazon S3

West Gate Tunnel Project Inquiry and Advisory Committee (IAC) – Version 14 Timetable | 12 September 2017

Page 6

following (TBC):

- Geoffrey London in urban design

- Steve Schutt in open space/landscape

- Chris Procter in urban design

1.00pm Lunch Break

2.00pm City of Melbourne cont’d

4.30pm Day 12 close

Day 13: Wednesday 30 August 2017

Venue: Footscray Community Arts Centre, 45 Moreland Street, Footscray

Time Party Sub No Allocated

10.00am Preliminary matters 15 mins

10.15am City of Melbourne cont’d calling expert evidence in

the following (TBC):

- Eric Keys in strategic transport

- Darren Tardio in noise

Day 3 of 4

1.00pm Lunch Break

2.00pm City of Melbourne cont’d

4.30pm Day 13 close

Day 14: Thursday 31 August 2017

Venue: Footscray Community Arts Centre, 45 Moreland Street, Footscray

Time Party Sub No Allocated

10.00am Preliminary matters 15 mins

10:15am Ashe Morgan represented by Chris Canavan QC

instructed by Andrea Towson of Arnold Bloch Leibler

and calling expert evidence from the following:

- Justin Madden in urban design

- Chris Butler in traffic

415

4 hours

1.00pm Lunch Break

2.00pm Ashe Morgan cont’d

3.00pm City of Melbourne cont’d (if required)

4.30pm Day 14 close

Page 8: PPV West Gate Tunnel Project IAC Timetable ... - Amazon S3

West Gate Tunnel Project Inquiry and Advisory Committee (IAC) – Version 14 Timetable | 12 September 2017

Page 7

Day 15: Friday 1 September 2017

Venue: Footscray Community Arts Centre, 45 Moreland Street, Footscray

Time Party Sub No Allocated

10.00am Preliminary matters 15 mins

10.15am City of Melbourne cont’d Day 4 of 4

1.00pm Lunch Break

2.00pm Legal Submission on Peer Review Issue (TBC)

4.00pm Day 13 close

Day 16: Monday 4 September 2017

Venue: Footscray Community Arts Centre, 45 Moreland Street, Footscray

Time Party Sub No Allocated

10.00am Preliminary matters 15 mins

10:15am Hobsons Bay City Council represented by Greg Tobin

and Kate Morris of Harwood Andrews and calling

expert evidence in the following:

- Andrew O’Brien in traffic

- Shane Elkin in acoustics

Day 1 of 3

1.00pm Lunch Break

2.00pm Hobsons Bay City Council cont’d

4.30pm Day 16 close

Day 17: Tuesday 5 September 2017

Venue: Footscray Community Arts Centre, 45 Moreland Street, Footscray

Time Party Sub No Allocated

10.00am Preliminary matters 15 mins

10.15am Hobsons Bay City Council cont’d calling expert

evidence in the following:

- Graeme Starke in air quality

- Bonnie Rosen in social impact

378 Day 2 of 3

1.00pm Lunch Break

2.00pm Hobsons Bay City Council cont’d

4.30pm Day 17 close

Page 9: PPV West Gate Tunnel Project IAC Timetable ... - Amazon S3

West Gate Tunnel Project Inquiry and Advisory Committee (IAC) – Version 14 Timetable | 12 September 2017

Page 8

Day 18: Wednesday 6 September 2017

Venue: Footscray Community Arts Centre, 45 Moreland Street, Footscray

Time Party Sub No Allocated

10.00am Preliminary matters Day 3 of 3

10.15am Hobsons Bay City Council cont’d calling expert

evidence from the following:

- A/Prof Louis Irving in public health

11.45am Lung Health Research Centre, University of

Melbourne represented by Teresa Bisucci of Best

Hooper Lawyers instructed by Clare Marie Walter and

calling expert evidence from the following:

- Prof Gary Anderson in health impacts

432 1.5 hours

1.15pm Lunch Break

2.00pm Maribyrnong City Council represented by Ragu

Appudurai of Counsel instructed by Maddocks

Lawyers and calling expert evidence in the following:

- David Barnes in planning

158 Day 1 of 3

4.30pm Day 18 close

Day 19: Thursday 7 September 2017

Venue: Footscray Community Arts Centre, 45 Moreland Street, Footscray

Time Party Sub No Allocated

10.00am Preliminary matters 15 mins

10.15am Maribyrnong City Council cont’d calling expert

evidence from the following:

- Kirsten Bauer in urban design and landscape

architecture

- Russell Symons in traffic engineering

Day 2 of 3

1.00pm Lunch Break

2.00pm Maribyrnong City Council cont’d

4.30pm Day 19 close

Page 10: PPV West Gate Tunnel Project IAC Timetable ... - Amazon S3

West Gate Tunnel Project Inquiry and Advisory Committee (IAC) – Version 14 Timetable | 12 September 2017

Page 9

Day 20: Friday 8 September 2017

Venue: Footscray Community Arts Centre, 45 Moreland Street, Footscray

Time Party Sub No Allocated

10.00am Preliminary matters 15 mins

10.15am Hobsons Bay City Council cont’d

11.15pm Maribyrnong City Council cont’d Day 3 of 3

12.15pm Lunch Break

1.00pm WDA cont’d calling expert evidence from the

following:

- Will Symons in greenhouse gas

2.00pm Day 20 close

Day 21: Monday 11 September 2017

Venue: Footscray Community Arts Centre, 45 Moreland Street, Footscray

Time Party Sub No Allocated

10.00am Preliminary matters 10 mins

10.10am Melbourne Water Corporation represented by Gerald

FitzGibbon

441 20 mins

10.30am Inner Melbourne Planning Alliance Inc. represented

by Gerry McLoughlin and calling expert evidence from

the following:

- Dr Ian Woodcock in urban design

- Professor Peter Graham in sustainability

374 1.5 hours

12.00pm Spotswood South Kingsville Residents Group Inc.

represented by Rosa McKenna and calling expert

evidence from the following:

- Dr Diane Keogh in air quality

326 1.5 hours

1.30pm Lunch Break

2.15pm Dr Patrick Love with Geoff Hjorth, Marlene Monahan

and Jacob Holley calling expert evidence from the

following:

- Dr John Stone in transport planning

409 1 hour

3.15pm Colleen Hartland MP 405 30 mins

3.45pm Port Phillip City Council represented by Claire Ferres

Miles

387 45 mins

4.30pm Day 21 close

Page 11: PPV West Gate Tunnel Project IAC Timetable ... - Amazon S3

West Gate Tunnel Project Inquiry and Advisory Committee (IAC) – Version 14 Timetable | 12 September 2017

Page 10

Day 22: Tuesday 12 September 2017

Venue: Footscray Community Arts Centre, 45 Moreland Street, Footscray

Time Party Sub No Allocated

10.30am Preliminary matters 10 mins

10.40am Friends of Moonee Ponds Creek Inc represented by

Kaye Oddie

17 20 mins

11.00am Planning Institute of Australia (Vic) represented by

Laura Murray

190 20 mins

11.20am Bicycle Network represented by Garry Brennan 449 10 mins

11.30am Christine Harris 217 15 mins

11.45am Break

11.50am National Trust of Australia (Victoria) represented by

Jessica Hood

442 20 mins

12.10pm CC Containers P/L represented by K&L Gates (TBC) 7 30 mins

12.40pm Melbourne City Western Connection represented by

Anthony McKee, Andrew Butt and Michael Richmond

444 30 mins

1.10pm Lunch Break

2.05pm Hyde Street Residents Group represented by Laura

Meese

192 30 mins

2.35pm Parkville Association Inc. represented by Robert

Krelle

263 20 mins

2.55pm Chalmers Industries represented by John Carew and

Kane Harnden

321 30 mins

3.25pm Break

3.35pm Flemington Association Inc. represented by Russell

Smith

343 30 mins

4.05pm Docklands Community Association represented by

Roger Gardner

435 15 mins

4.20pm Break

Day 22: Tuesday 12 September 2017 (Evening Session)

Venue: Footscray Community Arts Centre, 45 Moreland Street, Footscray

Time Party Sub No Allocated

5.40pm Dr Patrick Love with Geoff Hjorth, Marlene Monahan

and Jacob Holley calling expert evidence from the

following:

- Doug Harley in network modelling and

409 20 mins

Page 12: PPV West Gate Tunnel Project IAC Timetable ... - Amazon S3

West Gate Tunnel Project Inquiry and Advisory Committee (IAC) – Version 14 Timetable | 12 September 2017

Page 11

analysis

6.00pm Maribyrnong Truck Action Group represented by

Samantha McArthur and Martin Wurt

458 1.5 hours

7.30pm Jessica Marnich 467 10 mins

7.40pm Day 22 close

Day 23: Wednesday 13 September 2017

Venue: Footscray Community Arts Centre, 45 Moreland Street, Footscray

Time Party Sub No Allocated

10.30am Preliminary matters 15 mins

10.45am Kororoit Institute represented by Tony Smith 327 30 mins

11.15am Kensington Association represented by Francisca

Araneda and Michael Ingram

344 30 mins

11.45am Francisca Araneda 354 5 mins

11.50am JJ Cleaning Australia Pty Ltd represented by Stuart

Jones

429 15 mins

12.05pm Don’t Destroy Millers Road represented by residents

of Millers Road

352 20 mins

12.25pm Hobsons Bay Residents Association represented by

Jason Price

468 20 mins

12.45pm Lunch Break

1.45pm Yarra Campaign For Action on Transport represented

by Chris Star

437 20 mins

2.05pm Moreland Community for Active Transport

represented by Pauline Galvin

486 20 mins

2.25pm Friends of Stony Creek represented by Steven Wilson 161 20 mins

2.45pm Container Transport Alliance Australia represented

by Gerard Langes, Neil Chambers and a representative

CTAA Alliance Company

367 30 mins

3.15pm Break

3.25pm Croft Infrastructure Designs Pty Ltd represented by

Terry Fortescue Croft

396 30 mins

3.55pm Metropolitan Transport Forum represented by Cr

Martin Zakharov

426 20 mins

4.15pm LeadWest represented by Craig Rowley 434 15 mins

4.30pm Day 23 close

Page 13: PPV West Gate Tunnel Project IAC Timetable ... - Amazon S3

West Gate Tunnel Project Inquiry and Advisory Committee (IAC) – Version 14 Timetable | 12 September 2017

Page 12

Day 24: Thursday 14 September 2017

Venue: Footscray Community Arts Centre, 45 Moreland Street, Footscray

Time Party Sub No Allocated

11.00am Preliminary matters

11.15am Brooklyn Residents Action Group Inc. (BRAG Inc.)

represented by Egbert Boere and others

289 30 mins

11.45am Public Transport Users Association represented by

Tony Morton

430 15 mins

12.00pm Emma McLean Kindergarten and Daycare

represented by Jessica Johnson and Grace Guinto

399 15 mins

12.15pm Western Melbourne Tourism represented by Richard

Ponsford

456 10 mins

12.25pm Digital Harbour (Holdings) Pty Ltd represented by

Russell Nisbet

185 15 mins

12.40pm Lunch Break

1.45pm Owners Corporation 1 Plan Number 429674C

represented by Deborah Salins

389 15 mins

2.00pm Hobsons Bay Bicycle User Group (HBBUG) and other

On-Road Bicycle Riders represented by Noel Charles

Dyson

446 15 mins

2.15pm Glen and Jenny Preusker, Splashdown Properties Pty

Ltd and related entities represented by Peta Olive of

Aitken Partners

333 15 mins

2.30pm Protectors of Public Lands Inc. A00463575

represented by Ernest Healy

425 15 mins

2.45pm Impact Investment Group represented by Michael

Dunn

189 20 mins

3.05pm Break

3.10pm Ian Woodruff 20 15 mins

3.25pm CVCV Land Co. No 17 Pty Ltd represented by Edward

Townsing

386 10 mins

3.35pm Break

3.45pm Phillip Symons 361 10 mins

3.55pm Murray Case Photography Pty Ltd represented by

Murray John Case

264 20 mins

4.15pm Clamms Seafood Pty Ltd represented by Campbell

Carson

78 30 mins

4.45pm Andis Salins, Debbie Salins, Rex Industrial P/L, Salins

Equity P/L, Related Entities, Staff and Beneficiaries of

Associated Entities represented by Deborah Ann

Salins

182 20 mins

Page 14: PPV West Gate Tunnel Project IAC Timetable ... - Amazon S3

West Gate Tunnel Project Inquiry and Advisory Committee (IAC) – Version 14 Timetable | 12 September 2017

Page 13

5.05pm Break

Day 24: Thursday 14 September 2017 (Evening Session)

Venue: Footscray Community Arts Centre, 45 Moreland Street, Footscray

Time Party Sub No Allocated

6.20pm Transport for Melbourne represented by Roger Taylor 232 30 mins

6.50pm Victorian Transport Action Group represented by

Glenys Romanes and calling expert evidence from the

following:

- Dr Ian Woodcock in urban planning

364 1.5 hours

8.20pm Day 22 close

Day 25 Concurrent Sessions

Day 25: Friday 15 September 2017

Venue: Performance Space, Footscray Community Arts Centre, 45 Moreland Street, Footscray

Time Party Sub No Allocated

10.00am Preliminary matters 15 mins

10.15am Pauline Maree Galvin 420 10 mins

10.25am Terry Laidler 423 10 mins

10.35am Hui Gan 103 10 mins

10.45am Tamara Saulwick 105 10 mins

10.55am Andrew Webster

203

10 mins

11.05am Fiona Cotter 266 10 mins

11.15am Break

11.25am Janet Graham 303 10 mins

11.35am Ryan and Karen Thistlethwaite 372 10 mins

11.45am Chris Dunlevy 170 10 mins

11.55am Submitter 213 represented by Chris Dunlevy 213 10 mins

12.05pm Emma Janetzki 299 15 mins

12.20pm Kristy-Lee Riley 225 10 mins

12.30pm Lunch Break

1.30pm Ian Hundley 457 15 mins

1.45pm Ruth Skene 471 15 mins

Page 15: PPV West Gate Tunnel Project IAC Timetable ... - Amazon S3

West Gate Tunnel Project Inquiry and Advisory Committee (IAC) – Version 14 Timetable | 12 September 2017

Page 14

2.00pm Julian Hill 10 5 mins

2.05pm Daniel Ellul 21 10 mins

2.15pm Margaret Fried 87 5 mins

2.20pm Michelle Maugueret 98 5 mins

2.25pm Luke Hanigan 101 5 mins

2.30pm Break

2.40pm Charmian Gaud 146 10 mins

2.50pm Anthony McKee 460 10 mins

3.00pm Break

3.10pm Kieron James 464 10 mins

3.20pm Filicia Pirritano 205 5 mins

3.25pm Meaghan Paul represented by Rosa McKenna 215 10 mins

3.35pm Jason Blackman 503 5 mins

3.40pm Hallie Hodder 310 10 mins

3.50pm Senator Janet Rice 422 30 mins

4.20pm Day 25 close

Day 25: Friday 15 September 2017

Venue: Basement Theatre, Footscray Community Arts Centre, 45 Moreland Street, Footscray

Time Party Sub No Allocated

10.00am Preliminary matters 15 mins

10.15am Tammy Jones 475 10 mins

10.25am Sevasti Ficior 485 5 mins

10.30am David Sequeira 131 5 mins

10.35am Neva Simeoni 138 5 mins

10.40am Break

10.50am Mario Xerri 177 5 mins

10.55am Caroline Kennon 183 5 mins

11.00am Christopher Wheelhouse 186 5 mins

11.05am Jacinta Bleeser 197 5 mins

11.10am Tony Patone 201 5 mins

11.20am Lucy-Anne Inglis 216 5 mins

11.25am Colin Long 223 10 mins

11.35am Trirampage Pty Ltd represented by John Clark 172 5 mins

Page 16: PPV West Gate Tunnel Project IAC Timetable ... - Amazon S3

West Gate Tunnel Project Inquiry and Advisory Committee (IAC) – Version 14 Timetable | 12 September 2017

Page 15

11.40am Jucon Holdings Pty Ltd represented by Godfrey Smith 234 10 mins

11.50am Jacqui Keating 240 5 mins

11.55am Break

12.00pm Vesna Sparkes 279 10 mins

12.10pm Rachel Burns and Raphael Fiorese represented by

Jessica Burns

281 10 mins

12.20pm Lunch Break

1.35pm Simon Ellis and Paul Wood 292 10 mins

1.45pm Luke Sparkes 293 5 mins

2.00pm Louise Murphy 298 5 mins

2.05pm Derek Collins 301 10 mins

2.15pm Break

2.25pm Leon Joseph Calder 316 5 mins

2.30pm Stephanie Lou, Mark Wylob and Andrea Wylob

represented by Andrea Wylob

124 15 mins

2.45pm Kerryn Hill 391 20 mins

3.05pm Mary Jo Kelly 272 5 mins

3.10pm Break

3.15pm Geoff Leach 394 10 mins

3.25pm Georgia Webster 453 5 mins

3.30pm Alison and James Whitten 469 10 mins

3.40pm Ross Kingston 230 20 mins

4.00pm Day 25 close

Day 26: Monday 18 September 2017

Venue: Presidents Room, RSL Anzac House, 4 Collins Street, Melbourne

Time Party Sub No Allocated

10.00am Preliminary matters 15 mins

10.15am WDA – closing submission and right of reply 1 day

1.00pm Lunch Break

2.00pm WDA – closing submission and right of reply

4.30pm Day 26 close

Page 17: PPV West Gate Tunnel Project IAC Timetable ... - Amazon S3

West Gate Tunnel Project Inquiry and Advisory Committee (IAC) – Version 14 Timetable | 12 September 2017

Page 16

Day 27: Tuesday 19 September 2017

Venue: Presidents Room, RSL Anzac House, 4 Collins Street, Melbourne

Time Party Sub No Allocated

10.00am Preliminary matters 15 mins

10.15am Without prejudice session – EPRs and planning

scheme amendments

4 hrs

2.00pm Hearing close

Hearing Timetable Notes:

1. This timetable may be amended without notice but the IAC will try to notify parties and accommodate

requests where possible.

2. Please arrive at least 15 minutes before your scheduled time of commencement. If you are unable to

be present at your scheduled time, please contact Planning Panels Victoria as soon as practicable.

3. Any queries regarding this timetable should be made to Greta Grivas on 8392 5121.