ADS-B UAE IMPLEMENTATION CNS SG/8-PPT/8

Upload: others

Post on 13-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PPT8- ADS-B coverage SG8... · CNS SG/8-PPT/8. Background 2 • In 2009 ADS‐B coverage was installed throughout the UAE for operational use as part of the new ACC, Sheikh ZayedAir

ADS-BUAE IMPLEMENTATION

CNS SG/8-PPT/8

Page 2: PPT8- ADS-B coverage SG8... · CNS SG/8-PPT/8. Background 2 • In 2009 ADS‐B coverage was installed throughout the UAE for operational use as part of the new ACC, Sheikh ZayedAir

Background

2

• In 2009 ADS‐B coverage was installed throughout the UAE for operational use as part of the new ACC, Sheikh Zayed Air Navigation Center. 

• At the time the daily movements were around 1000 however as of 2018 the daily movements are now around 2800. 

• While the UAE doesn’t have a big FIR, it is highly complex and spilt into an upper and lower airspace.

• In December 2017 the UAE implemented the ARP3 which was a total overhaul of our FIR to facilitate air traffic growth throughout our FIR.

• To facilitate the traffic growth within the region comprehensive, redundant surveillance coverage is required as one of the enablers.

• Redundant Mode S radar coverage is available throughout our FIR however a radar station has a lifespan of around 15 year and replacing a site is extremely expensive.

• The cost benefit of replacing/supplementing radars with additional ADS‐B sites is a huge saving however a clear mandate needs to be in place to ensure all users of the FIR are ADS‐B equipped.

Page 3: PPT8- ADS-B coverage SG8... · CNS SG/8-PPT/8. Background 2 • In 2009 ADS‐B coverage was installed throughout the UAE for operational use as part of the new ACC, Sheikh ZayedAir

UAE FIR – Post ARP3

3

Page 4: PPT8- ADS-B coverage SG8... · CNS SG/8-PPT/8. Background 2 • In 2009 ADS‐B coverage was installed throughout the UAE for operational use as part of the new ACC, Sheikh ZayedAir

CURRENT UAE FIR

4

Page 5: PPT8- ADS-B coverage SG8... · CNS SG/8-PPT/8. Background 2 • In 2009 ADS‐B coverage was installed throughout the UAE for operational use as part of the new ACC, Sheikh ZayedAir

CURRENT UAE UPPER FIR

5

Page 6: PPT8- ADS-B coverage SG8... · CNS SG/8-PPT/8. Background 2 • In 2009 ADS‐B coverage was installed throughout the UAE for operational use as part of the new ACC, Sheikh ZayedAir

CURRENT UAE LOWER FIR

6

Page 7: PPT8- ADS-B coverage SG8... · CNS SG/8-PPT/8. Background 2 • In 2009 ADS‐B coverage was installed throughout the UAE for operational use as part of the new ACC, Sheikh ZayedAir

Current ADS-B coverage

7

Page 8: PPT8- ADS-B coverage SG8... · CNS SG/8-PPT/8. Background 2 • In 2009 ADS‐B coverage was installed throughout the UAE for operational use as part of the new ACC, Sheikh ZayedAir

ADS-B COVERAGE - FL130 TO FL450

8

Page 9: PPT8- ADS-B coverage SG8... · CNS SG/8-PPT/8. Background 2 • In 2009 ADS‐B coverage was installed throughout the UAE for operational use as part of the new ACC, Sheikh ZayedAir

9

ADS-B CONFIGURATION AND FUTURE PLANSCurrently we have 8 redundant en route ADS-B sites throughout the UAE.The following is planned:1 new site – Q1 20181 WAM system – Q4 20181 new site Q1 20201 new site Q4 2020

Based on a study GCAA did in 2015 around 60% of civil carriers using the UAE FIR were ADS-B compliant. As of Q1 2018 more than 95% of civil carriers are ADS-B compliant.

Page 10: PPT8- ADS-B coverage SG8... · CNS SG/8-PPT/8. Background 2 • In 2009 ADS‐B coverage was installed throughout the UAE for operational use as part of the new ACC, Sheikh ZayedAir

10

ADS-B CONFIGURATION AND FUTURE PLANSAs per the CAR Part IV, Operation Regulations, CAR – OPS 1 Commercial & Private Air Transportation (Aeroplanes):

CAR-OPS 1.867 ADS-B (OUT and IN)a) ADS-B OUTAn operator shall not operate an aeroplane under IFR after 01 January 2020, unless it is equipped with ADS-B OUT.b) ADS-B INAn operator shall not operate an aeroplane equipped with the ADS-B IN capability unless approved by the GCAA.