ASEMINAR PRESENTATION
ON SUMMER TRANING DONE AT
“HINDUSTHAN COPPER LIMITED ,KHETRI“
Submitted by:-Mahendra Bagriya(13EKTME34)VII SEMESTERMechanical Engineering
Submitted to:-Mr. Navin H. YadavSeminar Coordinator
![Page 2: ppt on summer training at hindustan copper limited](https://reader034.vdocuments.mx/reader034/viewer/2022042423/587c41801a28ab5a1d8b67f3/html5/thumbnails/2.jpg)
![Page 3: ppt on summer training at hindustan copper limited](https://reader034.vdocuments.mx/reader034/viewer/2022042423/587c41801a28ab5a1d8b67f3/html5/thumbnails/3.jpg)
CONTENT:-
• INTRODUCTION• UNITS OF HCL• KHERTI COPPER COMPEX (KCC)• ROPE WAY• COPPER ORE BELT CONVEYOR• GRINDING• PRODUCTION FLOWCHART• COMPRESSO HOUSE• MRR SHOP
![Page 4: ppt on summer training at hindustan copper limited](https://reader034.vdocuments.mx/reader034/viewer/2022042423/587c41801a28ab5a1d8b67f3/html5/thumbnails/4.jpg)
INTRODUCTION:-
• Hindustan Copper Limited (HCL), a public sector undertaking under the administrative control of the Ministry of Mines, was incorporated on 9th November 1967
• Shri K.D.Diwan, Chairman-cum-Managing Director.• The Company markets copper cathodes, copper wire bar,
continuous cast copper rod and by-products, such as anode slime (containing gold, silver, etc.), copper sulphate and sulphuric acid.
• More than 90% of the sales revenue is from cathode and continuous cast copper rods.
• In concluded financial year 2006-07, as per provisional estimates, the Company has earned a all time highest net profit Rs 331 crore against a sales turnover of Rs 1800 crore.
![Page 5: ppt on summer training at hindustan copper limited](https://reader034.vdocuments.mx/reader034/viewer/2022042423/587c41801a28ab5a1d8b67f3/html5/thumbnails/5.jpg)
UNITS OF HCL:-
• Khetri Copper Complex (KCC) at Khetrinagar, Rajasthan • Indian Copper Complex (ICC) at Ghatsila, Jharkhand• Malanjkhand Copper Project (MCP) at Malanjkhand, Madhya
Pradesh• Taloja Copper Project (TCP) at Taloja, Maharashtra• Gujarat Copper Project (GCP) at Jhagadia, Gujarat
![Page 6: ppt on summer training at hindustan copper limited](https://reader034.vdocuments.mx/reader034/viewer/2022042423/587c41801a28ab5a1d8b67f3/html5/thumbnails/6.jpg)
KHETRI COPPER COMPLE (KCC):-
• Khetri is situated at the foothills of the Aravalli Range.• which hosts copper mineralization, giving rise to a 80 km
long metallogenetic province from Singhana in the north to Raghunathgarh in the south, popularly known as Khetri Copper Belt
• Khetri comprises of Khetri town and Khetrinagar. • Khetri town was founded by Raja Khet Singhji Nirwan, and
Khetrinagar, which is about 10 km away from Khetri town, is developed and maintained by Hindustan Copper Limited.
![Page 7: ppt on summer training at hindustan copper limited](https://reader034.vdocuments.mx/reader034/viewer/2022042423/587c41801a28ab5a1d8b67f3/html5/thumbnails/7.jpg)
KHETRI COPPER COMPLEX (KCC)
![Page 8: ppt on summer training at hindustan copper limited](https://reader034.vdocuments.mx/reader034/viewer/2022042423/587c41801a28ab5a1d8b67f3/html5/thumbnails/8.jpg)
CAPICITY OF KCC:-
• Capacity 1.0 million tonnes of ore per annum.• Process plants to produce 31,000 TPA of refined copper
ORE OF COPPER
![Page 9: ppt on summer training at hindustan copper limited](https://reader034.vdocuments.mx/reader034/viewer/2022042423/587c41801a28ab5a1d8b67f3/html5/thumbnails/9.jpg)
ROPE WAY:-
• It transports copper ore from Kolihan to Khetri plant.
• There are 55 tower and 6 substation.
• Total length of rope way is 15 km.• There are 65 buckets and capacity
of each buckets is 1 tonne.• Maximum speed of rope is 2.8 m/s.• Minimum speed of rope is 1.4 m/s.• Rope is drive with the help of 280
HP motor.
![Page 10: ppt on summer training at hindustan copper limited](https://reader034.vdocuments.mx/reader034/viewer/2022042423/587c41801a28ab5a1d8b67f3/html5/thumbnails/10.jpg)
![Page 11: ppt on summer training at hindustan copper limited](https://reader034.vdocuments.mx/reader034/viewer/2022042423/587c41801a28ab5a1d8b67f3/html5/thumbnails/11.jpg)
![Page 12: ppt on summer training at hindustan copper limited](https://reader034.vdocuments.mx/reader034/viewer/2022042423/587c41801a28ab5a1d8b67f3/html5/thumbnails/12.jpg)
![Page 13: ppt on summer training at hindustan copper limited](https://reader034.vdocuments.mx/reader034/viewer/2022042423/587c41801a28ab5a1d8b67f3/html5/thumbnails/13.jpg)
COPPER ORE BELT CONVEYOR:-
![Page 14: ppt on summer training at hindustan copper limited](https://reader034.vdocuments.mx/reader034/viewer/2022042423/587c41801a28ab5a1d8b67f3/html5/thumbnails/14.jpg)
![Page 15: ppt on summer training at hindustan copper limited](https://reader034.vdocuments.mx/reader034/viewer/2022042423/587c41801a28ab5a1d8b67f3/html5/thumbnails/15.jpg)
GRINDING:-
• Grinding is done in the Ball Mills and Rod Mills.
• The limits of particles from 5µs to 300µs.
• After grinding ore is forward for Forth Flotation.
• Froth flotation is a process for selectively separating hydrophobic materials from hydrophilic.
![Page 16: ppt on summer training at hindustan copper limited](https://reader034.vdocuments.mx/reader034/viewer/2022042423/587c41801a28ab5a1d8b67f3/html5/thumbnails/16.jpg)
Types of grinding mill used in concentrator plant1.Rod mill 2.Ball mill
![Page 17: ppt on summer training at hindustan copper limited](https://reader034.vdocuments.mx/reader034/viewer/2022042423/587c41801a28ab5a1d8b67f3/html5/thumbnails/17.jpg)
SPECIFICATION OF ROD MILL
Rod Mill are driven by a 920w,200 rpm ,3.3 KV synchronous motor.
Length of the Rod is 17 Feet.
The weight of Rods is 27 tons.
Output 200 MT/hr
![Page 18: ppt on summer training at hindustan copper limited](https://reader034.vdocuments.mx/reader034/viewer/2022042423/587c41801a28ab5a1d8b67f3/html5/thumbnails/18.jpg)
SPECIFICATION OF BALL MILL
Ball Mill are driven by a 920 w,200 rpm ,3.3 KV synchronous motor.
The diameter of balls varies from 1’’ to 1½’’.
Maximum output of Ball mill is 200 MT/hr.
![Page 19: ppt on summer training at hindustan copper limited](https://reader034.vdocuments.mx/reader034/viewer/2022042423/587c41801a28ab5a1d8b67f3/html5/thumbnails/19.jpg)
![Page 20: ppt on summer training at hindustan copper limited](https://reader034.vdocuments.mx/reader034/viewer/2022042423/587c41801a28ab5a1d8b67f3/html5/thumbnails/20.jpg)
![Page 21: ppt on summer training at hindustan copper limited](https://reader034.vdocuments.mx/reader034/viewer/2022042423/587c41801a28ab5a1d8b67f3/html5/thumbnails/21.jpg)
![Page 22: ppt on summer training at hindustan copper limited](https://reader034.vdocuments.mx/reader034/viewer/2022042423/587c41801a28ab5a1d8b67f3/html5/thumbnails/22.jpg)
ORE AFTER GRINGING:-
![Page 23: ppt on summer training at hindustan copper limited](https://reader034.vdocuments.mx/reader034/viewer/2022042423/587c41801a28ab5a1d8b67f3/html5/thumbnails/23.jpg)
FLOATATION SECTION
CLEANINGRE-CLEANING
![Page 24: ppt on summer training at hindustan copper limited](https://reader034.vdocuments.mx/reader034/viewer/2022042423/587c41801a28ab5a1d8b67f3/html5/thumbnails/24.jpg)
![Page 25: ppt on summer training at hindustan copper limited](https://reader034.vdocuments.mx/reader034/viewer/2022042423/587c41801a28ab5a1d8b67f3/html5/thumbnails/25.jpg)
SLAG
Slag is the glass-like by-product left over after a desired metal has been separated (i.e., smelted) from its raw ore Slag is usually a mixture of metal oxides and silicon dioxide.However, slags can contain metal sulfides and elemental metals. While slags are generally used to remove waste in metal smelting, they can also serve other purposes, such as assisting in the temperature control of the smelting, and minimizing any re-oxidation of the final liquid metal product before the molten metal is removed from the furnace and used to make solid metal
![Page 26: ppt on summer training at hindustan copper limited](https://reader034.vdocuments.mx/reader034/viewer/2022042423/587c41801a28ab5a1d8b67f3/html5/thumbnails/26.jpg)
![Page 27: ppt on summer training at hindustan copper limited](https://reader034.vdocuments.mx/reader034/viewer/2022042423/587c41801a28ab5a1d8b67f3/html5/thumbnails/27.jpg)
![Page 28: ppt on summer training at hindustan copper limited](https://reader034.vdocuments.mx/reader034/viewer/2022042423/587c41801a28ab5a1d8b67f3/html5/thumbnails/28.jpg)
![Page 29: ppt on summer training at hindustan copper limited](https://reader034.vdocuments.mx/reader034/viewer/2022042423/587c41801a28ab5a1d8b67f3/html5/thumbnails/29.jpg)
![Page 30: ppt on summer training at hindustan copper limited](https://reader034.vdocuments.mx/reader034/viewer/2022042423/587c41801a28ab5a1d8b67f3/html5/thumbnails/30.jpg)
PRODUCTION FLOWCHART:-
![Page 31: ppt on summer training at hindustan copper limited](https://reader034.vdocuments.mx/reader034/viewer/2022042423/587c41801a28ab5a1d8b67f3/html5/thumbnails/31.jpg)
COMPRESSOR HOUSE:-
• There are four KIRLOSKAR compressors and one is CAMERON compressor.
• Compressor house provides compressed air to the mines to drive different pneumatic motors.
• This is also makes mines place workable.
![Page 32: ppt on summer training at hindustan copper limited](https://reader034.vdocuments.mx/reader034/viewer/2022042423/587c41801a28ab5a1d8b67f3/html5/thumbnails/32.jpg)
![Page 33: ppt on summer training at hindustan copper limited](https://reader034.vdocuments.mx/reader034/viewer/2022042423/587c41801a28ab5a1d8b67f3/html5/thumbnails/33.jpg)
MMR SHOP:-
• In Mining Machine Repair (MMR) shop, the pneumatic motors are repaired which are used in mines.
• Assembly of pneumatic motors.
• Repairing of loaders.
![Page 34: ppt on summer training at hindustan copper limited](https://reader034.vdocuments.mx/reader034/viewer/2022042423/587c41801a28ab5a1d8b67f3/html5/thumbnails/34.jpg)
![Page 35: ppt on summer training at hindustan copper limited](https://reader034.vdocuments.mx/reader034/viewer/2022042423/587c41801a28ab5a1d8b67f3/html5/thumbnails/35.jpg)
![Page 36: ppt on summer training at hindustan copper limited](https://reader034.vdocuments.mx/reader034/viewer/2022042423/587c41801a28ab5a1d8b67f3/html5/thumbnails/36.jpg)
Drilling For Searching Copper
![Page 37: ppt on summer training at hindustan copper limited](https://reader034.vdocuments.mx/reader034/viewer/2022042423/587c41801a28ab5a1d8b67f3/html5/thumbnails/37.jpg)
Drilling Sample
![Page 38: ppt on summer training at hindustan copper limited](https://reader034.vdocuments.mx/reader034/viewer/2022042423/587c41801a28ab5a1d8b67f3/html5/thumbnails/38.jpg)
CONCLUSION:-
• In review this internship has been an excellent and rewarding experience.
• I have been able to meet and network with so many people that I am sure will be able to help me with opportunities in the future.
• One main thing that I have learned through this internship is time management skills.
![Page 39: ppt on summer training at hindustan copper limited](https://reader034.vdocuments.mx/reader034/viewer/2022042423/587c41801a28ab5a1d8b67f3/html5/thumbnails/39.jpg)
ANY QUERIES ?
![Page 40: ppt on summer training at hindustan copper limited](https://reader034.vdocuments.mx/reader034/viewer/2022042423/587c41801a28ab5a1d8b67f3/html5/thumbnails/40.jpg)
THANK YOU