Minor Irrigation Project of Batch 5
![Page 2: PPt for Earthen Bunds](https://reader036.vdocuments.mx/reader036/viewer/2022082316/552762e255034622368b47a3/html5/thumbnails/2.jpg)
IRRIGATION 2.1 General: Irrigation may defined as science of artificial application
of water to the land in accordance with the crop requirements throughout the crop period for full fledged nourishment of the crop.
NECESSITY OF IRRIGATION:-(1) Inadequate rain fall(2) Uneven distribution of rainfall(3) Growing a number of crops during a year(4) Growing superior crops.
SYSTEM OF IRRIGATION:-In a system of irrigation we have got three components.(1) The source of water(2) Storage system(3) Distribution system
![Page 3: PPt for Earthen Bunds](https://reader036.vdocuments.mx/reader036/viewer/2022082316/552762e255034622368b47a3/html5/thumbnails/3.jpg)
2.2 Advantages and disadvantages of irrigation:
Advantages:- (1)Increase in food production:-(2)Optimum benefits:-(3)Elimination of mixed cropping:-(4)Generation of hydro electric power (5)Domestic water supply:- (6) Facilities of communication:- (7)Island navigation:- (8)Afforestation:-
Disadvantages:(1) Irrigation may contribute to water pollution.(2) Over irrigation may lead to water logging and may reduce crop yields.(3) Irrigation may result in colder and damper climate causing out break of diseases.(4) Irrigation is complex and expensive in itself.
![Page 4: PPt for Earthen Bunds](https://reader036.vdocuments.mx/reader036/viewer/2022082316/552762e255034622368b47a3/html5/thumbnails/4.jpg)
2.3 Water requirement of crops: A water requirement of crop means the total quantity and the way in which a crop requires water, from the time it is sawn to the time it is harvested.
2.4 CROP PERIOD AND BASE PERIOD
CROP PERIOD : It is the “time that elapses from the instant of sowing of crop to the instant of its harvesting”.
BASE PERIOD : It is the “time between the first watering of crop at the time it’s sowing to its last watering before harvesting”.
2.5 DUTY AND DELTA OF CROP
Duty of crop :It is the “numbers of hectors a land irrigated for full growth of a crop by supply of 1 meter cube per second of water continuously during the entire
base period (B) of the crop”.
Delta of crop :it is the “total quantity of water required by crop for its full growth or the total depth of water required by the crop to reach maturity”.
The relationship between duty and delta is given by -
Δ = (864 x B) / D in cm
Where, Δ - is delta in cm. D - is duty in hectors per cumecs. B - is base period in days.
![Page 5: PPt for Earthen Bunds](https://reader036.vdocuments.mx/reader036/viewer/2022082316/552762e255034622368b47a3/html5/thumbnails/5.jpg)
NEW TANK PROJECT
![Page 6: PPt for Earthen Bunds](https://reader036.vdocuments.mx/reader036/viewer/2022082316/552762e255034622368b47a3/html5/thumbnails/6.jpg)
3.1 Salient features of new tank project
1. Name of the project : Construction of minor Irrigation Project. At Kanavi Honnapur 2. Location : village-Kanavi Honnapur Taluq:Hubli. Dist:Dharwad. 3. Distance of project site : 14 km From nearest Taluk HQ 4. Nearest airport and its : 12 km Distance from site 5. Catchment area : 2km2 6. Dependable annual : 635.7 mm avg rainfall 7. Yield available : 0.294m3/sec 8. Storage details Live storage : 0.329Mm3
Dead storage : 0.036Mm3 9. Intensity of irrigation : 90% 10. Embankment a) Top of bund level : 565.0 b) HFL : 563.570 m c) FTL : 562.570 d) Length of bund : 255 m e) Top width : 7.00 m f) Max height above : 554.190 m g) Lowest bund level : 542.070 m
11. Bench mark : 567.340m 12. Capacity of tank : 0.366 Mm3
![Page 7: PPt for Earthen Bunds](https://reader036.vdocuments.mx/reader036/viewer/2022082316/552762e255034622368b47a3/html5/thumbnails/7.jpg)
4.1 Soil Abstract for new site:
Sl. No.Tests
Results
1.2.3.4.5.6.7.8.
Specific GravityBulk DensityDry DensityCompaction TestOptimum Moisture ContentMaximum Dry DensityLiquid Limit Testa. Liquid Limitb. Flow IndexPlastic Limit Testa. Plastic Limitb. Plasticity IndexShrinkage LimitDirect Shear Testa. Angle of internal frictionb. Cohesion (C)Safe Bearing Capacity of Soil
2.3817.29 kN/m3
12.24 kN/m3
19.00 %1.54 g/cc52 %23.1120.48 %31.5212.20 %22°15` 19 kN/m2
108.24 kN/m2
![Page 8: PPt for Earthen Bunds](https://reader036.vdocuments.mx/reader036/viewer/2022082316/552762e255034622368b47a3/html5/thumbnails/8.jpg)
up stream side down stream side
Horizontal filter 30m wide
Free board
H=
NEW TANK PROJECTDAM SECTION Batch no : 05
All dimensions are in mtrs
Sone pitching
GL
![Page 9: PPt for Earthen Bunds](https://reader036.vdocuments.mx/reader036/viewer/2022082316/552762e255034622368b47a3/html5/thumbnails/9.jpg)
Sone pitching
Phreatic line
up stream side down stream side
Horizontal filter 30m wide
Free board
NEW TANK PROJECTPhreatic line Batch no : 05
All dimensions are in mtrs
![Page 10: PPt for Earthen Bunds](https://reader036.vdocuments.mx/reader036/viewer/2022082316/552762e255034622368b47a3/html5/thumbnails/10.jpg)
Lever Arm
0.15m Concret slab
Stone masonary wall
Vertical arm to lift the sluice gate
sluice of 0.5m diameter
NEW TANK PROJECTCROSS SECTION OF SLUICE GATEBATCH NO :05
![Page 11: PPt for Earthen Bunds](https://reader036.vdocuments.mx/reader036/viewer/2022082316/552762e255034622368b47a3/html5/thumbnails/11.jpg)
![Page 12: PPt for Earthen Bunds](https://reader036.vdocuments.mx/reader036/viewer/2022082316/552762e255034622368b47a3/html5/thumbnails/12.jpg)
OLD TANK PROJECT
![Page 13: PPt for Earthen Bunds](https://reader036.vdocuments.mx/reader036/viewer/2022082316/552762e255034622368b47a3/html5/thumbnails/13.jpg)
5
5.1 Salient features:1. 1. Name of the project : Construction of minor irrigation project at Tarihal.. 2. Location : Village: Tarihal. Taluk: Hubli District: Dharwad. 3. Distance of project site : 12kms from nearest taluk HQ 4. Nearest airport : 10km distance from site 5. Catchment area : 2 km2 [from Toposheet] 6. Dependable annual : 635.70 mm average rainfall 7. Yield available : 0.294 m3/s 8. Storage Details Live Storage : 2.496 Mmm3 Dead Storage : 0.624 Mmm3 9. Intensity of irrigation : 90% 10. Embankment Top bund level : 575.900m Flood Water level(FW ) : 574.900m Full tank level (FTL) : 573.900m Length of bund : 265m Top width of bund : 6m Bottom width of bund : 91.00m Maximum height above : 17m lower bund level 11. Type of section sluice : Type of sluice gate: Direct sluice gate. RL: 175-2-1=.175m 12. Bench mark RL : 567.340m
![Page 14: PPt for Earthen Bunds](https://reader036.vdocuments.mx/reader036/viewer/2022082316/552762e255034622368b47a3/html5/thumbnails/14.jpg)
5.2 ABSTRACT OF SOIL
Sl. No. Tests Results
1.2.3.4.5.6.7.8.
Specific GravityBulk DensityDry DensityCompaction TestOptimum Moisture ContentMaximum Dry DensityLiquid Limit Testa. Liquid Limitb. Flow IndexPlastic Limit Testa. Plastic Limitb. Plasticity IndexShrinkage LimitDirect Shear Testa. Angle of internal frictionb. Cohesion (C)Safe Bearing Capacity of Soil
2.6517.62 kN/m3
15.97 kN/m3
14.00 %1.75 g/cc36.52 %10.2017.43 %19.0912.20 %26° 15 kN/m2
115.5 kN/m2
![Page 15: PPt for Earthen Bunds](https://reader036.vdocuments.mx/reader036/viewer/2022082316/552762e255034622368b47a3/html5/thumbnails/15.jpg)
GL
free baord
Horizontal filter of 20m wide
OLD TANK PROJECTDam section of Old tank Batch no:05
All dimension are in mm
Horizontal filter of 20m wide
Up stream side Down stream side
![Page 16: PPt for Earthen Bunds](https://reader036.vdocuments.mx/reader036/viewer/2022082316/552762e255034622368b47a3/html5/thumbnails/16.jpg)
Horizontal filter 30m wide
OLD TANK PROJECTPhreatic lineBatch no : 05
All dimensions are in mtrs
Free board
Sone pitching
Phreatic line
Upstream sideDownstream side
![Page 17: PPt for Earthen Bunds](https://reader036.vdocuments.mx/reader036/viewer/2022082316/552762e255034622368b47a3/html5/thumbnails/17.jpg)
Lever Arm
0.15m Concret slab
Stone masonary wall
Vertical arm to lift the sluice gate
sluice of 0.5m diameter
NEW TANK PROJECTCROSS SECTION OF SLUICE GATEBATCH NO :05
![Page 18: PPt for Earthen Bunds](https://reader036.vdocuments.mx/reader036/viewer/2022082316/552762e255034622368b47a3/html5/thumbnails/18.jpg)
Lever Arm
0.15m Concret slab
Stone masonary wall
Vertical arm to lift the sluice gate
sluice of 0.5m diameter
NEW TANK PROJECTCROSS SECTION OF SLUICE GATEBATCH NO :05