ppp projects rajasthan
TRANSCRIPT
1
Rajasthan Annexure - I
Status of Public Private Partnership (PPPs) Projects in Infrastructure (As on December 31- 2011) – Completed Projects
S.
No.
Project Name Department
/Agency
Estimated
Cost
(Rs. in crores)
Structure
BOT/BOOT
etc.
Date of
Completion
Remarks
If any
1 2 3 4 5 6 7
A.
Road Sector
1. Karaunti Bridge, Pali District PWD 2.95 BOT 25.02.1997 Completed and handed
over to Government.
2. Strengthening & Improvement of Mangalwar–
Nimbaheada - Neemuch Road (km.40/0 to 50/0
PWD 6.35 BOT 01.04.2000 Completed and handed
over to Government.
3. Widening, Strengthening and Improvement of Kekri -
Nasirabad Road (SH-26) Km. 0/0 to 25/0
PWD 4.00 BOT 10.02.1999 Completed and handed
over to Government.
4. Improvement & Strengthening of Sirohi - Anadar -
Reodar - Mandar Road upto State Border (km.197/0 to
214/0)km.0/0 at Beawar
PWD 7.29 BOT 01.04.2002 Completed and handed
over to Government.
5. Improvement of Sirohi – Mandar - Deesa Road SH-27
upto State Border (km 214/0 to 268/400
PWD 26.01 BOT 17.05.2003 Completed and handed
over to Government.
6. Construction of submersible bridge by providing RCC
Hume Pipe on existing causeway at Luni River on
Jodhpur Balotra Guda Road SH-289
PWD 4.00 BOT 10.06.2003 Completed and handed
over to Government.
7. Improvement & strengthening of Hanumangarh -
Suratgarh Road via peelibanga (km. 0/0 to 26/0)
PWD 10.24 BOT
26.03.2001 Completed and handed
over to Government.
8. Upgradation by Strengthening & Renewal of Kherwara
- Dungarpur Road SH-10 (km 0/0 to 20/0) Km. 0/0
Start from Malai chouraha
PWD 3.69 BOT 18.02.2001 Completed and handed
over to Government.
2
9. Strengthening, Widening & Improvement of road and
reconstruction of narrow & weak culverts on
Nathdwara - Mavali Road MDR-36(Km. 0/0 to 26/700
Km. 0/0.)
PWD 4.50 BOT 06.03.2002 Completed and handed
over to Government.
10. Bharatpur Bye-Pass PWD 13.25 BOT 12.04.2000 Completed and handed
over to Government.
11. Construction of Udaipur Bye-pass Phase – II PWD 23.99 BOT 1997 Completed and handed
over to Government.
12. Improvement of Alwar - Bhiwadi Road SH-25Km. 146/0
to 225/0
PWD 18.62 BOT 09.06.2004 Completed and handed
over to Government. (Toll
actually stopped on
16.10.2008 litigation
pending).
13. Sikar Bye-Pass PWD 13.75 BOT 15.01.2000 Completed and handed
over to Government.
14. Improvment of Banswara - Udaipur Road SH-32 (Km
91/500 to 165/0)
PWD 11.50 BOT 05.02.2002 Completed and handed
over to Government.
15. Strengthening of Banswara - Dahod Road (Km. 396/0
to 411/0 SH-4
PWD 2.65 BOT 04.11.2001 Completed and handed
over to Government.
16. Widening & Strengthening of Challa- Neem-ka-thana -
Kotputli Road SH- 13 &MDR- 25 (Km.60/800 to 125/0)
PWD 64.20 BOT 29.04.2005 Completed and handed
over to Government
17. Widening & Strengthening and Improvement of
Mangalwar- Nimbahera Road (Km. 0/0 to 40/0)
PWD 10.26 BOT 01.03.2002 Completed and handed
over to Government
18. Construction of H.L. Bridge on River Massi (Km. 48/200
of Sanganer-Malpura – Kekri Road) SH-12
PWD 1.94 BOT 08.04.2002 Completed and handed
over to Government
19. Improvement of Manglana-Makrana Road (Km. 400/0
to 415/0) and Makrana-Bidiyad Road (Km. 0/0 to 6/0)
PWD 6.54 BOT 21.04.2002 Completed and handed
over to Government
20. Widening & Improvement of Dantiwara-Pipar City –
Merta City Road (Km 0/0 to 26/500)
PWD 5.47 BOT 11.02.2002 Completed and handed
over to Government
21. Construction of Four Lane Road with Median Strip of
1.2 Mtr. Wide on Bar-Bilara-Jodhpur Road SH-5 (Km.
PWD 8.93 BOT 24.07.2002 Completed and handed
over to Government
3
90/0 to 105/0)
22. Bharatpur-Mathura Bye pass SH-1 PWD 13.25 BOT 07.04.2008 Completed and handed
over to Government
23. Kharka Bridge Udaipur (Bhinder-Salumber Road SH-53) PWD 1.35 BOT 01.08.1995 Completed and handed
over to Government
24. Bondu Nallah RSRDC 1.58 BOT 16.04.2009 Completed and handed
over to Government
25. Beedach Bridge RSRDC 4.43 BOT 25.08.1996 Completed and handed
over to Government
26. Jojri River Bridge RSRDC 1.26 BOT 1996 Completed and handed
over to Government
27. Bhilwara Bypass RSRDC 17.97 BOT 05.07.2001 Completed and handed
over to Government
28. D' Zone Bypass RSRDC 5.17 BOT 1999 Completed and handed
over to Government
29. Kherli Bridge RSRDC 0.18 BOT 01.04.1995 Completed and handed
over to Government
30. Khatoli Bridge RSRDC 1.84 BOT 24.07.1997 Completed and handed
over to Government
31. Sri Madhopur Bypass (SH) RSRDC 0.63 BOT 03.11.1999 Completed and handed
over to Government
32. Kankroli Bypass (SH) RSRDC 4.74 BOT 10.08.1998 Completed and handed
over to Government
33. Badgaon- Jaitpura Bridge (SH) RSRDC 1.72 BOT 01.04.1997 Completed and handed
over to Government
34. Gangapur City Bypass (SH) RSRDC 5.68 BOT 27.10.1999 Completed and handed
over to Government
35. Bikaner Bypass RSRDC 8.73 BOT 15.12.1999 Completed and handed
over to Government
36. Morel Bridge (SH) RSRDC 12.09 BOT 16.09.2002 Completed and handed
over to Government
4
37. Palighat Bridge (SH) RSRDC 9.42 BOT 01.04.1995 Completed and handed
over to Government
38. Kharer- Banmi Bridge (SH) RSRDC 1.97 BOT 01.04.1996 Completed and handed
over to Government
39. Jindoli Ghati Tunnel (SH) RSRDC 12.45 BOT 16.05.2001 Completed and handed
over to Government
40. Kali Sindh Bridge (NH) RSRDC 16.99 BOT 05.11.1997 Completed and handed
over to Government
41. Parvati Bridge (NH) RSRDC 8.04 BOT 1997 Completed and handed
over to Government
42. Pali Bye-Pass (Beawar - Bar - Pali - Sirohi NH-14 Km.
106/0 to 112/0)
PWD 10.25 BOT 05.12.1998 Completed and handed
over to Government
43. Construction of Pali Bye-Pass on Jodhpur-Sumerpur
Road NH-65 Km. 0/0 to 11/500 (0 at Km. 366/0)
PWD 30.00 BOT 04.05.2006 Project completed and toll
is on.
44. Improvement of Jhalawar-Indore Road SH-1A
(Strengthening & Widening Km. 9/700 to 29/900) 6.0
Km. away from Patan to State Border
PWD 7.15 BOT 01.04.2002 Project completed and toll
is on.
45. Upgradation (Strengthening and Renewal) of SH-32
Udaipur-Salumber-Banswara Road (Km. 5/0 to 72/0)
PWD 13.57 BOT 02.06.2004 Project completed and toll
is on.
46. Widening & Strengthening of Shri Ganga Nagar-
Hanuman Garh Road SH-36 Km. 1/500 to 56/0
PWD 16.03 BOT 18.02.2005 Project completed and toll
is on.
47. Construction of Nimbhahera Bye-pass on NH-79
(Ajmer-Bhilwara-Chittorgarh-Nimbahera-Ratlam-
Indore Road) Km. 209/087 to 217/400
PWD 31.48 BOT 18.05.2005 Project completed and toll
is on.
48. Widening & Strengthening of Sikar-Jhunjhunu-Loharu
Road SH-8 Km. 0/0 to 119/700
PWD 49.78 BOT 21.07.2004 Project completed and toll
is on.
49. Construction of Kelwa-Amet Road 0/0 to 18/0 PWD 5.70 BOT 05.05.2006 Project completed and toll
is on.
50. Widening & Strengthening and Improvement of
Nasirabad-Kekri-Deoli Road SH-26 Km. 25/0 to 56/500
PWD 21.40 BOT 15.12.2006 Project completed and toll
is on.
51. Widening & Strengthening and Delhi-Ramgarh-Alwar
Road (SH-13) Km. 125/400 to 160/300
PWD 25.28 BOT 19.04.2008 Project completed and toll
is on.
5
52. Strengthening and Improvement of Riding Quality of
Existing Bikaner Bye-Pass Road Km. 0/0 to 28/0
PWD 12.02 BOT 09.05.2008 Project completed and toll
is on.
53. Widening & Improvement of Kama-Nand Goan-Kosi
Road 56/200 to 64/200 and kama Bye Pass (SH-44)
Kama Jurehera Punhana Road (MDR-72) Km. 0/0 to
20/0 and Kama Pahari Road (ODR-16) Km. 0/0 to 22/0
PWD 35.66 BOT 05.08.2009 Project completed and toll
is on.
54. Widening & Strengthening of Nasirabad to Mangliawas
Road Km. 0/0 to 24/200 (MDR-39)
PWD 21.52 BOT 02.04.2009 Project completed and toll
is on.
55. Strengthening, Widening & Improvement of riding
Quality of Road Sirohi-Reodar-Mandar-Deesa Road
(Up to Gujrat Border) SH-27 Km. 197/0 to 268/400
PWD 133.79 BOT 2010 Project completed and toll
is on.
56. Hanuman Garh –Suratgarh Raod including ROB and
Hanumangarh (LC-71A)
RSRDC 39.90 BOT 01.07.2006 Project completed and toll
is on.
57. Chomu-Ajitgarh-Shahpura (Km. 0/0 to 50/500) RSRDC 38.38 BOT 01.04.2007 Project completed and toll
is on.
58. Bikaner Bye-Pass Connecting NH-15 (BK-JSL) to NH-15
(BK-SGR) Km. 0/0 to 26/0
RSRDC 41.69 BOT 31.12.2009 Project completed and toll
is on.
59. Phalodi to Ramgi ki Gol
RIDCOR 386.30 BOT 28.12.2007 Project completed and toll
is on. Indicated tolling
period is 30 years. Tolling
will commence uptill re-
payment of loan thereafter
GoR to take a decision on
utilization of surplus in SRF
or development of other
Roads.
60. Hanumangarh to Kishangarh
RIDCOR 627.20 BOT 28.02.2008
61. Alwar to Sikandra
RIDCOR 128.10 BOT 31.08.2008
62. Baran to Jhalawar
RIDCOR 111.70 BOT 15.04.2008
63. Lalsot to Kota
RIDCOR 303.70 BOT 15.12.2008
64. Hanumangarh to Sangaria (upto Haryana Border) RIDCOR 51.40 BOT 01.11.2011 Project completed and toll
is on. Indicated tolling
period is 30 years. Tolling
will commence uptill re-
payment of loan thereafter
6
GoR to take a decision on
utilization of surplus in SRF
or development of other
Roads.
Sub Total (A)
2521.62
(B)
Urban Infrastructure
1. Common Bio- Medical Waste Treatment Facility
(CBWTF), to cover Jhalawar and Baran
Local Bodies 0.70 DBOOT December,
2008
Plant is working through Sh.
Ankur M/s Hoswin
Incinator, Jhalawar
2. Common Bio- Medical Waste Treatment Facility
(CBWTF), to cover Kota and Bundi
Local Bodies 0.70 DBOOT 28.08.2010 Plant is working through Sh.
Rajdeep Biotech, Kota
3. Common Bio- Medical Waste Treatment Facility
(CBWTF), to cover Jaipur, Dausa, Nawa and Kuchaman
Local Bodies 0.70 DBOOT 2005 Plant is working through Sh.
Ranjeet Singh Rajputana,
Biotech Ltd. Sawai
Madhopur
4. Common Bio-Medical Waste Treatment Facility
(CBWTF) to cover Ajmer, Bhilwara, Parbatsar, Makrana
and Merta City
Local Bodies 0.70 DBOOT 21.02.2005 Plant is working through Sh.
Anil Jain sales promoters,
Ajmer.
5. Common Bio-Medical Waste Treatment Facility
(CBWTF) to cover Jodhpur and Pali
Local Bodies 0.70 DBOOT 21.02.2005 Plant is working through Sh.
Basant Rathore sales
promoters, Ajmer.
6. Common Bio-Medical Waste Treatment Facility
(CBWTF) to cover Hanumangarh and Shri Ganganagar
Local Bodies 0.70 DBOOT 21.02.2005 Plant is working through Sh.
Ghanshyam, E-Tech Project,
Ganganagar
7. Common Bio-Medical Waste Treatment Facility
(CBWTF) to cover Bikaner, Nagaur and Ladnun
Local Bodies 0.70 DBOOT 21.02.2005 Plant is working through Sh.
Manish Rajpurohit, E-Tech
Project, Bikaner
8. Common Bio-Medical Waste Treatment Facility
(CBWTF) to cover Sawai Madhopur, Tonk and Karauli
Local Bodies 0.70 DBOOT 21.02.2005 Plant is working through Sh.
Sumer Singh Rajputana,
Biotech Ltd. Sawai
7
Madhopur
9. Common Bio-Medical Waste Treatment Facility
(CBWTF) to cover Alwar and Bharatpur
Local Bodies 0.70 DBOOT 21.02.2005 Plant is working through Sh.
Arvind Sharma, M/s Hoswin
Incinator, Alwar
10. Common Bio-Medical Waste Treatment Facility
(CBWTF) to cover Jaipur City.
Local Bodies 0.70 DBOOT 21.02.2005 Plant is working through Sh.
Himanshu, Instromedics
Pvt. Ltd, Jaipur.
11. Solid Waste Treatment Plant, Jaipur JMC,
Jaipur
20.00 DBOOT April, 2007 Plant is working through
Grashim India Ltd. at
Langariwas
12. Construction of Foot Over Bridge at Collectorate
Circle, Jaipur
JDA 2.50 BOT August,
2006
Project completed by M/s
Pioneer Publicity
Corporation, Jaipur.
Concession period is 34
years 4 months including
the construction period
w.e.f. 15.07.2005.
Sub Total (B)
29.50
(C)
Water Sector
1. Desalination Plant, Matasukh (Nagaur) RSMM Ltd. 300.00
DBOOT 30.09.2010 Project completed by
Nagaur Water Supply
Company Pvt. Ltd.
(promoted by Doshion Ltd.)
Sub Total (C) 300.00
(D) Social Sector
1. Shree Devi Women Polytechnic College, Hanumangarh Technical
Education
5.49 BOT 09.03.2010 Classes running in its own
building.
2. Veena Institute of Technical Education, Karauli Technical
Education
5.49 BOT December,
2011
Classes running in its own
building.
3. Mantram Women Polytechnic College, Dungarpur Technical 5.49 BOT December, Classes running in its own
8
Education 2011 building.
4. Vikas Polytechnic College, Madera, Deeg Bhartpur
Road, Deeg (Bhartpur)
Technical
Education
9.30 BOT March,
2011
College running in its own
building
5. Saraswati Polytechnic College, School Building, Village:
Rajota, (Khetri)
Dist. - Jhunjhunu
Technical
Education
9.30 BOT March,
2011
College running in own
building.
6. Bright Career Polytechnic College, Bhamatsar, Nokha
[Bikaner]
Technical
Education
9.30 BOT March,
2011
College running in its own
building
7. Sugan Inst. Of Tech. & Engg.,Paramveer Near Electric
Board, Pokhran – Phalodi Road, Phalodi [Jodhpur]
Technical
Education
9.30 BOT March,
2011
College running in rented
building.
8. Rajasthan Polytechnic College,Behind State Middle
School, R.S.E.B. Raod, Ratangarh
Technical
Education
9.30 BOT March,
2011
College running in its own
building
9. Satyam Institute of Technology, Abhishek
Bhawan,Outside Nehru Gate, Beawar [Ajmer]
Technical
Education
9.30 BOT March,
2011
College running in rented
building.
10. Rajasthan Institute of Engineering & Technology ,
Bhankrota, Ajmer Road, Chittorgarh-302026
Technical
Education
16.40 BOT March,
2011
College running in its own
building
11. Dungarpur College of Engineering and Technology, Vill.
Bori Simalwada Road, Dungarpur
Technical
Education
16.40 BOT March,
2011
College running in its own
building
12. Chartered Institute of Technology, Kh. No. 276/252 at
Vill. Danvav, Abu Road
Technical
Education
16.40 BOT March,
2011
College running in its own
building
13. Tagore Engineering College, Technical 16.40 BOT March,
2011
College running in its own
9
Near DIET Vill. Pnwari, Kunchamancity, Nagaur Education building
14. Asians Institute of Technology
Viil. Bhunja Via Kathun, Techsil Newai,Tonk
Technical
Education
16.40 BOT March,
2011
College running in its own
building
15. Shri Digambar Prashikshan Avum Anusandhan
Sansthan, Gulzar Bagh, Bharatpur
Technical
Education
16.40 BOT March,
2011
College running in its own
building
16. Vedant College of Engineering and Technology, Bundi Technical
Education
16.40 BOT March,
2011
College running in its own
building
17. Regional Engineering College, Dhamotar, Pratapgarh Technical
Education
16.40 BOT March,
2011
College running in its own
building
Sub Total (D)
203.47
Grand Total (A+B+C)
3054.59
10
Rajasthan Annexure – II
Status of Public Private Partnership (PPPs) Projects in Infrastructure (As on December 31, 2011) – Projects under Implementation
S.
No.
Project Name Department/
Agency
Estimated
Cost
(Rs. in crores)
Structure
BOOT/
BOT
Date of
Award
Likely date of
Completion
Remarks
If any
1 2 3 4 5 6 7 8
(A)
Road Sector
1. Jaipur to Bhilwara (SH-12) PWD 220.00 DBFOT 16.03.2010 Dec., 2012 Agreement signed on 12.07.10
with M/s Jaipur-Bhilwara Tollway
Pvt. Ltd. Jaipur (M/s SPML).
Performance Security deposited
by Entrepreneur Supplementary
agreement signed on dated &
work started on 02.02.2012
2. Chomu to Mahala via Renwal
Jobner (SH -19 & 2C)
PWD, 134.20 DBFOT 22.02.2011 Jun, 2013 Fin. Bid Recd. with 13.41% VGE
from M/s Unity. Agreement
signed on 05.06.11 with Chomu-
mahala toll Way Pvt. Ltd. Jaipur
(SPV). Performance Security
deposited by entrepreneur.
3. Hanumangarh - Suratgarh RSRDC 255.84
BOT-
Annuity
07.09.2010 March, 2012 Km 9/0 to 50/0 and byepass road
furniture in progress protection
work in progress in km 36/0 to
15/0 work of gaggar bridge is also
in progress.
4. Chittorgarh – Kapasan - Mavli- RSRDC 425.96 BOT - 14.10.2010 March, 2012 Work of major bridge in km, 5/600
11
Dabok Annuity in progress and road signage in km
50/0 to 60/0 in progress
5. Pali – Nadol – Narlai - Gomti
Choraya
RSRDC 193.95
BOT -
Annuity
May, 2010 March, 2012 Tender for balance work in km
290/0 to 306/0 are in process of
approval.
6. (a) Merta-Ras (50)
(b) Ras-Mangliawas (35)
RSRDC 294.83
BOT -
Annuity
02.09.2010 March, 2012 Work in progress. Land acquisition
in progress.
7. Fatehnagar Dariba mines RSRDC 25.00 BOT -
Annuity
16.02.2010 March, 2012 Work in progress.
8. Mahuwa – Hindon - Karauli RSRDC 168.03
BOT -
Annuity
19.01.2011 April, 2012 Work in progress.
9. Jodhpur – Osiya - Phalodi RSRDC 208.74
BOT -
Annuity
03.02.2011 April, 2012 Work in progress.
10. Salumber - Keer ki Chowki RSRDC 163.50
BOT -
Annuity
03.02.2011 March, 2012 Work in progress.
11. Gotan – Pundulu – Borunda-
Ransigaon – Sojat
RSRDC 167.45
BOT -
Annuity
02.02.2011 March, 2012 Work in progress.
12. Banswara – Ratlam (Upto M.P.
Border)
RSRDC 117.03 BOT -
Annuity 23.05.11
June, 2012 Work in progress.
13. Mangalwar – Nimbahera RSRDC 86.73 BOT-
Annuity 5/11
July, 2012 Work in progress.
14. Bharatpur – Deeg- Alwar RSRDC 135.69 BOT-
Annuity
5/11 July, 2012 Work in progress.
15. Jahajpur – Mandalgarh RSRDC 197.37 BOT-
Annuity
- November,
2012
Work in progress. Likely date of
completion Nov. 2012
16. Alwar to Bhiwadi (4-Lane) RIDCOR 330.11 BOT
- - Work in progress. Indicated tolling
period is 30 years. Tolling will
commence uptill re-payment of
loan thereafter GoR to take a
decision on utilization of surplus in
SRF or development of other
17. Arjunsar to Pallu
RIDCOR 83.93 BOT -
-
18. Jhalawar to Jhalawar Road
RIDCOR 79.73 BOT - -
12
Roads.
19. Khushkhera to kasola Chowk RIDCOR 34.50 BOT - - Work in Progress. Land acquisition
issue in 2.5 KM is under process.
20. Kapren to Mangrol RIDCOR 121.69 BOT - - DPR completed. Part work being
taken up. Forest clearance
awaited from GOR, RFQ has been
submitted by 5 Agencies
21. Jhalwar to Ujjain (upto Raj.
Border)
RIDCOR 75.88 BOT - - CD works in progress in part
length, existing concession period
of BOT will end on 17.01.2012
22. Rohat-Jalor PWD 56.38 BOT 12.12.2011 - Concession agreement executed
on 17.01.2012 with M/s. Chetak
Enterprises.
23. Jalore – Ramsingh – Revdar PWD 51.75 BOT 09.12.2011 - LOA issued to M/s. D.K. Infra. Pvt.
Ltd. Mumbai.
24. Sanchore – Makhupura – State
Border
PWD 11.61 BOT - - Agreement signed on 04.11.2011
with M/s D.K. Infra Pvt. Ltd.
Mumbai. Commencement date
16.11.2011.
25. Chirawa – Singhana – Pacheri up
to Haryana Border
PWD 35.87 BOT - - Agreement signed on 09.12.2011
with M/s SPC Chetak Toll Roads
Pvt. Ltd. Jaipur
26. Kota – Jharal-Ke-Balaji – via Tather
– Sultanpur-Ganesh Ganj Itawa.
PWD 64.56 BOT - - Agreement signed on 09.12.2011
with M/s. Chetak Jainco Toll way
Pvt. Ltd. Jaipur. Commencement
date 05.02.2012
.
27. Bali – Sewaro – Pinwara PWD 25.21 BOT 25.10.2011 - LOA issued to M/s HG infra Pvt.
Ltd. Jaipur.
28. Laxmangarh – Salasar PWD 13.96 BOT - - Agreement signed on 03.01.2012
13
with M/s Deepak & Co., Sri
Ganganagar. Commencement
date 05.01.2012
29. Sriganganar – Padampur –
Raisinghnagar – Anupgarh
PWD 17.57 BOT - - Agreement signed on 30.11.2011
with M/s Deepak & Co., Sri
Ganganagar. Commencement
date 22.12.2011
30. Salumbar – Banswara PWD 46.33 BOT - - Agreement signed on 22.12.2011
with M/s GHV India Pvt. Ltd.
Mumbai. Commencement date
22.12.2011
31. Ring Road around Jaipur City
Jaipur
Development
Authority
890.00 DBFOT 16.05.2011 April, 2013 Land acquisition is in progress.
Around 30 km length has been
taken under possession out of 47
km.
32. Alternate route to Ghat Ki Guni by
construction of tunnel through
Jhalana hills to connect NH-11,
Agra Road
Jaipur
Development
Authority
150.00 DBFOT 13.10.2009 30.06.2012
The work is in progress. In about
860 mtr length, Tunnel Tube (each
tube) has been excavated;
excavation of tunnel inter
connector at two places have
been completed. Flyover work on
Agra Road near Chulgiri along with
RE wall work is in progress. CD
works at one location is
completed and at two locations
are in progress. Other works like
construction of drain, RCC
retaining wall, earth work & rock
excavation for roads is in progress.
Sub - Total (A)
4883.40
14
(B) Urban Infrastructure
1. Common Bio- Medical Waste
Treatment Facility (CBWTF), to
cover Sikar, Jhunjhunu, Didwana,
Mundwa and Kuchara
DLB 0.70 DBOOT 21.02.2005 - Civil work completed.
Establishment of Plant is in
process.
2. Common Bio- Medical Waste
Treatment Facility (CBWTF), to
cover Udaipur City
DLB 0.70 DBOOT 2005 - Agreement due.
3. Common Bio- Medical Waste
Treatment Facility (CBWTF),
Jalore
DLB 0.70 DBOOT 16.09.2008 - Agreement due.
4. Rope Way from Manikya Lal
Verma Park to Karni Mata
Temple, Udaipur
UIT,
Udaipur
3.00 BOT - - Work in progress.
5. Special Economic Zone (SEZ),
Jaipur
RICCO 1500.00 JV - - Work in progress.
6. Jal Mahal Tourism Project, Jaipur Tourism
(RTDC)
200.00 BOOT 22 Nov.,
2005
- Phase-I near completion and
phase-II will take 3 years after
completion of Phase-I.
7. Restoration and Conservation of
Tijara Fort, Alwar
Tourism
(RTDC)
25.00 BOOT 22 July,
2009
- Work in progress.
Sub – Total (B)
1730.10
(C)
Social Sector
1.
Affordable housing with focus on
EWS & LIG housing, Mukandpura
near Bhankrota, Jaipur through
M/s Vinkash Estess Pvt. Ltd.
UDH 17.90 Model No. 2
(Private
Developers
on land
owned by
them)
09.02.2011 08.02.2014 Under Affordable Housing Policy –
2009. Total 512 Flats Comprising
of 288 EWS, 144 LIG and 80 MIG.
15
2.
Affordable housing with focus on
EWS & LIG housing, Village Ramla
ka vaas Teshil, Kalwar, Jaipur
through M/s Bhairav Township
Pvt. Ltd.
UDH 19.36 Model No. 2
(Private
Developers
on land
owned by
them)
23.02.2011 22.02.2014 Under Affordable Housing Policy –
2009. Total 576 Flats Comprising
of 320 EWS, 192 LIG and 64 MIG.
3.
Affordable housing with focus on
EWS & LIG housing, village
Mahapura near Sez, Jaipur
through M/s Majestic Realmart
Pvt. Ltd.
UDH 31.95 Model No. 2
(Private
Developers
on land
owned by
them)
23.02.2011 22.02.2014 Under Affordable Housing Policy –
2009. Total 960 Flats Comprising
of 608 EWS, 224 LIG and 128 MIG.
4.
Affordable housing with focus on
EWS & LIG housing, near Pink
pearl, Ajmer Road, Jaipur through
M/s Sintex Industries Ltd.
UDH 14.30 Model No. 2
(Private
Developers
on land
owned by
them)
07.01.2011 06.01.2013 Under Affordable Housing Policy –
2009. Total 432 Flats Comprising
of 256 EWS, 128 LIG and 48 MIG.
5.
Affordable housing with focus on
EWS & LIG housing, Village Bagru
Khurd, Thikerya, Ajmer Highway,
Jaipur through M/s Siddha Infra
project Pvt. Ltd.
UDH 13.54 Model No. 2
(Private
Developers
on land
owned by
them)
23.02.2011 22.02.2013 Under Affordable Housing Policy –
2009. Total 400 Flats Comprising
of 224 EWS, 128 LIG and 48 MIG.
6.
Affordable housing with focus on
EWS & LIG housing, Village Bagru
UDH 25.38 Model No. 2 04.02.2011 03.02.2013 Under Affordable Housing Policy –
2009. Total 704 Flats Comprising
16
Khurd Omex city, Ajmer Road,
Jaipur through M/s Shiv Shakti
Real Homs Pvt. Ltd.
(Private
Developers
on land
owned by
them)
of 384 EWS, 192 LIG and 128 MIG.
7.
Affordable housing with focus on
EWS & LIG housing, Village
Shyampur Buhariya Vatika Road,
Sanganer, Jaipur through M/s
Regency Buildhome Pvt. Ltd.
UDH 39.17 Model No. 2
(Private
Developers
on land
owned by
them)
14.06.2011 13.06.2014 Under Affordable Housing Policy –
2009. Total 1120 Flats Comprising
of 672 EWS, 256 LIG and 192 MIG.
8.
Affordable housing with focus on
EWS & LIG housing, Village Nevta,
Teshil Sanganer, Jaipur through
M/s Siddhi Vinayak Affordable
Homes Ltd.
UDH 36.37 Model No. 2
(Private
Developers
on land
owned by
them)
11.03.2011 10.03.2014 Under Affordable Housing Policy –
2009. Total 1072 Flats Comprising
of 592 EWS, 352 LIG and 128 MIG.
9.
Affordable housing with focus on
EWS & LIG housing, Chakshu,
Jaipur through M/s Patni Builders
Pvt. Ltd.
UDH 59.76 Model No. 2
(Private
Developers
on land
owned by
them)
07.01.2011 06.01.2014 Under Affordable Housing Policy –
2009. Total 1880 Flats Comprising
of 1104 EWS, 648 LIG and 128
MIG.
10.
Affordable housing with focus on
EWS & LIG housing, Village
Biranvaas Tehsil Kotkasim,
UDH 13.75 Model No. 2
(Private
02.02.2011 01.02.2013 Under Affordable Housing Policy –
2009. Total 400 Flats Comprising
of 208 EWS, 144 LIG and 48 MIG.
17
Bhiwadi Distt. Alwar through
Falcon Reality services Pvt. Ltd.
Developers
on land
owned by
them)
11.
Affordable housing with focus on
EWS & LIG housing, Village
Biranvaas Tehsil Kotkasim,
Bhiwadi Distt. Alwar through Sun
System Institute of Information
UDH 13.57 Model No. 2
(Private
Developers
on land
owned by
them)
22.01.2011 21.01.2013 Under Affordable Housing Policy –
2009. Total 400 Flats Comprising
of 224 EWS, 128 LIG and 48 MIG.
12.
Affordable housing with focus on
EWS & LIG housing, panwadi
sargod, Trisingiya, Kuchaman city
Nagaur through Shree Ram Balaji
Developers & Infrastructures Pvt.
Ltd.
UDH 28.22 Model No. 2
(Private
Developers
on land
owned by
them)
16.06.2011 15.06.2013 Under Affordable Housing Policy –
2009. Total 848 Flats Comprising
of 496 EWS, 256 LIG and 96 MIG.
13.
Affordable housing with focus on
EWS & LIG housing, Ajmer-
Beawar Road NH-8, In front of
Tabiji Railway Station, Ajmer
through Golden Line
Infrastructure Pvt. Ltd.
UDH 20.24 Model No. 2
(Private
Developers
on land
owned by
them)
01.09.2011 31.08.2014 Under Affordable Housing Policy –
2009. Total 544 Flats Comprising
of 240 EWS, 192 LIG and 112 MIG.
14.
Affordable housing with focus on
EWS & LIG housing, Village Jirota
Khurd, near shyam sarowar, Distt.
Dausa on Main NH-11 through
UDH 14.66 Model No. 2
(Private
Developers
19.05.2011 18.05.2013 Under Affordable Housing Policy –
2009. Total 416 Flats Comprising
of 224 EWS, 128 LIG and 64 MIG.
18
Amit Colonizers Ltd. on land
owned by
them)
15 Baba Saheb Ambedker Technical
Education Society, B-75, Raksha
Vikash Appartment, Vikashpuri,
New Delhi-110018 (for Dholpur)
Technical
Education
16.40 BOT 2011-12 31.03.2013 New Society Selected. Land
allotted to society. Letter of
Approval from AICTE not received.
16 Kailker Awareness & Relief
Welfare Society, A-13, Mohan
Garden Ext. Uttam Nagar, New
Delhi-110059 (for Barmer)
Technical
Education
16.40 BOT 2011-12 31.03.2013 New Society Selected. Land
allotment under process
17 Veena Memorial Seva Society,
Gulab Baag, Karauli (for Karauli)
Technical
Education
16.40 BOT 2011-12 31.03.2013 New Society Selected. Land
allotment under process
18 Nav Uday Welfare & Charitable
Society, 29-A, Pocket-1, Sector-7,
Dwarla, Delhi (for Baran)
Technical
Education
16.40 BOT 2011-12 31.03.2013 New Society Selected. Land
allotment under process
19 Gyan Jyoti Shikshan Sansthan, 74,
Sharma Colony Ward no. 24,
Churu, Raj. (for Churu)
Technical
Education
16.40 BOT 2011-12 31.03.2013 New Society Selected. Land
allotment under process
20 Rajasthan Institute of Engineering
& Technology, Jaisalmer
Technical
Education
16.40 BOT 2011-12 31.03.2013 Land allotted to society. Letter of
Approval from AICTE not received.
21 Sawai Madhopur College
Engineering & Technology, Sawai
Madhopur
Technical
Education
16.40 BOT 2011-12 31.03.2013 Land allotted to society. Letter of
Approval from AICTE not received.
19
22 Swami Vivekanand College of
Engineering and Technology,
Jalore
Technical
Education
16.40 BOT 2011-12 31.03.2013 Land allotted to society. Letter of
Approval from AICTE not received.
23. Swasthya Kalyan Women
Polytechnic College Tonk
Technical
Education
5.49 BOT 2007-08 31.03.2013 College is running in own building
and building construction is under
progress.
24 Shri Jawahar Women Polytechnic
College, Dausa
Technical
Education
5.49 BOT 2007-08 31.03.2013 College is running in own building
and building construction is under
progress.
25 Vivakanand Institute of
Technology, Bhilwara.
Technical
Education
5.49 BOT 2007-08 31.03.2013 College is running in own building
and building construction is under
progress.
26 Bhadariya Mateshwari
Polytechnic College for Women,
Jalore
Technical
Education
5.49 BOT 2007-08 31.03.2013 College is running in own building
and building construction is under
progress.
27 Rajasthan Institute of Engineering
and Craft, Dholpur
Technical
Education
5.49 BOT 2007-08 31.03.2013 College is running in own building
and building construction is under
progress.
28 Rajasthan Girls Polytechnic
College, Baran
Technical
Education
5.49 BOT 2007-08 31.03.2013 College is running in own building
and building construction is under
progress.
29 Chandrawati Girls Polytechnic
College, Jaisalmer
Technical
Education
5.49 BOT 2007-08 31.03.2013 College building construction is
now not in progress. Admission nil
since last 2 sessions.
30 Emergency Response Service –
Knowingly as 108 Ambulance
Project
M & H
Deptt.
55.68 O & M 01.07.2010 Agreement
signed with
consortium
ZHL Ltd. on
07.04.2010
for 3 years
period
A consortion of Ziqitza Health
Care Ltd. and International Centre
for Emergency Techniques,
Bombay are operating 108-
Ambulance service since July,
2010 in the State. Presently A fleet
of 411 Ambulances including 14
20
which is
extendable
for next 2
year.
provided by Disaster Management
are in operation. As per the
agreement, operation cost per
Ambulance is Rs. 94,899/- and
Medicine cost approx. Rs. 5,000/
Ambulance/Month. As per
agreement, the ZHC Ltd. has to do
5 Trips/ Day /Ambulance,
otherwise amount is deducted
proportionately.
31 Rajiv Gandhi Mobile Medical
Services in Rajasthan
Medical &
Health
25.92 O & M October,
2011
- Presently State has 52 Medical
Mobile Units and 150 Medical
Mobile Vans. These are being
operated through NGOs/Service
Provider. Operation cost of Rs.
31.00 lacs is per year and Capex of
Rs. 37.88 lacs per year which
include procurement cost of
Medical Mobile Units and Vans.
32 Toll Free 104 Medical Advice
Service
M & H
Deptt.
1.15 O & M 06.09.2011 - Contract Agreement signed with
Health Management and Research
Institute (HMRI), Hyderabad
initially for 3+2 years on
21.09.2011. The service is
operational through a centralized
24X7 call centre which is
established at State HQ. The
service is started from 21.11.2011
however; formally launched on
16.01.2011.
33 Manas Arogya Heart - Care
Hospital & Research Institute in
Medical
Education
56.00 O & M June 09,
2011
November,
2012
Preferred bidder has been
identified and concession
21
Jaipur agreement executed for 30 years.
DPR of the concessionaire
approved. Works are in progress.
Sub – Total (C)
656.55
(D)
Power Sector
1. Lignite based Power Plant,
Bhadresh (Barmer)
RSMM Ltd. 5000.00 BOOM 29.05.2006 April, 2012 Total 8 units are to be setup. 4
units have started generating
power while remaining 4 units
are likely to generate power by
April, 2012.
2. 400 kV S/C Bikaner- Deedwana
– Ajmer Line with 400 kV/220
kV GSS at Deedwana
RRVPN
Ltd.
285.00 BOOM TSA with
DISCOM on
15.02.2011
2012-13 The firm has started work on the
line i.e. taking Transmission
licence from the regulator and
preliminary survey etc. It also
filed petitions for (i) Adoption of
Transmission charges and (ii)
Grant of Transmission License.
RERC ordered the petitions
adversely. The firm and RVPN
have filed appeal with appellate
tribunal APTEL.
3. 400 kV S/C Hindaun-Alwar Line
with 400/220 kV GSS at
Alwar
RRVPN
Ltd.
188.32 BOOM TSA with
DISCOM
signed on
19.01.2011
2012-13 The firm has started work on the
line i.e. taking Transmission
licence from the regulator and
preliminary survey etc. It also
filed petitions for (i) Adoption of
Transmission charges and (ii)
Grant of Transmission License.
RERC ordered the petitions
adversely. The firm and RVPN
22
have filed appeal with appellate
tribunal APTEL.
4.
220 kV S/C Sikar – Nawalgarh –
Jhunjhunu Line with 220/132
kV GSS at Nawalgarh
RRVPN
Ltd.
36.28 BOOM LoI issued
on
23.02.2011
2012-13 SPA and Transmission Service
Agreement (TSA) are to be signed
after signing of Sub-lease
agreement between SPV and
RVPN which is under process.
Sub – Total (D)
5509.60
(E)
IT Sector
1. Rajasthan State Wide Area
Network (RajSWAN) Project -
IT, Deptt. 120.21 BOOT 15 April,
2011
2015
Work order has been issued to
Bharti Airtel in the month of
April, 2011. The project will be
rolled out in the next financial
year.
2. Common Service Centres
Project.
RajComp 106.40 BOO - 2014 Work in progress. Total 6,626
kiosks will be set up across the
State under the project out of
which 2612 kiosks have been
made operational.
Sub – Total (E)
226.61
(F)
Any Other Sector
1.
Multi Chamber Cold Storage
(4000 M. T.) at Mandi Yard,
Alwar
RSAMB 3.85 O & M on
lease basis
22.03.2010 31.03.2012 Construction work is likely to be
completed by March 31, 2012
and operation will be done for a
5 year period after completion of
civil works by the selected Private
Agency - Shri Shubham Logistics
Ltd. Santacruz (E), Mumbai.
23
2. Multi Chamber Cold Storage
(2000 M. T.) at Mandi Yard,
Sikar
RSAMB 2.38 O & M on
lease basis
22.03.2010 31.01.2012 Construction work is likely to be
completed by March 31, 2012
and operation will be done for a
5 year period after completion of
civil works by the selected Private
Agency – Blue Star Ltd.,
Gurgaon, Haryana
3. Multi Chamber Cold Storage
(2000 M. T.) at Mandi Yard,
Udaipur
RSAMB 2.54 O & M on
lease basis
22.03.2010 31.03.2012 Construction work is likely to be
completed by March 31, 2012
and operation will be done for a
5 year period after completion of
civil works by the selected Private
Agency – Blue Star Ltd.,
Gurgaon, Haryana
4.
Multi Chamber Cold Storage
(1000 M. T.) at Mandi Yard,
Sumerpur, District Pali
RSAMB 1.28 O & M on
lease basis
15.04.2010 30.04.2012 Construction work is likely to be
completed by March 31, 2012
and operation will be done for a
5 year period after completion of
civil works by the selected Private
Agency – Blue Star Ltd.,
Gurgaon, Haryana
5.
Multi Chamber Cold Storage
(6000 M. T.) at Mandore
Mandi, Jodhpur
RSAMB 4.90 O & M on
lease basis
15.04.2010 31.01.2012 Construction work is likely to be
completed by March 31, 2012
and operation will be done for a
5 year period after completion of
civil works by the selected Private
24
Agency - Shri Shubham Logistics
Ltd. Santacruz (E), Mumbai.
6. Multi Chamber Cold Storage
(2000 M. T.) at Mandi Yard,
Bhilwara
RSAMB 2.28 O & M on
lease basis
22.03.2010 31.03.2012 Construction work is likely to be
completed by March 31, 2012
and operation will be done for a
5 year period after completion of
civil works by the selected Private
Agency – Blue Star Ltd.,
Gurgaon, Haryana
Sub – Total (F)
17.23
Grand Total
13023.49
25
Rajasthan Annexure - III
Status of Public Private Partnership (PPPs) Projects in Infrastructure (As on December 31, 2011) – Projects under Planning /
Pipeline
S.
No
Project Name Department
/Agency
Estimated Cost
(Rs. In crores)
Structure
BOOT/BOT
Likely Date of
Award
Remarks
If Any
1 2 3 4 5 6 7
(A)
Road Sector
1. Bikaner – Suratgarh ( NH-15 ) PWD 501.08 DBFOT January, 2012 RFQ process completed. (33/41)
Approved in the DEA/EI meeting held on
20 July, 2011 at Delhi & PPPAC meeting
on 10.08.2011. Approved in CCI dt.
16.11.2011 vide MoRTH letter dt.
02.12.2011. RFP issued BDD 12.12.2011
(mod.) 06 Nos RFP BID received on BDD.
Bids submitted to MoRTH for approval
on 19.12.2011. Bid of Highest Premium
Bidder (Rs. 251 Cr.) M/s MBL-SREI
Consortium approved by MoRTH on
02.01.2012 for LOA, which is issued on
09.01.12.
2. Chittorgarh – Neemuch
( MP Boarder) ( 38 KM) and
Nimbahera – Pratapgarh
( 80 KM ) ( NH- 79 & 113)
PWD 511.21 DBFOT - RFQ process completed. (36/42)
Approved in the DEA/ EI meeting held on
20 July, 2011 at Delhi & PPPAC meeting
held on 10.08.2011. Approved in CCI
dated 16.11.2011 vide MoRTH letter
dated 02.12.2011. RFP issued. BDD
07.12.2011 (Mod.) 09 Nos RFP BID
received on BDD. Bids submitted to
26
MoRTH for approval on 19.12.2011 with
highest bidder premium of Rs. 22.61 Cr.
By M/s Chetak Enterprise. Approval
awaited.
3. Suratgarh – Sriganganagar
(NH-15)
PWD 224.03 DBFOT - RFQ process completed. (39/44)
Approved in the DEA/EI meeting held on
20 July, 2011 at Delhi and PPPAC
meeting held on 10.08.2011. Competent
approval awaited. RFP issued. BDD is
18.01.2012 (Mod.) One No. Bid of M/s
Unity Infra projects Ltd. Quoting grant
of Rs. 5.70 Cr. recd.
4. Ajmer – Nagaur ( NH- 89) PWD 377.15 DBFOT - RFQ process completed. (38/44)
Approved in the DEA/EI meeting held on
20 July, 2011 at Delhi and PPPAC
meeting held on 10.08.2011. Competent
approval awaited. RFP issued. BDD is
18.01.2012 (Mod.) 4 No. Bids recd. with
lowest grant of Rs. 45.00 Cr. quoted by
M/s GVR infraprojects ltd. Chennai.
5. Sikar – Bikaner (NH-11) PWD 650.84 DBFOT - RFQ process completed. (42/49)
Approval of SFC/PPPAC/DEA from
MoRTH is awaited. Appraisal reply of
DEA & Planning Commission submitted
to MoRTH on 16.09.2011. RFP issued on
04.01.2012. Approved in PPPAC on
13.12.2011. BDD is 12.03.2012.
6. Nagaur – Bikaner (NH- 89) PWD 378.07 DBFOT - RFQ process completed. (37/44)
Modified PPACC & DEA proposal
submitted on 05.07.2011 & 18.08.2011
EI meeting held on 06.01.2012 New
Delhi. Approval awaited. BDD is
27
12.03.2012.
7. Nagaur– Jodhpur( NH- 65) PWD 411.18 DBFOT - RFQ process completed. (38/45)
Modified SFC/PPPAC/DEA proposals
submitted to MoRTH on 16.09.2011. EI
meeting held on 06.01.2012 at New
Delhi. Approval awaited.
8. Jodhpur – Pali ( NH-65) PWD 342.72 DBFOT - RE-RFQ (38 Nos) received on 09.11.2011
Approval/Evaluation under process.
Modified SFC/PPPAC/DEA proposals
submitted on 27.09.2011, 16.11.2011.
Approval awaited.
9. Bharatpur – Alwar – Beheror –
Narnaul Road (SH-14)
RSRDC 131.92 BOT-Annuity
- Tender Due on 12.03.2012
10. Kotputali to Kuchaman and
Daulatpura via Neem-Ka-
Thana (SH-37B &7)
RSRDC 357.75 BOT- Annuity - Tender Due on 12.03.2012
11. Jaipur to Nagaur via Jobner
( SH-2 & 7)
RSRDC 342.00 BOT- Annuity - Tender Due on 12.03.2012
12. Mathura (Raj. Border) to
Bharatpur to Hinduan via
Bayana (SH-1A)
RIDCOR 350.00 BOT- Annuity - No Financial bid received by RSRDCC on
due date. Project is awarded to RIDCOR.
13. Rawatsar – Nohar – Bhadra
upto Haryana Border (Km.
30/400 to Km. 148/00) (GREF-
Road)
RIDCOR 291.56 BOT- Annuity - Delisted from PPP model. Project
awarded to RIDCOR.
14. Dausa Chaksu Dudu (SH-2) PWD 165.00 BOT- Annuity - No Financial bid received on due date
29.09.2010. Proposed to transfer the
road to RSRDCC for development on BOT
(Annuity) and Toll basis.
15. Dudu Sambhar ( SH-2) PWD 40.00 BOT- Annuity - No Financial bid received on due date
08.12.2010. Proposed to transfer the
road to RSRDCC for development on BOT
28
(Annuity) and Toll basis.
16. Rishabhdeo – Salumber RSRDC 90.00
BOT - Annuity - DPR under preparation.
17. Dungarpur – Banswara RSRDC 165.00
BOT - Annuity - DPR under preparation.
18. Dhabadeh – Ramaganj mandi RSRDC 69.63
BOT - Annuity - To be taken up after comp. Of ROB.
19. Jhunjhunu – Udaipurwati –
Khandela
PWD 86.22 BOT - Bid received, tenders under approval.
20. Khandela – Srimadhopur –
Reengus – Khatushyamji
PWD 43.26 BOT - Bid received, tenders under approval.
21. Metra – Gotan – Piparcity –
Jodhpur
PWD 74.47 BOT - Bid received, tenders under approval.
22. Fatehpur – Jhunjhunu –
Malsisar – Rajgarh Road
PWD 25.44
BOT 20.03.2012. –
23. Aspur – Doongarpur PWD 64.10 BOT-VGF 20.02.2012.
–
24. Sardulshahar (Punjab state
Border) Hanumangarh- Tibbi-
Alinabad (Hariyana Border)
PWD 93.84 BOT-VGF 20.02.2012. –
25. Sirsa (Hariyana) Ludesar-
Bhadra-Sidhmukh-Rajgarh
PWD 45.16 BOT-VGF 20.02.2012. –
26. Lunkaransar (NH-15) Kalu-
Shreedoongargarh (NH-11)
Sardarsahahar (NH-64)
PWD 96.85 BOT-VGF 20.02.2012. –
27. Sardarsahahar (NH-64)
Tarangar – Rajarh (NH-64)
PWD 70.78 BOT-VGF 20.02.2012. –
Sub – Total (A)
5999.26
(B)
Urban Infrastructure
1. Exhibition cum Convention RIICO 216.65 BOT February, The preferred bidder has been identified
29
Centre at Sitapura Industrial
Area , Jaipur
2012 consequent upon the Request for
Proposal for the project. LoA has been
issued on 13 Feb., 2012 to preferred
bidder.
2. International Convention
Center, Pratap Nagar, Jaipur
RHB 1026.00 DBFOT - EoI was released in Oct., 2010 and
technical bids have also been received;
only one offer received. Final decision is
to be taken on the project.
3. Jalore Area Development
Program – Drinking Water
Supply & Sanitation Project
PHED 962.00 - - Implementation structure is under
approval.
4. Convention Centre, Kota UIT, Kota
81.46 BOT - Under bidding.
5. Jaipur Metro Rail Project Jaipur Metro
Rail
Corporation
(JMRC)
9732.00 - - Sanctioned under IIPDF scheme of
Government of India for project
development. Stage-II of this project for
development of Corridor (Ambabari –
Sitapura and Chandpole – Badi Chaupar),
acquisition of all rolling stock and
operation and maintenance of the entire
metro rail system are proposed on PPP
mode. Applications have been invited
through RfQ. 5 applications were
received, out of which 4 applications
have been qualified.
6.
Restoration and Conservation
of Forts in the State and
Conversion of same into
Heritage Hotels
Tourism/
RTDC
0.00 BOT (60 Year
Lease Basis)
- After successful biding out of the Tijara
Fort, Government decided to lease out
16 selected properties on the same lines.
Initial study found 3 forts as most
feasible ones out of total 16 and
Government is planning to bid out two
forts. Estimated cost will be in the range
30
of 20 Cr. to 30 Cr. for properties selected
under Phase-I.
7. Solid Waste Treatment Plant
at Sewapura
Nagar
Nigam,
Jaipur
20.00 DBOOT 2010-11 Work is yet to be started.
8. Solid Waste Treatment Plant
at Sikar
Municipal
Council, Sikar
13.00 DBOOT - LoA issued to M/s Ruchem Ltd. Mumbai.
Land has been allotted.
9. Integrated Solid Waste
Management Project Jaipur
Nagar
Nigam,
Jaipur
60.00 DBOOT - RfP is being issued.
10. Integrated Solid Waste
Management Project, Jodhpur
Nagar
Nigam,
Jodhpur
40.00 DBOOT - RfP is being issued.
11. Integrated Solid Waste
Management Project, Ajmer,
Kishangarh and Pushkar
DLB 0.00 DBOOT - -
12. Integrated Solid Waste
Management Project, Kota,
Bikaner and Udaipur
DLB 0.00 DBOOT - -
13. Amusement Park with Snow
Theme at Jawahar Circle,
Jaipur
JDA 33.50 DBFOT - Proposal dropped as the financial
module of the concessionaire M/s Pink
Paradise Fun & Food park, Faridabad
was not appropriate and viable.
Sub - Total (B)
12184.61
(C)
Water Sector
1. Bisalpur-Tonk – Uniyara
Drinking Water Supply Project
PHED 400.00 BOT with
Annuity based
- Consequent upon RfQ, 14 firms have
been short listed. RfP and Draft
31
for 2 towns (Tonk & Uniyara)
and 436 villages in Deoli,
Uniyara and Tonk Tehsils of
Tonk District
payments Concession Agreement are being
finalized.
2. Water Supply & Sewerage
System for Udaipur town
PHED 1000.00 DBFOT - Technical consultant has been
appointed.
3. Water Supply & Sewerage
System for Ajmer and Pushkar
PHED 700.00 DBFOT - Technical consultant has been
appointed.
4. Rehabilitation & O&M of Raw
Water Pumping Stations for
Jaisamand
PHED 9.00 BOT - -
Sub – Total (C)
2109.00
(D)
Power Sector
1. 400 kV D/C Babai - Jaipur
(North) (Twin Moose) line
along with 400/220 kV GSS at
Jaipur (North)
RRVPN
Ltd.
221.80 BOOM 2013-14 Notice inviting Bid published on
31.3.2011 and Pre- Bid conference held
on 16.5.2011. Short listing of bids is
under process.
2. 400 kV D/C Jodhpur (New)-
Udaipur (Twin Moose) Line
along with 400/220 kV GSS at
Udaipur
RRVPN
Ltd.
379.53 BOOM 2013-14 Notice inviting bid published on
21.09.2011 and Pre-bid conference held.
Short listing of bids is under process.
3. 400 kV Bikaner – Sikar D/C line
(Twin Moose) – 210 Km
RRVPN
Ltd.
219.58 BOOM 2013-14 Being structured as per the guidelines
based on VGF.
4. 400 kV AKAL – Jodhpur (New)
D/C line (Quad Moose) -240
Km
RRVPN
Ltd.
512.27 BOOM 2013-14 Being structured as per the guidelines
based on VGF
Sub –Total (D)
1333.18
(E)
Social Sector
32
1. Gyanodaya PPP Schools
(Establishment of 50 New
Senior Secondary Schools in 10
districts of Ajmer and Udaipur
Division on 30 year Concession
period)
School
Education
172.00 BOT May, 2012 Sanctioned under IIPDF scheme of
Government of India for project
development. Consequent upon the RfQ
for 50 schools, eligible applicants have
been short listed. Application for VGF
has been submitted to Govt of India in
August, 2011. GoI is yet to sanctions
VGF. Thereafter, RFP documents inviting
financial bids will be issued to shortlisted
eligible applicants.
2. Sun & Sand Industries Ltd.,
Plot. No. I & III, Block XVI,
Ogun Housing State Industrial
Corporation, Sangootta, Ogun
State – Nigeria
Technical
Education
13.00 BOT - Proposed College at Ajmer
3. Samsung Overseas Ltd.
104, Adishwar Appt.,
Ferozshah Road, New Delhi –
110 016
Technical
Education
13.00 BOT - Proposed College at Bhiwadi, Alwar
4. Shri Taijal Shikshan Sansthan
At SMPR Road, Bhairuji Mode,
Reengus, Sikar – 332404
Technical
Education
13.00 BOT - Proposed College at Reengus, Sikar
5. Vijay Shikshan Sewa Sansthan,
C/o Vijay Hospital, Behind
Police Station
Bandikui, Dausa – 303313
Technical
Education
13.00 BOT - Proposed College at Rural Area Baswa,
Dausa
6. Society Affiliated to Rural
Development for Health &
Agriculture, Sardha Society,
C/o Post Box No. 20, Deoli,
Dist.-Tonk – 304804
Technical
Education
13.00 BOT - Proposed College at Rural Area, Devli,
Tonk
33
7. Shyam Knowledge Park
Shiksha Samiti,
E-562, Lal Kothi Scheme, Jaipur
Technical
Education
13.00 BOT - Proposed College at Teh.-Bassi, Agra
Road, Distt.Jaipur
8. PNB Shikshan Santhan
Ward No. 12, Mukandpura,
Bhankrota,Jaipur
Technical
Education
13.00 BOT - Proposed College at Vill.Jalsu, Tel. Amer,
Distt. Jaipur
9. Dhayawan Vikas Sanstha,
Luriyawas, Teh. Sanganer,
Jaipur
Technical
Education
13.00 BOT - Proposed College at Rural Area,
Shahpura, Bhilwara
10. Gurukul Shikshan Sansthan,
V/P – Rundal, Teh.-Amer,
Jaipur
Technical
Education
13.00 BOT - Proposed College at Vill.Khor Bassi, Teh.
Beharor,Distt.Alwar
11. Bhagwati Shiksha Samiti,
47, Satya Vihar Colony, Lal
Kothi,
Jaipur – 302005
Technical
Education
13.00 BOT - Proposed College at Bharatpur
12. St. Conard Shiksha Samiti,
St. Conard's Sr. Sec. School,
Jagdish Talkies Tiraha, Dholpur
– 328001
Technical
Education
13.00 BOT - Proposed College at Rural Area Dholpur
13. Adarsh Indian Public School
Shiksha Samiti, Near CISF
Campus, Deoli, Tonk
Technical
Education
13.00 BOT - Proposed College at Bundi
14. Praband Samiti, Bhartiya Vidya
Mandir, 319, Dadu Marg,
Barkat Nagar, Jaipur – 302015
Technical
Education
13.00 BOT - Proposed College at Jaipur Road, Kota
15. Stone Age Ltd.
117, Jaipur Tower, M.I. Road,
Jaipur
Technical
Education
13.00 BOT - Proposed College at Rural, Deoli, Tonk
16. Vijayaraje Sindhiya Shikshan Technical 13.00 BOT - Proposed College at Rural
34
Sansthan,
Awali Kalan, Gyan Mandir,
Magan Bhai Market,
Bhawanimandi, Jhalawar-
326502
Education Bhawanimandi, Jhalawar
17. Sharda Manohar Zila Jhalawar
Mahila Vikas Samiti,New
Master Colony,Jhalawar-
326001
Technical
Education
13.00 BOT - Proposed College at Rural Jhalawar
18. Dee Jay Neelum Marble
Industries Pvt. Ltd., NH-8,
Bhuwana, Udaipur
Technical
Education
13.00 BOT - Proposed College at Udaipur
19. Shri Vinayak Mission Medical
Education Society, P.No. 1,
Mahaveer Nagar 'A', Muhana
Road, Mansarovar, Jaipur –
302020
Technical
Education
13.00 BOT - Proposed College at Kishangarh, Ajmer
20. Apex Education Committee,
VPO – Bassni, Teh. –
Mundawar, Alwar – 301401
Technical
Education
13.00 BOT - Proposed College at Teh.Khairthal, Alwar
21. Surendra Public School Samiti,
25, Goverdhan Colony, New
Sanaganer Road,
Jaipur – 302019
Technical
Education
13.00 BOT - Proposed College at Kishangarh, Ajmer
22. Computed Tomography (CT)
Scan facilities in 14 Districts of
Rajasthan
Medical &
Health
30.00 - - Initial tender process done in Nov/Dec,
2010. This had been failed as there were
no tenders. Transaction consultant is
being appointed for preparation of
project documents.
23. Setting up of a University for Youth Affairs 0.00 - - IIPDF assistance has been approved by
35
Physical Education and Sports,
Jhunjunjhu
and Sports DEA. 75% of the project development
cost shall be met by GoI and remaining
25% is being borne by ADB. Ernst &
Young have been retained as transaction
advisor and have commenced work. EOI
for the project is expected to be released
in March, 2012.
Sub – Total (E)
462.00
(F) Any Other Sector
1.
Project at Khamnaur
(Rajsamand) under Provision
of Urban Amenities in Rural
Area (PURA) Scheme
Rural Dev. 132.03 BOT - DPR submitted to GoI for approval.
2.
Project at Sanganer (Jaipur)
under Provision of Urban
Amenities in Rural Area (PURA)
Scheme
Rural Dev. 120.17 BOT - DPR submitted to GoI for approval.
Sub - Total (F)
252.20
Grand Total
22340.25