Name of Work :Package N.FDPR/PTN/35/15-16.Taluka- Radhanpur Dist.-Patan ASPHALT (RS-1 ) CONSUMPTION STATEMENT Description of Item Qty. 1 2 3 4 5 6 1 37 40.00 1344.00 2 38 368.00 12880.00 3 39 142.00 6390.00 Sr.N o. It. No Rate of consunption in Kg. Actual requirment in Kg. Providing and laying 25 mm thick premix asphalt carpet using 0.66 cmt per 1 MT.mix with M.C. stone agg. using asphalt 33.60 kg .ie. 3.36 % and mixing water proofing material ZYCOTHERM of Equivalent @ 0.10 % by total weight of ashphalt by Wwight for binding including heating the asphalt and aggregate by hot laid process using drum mix pant ,transporting themix, spreading the same by paver finisher with vibratory roller 80 to 100 KN. static wt. incl. providing all equipments tools and plants, fire wood, oil, kerosene, labour charges etc. complete with contractor's own machineries, etc. complete. 33.60 Kg./ MT Providing & laying 37.50mm thick Bituminous macadam with VG-30 bitumen for and mixing water proofing material ZYCOTHERM of Equivalent @ 0.10 % by total weight of ashphalt by Wwight for binding including heating the asphalt at the rate of 3.50 % i.e. 35.0 Kg/ M.T. by weight mix including heating & mixing in drum mix plant transporting the mix spreading the same by paver finisher and consolidation by vibratory roller as per MORT&H specification including cost of all materials fuel, labours, tools and plant etc using contractors own drum mix plant etc. comp. 35 Kg./ MT Providing and laying bitumenous Seal coat 0.18 cmt / 10 smt. with machine crushed aggregate using 45.00 kg. of bitumen per M.T. of total weight of mix agg. (4.50 % of total weight of mix) mixing by continuous batching of drum mix plant and mixing water proofing material ZYCOTHERM of Equivalent @ 0.10 % by total weight of ashphalt by Wwight for binding including heating the asphalt and aggregate by hot laid process using drum mix pant ,transporting themix, spreading the same by paver finisher and consolidation with vibratory roller 8 to 10 tonne incl. providing all materials equipments, tools and plants, fire wood, oil, kerosene, labour charges etc. comp & flushind sand @ rate of 0.30 cmt / 100 smt. 45 Kg./ MT

Upload: ketan-dhameliya

Post on 13-Apr-2016

4 views

Category:

Documents


0 download

DESCRIPTION

pp

TRANSCRIPT

Page 1: Documentpp

Name of Work :Package N.FDPR/PTN/35/15-16.Taluka- Radhanpur Dist.-Patan

ASPHALT (RS-1 ) CONSUMPTION STATEMENTDescription of Item Qty.

1 2 3 4 5 61 37 40.00 1344.00

2 38 368.00 12880.00

3 39 142.00 6390.00

Sr.No.

It.No

Rate of consunption in

Kg.

Actual requirment in

Kg.

Providing and laying 25 mm thick premix asphalt carpet using 0.66 cmt per 1 MT.mix with M.C. stone agg. using asphalt 33.60 kg .ie. 3.36 % and mixing water proofing material ZYCOTHERM of Equivalent @ 0.10 % by total weight of ashphalt by Wwight for binding including heating the asphalt and aggregate by hot laid process using drum mix pant ,transporting themix, spreading the same by paver finisher with vibratory roller 80 to 100 KN. static wt. incl. providing all equipments tools and plants, fire wood, oil, kerosene, labour charges etc. complete with contractor's own machineries, etc. complete.

33.60 Kg./ MT

Providing & laying 37.50mm thick Bituminous macadam with VG-30 bitumen for and mixing water proofing material ZYCOTHERM of Equivalent @ 0.10 % by total weight of ashphalt by Wwight for binding including heating the asphalt at the rate of 3.50 % i.e. 35.0 Kg/ M.T. by weight mix including heating & mixing in drum mix plant transporting the mix spreading the same by paver finisher and consolidation by vibratory roller as per MORT&H specification including cost of all materials fuel, labours, tools and plant etc using contractors own drum mix plant etc. comp.

35 Kg./ MT

Providing and laying bitumenous Seal coat 0.18 cmt / 10 smt. with machine crushed aggregate using 45.00 kg. of bitumen per M.T. of total weight of mix agg. (4.50 % of total weight of mix) mixing by continuous batching of drum mix plant and mixing water proofing material ZYCOTHERM of Equivalent @ 0.10 % by total weight of ashphalt by Wwight for binding including heating the asphalt and aggregate by hot laid process using drum mix pant ,transporting themix, spreading the same by paver finisher and consolidation with vibratory roller 8 to 10 tonne incl. providing all materials equipments, tools and plants, fire wood, oil, kerosene, labour charges etc. comp & flushind sand @ rate of 0.30 cmt / 100 smt.

45 Kg./ MT

Page 2: Documentpp

4

Bulk Asphalt S-90 20614.00K.G.

Say 20.61M.T.

Dy.Executive Engineer Executive EngineerR & B (P) Sub Division, R & B Division, GandhinagarRadhanpur Patan

Providing and laying bitumenous Seal coat 0.24 cmt / 10 smt. with machine crushed aggregate using 45.00 kg. of bitumen per M.T. of total weight of mix agg. (4.50 % of total weight of mix) mixing by continuous batching of drum mix plant and mixing water proofing material ZYCOTHERM of Equivalent @ 0.10 % by total weight of ashphalt by Wwight for binding including heating the asphalt and aggregate by hot laid process using drum mix pant ,transporting themix, spreading the same by paver finisher and consolidation with vibratory roller 8 to 10 tonne incl. providing all materials equipments, tools and plants, fire wood, oil, kerosene, labour charges etc. comp & flushind sand @ rate of 0.30 cmt / 100 smt.

Providing and laying c.c. 1:2:4 (1 cement : 4 coarse sand : 4 M.C. Stone Agg. 20 mm size ) and providing necessary vertical pin headers including formwork, vibrating, complete.

Page 3: Documentpp
Page 4: Documentpp

26.03