pp qpf workshop

5
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss PP QPF Workshop 8 March 2007, Langen

Upload: candice-forbes

Post on 31-Dec-2015

18 views

Category:

Documents


0 download

DESCRIPTION

PP QPF Workshop. 8 March 2007, Langen. Welcome …. … and Introduction: Aim of this workshop Collect results (deliverables) of task 3.1. Identify missing things for joint assessment (task 3.2) Define next steps. Plan summary report and paper. Aim of this workshop. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: PP QPF Workshop

Federal Department of Home Affairs FDHAFederal Office of Meteorology and Climatology MeteoSwiss

PP QPF Workshop

8 March 2007, Langen

Page 2: PP QPF Workshop

2 PP QPF Workshop | Langen, 8 March 2007Marco Arpagaus (marco.arpagaus [at] meteoswiss.ch)

Welcome …

… and Introduction:

Aim of this workshop

• Collect results (deliverables) of task 3.1.

• Identify missing things for joint assessment (task 3.2)

• Define next steps.

• Plan summary report and paper.

Page 3: PP QPF Workshop

3 PP QPF Workshop | Langen, 8 March 2007Marco Arpagaus (marco.arpagaus [at] meteoswiss.ch)

Aim of this workshop

• Collect results (deliverables) of task 3.1. done!

• Identify missing things for joint assessment (task 3.2) done.

• Define next steps.• Consolidate common findings (lead: Silke).• In parallel: visually inspect cases with most significant

changes; perform 'recommended analysis'.• Prepare some further sensitivity studies (see next page;

lead: Axel).• Run additional sensitivity studies (maybe 5?).

• Plan summary report (and proposal for follow-up project?) and paper.

Page 4: PP QPF Workshop

4 PP QPF Workshop | Langen, 8 March 2007Marco Arpagaus (marco.arpagaus [at] meteoswiss.ch)

Aim of this workshop

• Collect results (deliverables) of task 3.1. done!

• Identify missing things for joint assessment (task 3.2) done; deliver asap, but Fri 30 March the latest.

• Define next steps.• Consolidate common findings (lead: Silke); Fri 13 April.• In parallel, and until Fri 27 April: visually inspect cases with

most significant changes; perform 'recommended analysis'.• Prepare some further sensitivity studies (see next page)

until Fri 27 April (lead: Axel).• Run additional sensitivity studies (maybe 5?) and

submit all relevant results until Fri 29 June.

• Plan summary report (new due date: COSMO General Meeting) and paper (end of 2007).

Page 5: PP QPF Workshop

5 PP QPF Workshop | Langen, 8 March 2007Marco Arpagaus (marco.arpagaus [at] meteoswiss.ch)

Additional sensitivity studies

• COSMO V3.22 (or 4.1)!

• IFS convection scheme (if implemented until 20.4).

• IFS lateral boundaries.• LME analysis favoured

• another PBL related study?

• Targeted diffusion???

• ?

• Cross-experiments!• qv090 & RK & 3.22 & ? for overprediction in winter• some micro & some con & ? for overprediction in summer• ?