powerpoint presentation · sr 522/paradise lake road interchange improvements. 9 recommended...

11
Hung Huynh, Engineering Manager January 9, 2019 SR 522 Paradise Lake Rd to Snohomish River Roger Millar, Secretary of Transportation Keith Metcalf, Deputy Secretary of Transportation

Upload: others

Post on 20-Apr-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PowerPoint Presentation · SR 522/Paradise Lake Road Interchange Improvements. 9 Recommended Alternative. 10 SR 522/Paradise Lake Road Interchange Improvements • Estimate is $90

Hung Huynh, Engineering Manager

January 9, 2019

SR 522

Paradise Lake Rd to Snohomish River

Roger Millar, Secretary of Transportation

Keith Metcalf, Deputy Secretary of Transportation

Page 2: PowerPoint Presentation · SR 522/Paradise Lake Road Interchange Improvements. 9 Recommended Alternative. 10 SR 522/Paradise Lake Road Interchange Improvements • Estimate is $90

2

Agenda

• Current State

• SR 522/Paradise Lake Road to Snohomish River Widening

• SR 522/Paradise Lake Road Interchange Improvements

• Q & A

Page 3: PowerPoint Presentation · SR 522/Paradise Lake Road Interchange Improvements. 9 Recommended Alternative. 10 SR 522/Paradise Lake Road Interchange Improvements • Estimate is $90

3

Current state

Existing Funding

2017 - 19: $750K

2025 - 27: $5M

2027 - 29: $5M

Funding need amount assumes project is fully funded in 2019

Page 4: PowerPoint Presentation · SR 522/Paradise Lake Road Interchange Improvements. 9 Recommended Alternative. 10 SR 522/Paradise Lake Road Interchange Improvements • Estimate is $90

4

SR 522/Paradise Lake Rd to Snohomish River

Widening

• Estimate is $90 million (assumes project is fully funded in 2019)

• Eight known fish barriers

• If full funding is available:

o Preconstruction duration is estimated to be 2 years

o Construction duration is estimated to be 3 years

• Once funding is available:

o Design fish passages

o Update environmental documentation

o Update and acquire right of way

o Procure design-build contract

Page 5: PowerPoint Presentation · SR 522/Paradise Lake Road Interchange Improvements. 9 Recommended Alternative. 10 SR 522/Paradise Lake Road Interchange Improvements • Estimate is $90

5

4 known fish barriers

at the Paradise Lake

Road Interchange

8 known fish barriers

between Paradise

Lake Road and the

Snohomish River

Page 6: PowerPoint Presentation · SR 522/Paradise Lake Road Interchange Improvements. 9 Recommended Alternative. 10 SR 522/Paradise Lake Road Interchange Improvements • Estimate is $90

6

Fish barrier is

under tall walls

Page 7: PowerPoint Presentation · SR 522/Paradise Lake Road Interchange Improvements. 9 Recommended Alternative. 10 SR 522/Paradise Lake Road Interchange Improvements • Estimate is $90

7

Fish barrier extends

under railroad track

Page 8: PowerPoint Presentation · SR 522/Paradise Lake Road Interchange Improvements. 9 Recommended Alternative. 10 SR 522/Paradise Lake Road Interchange Improvements • Estimate is $90

8

SR 522/Paradise Lake Road Interchange

Improvements

Page 9: PowerPoint Presentation · SR 522/Paradise Lake Road Interchange Improvements. 9 Recommended Alternative. 10 SR 522/Paradise Lake Road Interchange Improvements • Estimate is $90

9

Recommended Alternative

Page 10: PowerPoint Presentation · SR 522/Paradise Lake Road Interchange Improvements. 9 Recommended Alternative. 10 SR 522/Paradise Lake Road Interchange Improvements • Estimate is $90

10

SR 522/Paradise Lake Road Interchange

Improvements

• Estimate is $90 million (assumes project is fully funded in 2019)

• Four known fish barriers

• If full funding is available:

o Preconstruction duration is estimated to be 3 years

o Construction duration is estimated to be 3 years

• Once full funding is available:

o Design fish passages

o Update environmental documentation

o Determine and acquire right of way

o Procure design-build contract

Page 11: PowerPoint Presentation · SR 522/Paradise Lake Road Interchange Improvements. 9 Recommended Alternative. 10 SR 522/Paradise Lake Road Interchange Improvements • Estimate is $90

11

Questions?