powerpoint presentation · •scheduled (major areas of construction activity) •per special...
TRANSCRIPT
The Concrete Convention
and Exposition
ACI 301-16
Chapter 9 – Post-Tensioned Concrete
Miroslav Vejvoda, PETechnical & Certification Director Post-Tensioning Institute
The Concrete Convention
and Exposition
ACI 301E Subcommittee Roster
1 Chair Larry Krauser General Technologies, Inc.
2 Voting Asit Baxi Suncoast Post-Tension, Ltd.
3 Voting Steve Close Jorgensen & Close Assoc., Inc.
4 Voting Charles Hanskat Concrete Engineering Group
5 Voting Neel Khosa Amsysco, Inc.
6 Voting Don Kline Kline Engineering & Consulting
7 Voting Frank Malits Cagley & Associates, Inc.
8 Voting Theodore Neff Post-Tensioning Institute
9 Voting Miroslav Vejvoda Post-Tensioning Institute
10 Voting Zuming Xia VSL
11 Ex Officio (NV) Michelle Wilson Portland Cement Association
12 Ex Officio (NV) James Cornell The Beck Group
The Concrete Convention
and Exposition
Primary Subcommittee Goals
ACI 301E – Post-Tensioning
June 4, 2010
1.Review document for accuracy and consistency with industry
practices.
2.Review and resolve “Tabled” items from previous specification cycle.
3.Incorporate new PTI/ASBI M50.3 Grouted Post-Tensioning
Specifications upon publication.
4.Process specific requests from Main ACI 301 Committee as they arise.
The Concrete Convention
and Exposition
ACI 301E Sequence of Work
Reviewed and reconciled Tabled Items
1. Identified sections for correction/consistency of industry
practices
2. Identified sections to incorporate PTI/ASBI M50.3 Grouted
Post-Tensioning Specifications
3. Provided Chapter to main committee for balloting
4. Main committee negatives (201 individual negatives, 158
resolved at meetings, 43 withdrawn)
5. Editorial modifications for overall consistency of ACI 301
6. TAC Comments
7. Public Comments (8 comments)
The Concrete Convention
and Exposition
Major Modifications
Chapter 9 – Post-Tensioning
1. Clarified specifications for personnel qualifications
2. Incorporation of PTI/ASBI M50.3 Guide Specification to Grouted Post-Tensioning
3. Incorporation of PTI M55.1 Specification for Grouting of
Post-Tensioned Structures
4. Incorporation of new requirements of ACI 423.7 in regards to encapsulated post-tensioning tendons
The Concrete Convention
and Exposition
Personnel Qualifications
Unless otherwise specified, personnel requirements per PTI Training and Certification for Field Personnel:• Scheduled (Major areas of construction activity)• Per Special Request (Any location; any time)• Available throughout the US and internationally• Available in English and Spanish (Unbonded PT)• Level 2 requires documented field experience• Certification valid for four years• Simple renewal
The Concrete Convention
and Exposition
Requirements: Bonded PT
301-10 301-16
Installer PTI Level 1 Bonded PT – Field Installation
50% PTI Level 1 Bonded PT –Field Installation
Crew Foreman PTI Level 2 Bonded PT Field Specialist
Tensioning Personnel 50% PTI Level 2 Bonded PT Field Specialist
Remaining Personnel PTI Level 1 Bonded PT – Field Installation
Grouting Personnel “Trained and experienced in grouting”
PTI Level 1 Bonded PT – Field Installation
Immediate Supervision “Person skilled in grouting” PTI Level 2 Bonded PT Field Specialist / ASBI Grouting Tech
Inspection PTI Level 2 Bonded PT Field Specialist
Comparison of Requirements 2010 – 2016
The Concrete Convention
and Exposition
Requirements: Unbonded PT
301-10 301-16
Installer PTI Level 1 Unbonded PT –Field Installation
50% PTI Level 1 Unbonded PT – Field Installation
Crew Foreman PTI Level 2 Unbonded PT Inspector or Ironworker
Tensioning Personnel 50% PTI Level 2 Unbonded PT Inspector or Ironworker
Remaining Personnel PTI Level 1 Unbonded PT –Field Installation
Inspection PTI Level 2 Unbonded PT Inspector
PTI Level 2 Unbonded PT Inspector
Comparison of Requirements 2010 – 2016
The Concrete Convention
and Exposition
Reference to PTI/ASBI M50.3 (Grouted PT)
and PTI M55.1 (Grouting)
• Industry standards adopted by many DOTs.• Developed by a committee with controlled membership and
stakeholders from:
• Developed under the same ANSI consensus process ACI uses; with the exception of pubic review – All future editions will include public review as well.
PTI Standards M50.3 and M55.1
The Concrete Convention
and Exposition
Reference to PTI/ASBI M50.3 Guide
Specification for Grouted Post-Tensioning
• Testing of bonded tendon components• Bonded tendon materials;
indicate Tendon Protection Level (PL)• Tendon tolerances (placement)
PTI Standards
The Concrete Convention
and Exposition
Reference to PTI M55.1 Specification for
Grouting of Post-Tensioned Structures
• Grout quality control testing• Grout mixtures for bonded tendons
• Exception: Water soluble chloride ions content not to exceed 0.06% by mass of cement (ASTM C1218)
• Field trial tests• Field mockup tests
PTI Standards
The Concrete Convention
and Exposition
• Major change in ACI 423.7-14: Encapsulated Unbonded
Tendon Materials
• All unbonded tendon materials used in structures designed
by ACI 318 or ACI 350 must be encapsulated.
• Exception: Nonencapsulated tendons allowed in industrial
slab-on-ground applications where specified.
New ACI 423.7 Requirements