![Page 1: PowerPoint Presentation€¦ · Demo site n.1 in Wales (10/10) •3.68 kW of power, grid connected (G98) •Total investment 25,700 GBP (incl. VAT) •Expected output 19,000 kWh per](https://reader033.vdocuments.mx/reader033/viewer/2022060514/5f842be839473724e763d49c/html5/thumbnails/1.jpg)
Field demonstration of Pumps as Turbines for Micro-HydropowerGlasgow, 14/11/2019
Daniele Novara & Aonghus McNabolaTrinity College Dublin
![Page 2: PowerPoint Presentation€¦ · Demo site n.1 in Wales (10/10) •3.68 kW of power, grid connected (G98) •Total investment 25,700 GBP (incl. VAT) •Expected output 19,000 kWh per](https://reader033.vdocuments.mx/reader033/viewer/2022060514/5f842be839473724e763d49c/html5/thumbnails/2.jpg)
1. Who we are
2. Pumps as Turbines (PAT)
3. PAT Applications
4. Barriers to large-scale PAT adoption
5. PAT selection software
6. Demo site n.1 in Wales
7. Demo site n.2 in Ireland
8. Conclusions2
Index
![Page 3: PowerPoint Presentation€¦ · Demo site n.1 in Wales (10/10) •3.68 kW of power, grid connected (G98) •Total investment 25,700 GBP (incl. VAT) •Expected output 19,000 kWh per](https://reader033.vdocuments.mx/reader033/viewer/2022060514/5f842be839473724e763d49c/html5/thumbnails/3.jpg)
The Dŵr Uisce Project aims at reducing
the energy consumption and CO2
emissions of the water industry, and to
decrease the associated costs of water
supply and treatment.
Part-funded by the Interreg Ireland Wales
Co-operation programme 2014-2020.
3
Who we are
![Page 4: PowerPoint Presentation€¦ · Demo site n.1 in Wales (10/10) •3.68 kW of power, grid connected (G98) •Total investment 25,700 GBP (incl. VAT) •Expected output 19,000 kWh per](https://reader033.vdocuments.mx/reader033/viewer/2022060514/5f842be839473724e763d49c/html5/thumbnails/4.jpg)
• Low purchase cost (5-10 times less expensive
than a conventional hydro turbine)
• Compact dimensions
• Mass manufactured, short delivery time
• Easy maintenance
• Work within a pressurized pipeline
4
• Low part-load efficiency
• Design uncertainties due to the unavailability of
performance curves given by producers
• Absence of sound design guidelines
Pumps As Turbines (PAT)
![Page 5: PowerPoint Presentation€¦ · Demo site n.1 in Wales (10/10) •3.68 kW of power, grid connected (G98) •Total investment 25,700 GBP (incl. VAT) •Expected output 19,000 kWh per](https://reader033.vdocuments.mx/reader033/viewer/2022060514/5f842be839473724e763d49c/html5/thumbnails/5.jpg)
5
PAT Applications• Traditional run-off-river hydropower for private or public users
• Particular interest in rural electrification (South-East Asia, Latin
America...)
• Energy recovery devices from pressurized water networks:
• Drinking water networks
• Irrigation networks
• Skiing resorts relying on artificial snow
• Mining sector
• Industrial cooling systems
• Upgrade of non-powered dams
• Integration of pre-existing hydropower schemes
![Page 6: PowerPoint Presentation€¦ · Demo site n.1 in Wales (10/10) •3.68 kW of power, grid connected (G98) •Total investment 25,700 GBP (incl. VAT) •Expected output 19,000 kWh per](https://reader033.vdocuments.mx/reader033/viewer/2022060514/5f842be839473724e763d49c/html5/thumbnails/6.jpg)
Insight: lack of proven design guidelines and a lack of awareness by potential
users/customers.
6
Barriers to large-scale PAT adoptionPump manufacturers
Not interested in investigating PAT use or promoting sales due to the
marginality of the sector respect to their core market
Potential PAT users
Not informed about PAT, risk averse (e.g. water utilities)
Hydro design firms and consultants
Unaware of the PAT potential, unexperienced, not willing to take on
project liability, concerned by the lack of design guidelines and existing field
applications
![Page 7: PowerPoint Presentation€¦ · Demo site n.1 in Wales (10/10) •3.68 kW of power, grid connected (G98) •Total investment 25,700 GBP (incl. VAT) •Expected output 19,000 kWh per](https://reader033.vdocuments.mx/reader033/viewer/2022060514/5f842be839473724e763d49c/html5/thumbnails/7.jpg)
7
PAT selection software (1/2)A comprehensive PAT design software has been developed and validated through a laboratory testing campaign.
![Page 8: PowerPoint Presentation€¦ · Demo site n.1 in Wales (10/10) •3.68 kW of power, grid connected (G98) •Total investment 25,700 GBP (incl. VAT) •Expected output 19,000 kWh per](https://reader033.vdocuments.mx/reader033/viewer/2022060514/5f842be839473724e763d49c/html5/thumbnails/8.jpg)
8
PAT selection software (2/2)
![Page 9: PowerPoint Presentation€¦ · Demo site n.1 in Wales (10/10) •3.68 kW of power, grid connected (G98) •Total investment 25,700 GBP (incl. VAT) •Expected output 19,000 kWh per](https://reader033.vdocuments.mx/reader033/viewer/2022060514/5f842be839473724e763d49c/html5/thumbnails/9.jpg)
PAT lab test rig
9
![Page 10: PowerPoint Presentation€¦ · Demo site n.1 in Wales (10/10) •3.68 kW of power, grid connected (G98) •Total investment 25,700 GBP (incl. VAT) •Expected output 19,000 kWh per](https://reader033.vdocuments.mx/reader033/viewer/2022060514/5f842be839473724e763d49c/html5/thumbnails/10.jpg)
10
Demo site n.1 in Wales (1/10)4 kW run-off-river hydropower scheme at Ty Mawr Wybrnant, Wales
![Page 11: PowerPoint Presentation€¦ · Demo site n.1 in Wales (10/10) •3.68 kW of power, grid connected (G98) •Total investment 25,700 GBP (incl. VAT) •Expected output 19,000 kWh per](https://reader033.vdocuments.mx/reader033/viewer/2022060514/5f842be839473724e763d49c/html5/thumbnails/11.jpg)
11
Demo site n.1 in Wales (2/10)Electric scheme
![Page 12: PowerPoint Presentation€¦ · Demo site n.1 in Wales (10/10) •3.68 kW of power, grid connected (G98) •Total investment 25,700 GBP (incl. VAT) •Expected output 19,000 kWh per](https://reader033.vdocuments.mx/reader033/viewer/2022060514/5f842be839473724e763d49c/html5/thumbnails/12.jpg)
12
Demo site n.1 in Wales (3/10)Intake construction
![Page 13: PowerPoint Presentation€¦ · Demo site n.1 in Wales (10/10) •3.68 kW of power, grid connected (G98) •Total investment 25,700 GBP (incl. VAT) •Expected output 19,000 kWh per](https://reader033.vdocuments.mx/reader033/viewer/2022060514/5f842be839473724e763d49c/html5/thumbnails/13.jpg)
13
Demo site n.1 in Wales (4/10)Powerhouse construction
![Page 14: PowerPoint Presentation€¦ · Demo site n.1 in Wales (10/10) •3.68 kW of power, grid connected (G98) •Total investment 25,700 GBP (incl. VAT) •Expected output 19,000 kWh per](https://reader033.vdocuments.mx/reader033/viewer/2022060514/5f842be839473724e763d49c/html5/thumbnails/14.jpg)
14
Demo site n.1 in Wales (5/10)Turbine and generator
![Page 15: PowerPoint Presentation€¦ · Demo site n.1 in Wales (10/10) •3.68 kW of power, grid connected (G98) •Total investment 25,700 GBP (incl. VAT) •Expected output 19,000 kWh per](https://reader033.vdocuments.mx/reader033/viewer/2022060514/5f842be839473724e763d49c/html5/thumbnails/15.jpg)
15
Demo site n.1 in Wales (6/10)Electric components
![Page 16: PowerPoint Presentation€¦ · Demo site n.1 in Wales (10/10) •3.68 kW of power, grid connected (G98) •Total investment 25,700 GBP (incl. VAT) •Expected output 19,000 kWh per](https://reader033.vdocuments.mx/reader033/viewer/2022060514/5f842be839473724e763d49c/html5/thumbnails/16.jpg)
Demo site n.1 in Wales (6/8)
16
![Page 17: PowerPoint Presentation€¦ · Demo site n.1 in Wales (10/10) •3.68 kW of power, grid connected (G98) •Total investment 25,700 GBP (incl. VAT) •Expected output 19,000 kWh per](https://reader033.vdocuments.mx/reader033/viewer/2022060514/5f842be839473724e763d49c/html5/thumbnails/17.jpg)
17
Demo site n.1 in Wales (8/10)
Comparison
with other
turbine types
![Page 18: PowerPoint Presentation€¦ · Demo site n.1 in Wales (10/10) •3.68 kW of power, grid connected (G98) •Total investment 25,700 GBP (incl. VAT) •Expected output 19,000 kWh per](https://reader033.vdocuments.mx/reader033/viewer/2022060514/5f842be839473724e763d49c/html5/thumbnails/18.jpg)
18
Demo site n.1 in Wales (9/10)
![Page 19: PowerPoint Presentation€¦ · Demo site n.1 in Wales (10/10) •3.68 kW of power, grid connected (G98) •Total investment 25,700 GBP (incl. VAT) •Expected output 19,000 kWh per](https://reader033.vdocuments.mx/reader033/viewer/2022060514/5f842be839473724e763d49c/html5/thumbnails/19.jpg)
19
Demo site n.1 in Wales (10/10)
• 3.68 kW of power, grid connected (G98)
• Total investment 25,700 GBP (incl. VAT)
• Expected output 19,000 kWh per year
• Expected revenues 2,900 GBP per year
• Predicted payback between 8 and 9 years
• Electricity cost ≈ 0.13 GBP/kW
Key figures:
Official opening on
21/11/2019!
![Page 20: PowerPoint Presentation€¦ · Demo site n.1 in Wales (10/10) •3.68 kW of power, grid connected (G98) •Total investment 25,700 GBP (incl. VAT) •Expected output 19,000 kWh per](https://reader033.vdocuments.mx/reader033/viewer/2022060514/5f842be839473724e763d49c/html5/thumbnails/20.jpg)
20
Demo site n.2 in Ireland (1/10)4 kW hydropower scheme at Blackstairs Water Treatment Plant
![Page 21: PowerPoint Presentation€¦ · Demo site n.1 in Wales (10/10) •3.68 kW of power, grid connected (G98) •Total investment 25,700 GBP (incl. VAT) •Expected output 19,000 kWh per](https://reader033.vdocuments.mx/reader033/viewer/2022060514/5f842be839473724e763d49c/html5/thumbnails/21.jpg)
21
Demo site n.2 in Ireland (2/10)
Source river Settling tank
Raw water tank
![Page 22: PowerPoint Presentation€¦ · Demo site n.1 in Wales (10/10) •3.68 kW of power, grid connected (G98) •Total investment 25,700 GBP (incl. VAT) •Expected output 19,000 kWh per](https://reader033.vdocuments.mx/reader033/viewer/2022060514/5f842be839473724e763d49c/html5/thumbnails/22.jpg)
22
Demo site n.2 in Ireland (3/10)Gross head 60 m, measured flow rate in the range 8-33 l/s
0
5
10
15
20
25
30
35
Flo
w r
ate
(l/s
)
![Page 23: PowerPoint Presentation€¦ · Demo site n.1 in Wales (10/10) •3.68 kW of power, grid connected (G98) •Total investment 25,700 GBP (incl. VAT) •Expected output 19,000 kWh per](https://reader033.vdocuments.mx/reader033/viewer/2022060514/5f842be839473724e763d49c/html5/thumbnails/23.jpg)
23
Demo site n.2 in Ireland (4/10)
Results
from the
PAT
selection
software
![Page 24: PowerPoint Presentation€¦ · Demo site n.1 in Wales (10/10) •3.68 kW of power, grid connected (G98) •Total investment 25,700 GBP (incl. VAT) •Expected output 19,000 kWh per](https://reader033.vdocuments.mx/reader033/viewer/2022060514/5f842be839473724e763d49c/html5/thumbnails/24.jpg)
24
Demo site n.2 in Ireland (5/10)Preliminary
design
![Page 25: PowerPoint Presentation€¦ · Demo site n.1 in Wales (10/10) •3.68 kW of power, grid connected (G98) •Total investment 25,700 GBP (incl. VAT) •Expected output 19,000 kWh per](https://reader033.vdocuments.mx/reader033/viewer/2022060514/5f842be839473724e763d49c/html5/thumbnails/25.jpg)
25
Demo site n.2 in Ireland (/)4.3 kW hydropower scheme at Blackstairs Water Treatment Plant
![Page 26: PowerPoint Presentation€¦ · Demo site n.1 in Wales (10/10) •3.68 kW of power, grid connected (G98) •Total investment 25,700 GBP (incl. VAT) •Expected output 19,000 kWh per](https://reader033.vdocuments.mx/reader033/viewer/2022060514/5f842be839473724e763d49c/html5/thumbnails/26.jpg)
Demo site n.2 in Ireland (7/8)
26
![Page 27: PowerPoint Presentation€¦ · Demo site n.1 in Wales (10/10) •3.68 kW of power, grid connected (G98) •Total investment 25,700 GBP (incl. VAT) •Expected output 19,000 kWh per](https://reader033.vdocuments.mx/reader033/viewer/2022060514/5f842be839473724e763d49c/html5/thumbnails/27.jpg)
27
Demo site n.2 in Ireland (8/10)Official opening on 2/5/2019
![Page 28: PowerPoint Presentation€¦ · Demo site n.1 in Wales (10/10) •3.68 kW of power, grid connected (G98) •Total investment 25,700 GBP (incl. VAT) •Expected output 19,000 kWh per](https://reader033.vdocuments.mx/reader033/viewer/2022060514/5f842be839473724e763d49c/html5/thumbnails/28.jpg)
28
Demo site n.2 in Ireland (9/10)Performance monitoring since startup
0
1
2
3
4
0
10
20
30
40
50
60
70
P (
kW)
Q (
m3
/h)
Q (m3/h) P (kW)
![Page 29: PowerPoint Presentation€¦ · Demo site n.1 in Wales (10/10) •3.68 kW of power, grid connected (G98) •Total investment 25,700 GBP (incl. VAT) •Expected output 19,000 kWh per](https://reader033.vdocuments.mx/reader033/viewer/2022060514/5f842be839473724e763d49c/html5/thumbnails/29.jpg)
29
Demo site n.2 in Ireland (10/10)
• 4 kW of nominal power, grid connected
• Total investment 25,300 GBP (incl. VAT)
• Expected output 25-35,000 kWh per year
• Expected revenues 3,400-5,200 GBP per year, given to charity
• Ideally, payback between 4 and 7 years
• Electricity cost ≈ 0.07 GBP/kWh (!)
Key figures:
![Page 30: PowerPoint Presentation€¦ · Demo site n.1 in Wales (10/10) •3.68 kW of power, grid connected (G98) •Total investment 25,700 GBP (incl. VAT) •Expected output 19,000 kWh per](https://reader033.vdocuments.mx/reader033/viewer/2022060514/5f842be839473724e763d49c/html5/thumbnails/30.jpg)
30
The developed PAT selection algorithm can be utilised to select the
appropriate PAT family and system configuration for any given potential
site in order to meet the existing constraints and satisfy the stakeholder’s
expectations.
The novelty of the two built pilot plants lies in the proof of the applicability of
PAT technology to both run-of-river and in-pipe hydropower schemes, as
well as proving the validity of the design guidance developed.
The adoption of PATs has the potential to achieve the economic feasibility of
schemes down to the "pico" scale (e.g. less than 5 kW of installed power).
Conclusions