SAMPLE HEAT RATE CALCULATIONS ABSTRACT FOR UNIT #1 to 6 FOR DEC. 07 CALCULATION FOR EFFICIENCY OF BOILER, TURBO-GENERATOR & OVERALL UNIT
S.No. Particulars : Unit I II III IV V VI
1 Gross C.V. Kcal/Kg 3845.71 3875.97 3828.86 3828.86 4079.45 4085.25
2 Total moisture in coal. % 11.15 11.12 11.46 11.46 11.48 11.54
3 Ash in coal % 36.64 36.40 36.12 35.31 34.59 34.68
4 Volatile Matter in coal % 20.91 21.05 20.40 21.20 21.50 21.40
5 Fixed Carbon % 31.39 31.52 32.10 32.10 32.12 32.08
6 Un burnt carbon in fly ash % 1.90 1.36 0.86 0.68 0.61 0.51
7 Un burnt carbon in bottom ash % 2.73 3.21 1.90 1.44 0.89 0.69
8 Flue gas temp. at APH outlet Degree C 136.36 148.97 143.81 145.60 136.00 126.14
9 Ambient Temperature Degree C 24.85 25.19 27.00 27.00 27.90 27.80
10 CO2 in flue gas at APH outlet % 15.67 15.12 14.47 14.87 13.89 13.89
11 Oxygen in flue gas at APH out let % 3.33 3.88 4.53 4.46 5.11 5.11
12 Average Vaccuum Kg/Sq cm 0.91 0.89 0.89 0.88 0.89 0.89
13 Average Main steam pressure before ESV. Kg/Sq cm 129.64 126.81 146.74 147.25 146.99 149.89
14 Average Main steam temperature before ESV Degree C 526.39 524.03 534.66 535.09 537.81 517.65
15 Average CRH Steam pressure after HPT Kg/Sq cm 36.70 34.28 36.25 36.79 37.59 37.67
16 Average R H Steam pressure before I.V. Kg/Sq cm 31.79 32.00 33.81 34.56 33.81 37.63
17 Average R H Steam temperature before I.V. Degree C 527.96 523.77 532.18 525.78 525.82 532.96
18 Average Feed water temperature at ECO. Inlet Degree C 189.25 195.35 248.97 245.81 245.75 236.68
19 D M water make-up % 2.64 2.80 6.24 4.89 0.87 1.22
20 Total Generation as on day L U 26.54 26.75 51.36 51.60 1557.50 1512.00
21 No. of hours m/c on bar. Hours 24.00 24.00 24.00 24.00
22 Avg. load M W 110.49 111.43 210.64 232.30 216.32 210.00
23 Total Quantity of oil used . K L 0.00 0.00 10.20 15.00
24 a)For start- up activities 10.20 15.00
b)For flame support
25 Oxygen in flue gas at APH Inlet % 2.33 2.88 3.33 3.46 3.50 3.40
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
3/63
SAMPLE HEAT RATE CALCULATIONS ABSTRACT FOR UNIT #1 to 6 FOR DEC. 07 CALCULATION FOR EFFICIENCY OF BOILER, TURBO-GENERATOR & OVERALL UNIT
contd2
S.No Particulars : Unit Unit-I Unit-II Unit-III Unit-IV Unit-V Unit-VI
1) EFFICIENCY OF BOILER
Net C.V of coal Kcal/Kg 3618.94 3648.47 3600.62 3597.36 3846.58 3852.53
Total moisture in fired coal (A) Kg/Kg of coal 0.39 0.39 0.39 0.40 0.40 0.40
Heat of Moisture (B) Kcal/Kg 658.47 664.13 634.73 635.53 658.31 653.88
Total Carbon (C) Kg/Kg of coal 37.61 37.87 37.86 38.58 38.87 38.74
Nitrogen (D) % 1.85 1.85 1.86 1.85 1.84 1.84
Total oxygen required (E) Kg/Kg of coal 1.15 1.16 1.16 1.18 1.19 1.19
Hydrogen % 3.07 3.09 3.06 3.12 3.15 3.14
Dry flue gas Kg mole/Kg 0.20 0.21 0.22 0.22 0.23 0.23
Total Unburnt Carbon. Kg/Kg of coal 0.01 0.01 0.00 0.00 0.00 0.00
Loss due to un-burnt carbon in ash. % 1.72 1.43 0.88 0.67 0.49 0.40
Loss due to dry flue gas. % 5.41 6.14 5.13 5.19 6.01 5.55
Loss due to moisture & hydrogen infuel. % 7.05 7.08 6.88 6.99 6.81 6.75
Loss due to sensible heat in ash. % 0.57 0.59 0.52 0.51 0.50 0.49
Loss due to moisture in air. % 0.18 0.19 0.15 0.16 0.17 0.16
Radiation & un-accounted loss(assumed) % 5.00 5.00 4.50 4.50 1.50 1.50
Total Losses : % 19.94 20.43 18.06 18.01 15.48 14.85
Boiler efficiency.(Guaranteed 86.1% at % 80.06 79.57 81.94 81.99 84.52 85.15
MCR based/ on Coal HHV 4278
Kcal/Kg)
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
4/63
SAMPLE HEAT RATE CALCULATIONS ABSTRACT FOR UNIT #1 to 6 FOR DEC. 07 CALCULATION FOR EFFICIENCY OF BOILER, TURBO-GENERATOR & OVERALL UNIT
contd3
(2) EFFICIENCY OF TURBO GENERATORI II III IV V VI
09/25/89 8923.50 8922.00 6672.00 6672.00 4998.00 1585.00
(Designed heat rate of Tur.-1980.64 Kcal/KWH)
Estimated heat rate of turbine due toaging factor (K cal/KWH) as on date :
Kcal/KWH 2272.01 2272.00 2052.89 2052.89 2034.47 1996.93
Increase in heat rate in K cal / KWH due to:-
Fall in vaccuum. Kcal/KWH 0.00 2.38 2.94 3.82 2.54 1.57
Fall in M S pressure Kcal/KWH 0.43 3.82 3.90 3.29 3.60 0.13
Fall in M S temperature Kcal/KWH 4.81 6.13 0.19 -0.05 -1.57 9.70
Fall in R H S Pressure Kcal/KWH 3.10 0.00 0.00 0.00 0.00 0.00
Fall in R H S Temperature Kcal/KWH 2.73 4.36 1.09 3.58 3.57 0.79
Fall in feed water temperature Kcal/KWH 37.87 33.22 -7.59 -5.19 -5.14 1.77
Kcal/KWH 48.94 49.92 0.53 5.46 3.00 13.96
Estimated heat rate of turbine Kcal/KWH 2320.96 2321.92 2053.42 2058.35 2037.47 2010.89
Efficiency of Turbine .( Designed 43.42 % ) % 37.05 37.04 41.88 41.78 42.21 42.77
(3) Over all Efficiency of the Unit
Thermal efficiency of the Unit. % 29.66 29.47 34.32 34.26 35.67 36.42Heat rate . Kcal/KWH 2899.1 2918.1 2506.0 2510.5 2410.7 2361.6
Increase in heat rate due to DM water makeup Kcal/KWH 0.00 15.68 30.04 23.57 4.03 5.54
Heat Value of oil Kcal/KWH 0.00 0.00 0.00 0.00 0.65 0.99
Windage loss ( Constant) Kcal/KWH 5.67 5.67 5.67 5.70 5.67 5.67
Total Heat Loss Kcal/KWH 5.67 21.34 35.70 29.27 10.35 12.20
Over all Heat rate of the Unit. Kcal/KWH 2904.72 2939.41 2541.73 2539.80 2421.06 2373.76Over all Thermal Efficiency of the Unit. % 29.61 29.26 33.84 33.86 35.52 36.23
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
5/63
UNIT WISE & STATION WEIGHTED AVERAGE GCV OF COALFOR THE YEAR 2000-01 to 2006-07
Year
Unit-2
GCV of Coal inKcal/Kg
SP.Coalconsumption
(kg/kwh)
SP.Oil consumption(ml/kwh)
Avg GCV of Oil(Kcal/Ltr.)
Heat Rate(Kcal/Kwh)
2000-01 4437 0.637 1.073 8995 2836
2001-02 4326 0.639 0.901 9064 2772
2002-03 4202 0.663 0.460 9139 2790
2003-04 4104 0.713 0.546 8989 2931
2004-05 3813 0.737 0.465 9044 2814
2005-06 4039 0.738 0.495 9001 2985
2006-07 3952 0.754 0.448 9937 2986
Year
Unit-1
GCV of Coal inKcal/Kg
SP.Coalconsumption
(kg/kwh)
SP.Oil consumption(ml/kwh)
Avg GCV of Oil(Kcal/Ltr.)
Heat Rate (Kcal/Kwh)
2000-01 4457 0.644 1.168 8972 2881
2001-02 4325 0.640 0.642 9054 2774
2002-03 4211 0.671 0.522 9071 2830
2003-04 4105 0.708 0.564 9042 2911
2004-05 3826 0.738 0.505 9092 2828
2005-06 4049 0.735 0.429 9093 2981
2006-07 3996 0.753 0.664 9945 3014
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
6/63
UNIT WISE & STATION WEIGHTED AVERAGE GCV OF COALFOR THE YEAR 2000-01 to 2006-07
Year
Unit-4
GCV of Coal inKcal/Kg
SP.Coalconsumption
(kg/kwh)
SP.Oil consumption(ml/kwh)
Avg GCV of Oil(Kcal/Ltr.)
Heat Rate(Kcal/Kwh)
2000-01 4415 0.571 0.507 9061 2526
2001-02 4323 0.583 0.582 8977 2526
2002-03 4204 0.611 0.400 9148 2572
2003-04 4035 0.645 0.170 9082 2604
2004-05 3909 0.667 0.568 8983 2613
2005-06 4003 0.642 0.308 9115 2574
2006-07 3948 0.666 0.475 9904 2633
Year
Unit-3
GCV of Coal inKcal/Kg
SP.Coalconsumption
(kg/kwh)
SP.Oil consumption(ml/kwh)
Avg GCV of Oil(Kcal/Ltr.)
Heat Rate(Kcal/Kwh)
2000-01 4406 0.588 0.294 8995 2593
2001-02 4328 0.583 0.584 9131 2529
2002-03 4196 0.611 0.440 9063 2568
2003-04 4047 0.645 0.440 8993 2614
2004-05 3922 0.640 0.434 9003 2514
2005-06 4013 0.642 0.304 9367 2580
2006-07 3933 0.671 0.580 9951 2644
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
7/63
UNIT WISE & STATION WEIGHTED AVERAGE GCV OF COALFOR THE YEAR 2000-01 to 2006-07
Year
Unit-6
GCV of Coal inKcal/Kg
SP.Coalconsumption
(kg/kwh)
SP.Oil consumption(ml/kwh)
Avg GCV of Oil(Kcal/Ltr.)
Heat Rate(Kcal/Kwh)
2004-05 4126 0.641 1.469 8967 2658
2005-06 4081 0.597 0.774 9029 2445
2006-07 3895 0.615 0.574 9927 2403
Unit No. #6 Commercial Operation w.e.f. 1st Aug. 2004.
Year
Unit-5
GCV of Coal in
Kcal/Kg
SP.Coal
consumption(kg/kwh)
SP.Oil consumption
(ml/kwh)
Avg GCV of Oil
(Kcal/Ltr.)
Heat Rate (Kcal/Kwh)
2000-01 4289 0.611 0.789 9009 2627
2001-02 4227 0.638 0.567 9033 2702
2002-03 3926 0.654 0.399 9010 2571
2003-04 3906 0.684 0.430 9017 2675
2004-05 3938 0.664 0.633 9016 2621
2005-06 4073 0.633 0.543 9027 2582
2006-07 3901 0.669 0.679 9929 2617
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
8/63
UNIT WISE & STATION WEIGHTED AVERAGE GCV OF COAL
FOR THE YEAR 2000-01 to 2006-07
Year
STATION
Station HR as
per RERC/CERC Norms
Design
SHR
GCV of Coalin Kcal/Kg
SP.Coalconsumption
(kg/kwh)
SP.Oilconsumption
(ml/kwh)
Avg GCV ofOil
(Kcal/Ltr.)
Heat Rate(Kcal/Kwh)
2000-01 4389 0.604 0.682 9005 2657
2348 Kcal/Kwh
2001-02 4300 0.611 0.628 9052 2633
2002-03 4131 0.635 0.431 9083 2627
2003-04 4022 0.670 0.394 9018 2698
2004-05 3927 0.672 0.671 9000 2645 2645
2005-06 4041 0.650 0.483 9084 2632 2621
2006-07 3932 0.675 0.572 9932 2661 2616
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
9/63
STACK EMISSION & AMBIENT AIR QUALITYDATA FOR 2007-08
SPM SO2 NOx CO RPM
Stg-IV
(1x195 MW)
ug/C
um
ug/C
um
ug/C
um
ug/C
um
ug/C
um
Unit-I Unit-IIn t-
IIIUnit-IV Unit-V Unit-VI
150 150 150 150 150 150 500 120 120 5000 120
Apr 2007 118 126 130 120 51 85 194 17 12 640 86
May 2007 105 113 119 110 64 60 191 17 12 507 82
Jun 2007 131 125 124 68 54 61 176 14 11 554 76
Jul 2007 S/D S/D 115 121 111 70 159 10 8 517 66Aug 2007 114 S/D 122 120 112 68 180 10 8 509 79
Sep 2007 S/D 113 123 100 75 50 173 11 9 506 80
Oct 2007 123 128 110 131 45 186 10 9 512 82
Nov 2007 126 130 121 78 47 194 10 8 498 82
Month
Average Stack Emission Average Ambient Air Quality
SPM (mg/N.cum)
Stg-I (2x110
MW)
Stg-II & III (3 x 210
MW)
Permissible
limit (Max.)
SPM SO2 NOx CO RPM
Stg-IV
(1x195 MW)
Unit-I Unit-IIn t-
IIIUnit-IV Unit-V Unit-VI
150 150 150 150 150 150 500 120 120 5000 120
Apr 2007 118 126 130 120 51 85 194 17 12 640 86
May 2007 105 113 119 110 64 60 191 17 12 507 82
Jun 2007 131 125 124 68 54 61 176 14 11 554 76
Jul 2007 S/D S/D 115 121 111 70 159 10 8 517 66Aug 2007 114 S/D 122 120 112 68 180 10 8 509 79
Sep 2007 S/D 113 123 100 75 50 173 11 9 506 80
Oct 2007 123 128 110 131 45 62.12 186 10 9 512 82
Nov 2007 126 130 121 78 47 92.32 194 10 8 498 82
Permissible
limit (Max.)
Month
Average Stack Emission Average Ambient Air Quality
SPM (mg/N.cum)
Stg-I (2x110
MW)
Stg-II & III (3 x 210
MW)
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
10/63
STACK EMISSION & AMBIENT AIR QUALITY DATA 2006-07
Month
Average Stack Emission Average Ambient Air Quality
SPM (mg/N.cum) SPM SO2 NOx CO RPM
Stg-I(2x110 MW)
Stg-II & III(3 x 210 MW)
Stg-IV(1x195MW)
ug/Cum
ug/Cum
ug/Cum
ug/Cum
ug/Cum
Unit-IUnit-
IIUnit-
IIIUnit-
IVUnit-V Unit-VI
Permissible limit(Max.)
150 150 150 150 150 150 500 120 120 5000 120
Apr 2006 60 68 98 69 61 70 200 16 13 607 91May 2006 78 S/D 110 84 62 66 191 30 27 512 83
Jun 2006 94 105 S/D 106 89 87 191 20 17 490 84
Jul 2006 S/D 93 89 68 61 73 184 18 15 446 77
Aug 2006 65 106 107 128 71 76 168 11 9 455 66
Sep 2006 111 112 123 S/D 96 87 168 14 11 559 73
Oct 2006 102 123 119 88 117 92 153 15 13 567 67
Nov 2006 86 101 99 75 86 93 158 17 14 557 70
Dec 2006 103 107 107 59 81 89 159 15 18 546 66
Jan 2007 72 110 120 64 51 89 173 16 19 490 75
Feb 2007 113 129 74 93 45 89 174 12 15 528 74
Mar 2007 123 S/D 106 96 52 89 170 16 11 491 73
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
11/63
TRADE EFFLUENT ANALYSIS RESULT OF KSTPS
Month
Condenser Cooling Water Stage-I Condenser Cooling Water Stage-II&III
pH Temp.inlet C
Temp.outet C
Temp.Diff. C
Free ofmg/lt
pH Temp.inlet C
Temp.outet C
Temp.Diff. C
Free ofmg/lt
Max. limit 6.5-8.5 10 0.5 6.5-8.5 10 0.5
Apr 06 7.9 33.6 42.2 8.6 Nil 7.9 33.6 40.0 6.4 Nil
May 06 8.1 35.4 44.0 8.6 Nil 8.1 35.4 43.1 7.7 Nil
Jun 06 7.9 35.4 44.0 8.6 Nil 8.0 35.4 43.0 7.6 Nil
Jul 06 7.7 33.6 42.3 8.7 Nil 7.7 33.6 41.7 8.1 Nil
Aug 06 7.7 31.2 39.5 8.3 Nil 7.8 31.2 38.7 7.5 Nil
Sep 06 7.8 30.0 38.8 8.8 Nil 7.7 30.0 38.0 8.0 Nil
Oct 06 7.6 29.8 38.3 8.5 Nil 7.7 29.8 36.5 6.7 Nil
Nov 06 7.7 28.5 37.2 8.7 Nil 7.7 28.5 36.2 7.7 Nil
Dec 06 7.7 23.0 32.0 9.0 Nil 7.8 23.0 31.0 8.0 Nil
Jan 07 7.7 23.2 32.0 8.8 Nil 7.8 23.2 31.2 8.0 Nil
Feb 07 7.7 25.5 34.4 8.9 Nil 7.7 25.5 33.5 8.0 Nil
Mar 07 7.8 26.5 35.2 8.7 Nil 7.8 26.5 34.6 8.1 Nil
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
12/63
TRADE EFFLUENT ANALYSIS RESULT OF KSTPS
Month
Cooling Tower Stage-IV Ash pond
Free clmg/lt.
Zincmg/lt
Cromiummg/lt
Phosphatemg/lt
pH TSSmg/lt
oil& greasemg/lt
Max. limit 0.5 1.0 0.2 5.0 6.5-8.5 100.0 20.0
Apr 06 Nil ND ND 0.63 7.59 69.00 4.80
May 06 Nil ND ND 0.60 7.65 63.00 5.20
Jun 06 Nil ND ND 0.61 7.52 56.00 4.10
Jul 06 Nil ND ND 0.62 7.43 59.00 3.90
Aug 06 Nil ND ND S/D 7.41 69.20 5.00
Sep 06 Nil ND ND 0.68 7.35 71.00 4.40
Oct 06 Nil ND ND 0.68 7.47 66.0 5.40
Nov 06 Nil ND ND ND 7.66 65.0 4.70
Dec 06 Nil ND ND ND 7.56 68.00 5.10
Jan 07 Nil ND ND ND 7.50 73.00 4.50
Feb 07 Nil ND ND 2.1 7.45 68.00 3.10
Mar 07 Nil ND ND 1.2 7.35 65.00 3.60
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
13/63
TRADE EFFLUENT ANALYSIS RESULT OF KSTPS
Month
Boiler blow down mix drain Unit-IV Boiler blow down mix drain Unit-V Boiler blow down mix drain Unit-VI
TSS
mg/lt
Oil &
Grease
mg/lt
Cu.
mg/lt
Fe
mg/lt
TSS
mg/lt
Oil &
Greasemg/lt
Cu.
mg/lt
Fe
mg/lt
TSS
mg/lt
Oil &
Greasemg/lt
Cu.
mg/lt
Fe
mg/lt
Max. limit 100.0 20.0 1.0 1.0 100.0 20.0 1.0 1.0 100.0 20.0 1.0 1.0
Apr 06 5.20 1.10 0.10 0.11 5.10 1.00 0.10 0.10 5.20 1.1 0.10 0.11
May 06 5.10 1.00 0.10 0.10 5.20 1.10 0.10 0.11 5.20 1.10 0.10 0.10
Jun 06 5.10 1.00 0.10 0.10 5.20 1.10 0.10 0.10 5.20 1.10 0.10 0.10
Jul 06 5.20 1.04 0.10 0.10 5.10 1.00 0.10 0.10 5.16 1.02 0.10 0.10
Aug 06 5.10 1.00 0.10 0.11 5.20 1.05 0.10 0.11 S/D S/D S/D S/D
Sep 06 S/D S/D S/D S/D 5.30 1.10 0.10 0.11 5.20 1.10 0.10 0.11
Oct 06 5.08 1.00 0.10 0.10 5.08 1.00 0.10 0.10 5.10 1.00 0.10 0.10
Nov 06 5.20 1.05 0.10 0.10 5.07 1.03 0.10 0.10 5.15 1.05 0.10 0.10
Dec 06 5.32 1.02 0.10 0.10 4.97 1.00 0.10 0.10 4.95 1.00 0.10 0.10
Jan 07 5.13 1.00 0.10 0.10 5.07 1.10 0.10 0.10 5.13 1.00 0.10 0.10
Feb 07 5.70 0.42 0.01 0.11 5.00 0.18 0.01 0.11 5.50 0.43 0.01 0.10
Mar 07 5.25 1.00 0.01 0.11 4.50 1.00 0.01 0.09 4.50 1.00 0.01 0.10
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
14/63
TRADE EFFLUENT ANALYSIS RESULT OF KSTPS
Month
Boiler blow down mix drain Unit-I Boiler blow down mix drain Unit-II Boiler blow down mix drain Unit-III
TSSmg/lt
Oil &Greas
emg/lt
Cu.mg/lt
Femg/lt
TSSmg/lt
Oil &Greasemg/lt
Cu.mg/lt
Femg/lt
TSSmg/lt
Oil &Greasemg/lt
Cu.mg/lt
Femg/lt
Max. limit 100.0 20.0 1.0 1.0 100.0 20.0 1.0 1.0 100.0 20.0 1.0 1.0
Apr 06 5.20 1.00 0.10 0.11 5.20 1.00 0.10 0.10 5.30 1.10 0.10 0.11
May 06 5.20 1.10 0.10 0.10 5.20 1.10 0.10 0.11 5.20 1.10 0.10 0.11
Jun 06 5.10 1.00 0.10 0.10 5.10 1.00 0.10 0.11 S/D S/D S/D S/D
Jul 06 5.20 1.15 0.10 0.11 5.20 1.12 0.10 0.11 5.12 1.05 0.10 0.10
Aug 06 5.07 1.00 0.10 0.10 5.07 1.00 0.10 0.10 5.17 1.02 0.10 0.10
Sep 06 5.05 1.00 0.10 0.10 5.10 1.00 0.10 0.10 5.07 1.00 0.10 0.10
Oct 06 5.20 1.10 0.10 0.11 5.12 1.04 0.10 0.10 5.16 1.04 0.10 0.10
Nov 06 5.02 1.00 0.10 0.11 4.80 1.03 0.10 0.10 5.10 1.00 0.10 0.10
Dec 06 5.07 1.02 0.10 0.10 4.87 1.00 0.10 0.10 5.02 1.00 0.10 0.10
Jan 07 5.10 1.00 0.10 0.10 5.03 1.00 0.10 0.10 5.13 1.00 0.10 0.10
Feb 07 7.00 0.35 0.01 0.1 5.2 0.45 0.01 0.10 6.50 0.41 0.01 0.10
Mar 07 5.70 1.00 0.01 0.09 5.00 1.00 0.01 0.10 5.25 1.00 0.01 0.10
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
15/63
ESP DATA
Unit
No.
Rating
(MW )
No. of
existingfields
No. of
fieldsadded
Efficiency of
revamped /retrofitted ESP
Designed
emission levelafterretrofitting
(in mg/Cu.M)
Month of
commi-ssioning
I 110 10 7 99.82% 105 Nov.93
II 110 10 7 99.82% 105 July, 94
III 210 24 4 99.84% 80 Sept. 92
IV 210 24 4 99.84% 80 July, 92
V 210 28 - 99.94% 30 March, 94
VI 195 28 - 99.94% 30 July, 03
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
16/63
DESIGN STACK DATAParticulars Stage-I
(2x110 MW)
Stage-II
(2x210 MW)
Stage-III
(1x210 MW)
Stage-IV
(1x195 MW)
Stack height (Mtr.) 180 (Onestack two
flues)
180 (One stackthree flues. Oneflue for Stg.III
180 (II stack) 180(Single)
Flue gas Temp. at inletof ESP in C
141 136 136 136
Assumed temp. at exit
point with 5 C Temp. fall
136 131 131 131
Stack top inside dia. (M) 4.125 4.90 4.90 4.50
Stack top inside venturidiameter (Mtr.)
3.20 4.13 4.13 4.13
Flue gas exit velocity atstack top 174 M (M/sec.)
13.84 18.7 18.7 18.7
Flue gas exit velocity atventuri (M/sec.)
25 27.4 27.4 27.4
Coal consumption(T/day) with ash content
2x2000
33.5% (ash)
2x3550
33.5% (ash)
1x3550
33.5% (ash)
1x3550
33.5% (ash)
Emission rate (Kg. hr)(Calculated from designgas flow & SPM)
74.8 100.1 87.6 87.6
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
17/63
ELECTROSTATIC PRECIPITATOR (ESPs) DESIGN DATA
S.No. Description Stage-I Stage-II Stage-III Stage-IV
1- Manufacturer BHEL BHEL BHEL BHEL
2- Arrangement(Inline) In line In line In line In line
3- Type of ESP Rigid frame Rigid frame Rigid frame Rigid frame
4- No.of ESP Boxes 4 2 2 2
5- Gas flow 198 m3 / Sec. 347 m3 / Sec. 348 m3 / Sec. 419 m3 / Sec.
6- Total gas treated 400 TPH 600 TPH 600 TPH 600 TPH
7- Gas temperature at inlet 141 Deg.C. 134 Deg.C. 129 Deg.C. 132 Deg.C.
8- Design efficiency 99.82% 99.84% 99.94% 99.94%
9- Number of bus sections 2 4 4 4
10- What % of bus sectionscan be de-emergized to
meet design efficiency
NA NA NA NA
11- Net specific collection area 128 m2/ m3 /Sec. 187 m2/ m3 /Sec. 331 m2/ m3 /Sec. 275 m2/ m3 /Sec.
12- Number of fields per boiler 17 28 28 28
13- Fields in operation at full load 17 28 28 28
14- Any fly ash treatment used No No No No
15- Hopper fly ash handling system Pneumatic Pneumatic Pneumatic Pneumatic
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
18/63
ELECTROSTATIC PRECIPITATOR (ESPs)Contd
16-Hopper heating system
design detail6 KW 6 KW 6 KW 6 KW
17- Type of supervisorycontrol for ESP
i-Monitoring of automatic
HV controlsAICE AICE ICE BAPCON
ii- T-R-Sets Manual Manual Manual Manual
iii- Rapping system Auto run Auto run Auto run Auto run
iv-Ash Hopper level
indicatorsNot installed Partly installed Auto Auto
v- Hopper Heaters Auto Auto Auto Auto
18-Is opacity used as a feed
back in controlNo No No No
19-Are there mass
emissions
or opacity regulatorylimits
150 mg/Nm3 150 mg/Nm3 150 mg/Nm3 150 mg/Nm3
20-Any co-relation done
between mass emissions
&
opacity
No No No No
21-Estimated power needs
for
ESP Control
715KVA 820 KVA 415 KVA 440 KVA
22-No x control & FGD
SystemNot installed Not installed Not installed Not installed
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
19/63
STEAM GENERATOR (BOILER)
INCLUDING DUCTS & VALVES :
Description Stage-I Stage-II Stage-III Stage-IVType Natural circulation, Single drum, Radiant reheat type,
Tangentially fired, balanced draught, Make: BHEL
Make BHEL
Size /Capacity 375 T/HR 880 T/HR 690 T/HR 670 T/HR
Steam Pressure (atboiler outlet)
138 Kg./sqm. 155 Kg./sqm. 155Kg./sqm.
155Kg./sqm.
Steam Temperature
(at boiler outlet)
540C
Type of air pre-heater Rotary regenerative tri sector
Fuel used :
Primary
Secondary
Others
Pulverised coal
HSD/FO/LSHS
Nil
Boiler efficiency 86.8% 86.1% 86.1% 86.1%
EQUIPMENT DETAILS
STEAM GENERATOR
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
20/63
STEAM GENERATORDescription Unit 1 & 2 Unit 3 & 4 Unit No. 5 Unit No. 6.
Manufacturer: M/s BHEL M/s BHEL M/s BHEL M/s BHEL
Type- Drum/Once Through: Drum Type Drum Type Drum Type Drum Type
Division Wall: Fusion welded wall
Balance Draft or Forced Draft: Balanced Draft
Operating Pressure With % Overpressure (Drum Pr. Inkg/cm)
148.96 164.9 164.9 164.9
Super Heater Pr. In kg/cm : 138 154.35 154.16 154
Super Heater & Reheater Outlet Tempr.: 540C 540C 540C 540C
Firing Configuration: Tangential Tilting
No. of Installed Pulverizer: 4 Nos. 6 Nos. 3 Nos. 3 Nos.
No. Pulverizers To Meet Design Steam Flow: 3 Nos. 4 Nos. 2 Nos. 2 Nos.
Type of Pulverizer: Bowl Mill Bowl Mill Ball Mill Ball Mill
Manufacturer: M/s BHEL M/s BHEL M/s BHEL M/s BHEL
No. of Burners Per Pulverizer: 4 Nos. 4 Nos. 8 Nos. 8 Nos.
Burner Manufacturer: M/s BHEL M/s BHEL M/s BHEL M/s BHEL
No. of Wall Soot Blowers: 40 Nos. 52 Nos. 56 Nos. 56 Nos.
No. of Retractable Soot Blower: 28 Nos. 24 Nos. 22 Nos. 18 Nos.
Soot Blowing Media (Air or Steam) Steam Steam Steam Steam
Rated Main Steam Flow - T/Hr. 338 TPH 630.8 TPH 630.8 TPH 627 TPH
Reheater Steam Flow - T/Hr. 316 TPH 567.8 TPH 567.8 TPH 563 TPH
Primary Fuel Coal Coal Coal Coal
Secondary Fuel - - - -
Ignition Fuel HSD/FO HSD/FO HSD/FO HSD/FO
Circulation (Natural or Forced?) Natural Natural Natural Natural
FANS MANUFACTURER
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
21/63
FANS MANUFACTURERDescription Unit 1 & 2 Unit 3 & 4 Unit No. 5 Unit No. 6.
Fans Manufacturer:
FD & ID (If Balanced Draft Furnace) M/s BHEL M/s BHEL M/s BHEL M/s BHEL
Primary Fans: M/s BHEL M/s BHEL M/s BHEL M/s BHEL
Numbers Installed PA Fan 3 Nos. 3 Nos. 3 Nos. 3 Nos.
Numbers Installed FD Fan 2 Nos. 2 Nos. 2 Nos. 2 Nos.
Numbers Installed ID Fan 3 Nos. 4 Nos. 5 Nos. 6 Nos.
Capacity SCFM Each PA Fan: 45.79 70.00 66.00 66.00
Capacity SCFM Each FD Fan: 48.57 105.30 89.00 89.00
Capacity SCFM Each ID Fan: 148.3 230.00 230.00 230.00
Total Discharge Pressure - (H2O At MCR For PA): 1300 1210 1220 1220
Total Discharge Pressure - (H2O At MCR For FD): 377 520 475 475
Total Discharge Pressure - (H2O At MCR For ID): 384 398 500 500
Total Suction Pressure- (H2O For FD/ID/PA?)
Controls Used (Blade Pitch, Inlet Vanes) PA IGV Damper Damper Damper
Controls Used (Blade Pitch, Inlet Vanes) FD IGV IGV IGV IGV
Controls Used (Blade Pitch, Inlet Vanes) ID Speed Speed Speed Speed
Motor Size - KW (FD/ID/PA) 300/850/820 800/1400/1250 600/1700/1250 1500/1700/1250
Type of Fans (Axial, Centrifugal?) FD Fan Radial Axial Axial Axial
Type of Fans (Axial, Centrifugal?) ID & PA Fan Radial Radial Radial Radial
Any Air Preheating of Air SCAPH SCAPH SCAPH SCAPH
Air Preheater Manufacturer : M/s BHEL M/s BHEL M/s BHEL M/s BHEL
Type (Coils In Duct Work?)
Source of Heat: Flue Gas Flue Gas Flue Gas Flue Gas
If Coils, Heating Medium In Coil: Steam Steam Steam Steam
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
22/63
MAIN & REHEAT STEAM TEMPEATUREDescription Unit 1 & 2 Unit 3 & 4 Unit No. 5 Unit No. 6.
- Main Steam Temperature 540C 540C 540C 540C
- Reheat Steam Temperature 540C 540
C 540
C 540
C
- Design Steam Temperatures 540C 540C 540C 540C
-Trend Over Load Range If Possible
Attemperator Requested At Full and Low Loads:
- Main Attemperator Flow 12.0 TPH 22.7 TPH 17.5 TPH 9.0 TPH
- Reheater Attemperator Flow - - - -
- Design Attemperator Temperatures - - - -
- Trend Over Load Range If Possible
Boiler Data Requested At Full and Low Loads:
- Fly ash & Bottom Ash LOI
- Exit Gas Temperature 120 C 120 C 120 C 120 C
- SO3 Dew point Temperature
- Coal Fineness Data (100 mesh) % 85-92 85-92 98-99 98-99
- Air Heater Leakage Based On Past Testing 12.50% 12.50% 12.50% 12.50%
- Design Air Heater Leakage
- Excess Air 3.40% 3.40% 3.40% 3.40%
- Design Excess Air 4.00% 4.00% 4.00% 4.00%
- Excess Air Curve Control Over Load Range
- Steam Coil Preheating Flow
- Number of SB Out of Service & Location Nil Nil Nil Nil
- Operator Soot blower Guideline. Yes Yes Yes Yes
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
23/63
BOILER AUXILIARIES :
Description Stage-I Stage-II Stage-III Stage-IV
(a) I.D. FANS:
Type Radial Radial Radial Radial
Size /Capacity 850 KW
143 Cum/sec.
1400 KW
230 Cum/sec.
1700 KW
230 Cum/sec.
1700 KW
230 Cum/sec.
Quantity (Nos.) 2x3 2x3 1x3 1x3
(b) F.D. FANS:
Type Radial Axial Axial Axial
Size /Capacity 300 KW
48.57 Cum/sec.
800 KW
105.3 Cum/sec.
600 KW
89 Cum/sec.
600 KW
89 Cum/sec.
Quantity (Nos.) 2x2=4 2x2=4 2 2
(c) P.A. FANS:
Type Radial Radial Radial Radial
Size /Capacity 820 KW
45.79 Cum/sec.
1250 KW
70 Cum/sec.
1250 KW
66Cum/sec.
1250 KW
66Cum/sec.
Quantity (Nos.) 2x2 2x2 3 3
EQUIPMENT DETAILS
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
24/63
Description Stage-I Stage-II Stage-III Stage-IV
(d) COAL MILLS:
Type
PressurisedBowl Mills
PressurisedBowl Mills
PressurisedTube Mills
PressurisedTube Mills
Size /Capacity 34 T/HR
340 KW
36.9 T/HR
340 KW
78.5 T/HR
2100 KW
78.5 T/HR
2100 KW
Quantity (Nos.) 2x4=8 2x6=12 3 3
EQUIPMENT DETAILS
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
25/63
COAL FEEDERS
Description Unit 1 & 2 Unit 3 & 4 Unit No. 5 Unit No. 6.
Coal Feeder Manufacturer: M/s BHEL M/s BHEL M/s BHEL M/s BHEL
No. of Feeders 4 Nos. 6 Nos. 6 Nos. 6 Nos.
Type (Gravimetric?): Volumetric Gravimetric Gravimetric Gravimetric
Economizer Inlet Temperature F: 238C 244C 246C 246C
Air Heater Manufacturer M/s BHEL M/s BHEL M/s BHEL M/s BHEL
Type : Rotay Regenrative Tri sector
Number- Primary 2 Nos. 2 Nos. 2 Nos. 2 Nos.
Secondary - - - -
Design Gas Temperature Leaving Air Heater
Excluding Air Leakage, F : - - - -
Including Air Leakage, F : 145 C 132 C 136 C 134 C
Boiler Bottom - Wet or Dry: Wet Wet Wet Wet
Source of Attemperator Water
For Superheater Feed Water Feed Water Feed Water Feed Water
For Reheater: Feed Water Feed Water Feed Water Feed Water
Control System provided With Steam Generator Yes Yes Yes Yes
Combustion and Burner Controls: Auto Auto Auto Auto
Q S
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
26/63
(B) TURBINE
Description Stage-I Stage-II Stage-III Stage-IV
Type Three casing, condensingsteam impulse turbinewith reheating & nonregulated 8 Nos.extractions without HP/LPbypass.
Three casing, condensing steamreaction turbine with reheating nonregulated 6 Nos. extractions with HP/LPbypass.
Make BHEL (SKODA) BHEL (KWU)
No. of stages percylinder
HP 8
IP 12
LP 2x4
HP 25
IP 2x20
LP 2x8
HP 25
IP 2x19
LP 2x8
Exhaust Pressure 0.10 Kg./cm2 0.1033 Kg./cm2 0.1187 Kg./cm2
Exhaust Temp. 46 Deg.C 49 Deg. C
Critical speed 1500 to 2500 RPM 1526 to 2127 RPM
Type of governingsystem
Nozzle Throttle
Type of governing
/control fluid
Turbine Oil -46
EQUIPMENT DETAILS
EQUIPMENT DETAILS
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
27/63
Description Stage-I Stage-II Stage-III Stage-IV
TURBINE AUX. :(a) Boiler Feed Pump:
Type 200 KHI FK 6D30 FK 6D30 FK 6D30
Size /Capacity 480 T/HR
(4000 KW)
387 Cum/HR
(3500 KW)
445 Cum/HR
(4000 KW)
445 Cum/HR
(4000 KW)
Quantity (Nos.) 2x2=4 2x3=6 3 3
(b) C.E.P.
Type
150 CJWS CanisterEN5J40D30A
CanisterEN5J40D30A
CanisterEN5J40D30A
Size /Capacity 180 T/HR
(225 KW)
687 Cum/HR
(500 KW)
662 Cum/HR
(500 KW)
662 Cum/HR
(500 KW)
Quantity (Nos.) 2x3=6 2x2=4 2 2
EQUIPMENT DETAILS
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
28/63
Description Stage-I Stage-II Stage-III Stage-IV
(c) C.T. Pump
Type
WKS CHC100/320
CHC100/320
CPHM 80-32
Size /Capacity 68.38CUM/HR
(55 kw)
100 CUM/HR
(15 KW)
100 cum/hr
(15 KW)
75 M/HR.(15 kw)
Quantity (Nos.) 2x4=8 2X3=6 3 2
EQUIPMENT DETAILS
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
29/63
PLANT COMPONENT & DESIGN INFORMATION
S.No. Equipment Unit #1&2
Stg.I
Unit #3&4
Stg.II
Unit #5&6
Stg. III & IV
1 TURBINE
(a) Manufacturer BHEL,Hyderabad BHEL BHEL
(b) Type 3 Casing condensingsteam turbine (impulsetype with two curtis wheelin HP Stage) withreheating and nonregulating extraction
3 Cylinders tandumcompound / reaction,reheat, regerative/condensing turbine
Same as Unit # 3 & 4
(c) Guaranteed Grossrating MW
110 MW 210 MW Unit # 5 -210 MWUnit # 6 195 MW
(d) Design ExhaustPressure
0.10 abs 0.1033 abs 0.1033 abs
(e) Design inletsteam conditionPr./Temp.
MS Pr. 130 ata 535 Deg.C
RH Pr. 31.63 ata 535
Deg.C
MS Pr. 150 Kg/CM2 535Deg.C
RH Pr. 34.55 Kg;/cm2 535Deg.C
Same as Unit # 3 & 4
-do-
(f) Design Steamflow
363.5 TPH 632.76 TPH U # 5 628 TPH
U # 6 626 TPH
(g) Provision for overpressureoperation Yes/No%
Over Pr. Ms 146 ata OverTemp. 545 Deg.C
Over Pr. RH 35 ata OverTemp. 545 Deg.C
Yes but limited to 12 hrs.per year
Yes but limited to 12hrs. per year
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
30/63
PLANT COMPONENT & DESIGN INFORMATION
SNo. TURBINE Unit #1&2
Stg.I
Unit #3&4
Stg.II
Unit #5&6
Stg. III & IV
C.E.P. : Condensate Pump
a) Manufacturer BHEL BHEL BHEL
b) No. of pumpsinstalled
3 Nos. 2 Nos. Unit # 5 : 2
Unit # 6 : 2
c) No. required at fullload 2 Nos. 1 No. Unit # 5 : 1 No.Unit # 6 : 1 No.
d) Capacity of eachlbs/hr. at Temp. rating
350 lbs/hr. at 40 Deg.C (160TPH)
1381 lbs/Hr. (627 TPH) Unit # 5 : 1458 lbs/Hr.
Unit # 6 : 1458 lbs/hr.
e) Design head at temp.rating
270 M WCL at 40 deg.C 21 Kg/cm2 Unit # 5 : 21 Kg/cm2
Unit # 6 : 21 Kg/cm2
f) Type of Pump Vertical, Multistage withelectric drive
Vertical, Multistage,centrifuge pump withElectric drive
Same as Unit # 3 & 4
g) Stages 8 Stages 5 Stages U # 5 : 6 Stages
U # 6 : 6 Stages
h) Type of flow control Through pneumatic control
valve
Through pneumatic
Control Valve
Same as Unit # 3 4
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
31/63
PLANT COMPONENT & DESIGN INFORMATION
S.No. TURBINE Unit #1&2
Stg.I
Unit #3&4
Stg.II
Unit #5&6
Stg. III & IV
Main Condenser
a) Manufacturer BHEL BHEL BHEL
b) Type Two pass, divided waterbox type
Two pass, Surface type Two pass surfacetype
c) Surface area(Sq.ft)
36360 Sq.ft (3380 M2) 123668 Sq.ft 123668 Sq.ft for eachunit
d) No. of pass Two Two for each unit Two for each unit
e) No. of shells 4 (Two shells percondenser)
One for each unit One for each unit
f) Designcondensate flowrate
259 TPH 435 TPH 435 TPH
g) Design condenserback pressure
0.10 abs 0.1033 abs 0.1033 ABS
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
32/63
PLANT COMPONENT & DESIGN INFORMATION
S.No. TURBINE Unit #1&2
Stg.I
Unit #3&4
Stg.II
Unit #5&6
Stg. III & IV
h) DesignCirculatingWater Inlettemp.
32 deg.C 33 Deg.C for each unit 33 Deg.C for eachunit
i) Design circulatingwater flow
15400 TPH for bothcondenser
27000 TPH each unit Same as Unit # 3 & 4
j) Tube length /
OD/Gauge
7500mm / 22mmm /1 mm
thk
7.5mm/ 25,4mm/ 1 mm
same for both units
7.6 M/25.4mm/ 1mm
k) Material tube
Tube sheet
Aluminium brass/ CuproNickel 90-10
Rolled steel plate
Cupro Nickel 90-10 samefor both units
Mild steel
Cupro Nickel 90-10same for both units
Mild steel
l) Method of tubesheet installed
(Rolled) ?m) Designed water
circulation flowrate
2m/sec. 1.81m/sec. 1.81m/sec.
n) Design water boxpressure
3.5 Kg/cm2 3.5 Kg/cm2 U # 5 : 3.5 Kg/cm2
U # 6 : 3.5 Kg.cm2
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
33/63
PLANT COMPONENT & DESIGN INFORMATION
S.No. TURBINE Unit #1&2
Stg.I
Unit #3&4
Stg.II
Unit #5&6
Stg. III & IV
o) Orientation(transerverse)
p) Multi pressure No Single pressure No single pressure No Single pressure
q) Temp. rise 9.25 Deg.C 8.76 Deg.C for each unit 8.76 Deg.C for eachunit
r) Type of airremovalequipment (Mech.Vac. Pump)
Through steam jet ejector Through steam jet ejector U # 5 : Throughsteam jet ejector
U # 6 : Vacuum pumpwith steam jet ejector
s) Type of tubecleaning system
NIL NIL NIL
t) Type of
Expansion Joints
Rubber expansion joint Rubber expansion joint Rubber expansion
joint
v) Any Aux.condenser
No No No
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
34/63
PLANT COMPONENT & DESIGN INFORMATION
S.No. TURBINE Unit #1&2
Stg.I
Unit #3&4
Stg.II
Unit #5&6
Stg. III & IV
FEED WATER HEATER
a) Manufacturer BHEL BHEL BHEL
b) By Pass capability Yes Yes Yes
c) Low Pressure:
i) No.of stages
ii) No.of heaters
iii) Location ofheaters & Stages
(Condenser Neck)
5
7
3 Heaters are locatedoutside condenser and 4heaters on LP casing
3
3
All 3 Heaters are outsidethe condenser
3
3
Same as Unit # 3 & 4
d) High Pressure
i) No.of Stages
ii) No.of heater
per stage
iii) Tube material
iv) Configuration
One
One
Stainless steel SS-304
LP Heater Vertical, Crossflow, Four Pass
HP Heater Vertical ,Cross flow, Double pass
Two
One
SS-304
LP Heater Vertical ,Cross flow, Double pass
Two
One
SS-304
Same as Unit # 3 & 4
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
35/63
PLANT COMPONENT & DESIGN INFORMATIONS.No. TURBINE Unit #1&2
Stg.I
Unit #3&4
Stg.II
Unit #5&6
Stg. III & IV
DEAERATING HEATERa) Heater Type Re-boiling Spray Tray type At 24 M elevation Spray
tray reboiling typeAt 24 M ElevationSpray Tray Reboilingtype
b) Physical location At 42 M Elevation
c) Storage capacity 265000 lbs (120 tonnes) 286000 lbs (130 Tonnes) 286000 lbs (130Tonnes)
d) CondensateCentering Temp.
Leaving
304 Deg. F (151 Deg.C)
350 Deg. F (176 Deg.C)
248 Deg. F (120 Deg.C)
323 Deg. F( 162 Deg.C)
248 Deg. F (120 Deg.C)
323 Deg. F (162 Deg.C)
BOILER FEEDPUMP
a) Manufacturer BHEL BHEL BHEL
b) Numbers Two Three Three
c) Capacity Per Hr. 980000 lbs / Hr. (445 TPH) 852000 lbs/Hr. (387 TPH) 980000 lbs/Hr. (445TPH)
d) Design SuctionHead Pressure
7.83 atg 16 Kg/cm2 16 Kg/cm2
e) Design Pressurehead dischargePr.
177.85 atg 209.1 Kg/cm2 U # 5 : 212.7 Kg/cm2
U # 6 : 212. 7 Kg/cm2
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
36/63
PLANT COMPONENT & DESIGN INFORMATION
S.No. TURBINE Unit #1&2
Stg.I
Unit #3&4
Stg.II
Unit #5&6
Stg. III & IV
f) Boiler feed pumpdrive
(i) Elect. Or Steam Electric drive Electric Drive Electric drive
(ii) Manufacturer BHEL BHEL BHEL
(iii) Horse Power 5362 HP (4000 KW) 4691 HP (3500 KW) U # 5 : 4691 HP (3500KW)
U # 6 : 5362 HP (4000 KW)
EQUIPMENT DETAILS
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
37/63
(B) GENERATOR
Description Stage-I Stage-II Stage-III Stage-IV
Make BHEL
Type 234260 / 2 H THW-210-2A THW-210-2A THRI 108/44
Rated capacity 137.5 MVA 247.0 MVA 247.0 MVA 229.4 MVA
Power factor 0.80 Lagging 0.85 Lagging
Frequency 50 Hz.
EQUIPMENT DETAILS
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
38/63
GENERATOR WITH SEAL OIL SYSTEM,
HYDROGEN GAS/ STATOR COOLINGWATER SYSTEM
Description Stage-I Stage-II Stage-III Stage-IV
Type TG234260/2H THW-210-2A THW-210-2A THRI108/44
Size /Capacity 137.5 MVA 247.0 MVA 247.0 MVA 229.4 MVA
Quantity (Nos.) 1x2=2 1x2=2 1 1
EQUIPMENT DETAILS
EQUIPMENT DETAILS
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
39/63
EQUIPMENT DETAILS(C) GENERATOR
SNo. Particulars Unit #1 Unit #2 Unit #3 Unit #4 Unit #5 Unit #6
1. Manufacturer BHEL BHEL BHEL BHEL BHEL BHEL2. Type of excitation system Static Static Static Static Static Brushless
3. Rotor Cooling Media Hydrogen Hydrogen Hydrogen Hydrogen Hydrogen Hydrogen
4. Stator Cooling Media Hydrogen Hydrogen DM water &Hydrogen
DM water &Hydrogen
DM water &Hydrogen
Hydrogen
5. Rating 137.5 MVA 137.5 MVA 247 MVA 247 MVA 247 MVA 229.41 MVA
6. Maximum gross outputwith valves wide open(with design exhaustpressure, makeup over
110 MW 110 MW 210 MW 210 MW 210 MW 195 MW
7. Approx. Aux. Power
8. Maxm. Net output (Gross-Aux.) MW
9. Voltage- KV 11 KV 11 KV 15.75 KV 15.75 KV 15.75 KV 15.75 KV
10. Amperes 7220 Amp. 7220 Amp. 9050 Amp. 9050 Amp. 9050 Amp. 8410 Amp.
11. Power factor 0.8 Lag. 0.8 Lag. 0.85 Lag. 0.85 Lag. 0.85 Lag. 0.85 Lag.
12. Short circuit ratio 0.5 0.5 0.49 0.49 0.49 0.48
13. Normal/ Maxm. H2pressure
2.00 Kg./cm
2.30 Kg./cm
2.00 Kg./cm
2.30 Kg./cm
3.50 Kg./cm
3.70 Kg./cm
3.50 Kg./cm
3.70 Kg./cm
3.50 Kg./cm
3.70 Kg./cm
2.00 Kg./cm
2.20 Kg./cm
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
40/63
Description Stage-I Stage-II Stage-III Stage-IV
TRANSFORMERS
(a) Generator
Transformers
Type 11/220 KV 15.75/240KV
15.75/240KV
15.75/240KV
Size /Capacity 125 MVA 250 MVA 250 MVA 250 MVA
Quantity (Nos.) 2 1 1
(b) Station
Transformers
Type 220/7/7 KV 220/7/7 KV 220/7/7 KV
Size /Capacity 50 MVA 50 MVA 50 MVA
Quantity (Nos.) 2 1 1
EQUIPMENT DETAILS
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
41/63
Description Stage-I Stage-II Stage-III Stage-IV
(c) ServiceTransformers
Type :
0.5 MVA - 1+1 - -
1.0 MVA 9 6 2 1
1.6 MVA 4 12 6 3+2
2.0 MVA - 6 4 2
Total :
0.5 MVA 2 Nos. (Oil-1 No.+ Dry-1 No.)
1.0 MVA 18 Nos. (Oil 18 Nos.)
1.6 MVA 27 Nos. (Oil 25 No. + Dry - 2 Nos.)
2.0 MVA 12 Nos. (Oil 10 Nos. + Dry 2 Nos.)
EQUIPMENT DETAILS
EQUIPMENT DETAILS
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
42/63
Description Stage-I Stage-II Stage-III Stage-IV
COMMON AUXILIARIES:
(A) Clarification cum filtration Plant
Type Clarifiocculator bridge & rapid gravity filter bed
Size /Capacity Rated -1000
Cum/HrMax,. 1250
Cum/Hr
Rated -1750
Cum/HrMax,. 2000
Cum/Hr
Rated -500
Cum/Hr
Rated -500
Cum/Hr
Quantity (Nos.) 1 1 1 1
(B) C.W. SYSTEM :
Type Vertical shaft mixed flow turbine pumps
Size / Capacity 8.275
Cum/Hr.
16.000
Cum/Hr.
16.000Cum/Hr.
16.000Cum/Hr.
Quantity 5 5 3 3
EQUIPMENT DETAILS
EQUIPMENT DETAILS
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
43/63
Description Stage-I Stage-II Stage-III Stage-IV
(C)D.M. Cum-Softening Plant
Type Ion exchange process
Size /Capacity DM Plant
Rated 60 Cum/Hr
Max. 70 Cum/Hr.
Soft Plant
Rated 100 Cum/Hr.
Max. 125 Cum/Hr.
DM Plant
Rated 80 Cum/Hr
Max. 90 Cum/Hr.
Soft Plant
Rated 210
Cum/Hr.Max. 210 Cum/Hr.
DM Plant
Rated 80 Cum/Hr
Max. 90 Cum/Hr.
Soft Plant
Rated 210 Cum/Hr.
Max. 210 Cum/Hr.
Quantity (Nos.) DM plant-2
Soft plant-4
DM plant-3
Soft plant-3
DM plant-1
Soft plant-1
(D) Electro Static Precipitator
Type 2FAA-5X32-11090-2 FAA-6x36(36)-2x90125-2 FAA-7x45-2x1092135-2 FAA-7x45-2x1092135-2
Size / Capacity 128 m/m/sec. 187 m/m/sec. 331.7 m/m/sec. 275.8m/m/sec.
Quantity 2 2 1 1
EQUIPMENT DETAILS
EQUIPMENT DETAILS
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
44/63
Description Stage-I Stage-II Stage-III Stage-IV
(E) Ash Handling Plant
Type B.A. - Wet system
Fly Ash - Pneumatic/ Wet system
Size /Capacity BA 80 TPH
FA 85 TPH
BA 2x 80TPH
FA 180 TPH
BA 2x76 TPH
FA 148 TPH
BA 2x76 TPH
FA 148 TPH
Quantity (Nos.) 1 1 1 1
(F) Bearing Cooling Water System
Type Recirculation typeclose cycle
Recirculationtype closecycle
Recirculationtype closecycle
Recirculationtype closecycle
Size / Capacity 500 CUM/Hr.
1100 CUM/Hr.
1100 CU M/Hr. 3000 CU M/Hr.
Quantity 5 8 4 2
EQUIPMENT DETAILS
EQUIPMENT DETAILS
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
45/63
Description Stage-I Stage-II Stage-III Stage-IV
(G)Air Compressor
Type Reciprocating type
Size /Capacity (i)
(ii)
(iii)
600 Cfm
200 Cfm
15 Cum/Min.
600 Cfm 600 Cfm 19.7Cum/Min
Quantity (Nos.)(i)
(ii)(iii)
2
44
7 5 5
(H) Hydrogen generating Plant
Type Electrolysis type
Size / Capacity 10 Cu M/Hr
Quantity (Nos.) 1
(I) Raw watersystem
Type - VT type -
Size / Capacity - 2400 M/Hr. -
Quantity (Nos.) - 6 -
EQUIPMENT DETAILS
EQUIPMENT DETAILS
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
46/63
Description Stage-I Stage-II Stage-III Stage-IV
(J) B.C.W. Raw water Pump Stg.I
Type VT type - - -
Size /Capacity 1200 M/Hr - - -
Quantity (Nos.) 3 - - -
(K) Clarified Raw Water pump Stage-I
Type VT type
Size / Capacity 600 M/Hr
Quantity (Nos.) 3
EQUIPMENT DETAILS
CIRCULATING WATER PUMPS
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
47/63
CIRCULATING WATER PUMPS
S.No. Technical Details Stage-I Stage-II Stage-III Stage-IV
1. Manufacturer M/s. WorthingtonPump India Ltd.
M/s. Jyoti Ltd. M/s. BHEL M/s. KBL
2. No. Installed 5 Nos. 5 Nos. 3 Nos. 3 Nos.
3. Capacity of each
design flow8275 M /Hr. 16000 M/Hr. 16000 M /Hr. 16000 M /Hr.
4. No. of operational atDesigned Unit Load
4 Nos. 4 Nos. 2 Nos. 2 Nos.
5. Design head 19.4 MWC 25.3 MWC 26.5 MWC 25.1 MWC
6. Type of pumps Vertical Turbine Vertical mixed flow Vertical mixed
flow
Vertical Turbine
7. Type of Motor 3 PhaseAsynchronous
motor
3 Phase squirrelcage CACW
motor
3 PhaseAsynchronous
motor
3 Phase squirrelcage motor
COOLING TOWER
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
48/63
COOLING TOWER1- Manufacturer M/s Gammon India Ltd.
2- Type IDCT
3- Design flow rate 34000 CMH(16 Cells)4- Heat Removed (10 K.Cal/Hr.) 275400 to 504900
5- Circulating water flow 34000 CMH(16 Cells)
6- Hot Water Temperature 42 C
7- Temperature range 42C to 32 C
8- Design Wet Bulb Temperature 27.8 C
9- Approach to wet bulb 4.2 C
10- Fill material / Depth Pre Cast RCC Splash bar / 3 Meter
11- Make up / blow down flow rate 600 M /Hr. / 300 M /Hr.
12- No. of Cells 16 + 2 (standby)
13- Chemical treatment used H2 SO4, Chlorine
14- Design Cycle of concentration 4.5 COC
WATER TREATING EQUIPMENT
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
49/63
WATER TREATING EQUIPMENT
Raw Water Quality information : Turbidity : 350 NTU ( Mansoon Average)pH : 8.0Total Hardness ( as CaCo3 ) : 100
Silica : 3 to 5 ppm
Water treatment equipment supplier : M/s Geo- Miller , Delhi.
Treatment stems involved :Raw water Clarification filtration- F.A.C - S.A. C. - W. B.A. - S.B.A. M.B ( DM Water)
Base Exchanger ( soft water )
Make Up water uses : Steam Cycle ( Boiler) , Stator cooling
Make Up water quality : pH : 6.8 to 7.2Conductivity : < 0.2 umho/ cmHardness : NilTotal silica : < 0.01ppmChloride : Nil
Make Up rate : - 50 to 60 M/hr.
Storage details for condensate makeup water :- 750 M in each unit No. 3,4,5,& 6& 300 M in each unit No. 1 & 2
Feed point for condensate make up : Hot Well
S O Q
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
50/63
LIST OF PLANT EQUIPMENT
Sl.
No.
Description AHP Stage-I AHP Stage-II AHP Stage-III AHP Stage-IV
(2 x 110 MW) (2 x 210 MW) (1 x 210 MW) (1 x 195 MW)
1 ManufacturesBottom Ash
Handling
Design
M/s Indure Pvt. Ltd.,
New Delhi
M/s Burn Standard &
Company Ltd.,
Howrah, W.B.
M/s DCIPS Ltd., Kolkata,
W.B.M/s BHEL (ISG),
Banglore (K.S.)
2 Capacity ofbottom ash
hopper
Maximum coal consumption
at MCR is 75 Ton / hours at
3728 calorific value Kcal /
Kg. with ash contents of
42%
160 Ton / hours at
3728 calorific value
Kcal / Kg. with ash
contents of 42%
160 Ton / hours at 3728
calorific value Kcal / Kg.
with ash contents of 42%
160 Ton / hours at 3728
calorific value Kcal /
Kg. with ash contents
of 42%
Maximum bottom ash
collection value 7.5 MT per
hour Total for 8 hour shift 60
Tonnes
Maximum bottom ash
collection value 16
Tonnes per hour Total
for 8 hour shift 128
Tonnes
Maximum bottom ash
collection rate 16
Tonnes per hour.
Total collection in 8
hours of shift 128
Tonnes
Maximum bottom ash
collection rate 16
Tonnes per hour. Total
collection in 8 hours of
shift 128 Tonnes
3 Bottom ash
disposed to
Ash dyke (ash pond)
distance about 3.0 KM.
Ash dyke (ash pond)
distance about2.5 KM.
Ash dyke (ash pond)
distance about 2.5KM.
Ash dyke (ash pond)
distance about 2.0 KM.
4 Economizerash handling
and storage
design
420 Kg. x 4 ECO hoppers =
1680 Kg. / Hrs. / Unit
900 Kg. x 4 ECO
hoppers = 3600 Kg. /
Hrs./Unit
900 Kg. x 4 ECO hoppers
= 3600 Kg. / Hrs./Unit900 Kg. x 4 ECO
hoppers = 3600 Kg. /
Hrs./Unit
8 x 1680 = 13,440 Kg. in
each shift of 8 Hrs./Unit8 x 3600 = 28,800 Kg.
in each shift of 8
Hrs./Unit
8 x 3600 = 28,800 Kg. in
each shift of 8 Hrs./Unit
8 x 3600 = 28,800 Kg.
in each shift of 8
Hrs./Unit
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
51/63
LIST OF PLANT EQUIPMENTContd..
Sl .
No.
Description AHP Stage-I AHP Stage-II AHP Stage-III AHP Stage-IV
(2 x 110 MW) (2 x 210 MW) (1 x 210 MW) (1 x 195 MW)
5 Fly ash handlingand storage
i) Both wet and dry i) Both wet and dry i) Both wet and dry i) Dry
(dry /wet, ash
pond / storageSilo)
ii) Ash ponds ii) Ash ponds ii) Ash ponds ii) Storage Silo
iii) Storage Silo iii) Storage Silo iii) Storage Silo a) 1 x 500 MT + 1x100
MT
a) 2 x 75 MT = 150 MT a) 1 x 200 MT a) 1 x 300 MT b) 2 x 500 MT
b) 1 x 500 MT b) 1 x 500 MT b) 2 x 500 MT
6 Fly ash handlingequipments
design details
(vacuum pumps
or wet pumps or
screw conveyors)
i) Water exhauster i) Water exhauster i) Water exhauster i) Dense phase
ii) Vacuum pumps (Mech.
Exhauster)ii) Vacuum pumps
(Mech. Exhauster)ii) Dense phase system ii) Vacuum pumps
(Mech.
Exhauster)
iii) Dense phase
system
C&I EQUIPMENT
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
52/63
C&I EQUIPMENTS.No DESCRIPTION
STAGE - I STAGE II STAGEIII STAGE-IV,
UNIT # 1 & 2 UNIT # 3 & 4 UNIT # 5 UNIT # 6
1 Control Concept Used (Analog, digital,
distributed Microprocessor, etc.)
Analog Analog DCS (H&B)
Contronic-E
DCS (ABB)
Symphony Melody
2 Manufacturer I .L .Kota SIEMEN (BHEL), PROCONTROL MAX DNA (BHEL)
H&B (M/s ILK) (BHEL), Hartmann ABB, Symphony
& Braun ( IL Kota) Melody (ILK)
3 Operation Stations (CRTs or Panel
Mounted)
DESK Panel Mounted CRT CRT
(M/s ILK)
4 Alarm Station (CRTs or Annunciator) Annunciation Annunciator System CRT & Audio CRT & Audio
(M/s ILK) Visual Visual
5 Engineers Stations (CRTs) NIL Only for DAS CRT CRT
6 Data logging features (Strip charts, Only Records
available.
Data logging through DAS Data Acquisition Data Acquisition
Log sheets or Data logger) System System
7 Historical data storage and retrieval
capabilities.
-do- Yes, DAS
Symphony (ABB)
Yes Yes
8. Are major plant systems controlled by
Central Supervisory equipment or by
Standard Contractor supplied control
system (i.e. separate, Turbine-Generator
controls, Boiler feed pump controls,
Soot blower controls, Burner controls,
ESP), If so Manufacturers of
such controls for these systems.
Nil
C-34 Transdata
system supplied by
H&B and IL Kota.
Turbine: EAST
Packages (BHEL)
BFP's, Burner controls,.
Fam. Drum level,
Furnance Draft etc.
Contronic e (M/s. ILK)
Soot blowers :
Relay Logics
Central Supervisory
-do-
Central Supervisory
-do-
9 Balance of plant controls Combustion
controls, feed water and condensate,
minor plant loops, ash handling, coal
handling, water treatment.
Combustion
Control
Feed water
control.
ombustion Control
Feed water control.
Combustion Control
Feed water control,
Minor plant loops.
Combustion Control
Feed water control,
Minor plant loops.
EQUIPMENT DETAILS
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
53/63
Description Stage-I Stage-II Stage-III Stage-IV
COAL HANDLING PLANT
(A) Locomotive
Type WDS-6
Size /Capacity 1400 HP
Quantity (Nos.) 2+1
(B) Locomotive
Type WDS-45
Size /Capacity 700 HP
Quantity (Nos.)
(C ) Railway Track with associated Point &
Crossing Tack points etc.
Type Broad gauge
Size /Capacity 52 Kg. rails C-Class
Quantity (Nos.) 35+11
EQUIPMENT DETAILS
EQUIPMENT DETAILS
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
54/63
Description Stage-I Stage-II Stage-III Stage-IV
(D) Wagon Tippler Area
(1) Wagon Tippler No. 1 & 4 with Beetle
Charger & Associated equipment Stg.I & II
Type Rotaside - - -
Size /Capacity 95 MT 12Tips/Hr.
- - -
Quantity (Nos.) 4 - - -
(2) Wagon Tippler No. 5 with associated equipment
such as Side Arm Charger Stg.III
Type Rotaside XL
Size /Capacity 100 MT 24 Tips/Hr.
Quantity (Nos.) 2
(3) Apron feeder
Type -
Size /Capacity 1350 TPH
Quantity (Nos.) 1
EQUIPMENT DETAILS
EQUIPMENT DETAILS
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
55/63
Description Stage-I Stage-II Stage-III Stage-IV
(4) Scrapper Conveyor
Type -
Size /Capacity 15 TPH
Quantity (Nos.) 1
(5) Rotary Breaker
Type 12 x 21
Size /Capacity Rated 1350 TPH
Quantity (Nos.) 1
(6) Roll Crusher
Type 80 SA Breaker (Roll crusher)
Size /Capacity 1350 TPH
Quantity (Nos.) 1(E) Crusher Area
(1) Crusher No. 2, 3& 6
Type Ring Graulator TK-16-54B
Size /Capacity 550 TPH
Quantity (Nos.) 3 Nos.
Q
EQUIPMENT DETAILS
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
56/63
Description Stage-I Stage-II Stage-III Stage-IV
(2) Crusher No. 4, 5, &7
Type Ring Graulator, RG-721
Size /Capacity 550 TPH
Quantity (Nos.) 3 Nos.
(3) Crusher No. 8, 9 & 10
Type Ring GraulatorEKK 48X93
Size /Capacity 750 TPH
Quantity (Nos.) 3 Nos.
(F) FLOW FEEDER M/Cs AREA
Flow Feeder M/c. No. 1 & 2Type Rotary discharge machine block model
Size /Capacity 750 TPH
Quantity (Nos.) 2 Nos.
EQUIPMENT DETAILS
EQUIPMENT DETAILS
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
57/63
Description Stage-I Stage-II
Stage-III
Stage-IV
(G) STACKER RECLAIMER AREA(1) Stacker Reclaimer M/c. (M/c. S.No. HM-225) & HM-313
manufactured & supplied by M/s. ELECON
Type ASK-550
Size /Capacity 1350 TPH Stacking & reclaiming
Quantity (Nos.) 2 Nos.
(H) DOZERS AREA:
(1) Dozer
Type BEML/Komatsu/ Cummins/D.155
Size /Capacity 320 HPQuantity (Nos.) 5 Nos.
(2) Dozer
Type BEML/Komatsu/ Cummins/D.155
Size /Capacity 350 HP
Quantity (Nos.) 2 Nos.
EQUIPMENT DETAILS
EQUIPMENT DETAILS
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
58/63
Description Stage-I Stage-II Stage-III Stage-IV
(H) DOZERS AREA:
(1) Dozer
Type BEML/Komatsu/ Cummins/D.155
Size /Capacity 320 HP
Quantity (Nos.) 5 Nos.
(2) Dozer
Type BEML/Komatsu/ Cummins/D.155
Size /Capacity 350 HP
Quantity (Nos.) 2 Nos.
EQUIPMENT DETAILS
EQUIPMENT DETAILS
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
59/63
Description Stage-I Stage-II Stage-III
Stage-IV
(3) Dozer
Type TIL/Caterpillar/ D6H
Size /Capacity 175 HP
Quantity (Nos.) 2
(I) (a) FUEL OIL DECANTING PUMPS AREA :
Type / Make FO -Flowmore
HSD -Flowmore
FO - Roto
HSD Roto
FO -Roto
Size /Capacity FO - 100 KL/H
HSD - 30KL/H
FO - 210 KL/H
HSD 100KL/H
FO -250
KL/H
Quantity (Nos.) FO 4
HSD 2
FO 4
HSD - 2
FO 2
EQUIPMENT DETAILS
EQUIPMENT DETAILS
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
60/63
Description Stage-I Stage-II Stage-III
Stage-IV
(I) (b) OIL TANK AREA :Type
F.O. Tank
HSD Tank
LDO Tank
F.O.
H.S.D.
LDO Tank
3000 KL ( 2 Nos.)
700 KL (1 (No.)
700 KL (1 No.)
4120 KL (1 No.)
800 KL ( 1 No.)
800 KL (1 No.)
(J) WORKSHOP AREA :
(1) Lathe Machine Type : Vikram 1250 mm Bed, 390 mm dia. 1No.
(2) Lathe Machine Type : NH-26/1000, HMT, 575 mm dia. 1 No.
(3) Lathe Machine Type : NH-26/3000, HMT, 575 mm - 1 No.
EQUIPMENT DETAILS
EQUIPMENT DETAILS
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
61/63
Description Stage-I Stage-II Stage-III Stage-IV
(4) Milling Machine Type : FN-30 `HMT make - 1 No.
(5) Tool Cutter Grinder Type : CTC-28/T `HMT make - 1 No.
(6) Radial Drill machine Type : RM-63 HMT Sr. No. 33174 (80 MM) -1 No.
(7) E.O.T. Crane 5 T capacity , Universal ropeways 1 No.
(8) Drill Machine (WNP) Bajaj DS -40, 1 - 1 No.
9) Power Hacksawmachine
1 No.
EQUIPMENT DETAILS
EQUIPMENT DETAILS
-
7/31/2019 POWER POINT PRESENTATATION OF PEER GROUP
62/63
Description Stage-I Stage-II Stage-III
Stage-IV
(10) Shaping machine ROP MODEL RPS-600 - 1 No.
(11) Power Hacksaw
(Hydraulic)
`BESTO Make, 8 1 No.
(12) Hydraulic press 100 MT 1 No.
(K) CONVEYOR SYSTEM AREA
Conveyor System of-
Type Nylone belts Nylone belts Nylonebelts
Nylonebelts
Size /Capacity 750 /1350 TPH 1350 TPH 1350TPH
1350 TPH
Quantity Stage-wise
(in Mtr.)
5689 5491 4415 356
Total Quantity 1595 Mtrs.
EQUIPMENT DETAILS
-