Section 7.1 - General Features of Hydro Electric Project
Overview
• Hydroelectric converts water potential energy into work
• Energy output is based on head – difference in height
• Hydroelectric power is a renewable resource• Water is “fuel” but still needs management• Typically power is transmitted over longer
distances• China is now the production leader with the 3
Gorges dam.
3
Section 7.1 - General Features of Hydro Electric Project
Types of Development
• Run of the River – Flow Rate and Volume of River• Reservoir
• Ponding – Peak Use• Seasonal Storage – Dry Time Use - Summer• Long Term Storage – Base Load
• Pumped Storage• Pure Pumped Storage – Between two
reservioris• Pump-Back Pumped Storage – River and
Storage• Seasonal Pumped Storage – Demand and
River Flow
4
Section 7.1 - General Features of Hydro Electric Project
Planning Process
1. Establishment of Goals, Objectives and Standards – Measure, Power, Attractiveness
2. Feasibility Study Design
3. Inventory – Needs, Opportunities, Resources
4. Analysis and Forecasts – Life of Plant
5. Formation of Alternate Plans – Functionality and Physicality
6. Evaluation of Alternate Plans – 1 to 3 to Explore
7. Selection and Definition of Next Course of Action
Output - Feasibility StudyOutput - Feasibility Study
5
Section 7.1 - General Features of Hydro Electric Project
Implementation Process
• Contracting Methods• Unit Price
• Bid Price per Quantity and Total Price• Lump Sum
• One Price, All inclusive• Design/Build
• Drawings and Engineering part of Bid – Turn Key – “Architect Engineer” – Sub Contract
• Pricing• Time and Materials• Firm Price
6
Section 7.1 - General Features of Hydro Electric Project
General Arrangement
Diversion Dam
Storage Dam
Spillway
Outlet Works
Intake
7
Section 7.1 - General Features of Hydro Electric Project
Environmental Considerations
• Flora and Fauna• Down Stream
• Habitation• Cities• Industry
• Upstream• Lost Land• Habitation• Oxygenation
• Open Water• Winter Environment• Water Sports
8
Questions?
Section 7.1 - General Features of Hydro Electric Project