MEIDEN REVIEW Series No.174 2018 No.3 35
1 Preface
In Bangkok, the capital of The Kingdom of Thailand, there are many on-going and future plans for railway network update and expansion to ease traffic congestion. In relation to part of these on- going plans, we have taken part in the Purple Line Project since 2014.
Fig. 1 shows the route map of the Purple Line. This line links the Tao Poon Station in the north of Bangkok and the Khlong Phai Station in about 30 minutes. The route length is about 23km and there are 16 stations for this line. This paper introduces our supplied power facilities and related electrical construction work under the supplied system, elec-tric power is fed to the station facilities and trains.
2 Outline of Power Supply System
Electric power for the Purple Line is received from two Bulk Substations (BSSs) and each BSS has a different receiving voltage level. These Bulk Substations are connected to the power transmis-sion network of the Metropolitan Electricity Authority (MEA). BSS1 receives power at 115kV while BSS2 at 69kV. Voltages of electric power for Traction Substations (TSS), Service Substations (SSS), and the depot are stepped down at the main transformer of the BSS so that the incoming power is received at 22.8kV. The TSS supplies the rectified power at 750V DC to train cars. Part of the electric power is stepped down at 400V AC and fed to station facili-ties. Power facilities under the 400V power network are equipped with an Uninterruptible Power System (UPS) as a backup power for the power supply of mission-critical facilities.
2.1 Power Receiving Power Network System Fig. 2 shows an overall power network system
including the 115/69kV power receiving and trans-mission and 22.8kV loop power distribution facili-ties. The 115/69kV power network system at the incoming power substation is designed according to the MEA Specifications. The main power trans-former of 50/75MVA ONAN/ONAF is equipped with an on-load tap changer and it conducts constant voltage control at 22.8kV. The main transformer capacity is designed to provide stable power supply even in a situation when train cars are changed
[ Introduction of Supplied Equipment ]
Power Facilities for the Purple Line, The Kingdom of Thailand
Jun Tanada
Keywords Thailand, Railway, Power transmission
Abstract
The Purple Line is an elevated railway that runs 23km. This line starts from the Khlong Bang Phai Station situated in Nonthaburi Province in the suburbs of Bangkok and joins the Tao Poon Station connected with the MRT Blue Line (sub-way) in the north of Bangkok. This line has been constructed to decrease the number of private passenger cars running from Nonthaburi Province to Bangkok to eliminate traffic congestion. We supplied one complete set of facilities for power receiving, traction power feeding, and power distribution to the Purple Line. In addition, we completed related equipment installation work.
Tao Poon
Wong Sawang
Yaek Tiwanon
Bang Son
Ministry ofPublic Health
Nonthaburi Civic CentreBang Krasor
Phra NangKlao Bridge
Sam YaekBang Yai
Sai Ma
Bang RakNoi Tha It
Bang RakYai
BangPhlu
Talad Bang Yai
Khlong Bang Phai
CHAO PHRAYARIVER
Bang Su
Depot& BSS1
Yaek Nonthaburi 1
Purple Line Station
Park and Ride
Purple Line
Blue Line Station
Blue Line
[Legend]
BSS2
Pure Line (future extension)
Position of the purple line and the number of stations are shown.
Fig. 1 Route Map of Purple Line
![Page 2: Power Facilities for the Purple Jun Tanada Line, The …...2018/10/03 · SSS1 SSS1 SSS2 HR22 89RM22 SSS2 STABLING YARD WORK SHOP DOMITORY & TRAINING CENTER OSS PL1C - 79141 PL1S](https://reader030.vdocuments.mx/reader030/viewer/2022011900/5f037f547e708231d4095cb7/html5/thumbnails/2.jpg)
MEIDEN REVIEW Series No.174 2018 No.336
ME
AM
EA
ME
A
LEG
EN
D
SY
MB
OL
DE
SC
RIP
TIO
N
3 W
IND
ING
S T
RA
NS
FO
RM
ER
2 W
IND
ING
S T
RA
NS
FO
RM
ER
RE
CT
IFIE
R
CIR
CU
IT B
RE
AK
ER
(N
/C)
DIS
CO
NN
EC
ING
SW
ITC
H (
N/C
)
LOA
D B
RE
AK
SW
ITC
H (
N/C
)
CIR
CU
IT B
RE
AK
ER
(N
/C)
DIS
CO
NN
EC
ING
SW
ITC
H (
N/C
)
LOA
D B
RE
AK
SW
ITC
H (
N/C
)
VO
LTA
GE
TR
AN
SF
OR
ME
R
N/O
: NO
RM
ALL
Y O
PE
N,
N/C
: NO
RM
ALL
Y C
LOS
ED
ME
A 1
15kV
AC
ME
A 6
9kV
AC
ME
A
PL1
S-7
012
PL1
C-7
912
~M
T01
50/7
5MV
A
~M
T01
50/7
5MV
A
H5
52IN
1
H11
52G
1H
R01
52R
M1
HR
0152
RM
1H
R11
89R
M11
HR
1189
RM
11H
R12
89R
M12
HR
1289
RM
12
HR
2189
RM
21
HR
2189
RM
21
HR
2289
RM
22
HR
1489
RM
14
HR
1489
RM
14H
R23
89R
M23
HR
1389
RM
13N
/OH
R03
52F
R1
HR
0352
FR
1
HR
1352
RM
13
HR
2352
RM
23
H13
52IN
1
RE
C01
2.5M
WR
EC
012.
5MW
D1
72P
1D
172
P1
D2
72F
1D
372
F2
D3
72F
2D
272
F1
D4
72F
3
D5
72F
4
RT
0128
00kV
A
RT
0128
00kV
A
RT
0128
00kV
A
RT
0128
00kV
A
RT
0128
00kV
A
RT
0128
00kV
A
RT
0128
00kV
A
RT
0128
00kV
A
HR
0252
RM
2H
R02
52R
M2
H12
52F1
H1
52SC
1H
252
RM1
H3
52LM
1H
452
RM2
H7
52RM
3H
852
LM2
H9
52RM
4H
1052
F2H
152
F1H
252
RM1
H3
52LM
1H
452
LM2
H5
52RM
2H
652
BT1
H7
52RM
3H
852
LM3
H9
52RM
4H
1052
LM4
H12
52SC
1H
1452
F2
H4
52LF
2H
452
LF2
H4
52LF
2H
452
LF2
H1
52LF
1H
552
LF3
H4
52LF
2H
552
LF3
H4
52LF
2H
152
LF1
H1
52LF
1H
152
LF1
H1
52LF
1H
152
LF1
H4
52LF
2H
152
LF1
H4
52LF
2H
152
LF1
H4
52LF
2H
452
LF2
H1
52LF
1H
152
LF1
H2
52F
R1
D1
72P
1D
172
P1
D1
72P
1D
172
P1
D1
72P
1D
172
P1
D1
72P
1D
172
P1
D1
72P
1D
172
P1
H2
52F
R1
H2
52F
R1
H2
52FR
1H
252
FR
1H
252
FR
1
RT
0128
00kV
A
H2
52F
R1
D5
72F
4D
572
F4
D5
72F
4
MH
289
F34
MH
289
F34
MH
289
F34
MH
189
F12
MH
189
F12
MH
189
F12
MH
289
F34
MH
189
F12
MH
289
F34
MH
189
F12
D4
72F
3D
472
F3
D4
72F
3D
372
F2
D3
72F
2D
372
F2
D2
72F
1D
272
F1
D2
72F
1
D5
72F
4
D4
72F
3D
372
F2
D2
72F
1
MH
289
F34
MH
189
F12
MH
289
F34
MH
189
F12
D5
72F
4D
572
F4
D4
72F
3D
372
F2
D4
72F
3D
372
F2
D2
72F
1D
272
F1
MH
289
F34
MH
189
F12
D5
72F
4
D4
72F
3D
372
F2
D2
72F
1
MH
289
F34
MH
189
F12
D5
72F
4
D4
72F
3D
372
F2
D2
72F
1
D5
72F
4
D4
72F
3D
372
F2
D2
72F
1
MH
289
F34
MH
189
F12
D5
72F
4
D4
72F
3D
372
F2
D2
72F
1
H6
52B
T1
GS
U
ST
01
24kV
AC
GE
N1
1250
kVA
G
AT02
400
kVA
AT01
2500
kVA
AT02
2500
kVA
AT01
400
kVA
AT02
400
kVA
AT01
200
kVA
AT02
200
kVA
24kV
AC
AT01
630
kVA
AT02
630
kVA
AT01
400
kVA
1250
kVA
BS
S1
DE
PO
TB
SS
2
NB
NB
NB
NB
NB
NB
NB
NB
NB
NB
SB
SB
NB
SB
SO
UT
H B
OU
ND
NO
RT
H B
OU
ND
SB
SB
SB
SB
SB
SB
SB
TS
ST
SS
SS
S1
SS
S1
SS
S2
HR
2289
RM
22S
SS
2
STA
BLI
NG
YA
RD
WO
RK
SH
OP
DO
MIT
OR
Y &
TR
AIN
ING
CE
NT
ER
OS
S
PL1
C-7
9141
PL1
S-
7022
ME
A
MR
TA
ME
A
MR
TA
PL2
S-6
012
PL2
C-6
912
PL2
S-
6022
RE
C01
2.5M
WR
EC
012.
5MW
RE
C01
2.5M
WR
EC
012.
5MW
RE
C01
2.5M
W
RT0
128
00kV
A
H2
52F
R1
RE
C01
2.5M
W
750V
DC
RT
0128
00kV
A
H2
52F
R1
RE
C01
2.5M
W
RT
0128
00kV
A
H2
52F
R1
RE
C01
2.5M
WR
EC
012.
5MW
RE
C01
2.5M
W
HR
1289
RM
12
HR
1389
RM
13H
R13
89R
M13
HR
1389
RM
13
HR
2389
RM
23H
R23
89R
M23
HR
2389
RM
23
HR
1189
RM
11
HR
2289
RM
22H
R21
89R
M21
AT01
1200
kVA
AT02
1200
kVA
AT01
1000
kVA
AT01
1000
kVA
AT01
1000
kVA
AT01
1000
kVA
AT01
1000
kVA
AT01
1000
kVA
AT01
1000
kVA
AT01
1000
kVA
AT01
1000
kVA
AT01
1000
kVA
AT01
1000
kVA
AT01
1000
kVA
AT01
1000
kVA
AT01
1000
kVA
AT02
1000
kVA
AT02
1000
kVA
HR
1389
RM
13
HR
2389
RM
23
AT02
1000
kVA
HR
1389
RM
13
HR
2389
RM
23
AT02
1000
kVA
HR
1389
RM
13
HR
2389
RM
23
AT02
1000
kVA
HR
1389
RM
13
HR
2389
RM
23
HR
2389
RM
23H
R23
89R
M23
HR
2289
RM
22H
R21
89R
M21
HR
2289
RM
22
HR
1389
RM
13
HR
1389
RM
13
HR
1289
RM
12H
R14
89R
M14
HR
1489
RM
14
HR
1189
RM
11
HR
1189
RM
11
HR
1289
RM
12
HR
2489
RM
24
HR
2189
RM
21
HR
2489
RM
24
AT02
1000
kVA
HR
1389
RM
13
HR
2389
RM
23
AT02
1000
kVA
HR
1389
RM
13
HR
2389
RM
23
AT02
1000
kVA
HR
1389
RM
13
HR
2389
RM
23
AT02
1000
kVA
HR
1389
RM
13
HR
2389
RM
23
AT02
1000
kVA
HR
1389
RM
13
HR
2389
RM
23
AT02
1000
kVA
HR
1389
RM
13
HR
2389
RM
23
AT02
1000
kVA
HR
1389
RM
13
HR
2389
RM
23
AT02
1000
kVA
AT02
1000
kVA
AT01
1000
kVA
AT02
1000
kVA
SS
S1
HR
1289
RM
12H
R11
89R
M11
SS
S1
HR
1289
RM
12H
R11
89R
M11
SS
S1
HR
1289
RM
12H
R11
89R
M11
SS
S1
HR
1289
RM
12H
R11
89R
M11
SS
S1
HR
1289
RM
12H
R11
89R
M11
SS
S1
HR
1289
RM
12H
R11
89R
M11
SS
S1
HR
1189
RM
11H
R12
89R
M12
SS
S1
HR
1189
RM
11H
R12
89R
M12
SS
S1
HR
1189
RM
11H
R12
89R
M12
SS
S1
HR
1189
RM
11H
R12
89R
M12
SS
S1
HR
1189
RM
11H
R12
89R
M12
SS
S1
HR
1189
RM
11H
R12
89R
M12
SS
S1
HR
1189
RM
11H
R12
89R
M12
SS
S1
SS
S1
SS
S1
SS
S2
S16
TAO
PO
ON
HR
2289
RM
22H
R21
89R
M21
SS
S2
S15
BA
NG
SO
N
HR
2289
RM
22H
R21
89R
M21
SS
S2
S14
WO
NG
SA
WA
NG
HR
2289
RM
22H
R21
89R
M21
SS
S2
S13
YE
AK
TIW
AN
ON
HR
2289
RM
22H
R21
89R
M21
SS
S2
S12
MIN
IST
RY
OF
PU
BLI
C H
EA
LTH
HR
2289
RM
22H
R21
89R
M21
SS
S2
S11
NO
NT
HA
BU
RI
CIV
IC C
EN
TE
R
HR
2289
RM
22H
R21
89R
M21
N/O
N/O
N/O
N/O
SS
S2
SS
S2
S10
SI P
HO
NS
AW
AN
HR
2189
RM
21H
R22
89R
M22
SS
S2
S07
SA
I MA
HR
2189
RM
21H
R22
89R
M22
SS
S2
S06
TH
A IT
HR
2189
RM
21H
R22
89R
M22
SS
S2
S05
BA
NG
RA
K Y
AI
HR
2189
RM
21H
R22
89R
M22
SS
S2
S04
BA
NG
PH
LU
HR
2189
RM
21H
R22
89R
M22
SS
S2
S03
SA
M Y
EA
KB
AN
G Y
AI
HR
2189
RM
21H
R22
89R
M22
SS
S2
S02
TALA
D B
AN
GYA
I
HR
2189
RM
21H
R22
89R
M22
SS
S2
S01
KH
LON
G B
AN
GP
HA
I
S09
YE
AK
NO
NT
HA
BU
RI 1
SS
S2
S08
PH
RA
NA
NG
KLA
O B
RID
GE
Pur
ple
Line
Pow
er S
uppl
y O
vera
ll S
yste
m D
iagr
am is
sho
wn.
Fig
. 2P
urp
le L
ine
Po
wer
Su
pp
ly O
vera
ll S
yste
m D
iag
ram
![Page 3: Power Facilities for the Purple Jun Tanada Line, The …...2018/10/03 · SSS1 SSS1 SSS2 HR22 89RM22 SSS2 STABLING YARD WORK SHOP DOMITORY & TRAINING CENTER OSS PL1C - 79141 PL1S](https://reader030.vdocuments.mx/reader030/viewer/2022011900/5f037f547e708231d4095cb7/html5/thumbnails/3.jpg)
MEIDEN REVIEW Series No.174 2018 No.3 37
from 3-car train to 6-car train.
2.2 22.8kV AC Power Distribution System As shown in Fig. 2, the TSS works on a 22.8kV
loop network system while the SSS and depot belong to a 22.8kV ring network system.
For loop network system between TSS and another TSS, the protection of sections is covered by directional overcurrent and earth fault protection. Each SSS has enough capacity to maintain a sta-tion service even if there is a failure in one of the dual power transmission lines. If there is a power outage in one of the dual transmission lines con-necting a BSS, the power system is designed to control an automatic power supply extension using the other healthy transmission line connected to other BSS. For this purpose, the Programmable Logic Controller (PLC) is installed. By using this equipment, power network‘s power outage time is reduced to a minimum. By using this PLC, recovery operation of the power network system is automati-cally carried out to return the power supply in the normal mode.
When both power receiving network systems of 115kV and 69kV face a power failure, an emer-gency power generator installed at the BSS1 is used to feed power to the operation command facility located inside the depot.
2.3 750V DC Traction Power System As shown in Fig. 2, each TSS is equipped with
a rectifier unit. At each substation, a 12-phase recti-fier transformer is installed. The phase of the delta winding on the primary side is shifted by ±7.5 degrees. By using each transformer between the two different substations, it synthesizes two 12-pulse outputs with different phase (±7.5° shifted) into a 24-pulse output. By this method, we aimed to reduce the amount of harmonics flow-out. The rectifier capacity is specified to eliminate any adverse influ-ence upon train operations even in the event of an out of order TSS.
The 750V traction feeder line is provided with a direct acting function on a DC Circuit-Breaker (CB). In addition, multi-function protection relays are used. These relays come with the functions of measuring the current changing rate (rate of rise) and the cur-rent increase range (ΔI). Further, the DC feeder is an equipped function of a transfer trip. This function is a de-energized fault zone.
In the DC traction system, system restoration
is possible even though an electric accident may occur. For this reason, a DC system is a provided function of a CB reclosure. In addition, since a load measuring function is additionally provided, it is possible to identify the presence of any short-circuit failure in the line. This function is effective in meas-uring the external line voltage and resistance by trial line charging through current limited resistance. If measuring the value under the setting, this function will cancel the HSCB closing command.
The negative panel is equipped with a Voltage Limiting Device (VLD) together with a function of leakage current measurement. The VLD is used to detect the presence of overvoltage between the negative and the earth. When an overvoltage is sensed, a magnetic contactor is instantly turned on to short-circuit the section between the negative and the earth. This operation protects passengers from any electric shock at the station by using a potential difference between the car body (negative pole) and the platform.
For the measurement of leakage current, a mesh earth to collect the stray current recovery is connected to the negative panel and the panel measures the current value of the leakage.
Meanwhile, protection against a DC ground fault is conducted by the frame leakage relay. With a ground wire connected directly to the panel frame, the frame leakage relay detects the ground fault current. The rectifiers and DC CB panels are, there-fore, installed on the insulated floor.
2.4 Electrical Construction Work We conducted installation work and cabling
works for our electrical facilities. The electrical facilities include a variety of large and small equip-ment and units. According to the equipment struc-ture and size, we planned and implemented safe equipment carry-in and solid installation work. When 24kV power cables were laid, we used a work train and the total length of cables amounted to approximately 400km. Fig. 3 shows a view of cable laying work.
3 Specifications of Incoming Power Substation Facilities
Under the Purple Line, it is designed so that even a single failure will not affect the entire system operation. The basic system configuration for the power facilities is such that all facilities are made
![Page 4: Power Facilities for the Purple Jun Tanada Line, The …...2018/10/03 · SSS1 SSS1 SSS2 HR22 89RM22 SSS2 STABLING YARD WORK SHOP DOMITORY & TRAINING CENTER OSS PL1C - 79141 PL1S](https://reader030.vdocuments.mx/reader030/viewer/2022011900/5f037f547e708231d4095cb7/html5/thumbnails/4.jpg)
MEIDEN REVIEW Series No.174 2018 No.338
redundant or it uses backup facilities. Major equip-ment specifications are as follows:
3.1 Incoming Bulk Substation (1) 115kV Gas Insulated Switchgear (GIS) (BSS1)/ 69kV GIS (BSS2) Standard: IEC62271 Type: Indoor GIS
Ratings: Rated voltage: 115kV (BSS1)/69kV (BSS2) Rated breaking current: 40kA Rated current: 2000A
Fig. 4 shows an external appearance of the 69kV GIS. (2) 112/22.8kV (BSS1) 67/22.8kV (BSS2) main power transformers Standard: IEC60076 Type: Outdoor oil-immersed self-cooled/forced air cooled type Ratings: 50/75MVA
112/22.8kV (BSS1) 50Hz with OLTC 67/22.8kV (BSS2) 50Hz with OLTC Percent impedance: 12.5% Connections: Dyn1
Fig. 5 shows an external appearance of the 112/ 22.8kV main power transformer. (3) 22.8kV GIS Standard: IEC60298 Type: Indoor GIS Ratings: Rated voltage: 24kV
Rated breaking current: 25kA Rated current: 2000/1250A
Fig. 6 shows an external appearance of the 22.8kV GIS. (4) Emergency generator (BSS1) Standard: IEC60034-1 Type: Diesel engine generator Ratings: Rated capacity: 1250kV
Rated voltage: 416/240V 50Hz Rated current: 2000/1250A
Fig. 7 shows an external appearance of the emer-gency generator.
View of cable laying work is shown.
Fig. 3 View of Cable Laying Work
External appearance of GIS for receiving power from a power utility’s 69kV electric power network system is shown.
Fig. 4 69kV GIS
Main power transformer for stepping down from 112kV to 22.8kV is shown.
Fig. 5 112/22.8kV Main Power Transformer
![Page 5: Power Facilities for the Purple Jun Tanada Line, The …...2018/10/03 · SSS1 SSS1 SSS2 HR22 89RM22 SSS2 STABLING YARD WORK SHOP DOMITORY & TRAINING CENTER OSS PL1C - 79141 PL1S](https://reader030.vdocuments.mx/reader030/viewer/2022011900/5f037f547e708231d4095cb7/html5/thumbnails/5.jpg)
MEIDEN REVIEW Series No.174 2018 No.3 39
In addition, the BSS is composed of the protec-tive relay panels to MEA Specifications, on-load tap changer control panels for main power transform-ers, main transformer secondary side grounding resistors (NGR), 22.8kV step-up cast resin molded transformers for emergency generators, local trans-formers, 110V DC source panels, UPS, and others.
3.2 TSS (1) 22.8kV GIS Standard: IEC60298 Type: Indoor GIS Ratings: Rated voltage: 22.8kV
Rated breaking current: 25kA Rated current: 1250A
(2) Rectifier transformer Standard: IEC60076 Type: Indoor cast resin mold Ratings: 2800/1400/1400kVA
22.8/0.585kV 50Hz Percent impedance: 8.0% Connections: D (+7.5 or -7.5) d0y11
Fig. 8 shows an external appearance of the rectifier transformer. (3) Auxiliary transformer Standard: IEC60076 Type: Indoor cast resin mold Ratings: 2500/1200/1000/630/400/200kVA
22.8/0.416kV 50Hz Percent impedance: 6% Connections: Dyn1
(4) Rectifiers Standard: IEC60146 Type: Indoor self-cooled Ratings: Rated voltage: 900V DC
Rated capacity: 2500kW (12-phase rectifi-cation)
Overload capacity: 150% for 2 hours, 300% for 1 minute
Fig. 9 shows an external appearance of rectifiers.
External appearance of 22.8kV system distribution GIS is shown.
Fig. 6 22.8kV GIS
External appearance of emergency generator is shown.
Fig. 7 Emergency Generator
External appearance of transformer to be connected to the rectifier.
Fig. 8 Rectifier Transformer
![Page 6: Power Facilities for the Purple Jun Tanada Line, The …...2018/10/03 · SSS1 SSS1 SSS2 HR22 89RM22 SSS2 STABLING YARD WORK SHOP DOMITORY & TRAINING CENTER OSS PL1C - 79141 PL1S](https://reader030.vdocuments.mx/reader030/viewer/2022011900/5f037f547e708231d4095cb7/html5/thumbnails/6.jpg)
MEIDEN REVIEW Series No.174 2018 No.340
(5) 750V DC CB panel Standard: IEC61992 Type: Indoor DC CB panel Ratings: Rated voltage: 900V DC
Rated breaking current: 180kA peak Rated current: 4000A
Fig. 10 shows an external appearance of the 750V DC CB panel. (6) 750V DC bypass LBS panel Standard: IEC61992 Type: Indoor DC CB panel Ratings: Rated voltage: 900V DC
Rated breaking current: 180kA peak Rated current: 4000A
Fig. 11 shows an external appearance of the 750V DC bypass LBS panel. (7) 750V negative panel Type: Indoor DC cathode panel Ratings: Rated voltage: 900V DC
Rated current: 6000A (8) VLD Standard: EN50122-1 Ratings: Rated voltage: 900V DC Rated current: 500A Fig. 12 shows an external appearance of the VLD and cathode panel.
Device for converting AC electricity into DC electricity.
Fig. 9 Rectifiers
Direct current CB board that protects 750V DC to the vehicle is shown.
Fig. 10 750V DC CB Panel
Bypass board that extends power supply in case of emergency is shown.
Fig. 11 750V DC Bypass LBS Panel
VLD and Cathode Panel are shown.
Fig. 12 VLD (Left) and Cathode Panel (Right)
![Page 7: Power Facilities for the Purple Jun Tanada Line, The …...2018/10/03 · SSS1 SSS1 SSS2 HR22 89RM22 SSS2 STABLING YARD WORK SHOP DOMITORY & TRAINING CENTER OSS PL1C - 79141 PL1S](https://reader030.vdocuments.mx/reader030/viewer/2022011900/5f037f547e708231d4095cb7/html5/thumbnails/7.jpg)
MEIDEN REVIEW Series No.174 2018 No.3 41
Local facilities in TSS are composed mainly of 110V DC source panels and UPS.
3.3 SSS The equipment for each SSS comes in the
24kV Ring Main Unit (RMU), local transformer, 110V
DC source panel, and UPS. Equipment specifica-tions are as shown below. (1) 22.8kV RMU Standard: IEC62271 Type: Indoor GIS Ratings: Rated voltage: 24kV
Rated current: 630A Fig. 13 shows an external appearance of the RMU.
3.4 Depot Substation Equipment of the depot substation is the same
as that of a TSS.
4 Postscript
The Purple Line commenced its business operation on August 6, 2016. Since then, stable operation has been maintained. We expect that the Purple Line will be popular and be used by many people in the future whereby improving connectivity and transit. We sincerely believe that this project could not be completed successfully in such a short period of time without the sound advices and coop-eration from project-related people.
Lastly, we would like to express our gratitude to the project-related people.
・ All product and company names mentioned in this paper are
the trademarks and/or service marks of their respective owners.
RMU for 22.8kV distribution is shown.
Fig. 13 RMU