post school design
DESCRIPTION
built architecture workTRANSCRIPT
Open O�ce1400 sf
Warehouse Storage650 sf
Mechanical17.5 sf
Existing Sidewalk
Egress
Egress
1/8” = 1’
Existing Electric Panel to remain
1311 E Cesar Chavez
Kitchenette
Existing Doors
Replace existing transom with new insulating glass.Typical.
Existing Store Front Windowswith transoms to remain
Existing Store Front to remain Existing Store Front Windowswith transoms to remain
Replace existing plywood transom with new windowNotes:
-New HVAC-New Electrical to code-Spray Insulation: Walls = R 19-Existing Insulation: Ceiling = R 38
Building Square Footages:1400 sf O�ce650 sf Warehouse Storage73.5 sf Restroom17.5 sf Mechanical2141 sf Building Total
New HVAC units on Roof.Typical.
New HVAC units on Roof.Typical.
Existing Door3’ wide6‘ 8” tall
New door to be installed
Hot Water Heater
Existing UnisexToilet Room
73.5 sf
Furniture System.Typical.
New 8’ high partition
New Fleetwood Sliding Door System
Existing Drywall along perimeter of Building
Drafted by James O’Brien10.8.9