Bedroom InstallationFall 2010Personal

Open O�ce1400 sf

Warehouse Storage650 sf

Mechanical17.5 sf

Existing Sidewalk

Egress

Egress

1/8” = 1’

Existing Electric Panel to remain

1311 E Cesar Chavez

Kitchenette

Existing Doors

Replace existing transom with new insulating glass.Typical.

Existing Store Front Windowswith transoms to remain

Existing Store Front to remain Existing Store Front Windowswith transoms to remain

Replace existing plywood transom with new windowNotes:

-New HVAC-New Electrical to code-Spray Insulation: Walls = R 19-Existing Insulation: Ceiling = R 38

Building Square Footages:1400 sf O�ce650 sf Warehouse Storage73.5 sf Restroom17.5 sf Mechanical2141 sf Building Total

New HVAC units on Roof.Typical.

New HVAC units on Roof.Typical.

Existing Door3’ wide6‘ 8” tall

New door to be installed

Hot Water Heater

Existing UnisexToilet Room

73.5 sf

Furniture System.Typical.

New 8’ high partition

New Fleetwood Sliding Door System

Existing Drywall along perimeter of Building

Drafted by James O’Brien10.8.9

Offi ce RemodelFall 2010Big Red Sun

Wesner ResidenceSpring 2010Big Red Sun