Portland NorthPortland NorthAlternative Modes ProjectAlternative Modes Project
Public MeetingMay 4, 2010
![Page 2: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/2.jpg)
AgendaAgendaIntroductionsProgress UpdateSummary of AlternativesRidership ProjectionsPreliminary CostsSmall StartsAmtrak Extension Feasibility StudyNext StepsQuestions
![Page 3: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/3.jpg)
What We Have AccomplishedWhat We Have AccomplishedPHASE 1
Developed Initial Range of AlternativesMet with Stakeholder groups and communitiesFTA coordinationAlternative refinement– Alignment– Station– Cost– Ridership
Screened from alternatives 30 to 6 (with terminus options)
![Page 4: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/4.jpg)
WhatWhat Is Underway NowIs Underway NowPHASE 2
Refine data– Station locations– Station layouts– Rail and Road infrastructure– Economic– Environmental– Costs
Stakeholder CoordinationFTA coordinationScreen range of alternatives to 1
![Page 5: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/5.jpg)
Key Issues We’ve HeardKey Issues We’ve HeardBus vs. RailHighway WideningCostFundingEvaluation CriteriaPublic InputAmtrak ServiceSchedule
![Page 6: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/6.jpg)
What Would be ServedWhat Would be ServedThree service alternatives– Yarmouth– Brunswick (Bath)– South Auburn (Lewiston)Three route alternatives:– Saint Lawrence and Atlantic Railway (SLR)– Pan Am Railway– Highways (Bus)Five Portland terminal alternatives:– Bayside (SLR)– India Street (SLR)– Union Station (Pan Am)– Center Street (Pan Am)– Monument Square (Express Bus)
![Page 7: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/7.jpg)
Auburn
Lewiston
New Gloucester
GrayFreeport
Brunswick
Bath
Yarmouth
Falmouth
Portland
Study AreaHighwayNetwork
I-95
US 1
I-295
I-95
I-95
I-295
![Page 8: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/8.jpg)
On the same base map show the tworail routes
Portland
Brunswick
Bath
Lewiston
Yarmouth Junction
Pineland WestPineland East
Falmouth (Exit 10)
Freeport
South Auburn (Exit 75)
Auburn
Cumberland
West Falmouth (Exit 53)
Yarmouth (Exit 15)
Lewiston
Pan AMSLRState of ME
Study AreaRailroadNetwork
![Page 9: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/9.jpg)
Rail Options
![Page 10: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/10.jpg)
South Auburn (Exit 75)
Auburn Lewiston
New Gloucester
GrayFreeport
Brunswick
Bath
Yarmouth (Exit 15)
Falmouth (Exit 10)
Portland
Bus-On-ShoulderExclusive Bus ROWBus in Mixed Traffic
Study AreaExpress BusRoutes
![Page 11: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/11.jpg)
Express BusExpress Bus
![Page 12: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/12.jpg)
How Often Service Would OperateHow Often Service Would Operate
22 Roundtrips per Weekday (Train/Bus)Service Headways– 30 minute peak– 60 minute off-peak
First trip arrives Portland: 6:45 AMLast trip departs Portland: 10:55 PMShuttle Bus Service in Portland from all butCenter Street rail station
![Page 13: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/13.jpg)
Publicly Owned
Pan Am
Track to Rebuild
PortlandTransportation
Center
India Street
Bayside
Union StationCenter Street
PULSE
MonumentSquare
Where Would it Leave YouWhere Would it Leave You
![Page 14: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/14.jpg)
Yarmouth Rail ServiceYarmouth Rail ServiceSLR Pan Am
India Street
Falmouth (Exit10)
Yarmouth (Exit15)
BaysideCenter Street
UnionStation
West Falmouth(Exit 53)
Cumberland
Yarmouth Jct
![Page 15: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/15.jpg)
On the same base map show the two railroutes
Portland
Brunswick
Bath
Lewiston
Yarmouth Junction
Pineland WestPineland East
Falmouth (Exit 10)
Freeport
South Auburn (Exit 75)
Auburn
Cumberland
West Falmouth (Exit 53)
Yarmouth (Exit 15)
Lewiston
Pan AMSLRState of ME
Study AreaRailroadNetwork
![Page 16: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/16.jpg)
Yarmouth Express Bus ServiceYarmouth Express Bus ServiceHighway Shoulder Running
PULSE
Falmouth(Exit 10)
Yarmouth (Exit15)
Exclusive ROW
Falmouth (Exit10)
Yarmouth (Exit15)
PULSE
![Page 17: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/17.jpg)
South Auburn (Exit 75)
Auburn Lewiston
New Gloucester
GrayFreeport
Brunswick
Bath
Yarmouth (Exit 15)
Falmouth (Exit 10)
Portland
Bus-On-ShoulderExclusive Bus ROWBus in Mixed Traffic
Study AreaExpress BusRoutes
![Page 18: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/18.jpg)
Bath Rail ServiceBath Rail ServiceSLR Pan Am
India StreetBayside
Falmouth (Exit10)
Yarmouth(Exit 15)
Freeport
Brunswick Bath
Center Street
Union Station
Falmouth (Exit 53)
Cumberland
Yarmouth Jct
Freeport
Brunswick Bath
![Page 19: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/19.jpg)
On the same base map show the two railroutes
Portland
Brunswick
Bath
Lewiston
Yarmouth Junction
Pineland WestPineland East
Falmouth (Exit 10)
Freeport
South Auburn (Exit 75)
Auburn
Cumberland
West Falmouth (Exit 53)
Yarmouth (Exit 15)
Lewiston
Pan AMSLRState of ME
Study AreaRailroadNetwork
![Page 20: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/20.jpg)
Bath Express Bus ServiceBath Express Bus Service
Highway Shoulder Running
PULSE
Falmouth (Exit 10)
Yarmouth (Exit 15)
Freeport
Brunswick
Bath
PULSE
Falmouth (Exit 10)
Yarmouth (Exit 15)
Freeport
Brunswick
Bath
Exclusive Bus ROW
![Page 21: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/21.jpg)
South Auburn (Exit 75)
Auburn Lewiston
New Gloucester
GrayFreeport
Brunswick
Bath
Yarmouth (Exit 15)
Falmouth (Exit 10)
Portland
Bus-On-ShoulderExclusive Bus ROWBus in Mixed Traffic
Study AreaExpress BusRoutes
![Page 22: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/22.jpg)
Lewiston Rail ServiceLewiston Rail ServiceSLR Pan Am
Union Station Center Street
West Falmouth (Exit 53)
Cumberland
Pineland West
South Auburn (Exit75)
Auburn Lewiston
BaysideIndia Street
Yarmouth (Exit 15)
Pineland East
Auburn Intermodal
Lewiston
Falmouth (Exit 10)
![Page 23: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/23.jpg)
On the same base map show the two railroutes
Portland
Brunswick
Bath
Lewiston
Yarmouth Junction
Pineland WestPineland East
Falmouth (Exit 10)
Freeport
South Auburn (Exit 75)
Auburn
Cumberland
West Falmouth (Exit 53)
Yarmouth (Exit 15)
Lewiston
Pan AMSLRState of ME
Study AreaRailroadNetwork
![Page 24: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/24.jpg)
Lewiston Express Bus ServiceLewiston Express Bus ServiceExpress Bus
South Auburn (Exit75)
Auburn Lewiston
Falmouth (Exit10)
MonumentSquare
Gray
New Gloucester
South Auburn(Exit 75)
Auburn Lewiston
Falmouth(Exit 10)
MonumentSquare
Gray
Exclusive Bus ROWNew Gloucester
![Page 25: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/25.jpg)
South Auburn (Exit 75)
Auburn Lewiston
New Gloucester
GrayFreeport
Brunswick
Bath
Yarmouth (Exit 15)
Falmouth (Exit 10)
Portland
Bus-On-ShoulderExclusive Bus ROWBus in Mixed Traffic
Study AreaExpress BusRoutes
![Page 26: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/26.jpg)
CostsCosts
Capital– Track– Bridges– Train sets– Signals– Stations
Operating– Management– Fuel– Maintenance
![Page 27: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/27.jpg)
![Page 28: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/28.jpg)
![Page 29: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/29.jpg)
Our Approach to Calculating RidersOur Approach to Calculating RidersWe methodically examine key questions:
• For what purposes will people travel?• Where would these trips begin?• How many of these trips will people make?• Where are the trips headed?• What are the attributes of traveling by car or by
transit that would affect mode choice?• What would determine a motorist’s choice of route?
![Page 30: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/30.jpg)
A logical, regional modelA logical, regional modelTrip generation
Trip distribution
Vehicle assignment
Transit pathdevelopment Mode split
Transitassignment
Population andemployment
data
Road network
Trip ends
Person trip matrix (origins to destinations)
Expedited mode splitVehicle trips
Transit network
Congested network
Transit boardings
Transittimes,costs
![Page 31: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/31.jpg)
1027 TransportationAnalysis Zones
The Modeled RegionThe Modeled Region
![Page 32: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/32.jpg)
Lewiston / AuburnLewiston / Auburn
![Page 33: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/33.jpg)
PortlandPortland
![Page 34: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/34.jpg)
Brunswick and FreeportBrunswick and Freeport
![Page 35: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/35.jpg)
Vehicle volumes (screenlines)Vehicle volumes (screenlines)How well does model represent flows?
screenline ADT model % differenceNorth of Saco 137,225 137,545 0.23East of Gorham 82,730 72,289 -12.62North of Portland 75,220 59,049 -21.50South of Yarmouth 80,122 88,701 10.71South of Auburn 49,345 53,781 8.99SE of Lewiston 22,968 31,776 38.35South of Freeport 87,365 91,261 4.46
all screenlines 534,975 534,402 -0.11
Average daily traffic
![Page 36: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/36.jpg)
Travel times (minutes)Travel times (minutes)How well does model represent flows?
model
AM peak3 hrs
leave6:15
leave7:35
from Lewiston (Oak & Bates)to Portland (Franklin & Marginal Way) 49.8 46 49
AM peak3 hrs
leave6:00
leave7:58
from Bath (Rt 1 & Washington St)to Portland (Franklin & Marginal Way) 45.3 37 34
AM peak3 hrs
from Saco P&R to Congress & Bramhall 22.9
observed times
Zoom schedule
20 to 23
![Page 37: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/37.jpg)
ZOOM Turnpike Express BoardingsZOOM Turnpike Express BoardingsHow well does model represent flows?
model observedBiddeford P&R 82 85Saco P&R 80 75
Bramhall & Congress 33 29High & Congress 82 25Monument Square 36 98USM 11 8
Total 324 320
Daily boardings in either direction
![Page 38: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/38.jpg)
Key Factors Affecting BehaviorKey Factors Affecting Behavior
Not just comparison of auto vs. transit in-vehicle times– wait time, need for a transfer, fare, and time to/from stations
also matterIncreasing, non-linear penalty for walks over 10 minutesDirect service preferable to local bus connectionTravelers “don’t drive backwards” to a park & ride“let someone else drive” more important with increasingdistanceNo modeled preference for rail compared to bus
![Page 39: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/39.jpg)
ModeMode SharesShares toto CentralCentral PortlandPortland– 2035 Bath to
Bayside commuteforecast
![Page 40: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/40.jpg)
Mode Shares to Central PortlandMode Shares to Central Portland– 2035 Bath to
Center Streetcommute forecast
![Page 41: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/41.jpg)
Mode Shares to Central Portland– 2035 Lewiston to
Center Streetcommute forecast
![Page 42: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/42.jpg)
Mode Shares to Central Portland– 2035 Lewiston to
Bayside commuteforecast
![Page 43: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/43.jpg)
Trip origins of commuters to PortlandTrip origins of commuters to PortlandForecasting to 2035
![Page 44: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/44.jpg)
PortlandPortland--bound Commuters (2035)bound Commuters (2035)
Pineland toLewiston:1627 commuters toCentral Portland
Freeport toBrunswick:3252 commuters toCentral Portland
![Page 45: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/45.jpg)
Changing work trip destinationsChanging work trip destinationsForecasting to 2035
State projection of future job sites
![Page 46: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/46.jpg)
![Page 47: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/47.jpg)
Ridership ObservationsRidership Observations
Model reveals a sensible pattern by stationCenter Street service has highest ridership for eachstarting pointTwo key reasons for this:– Two stops in Portland, short walk to business centers– Line stops at Cumberland Center, not served by SLR or bus
optionsPortland is attraction end for at least 79 percent of trips(99 percent for alignments only to Yarmouth)
![Page 48: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/48.jpg)
$ 68
.4
$ 15
6.8
$ 19
3.6
$ 10
2.4
$ 12
1.0
$ 69
.9
$ 15
8.7 $
195.
2
$ 10
4.0
$ 12
2.6
$ 37
.7
$ 77
.3 $ 95
.5
$ 54
.9 $ 73
.3
$ 42
.4
$ 81
.8
$ 10
0.2
$ 59
.7
$ 90
.9
$ 6.
4
$ 13
.9
$ 16
.1
$ 12
.2
$ 19
.1
$ 40
.5
$ 44
.4
$ 46
.6
$ 46
.0
$ 52
.8
$ 0.0
$ 20.0
$ 40.0
$ 60.0
$ 80.0
$ 100.0
$ 120.0
$ 140.0
$ 160.0
$ 180.0
$ 200.0
Yarmouth Auburn Lewiston Brunswick Bath
($ m
illio
ns)
Capital Cost Summary ($ millions)
Bayside (SLR)India Street (SLR)Union Station (PA)Center Street (PA)Bus on HighwayBus Hwy/Excl. ROW
![Page 49: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/49.jpg)
![Page 50: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/50.jpg)
![Page 51: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/51.jpg)
Phase 2 AlternativesPhase 2 Alternatives
Rail:– Pan Am to Yarmouth– Pan Am to Auburn/Lewiston– Pan Am to Brunswick/Bath
Bus:– Portland to Yarmouth on Highway and Shoulder– Portland to Auburn/Lewiston on Highway and Shoulder– Portland to Brunswick/Bath on Highway and Shoulder
![Page 52: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/52.jpg)
Small Starts ParametersSmall Starts ParametersCapital costs associated with new fixedguideway systems, extensions, and bus corridorimprovementsRequests under $75 million and total projectcosts must be under $250 millionIn addition, Small Starts eligible if:– (a) meet the definition of a fixed guideway for at
least 50 % of the project length in the peak period– (b) be a new fixed guideway project, or
![Page 53: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/53.jpg)
Small Starts (cont.)Small Starts (cont.)
– (c) be new corridor-based bus projectwith all of the following minimumelements:
• Substantial transit stations• Traffic signal priority/pre-emption, to the extent, if any,
that there are traffic signals on the corridor• Low-floor vehicles or level boarding• Branding of the proposed service• 10 minute peak/15 minute off peak headways or better
while operating at least 14 hours per weekday
![Page 54: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/54.jpg)
What Has Been Funded (FY10)What Has Been Funded (FY10)
$174 Million for 16 projects
Maximum grant $54.5 Million
![Page 55: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/55.jpg)
Geographic and Modal DistributionGeographic and Modal DistributionFlagstaff, AZ, Mountain Links BRTLivermore, CA, Livermore-Amador Route 10 BRTLos Angeles, CA, Metro Rapid Bus System Gap ClosureLos Angeles, CA, Wilshire Boulevard Bus-Only LaneSan Bernardino, CA, E Street Corridor BRTSan Diego, CA, Mid-City RapidSan Joaquin, CA, Metro Express - Airport Way Corridor BRT ProjectFort Collins, CO, Mason Corridor BRTRoaring Fork Valley, CO, BRT ProjectKansas City, MO, Troost Corridor BRTAustin, TX, Metro Rapid BRTKing County, WA, Bellevue - Redmond BRTKing County, WA, Pacific Highway South BRTRiverside, CA, Perris Valley Line MediumMonterey, CA, Monterey Bay Rapid TransitFitchburg, MA, Commuter Rail Improvements
![Page 56: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/56.jpg)
FTA Critical Success FactorsFTA Critical Success FactorsOverall Project
Rating
ProjectJustification
Criteria
CostEffectiveness
Local FinancialCommitment
Land Use Other Factors –Economic
Development
![Page 57: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/57.jpg)
FTA Small Starts Evaluation CriteriaFTA Small Starts Evaluation CriteriaCost Effectiveness (which is a combined measure of annual traveltime savings and annualized cost)Total Cost compared to State and Local Financial Capacity– Capital cost (including highway or rail improvements including
railroad bridge costs)– Operations and Maintenance (O&M) costs
Transportation Measures (which would be roughly proportional tovehicular emissions)– Level of Service– Total System Vehicle Miles Traveled– Total System Vehicle Hours Traveled
Land Use– Existing Land Use Patterns– Transit supportive plans and policies– Performance and impact of these policies
Economic Development
![Page 58: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/58.jpg)
Amtrak Extension Feasibility StudyAmtrak Extension Feasibility StudyScope of Work– Modes
• Intercity Rail for Portland to Auburn/Lewiston• Intercity Rail from Portland to Montreal• Bus service from Auburn/Lewiston to Brunswick
and Portland– Elements
• Schedule• Costs (capital and operating)• Ridership
![Page 59: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/59.jpg)
What Happens NextWhat Happens Next
Finalize Phase 2 (June)Provide recommendation for SmallStarts (June)Final Report (July)Initiate Small Starts application (July)Initiate Amtrak Study (May)
![Page 60: Portland North Alternative Modes Project - Maine.gov€¦ · Small Starts (cont.) – (c) be new corridor-based bus project with all of the following minimum elements: • Substantial](https://reader034.vdocuments.mx/reader034/viewer/2022050201/5f54d09e25c3e16a50095004/html5/thumbnails/60.jpg)
Questions?Questions?