portfolio portfolio.pdf · i. residential buildings & compounds sodic projects 270 million egp...

181

Upload: others

Post on 22-Jul-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90
Page 2: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Portfolio

Version: Sep-2018

Page 3: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

History

Construction & Design Company ‘Constec’, an Egyptian

joint stock company, established in 1989 and has been

providing fully integrated contracting solutions since then.

Currently, Constec is one of Egypt’s leading construction

companies that ranks “1st Class General Contracting,

Finishes & MEP” with rich experience in implementing

industrial, residential, commercial and tourist projects

including Infrastructure, Electromechanical works and

Management.

Page 4: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Mission Statement

Client satisfaction is our principal objective.

To achieve that, we perform any undertaking assigned to us

on time, within the allocated budget and within the

specification set for the job; to assure all expectations are

met.

Page 5: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Scope Of Activities

We execute and manage turnkey projects through performing

a variety of construction works and related services. Our

experience covers the following sectors:

– Residential Buildings & Compounds

– Industrial & Warehouses Buildings

– Commercial Buildings

– Hotels & Resorts

– Landscape and Urban Development

– Treatment Plants

– Infrastructure

Page 6: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Partners in Success

Page 7: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Eng. Mohamed Edrees Chairman

Eng. Ashraf Abd El Hakam Managing Director

Eng. Nouh Meshref Board Member

Mr. Hazem Moustafa Board Member

Eng. Fathia Shtewy Board Member

Eng. Mohamed Ramadan Board Member

Eng. Ahmed Aziz Board Member

Board Of Directors

Page 8: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Chairman & Board

ExecutiveManager

HR Manager

Admin Off

Recruitment & Development

IT Manager

Programing & Development

Networks

Tech Support

Procurement Manager

Contracts Manager

Owner Contracts

S/C Contracts

Purchasing Manager

Buyers

Technical Manager

Projects Follow Up

Shop Drawings

Projects Invoices

Q.S.

Projects Manager

HSE Manager

Projects Controls

Quality Control

Sr. Planning Engineer

Planning Engineers

Cost Control

Project Managers

Construction Managers

Site Engineers

Tech. Office Engineer

Electro-Mechanic

Site Supervisors

Surveyors

Asset Manager

Assets

Drivers

LogisticsTendering Manager

Tendering

Sr. Tendering Engineer

Estimators

Quantity Surveyors

Electrical Mechanical

Financial Manager

Document Control

General Accounting

Banks and Treasury

Treasury

Banks

Contractors Accounts

Customer Accounts

Site Accountants

Warehouse

Organization Chart

Internal Audit & Quality Assurance

Business Development

E.M. Secretary

Page 9: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Overview

Authorized Capital 100 Million EGP

Issued Capital 20 Million EGP

Assets 9 Million EGP

Staff Strength 300 Employees

Supplementary Staff 500 Employees

Page 10: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

ISO 9001 & 140001 Certificate

Page 11: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Personnel

Management Team 12

Office Engineers 25

Office Administration & Financing 20

Projects Managers 10

Site Managers 10

Site Engineers 45

Technical Site Helpers and Foreman 178

Page 12: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Equipment

Earth Moving

Equipment

15%

Generators &

Handling

Equipment

15%

Workshop

Equipment

4%

Light Equipment

13%

Transprtation

Equipment

37%

Transportation

Equipment

21%Cranes

9%

Earth Moving Equipment

Generat ors & Handlin g Equipm ent

Workshop Equipment

Light Equipment

Transprtation Equipment

Scaffold ing

Cranes

Page 13: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Equipment

Page 14: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Equipment

Page 15: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Equipment

Page 16: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Equipment

Page 17: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Equipment

Page 18: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Capacity

Produces 30,000 cubic meter of concrete per month

Excavates in normal soil of 150,000 cubic meter per month

A rebar workshop of 15,000 tons per month.

Page 19: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Ongoing Projects

No. Project NameScope ofWorks

Client Consultant Value (EGP)

1 Pyramids Heights Core & ShellSamcrete

DevelopmentABCG 65,000,000

2 Villette Core & Shell SODIC Ehaf 90,000,000

3 Cairo Business Park Civil Works Misr Italia ECB 95,000,000

4 Block 34 – Eastown Core & Shell SODIC EGEC 90,000,000

5 Fouka Bay – North Coast Turn Key Tatweer Misr KAF 90,000,000

6 Hyde Park – CL 6 & 16 Turn Key Hyde Park ECG 85,000,000

7 October Plaza Core & Shell SODIC Ehaf 125,000,000

8 AEON Civil Works Marakez ABCG 70,000,000

9 Beltag WWTP (6500 m3/day) Turn Key Gharbia HCWW ACE 200,000,000

10 Hyde Park – CL 19 Turn Key Hyde Park ECG 140,000,000

Note: Core & Shell Scope includes; exterior finishes (painting, aluminum windows,

ornamental steel works, marble, etc…), interior finishes (wooden doors, marble for

entrance and common area, painting, etc…), and all MEP works

Page 20: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

PROJECTS AND CLIENTS

Success story extends for more than 28 years

Page 21: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

I. RESIDENTIAL BUILDINGS

& COMPOUNDS

Success story extends for more than 28 years

Page 22: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

I. Residential Buildings & Compounds

SODIC Projects 270 Million EGP

Hyde Park – CL 19 140 Million EGP

October Plaza 125 Million EGP

Block 34 Eastown 90 Million EGP

Hyde Park – CL 6&16 85 Million EGP

AEON – Marakez 70 Million EGP

Pyramids Heights – SamCrete in 6th October city 65 Million EGP

Green 3 in Zayed 60 Million EGP

Royal City compound in Zayed 70 Million EGP

Green Waves in Zayed 65 Million EGP

Green Residence 1 in Zayed 28 Million EGP

Green Residence 2 in Zayed 28 Million EGP

Green Hills Compound in Zayed 19 Million EGP

Page 23: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

SODIC Spine - West Town

Construction of Blocks 28, 29, 32, 33 comprising a total of 59

Core & Shell Villas of different Models and areas

Location: Zayed (West Town)

Consultant: Al Amar (AMG)

Owner: SODIC

Duration : 1 Year

Contract Date : 2015

Project Value 30 Million EGP

Page 24: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

SODIC Spine - West Town

Page 25: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

SODIC Spine - West Town

Page 26: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

SODIC Spine - West Town

Page 27: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

SODIC Spine - West Town

Page 28: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

SODIC Phase 10 Block 4 - West Town

Residential Compound comprises 17 Multi Story Semi

finished Buildings of different Models and areas, in addition

to the construction of an electrical room

Location: Zayed (West Town)

Consultant: Al Amar (AMG)

Owner: SODIC

Duration : 18 Months

Contract Date : 2015

Project Value 70 Million EGP

Page 29: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

SODIC Phase 10 Block 4 - West Town

Page 30: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

SODIC Phase 10 Block 4 - West Town

Page 31: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

SODIC Phase 10 Block 4 - West Town

Page 32: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

SODIC Phase 10 Block 4 - West Town

Page 33: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

SODIC Villette

Residential Compound comprises 22 Semi Finished Town

Houses and 17 Semi Finished Twin Houses, of different

Models and areas.

Location : New Cairo (East Town)

Consultant: EHAF

Owner: SOREAL for Real Estate

Investment (SODIC)

Duration : 18 Months

Contract Date : 2017

Project Status: Under Construction

Project Value 95 Million EGP

Page 34: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

SODIC Villette

Page 35: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Hyde Park – Cluster 19

Residential Compound comprises 44 Fully Finished Town

and Twin Houses (G+2) of different Models and areas.

Scope of works include; skeleton works, interior & exterior

finishes and general site works.

Location: New Cairo

Consultant: ECG

Owner: Hyde Park

Duration: 17 Months

Contract Date: 2018

Project Status: Under Construction

Project Value 140 Million EGP

Page 36: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

October Plaza

Residential Compound comprises 8 Semi Finished Multistory

buildings (G+3) of different Models and areas.

Scope of works include; skeleton works, design & execution

of post tension slabs, interior & exterior finishes and site

works.

Location : 6th October

Consultant: Ehaf

Owner: SODIC

Duration : 12 Months

Contract Date : 2017

Project Status: Under Construction

Project Value 125 Million EGP

Page 37: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

SODIC Block 34 - Eastown

Residential Compound comprises 11 Semi Finished Multi

Story Buildings of different Models and areas. Scope of works

include; skeleton, interior finishes, exterior finishes and

general site works.

Location : New Cairo (East Town)

Consultant: EGEC - Engineering House of Expertise

Owner: SODIC

Duration : 18 Months

Contract Date : 2017

Project Status: Under Construction

Project Value 90 Million EGP

Page 38: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

SODIC Block 34 - Eastown

Page 39: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Hyde Park – Cluster 6 & 16

Residential Compound comprises 51 Semi Finished Town and

Twin Houses (G+2) of different Models and areas, in addition

to the interior finishes of 21 Town Houses and Twin Houses.

Scope of works include; skeleton works, interior & exterior

finishes and general site works.

Location: New Cairo

Consultant: ECG

Owner: Hyde Park

Duration: 10 Months

Contract Date: 2017

Project Status: Under Construction

Project Value 90 Million EGP

Page 40: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Hyde Park

Page 41: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

AEON - Marakez

Residential Compound comprises 6 Multistory buildings, of

different Models and areas.

Location: Six October City.

Consultant: Active Brains

Owner: Marakez – Mall of Arabia

Duration : 12 Months

Contract Date : 2018

Project Status: Under Construction

Project Value 70 Million EGP

Page 42: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

AEON - Marakez

Page 43: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Pyramids Heights – SamCrete in 6th

October city

Residential Compound comprises 40 Villas, of different

Models and areas.

Location: Six October City.

Consultant: Active Brains Consulting Group (ABCG)

Owner: SamCrete

Duration : 18 Months

Contract Date : 2016

Project Status: Under Construction

Project Value 65 Million EGP

Page 44: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Pyramids Heights – SamCrete in 6th

October city

Page 45: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Green 3 in Zayed

Turnkey residential compound comprising of 35 Twin Houses

and 110 Apartment Units in several Multistory Buildings

Location: Zayed

Area: 54,600 m2

Consultant: El Gabaly Consultant

Owner: Mabany for Real Estate Investment

Duration : 2 Years

Contract Date : 2010

Project Value 60 Million EGP

Page 46: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Green 3 in Zayed

Page 47: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Green 3 in Zayed

Page 48: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Green 3 in Zayed

Page 49: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Royal City Compound in Zayed

Turnkey residential compound comprising the construction of

two phases of 45 and 21 villas of different models and size

Location: Zayed

Consultant: Mohram Bakhoum Infrosefk

Owner: Al-Babtain Group “Kuwait”

Duration : 2 Years

Contract Date : 2008

Project Value 70 Million EGP

Page 50: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Royal City Compound in Zayed

Page 51: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Royal City Compound in Zayed

Page 52: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Green Waves Compound in Zayed

Turnkey residential compound comprises the construction of

two phases of 10 Multi Story Buildings & 4 Villas then 5

Multi Story Buildings of different models and sizes

Location: Zayed

Consultant: Urban Projects Office

Owner: Mabany Real Estate Co.

Duration : 3 Years

Contract Date : 2010

Project Value 65 Million EGP

Page 53: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Green Residence 1 in Zayed

Turnkey residential compound comprising of 120 Apartment

Units in 7 Multistory Buildings

Location : Zayed

Area: 20,000 m2

Consultant: Engineer M. Omar Ghazal

Owner: Mabany for Real Estate Investment

Duration : 2 Years

Contract Date : 2005

Project Value 28 Million EGP

Page 54: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Green Residence 1 in Zayed

Page 55: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Green Residence 1 in Zayed

Page 56: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Green Residence 2 in Zayed

Turnkey residential compound comprising of 115 Apartment

Units in 7 Multistory Buildings

Location: Zayed

Area: 20,000 m2

Consultant: PhD. Eng. M. Omar Ghazal

Owner: Mabany for Real Estate Investment

Duration : 2 Years

Contract Date : 2007

Project Value 28 Million EGP

Page 57: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Green Residence 2 in Zayed

Page 58: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Green Residence 2 in Zayed

Page 59: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Green Hills Compound in Zayed

Residential compound comprising 4 multistory buildings and

45 residential villas of different models and size

Location: Zayed

Consultant: En. Integrated

Consulting Group (JADE)

PhD Eng. Ayman Meselhy

Owner: Egypt Real Estate

Development

Duration : One Year

Contract Date : 2007

Project Value 19 Million EGP

Page 60: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Green Hills Compound in Zayed

Page 61: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Green Hills Compound in Zayed

Page 62: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Green Hills Compound in Zayed

Page 63: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

II. HOTELS & RESORTS

Success story extends for more than 28 years

Page 64: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

II. Hotels and Resorts

Royal Palm Beach Hotel in Hurghada 200 Million EGP

Amer Group Projects 175 Million EGP

Fouka Bay – North Coast 90 Million EGP

Caesar – North Coast 75 Million EGP

Movenpick Hotel in Al Haram 45 Million EGP

Multi Purpose Building in Suez City 24 Million EGP

Palm Beach Hotel 12 Million EGP

Mubarak Hotel in Siwa Oasis 6 Million EGP

Pyramisa Village in Hurghada 4 Million EGP

Officers House in Sidi Barani 2 Million EGP

Pyramisa Hotel 1 Million EGP

Page 65: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Royal Palm Beach Hotel in Hurghada

Construction of the hotel comprising 350 rooms on an area of

60,000 m2 , including the main building , swimming pool, soft

and hard scape

Location of the project: Hurghada City

Area: 60,000 m2

Consultant: ASA Consultant-

Eng. Omar Zatoun

Owner : Red Sea for Tourism Development

Duration : 4 Years

Contract Date : 2005

Project Value 200 Million EGP

Page 66: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Royal Palm Beach Hotel in Hurghada

Page 67: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Royal Palm Beach Hotel in Hurghada

Page 68: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Royal Palm Beach Hotel in Hurghada

Page 69: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Amer Group Projects

Specializing in Turn Key projects for Recreational Resorts

projects.

Total Projects 175 Million EGP

50 M EGP 55 M EGP

Start of Journey

South Beach Project

Challenging Scope

South Beach - Water Treatment Plant

Client Satisfaction

Porto Sokhna – Golf Bay

New Challenge

Hanging Gardens Platform 5

5 M EGP 65 M EGP

Page 70: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Porto Sokhna – South Beach

Turn Key project comprises construction and handover of 7

multistory Buildings: H2, H4, H5, H7, RU1, RU2 &RU3

comprising a total of 348 chalet

Location: Sokhna

Consultant: Shaker Group and

Moharam Bakhoum “ACE”

Owner : Amer Group

Duration : 2 Years

Contract Date : 2013

Project Value 50 Million EGP

Page 71: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Porto Sokhna – South Beach

Page 72: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Porto Sokhna – South Beach

Page 73: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Porto Sokhna – South Beach

Page 74: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Porto Sokhna – South Beach

Page 75: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Porto Sokhna – South Beach WTP

Construction of the Porto South Beach main Water

Treatment Plant of daily capacity 800 m3/day

Location: Sokhna

Consultant: Shaker Group and

Moharam Bakhoum “ACE”

Owner : Amer Group

Duration : 1 Year

Contract Date : 2013

Project Value 5 Million EGP

Page 76: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Porto Sokhna – South Beach WTP

Page 77: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Porto Sokhna – Golf Bay

Turn Key project comprises construction and handover of 4

Multistory Buildings: B1, B2, B3 & B4 comprising a total of

374 chalet

Location: Sokhna

Consultant: Hill International

and ACE

Owner : Amer Group

Duration : 2 Years

Contract Date : 2013

Project Value 55 Million EGP

Page 78: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Porto Sokhna – Golf Bay

Page 79: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Porto Sokhna – Golf Bay

Page 80: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Porto Sokhna – Golf Bay

Page 81: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Porto Sokhna – Hanging Gardens (PL5)

Construction of Hanging Gardens Platform 5 consisting of 12

Multi Story Building comprising 294 Chalets of different

models and areas

Location: Sokhna

Consultant: Hill International and

ACE

Owner : Amer Group

Duration : 1 Year

Contract Date : 2016

Project 65 Million EGP

Page 82: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Porto Sokhna – Hanging Gardens (PL5)

Page 83: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Fouka Bay – North Coast

Turn Key recreational compound for two platforms

comprising 33 Twin House of different Models and areas.

Location: Ras El Hekma – North Coast

Consultant: KAF Consultant

Owner : Tatweer Misr

Duration : 16 Months

Contract Date : 2017

Project Status: Under Construction

Project Value 90 Million EGP

Page 84: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Fouka Bay – North Coast

Page 85: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

SODIC Caesar in Ras El Hekma

Construction of Zone A,B & C consisting of 45 Core & Shell

villas in addition to the external finishes

Location: Ras El Hekma – North Coast

Consultant: Active Brains

Owner : SODIC (Tabrook

for Development)

Duration : 18 Months

Contract Date : 2015

Project Value 75 Million EGP

Page 86: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

SODIC Caesar in Ras El Hekma

Page 87: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

SODIC Caesar in Ras El Hekma

Page 88: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Movenpick Hotel in Al Haram

Turn Key project comprises construction and fully furnishing

of 148 rooms and suits as an extension of the existing

Movenpick Hotel on a total area of 4,000 m2

Location: Giza

Area: 4,000 m2

Consultant: Integrated Consultant

Group “Gayed”- Dr. Aymen Meselhy

Owner : Tourism Urbanization Company

Duration : 3 Years

Contract Date : 2009

Project Value 45 Million EGP

Page 89: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Movenpick Hotel in Al Haram

Page 90: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Movenpick Hotel in Al Haram

Page 91: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Movenpick Hotel in Al Haram

Page 92: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Movenpick Hotel in Al Haram

Page 93: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Movenpick Hotel in Al Haram

Page 94: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Multi Purpose Building in Suez City

Turnkey Project comprises the construction of a reinforced

concrete multi purpose building on an area of 20,000 m2.

Including all the interior & exterior finishing , MEP and

landscape work. The Project Consists of:

1. 120 Room Hotel Building

2. Main Building

3. 1,000 m2 Auditorium

Project Value 24 Million EGP

Page 95: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Multi Purpose Building in Suez City

Location : Suez City

Area: 20,000 m2

Consultant: Barakat & Associates-Dr Magdy Barakat

Owner : Al Nasr for Petroleum Co.

Contract Date : 2010

Page 96: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Multi Purpose Building in Suez City

Page 97: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Multi Purpose Building in Suez City

Page 98: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Multi Purpose Building in Suez City

Page 99: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Palm Beach Hotel

Turnkey project comprising the construction of: 8 Suits , 92

Rooms , Restaurant, Kitchen , Laundry , Cafeteria Beach

Swimming, Pool with an area

of 420 m2.

Location : Hurghada

Consultant: ASSA Consulting

Eng. Omar Zatoun

Owner : Red Sea for Tourism

Development

Duration : One Year

Contract Date : 2005

Project Value 12 Million EGP

Page 100: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Project 4 Million EGPProject 6 Million EGP

Mubarak Hotel in Siwa Oasis

Construction of the Olympic Village Hotel which comprises the following:

– 4 Main Suits

– 3 Presidential Suits

– 60 Rooms

– Restaurant

– Kitchen

– Laundry

– Landscape

Location: Siwa Oasis

Consultant: Egyptian Engineering House Dr. Hany El Gamal

Owner : Region of Western Military

Duration: 18 Months

Contract Date : 2001

Pyramisa Village in Hurghada

Construction of the Market Facility which comprises the following:

– Antique Shops

– Main Gate

– Fences

Location: Hurghada City

Consultant: Decoration Office Omar Ghoneim

Owner : Misr Real Estate Development

Duration : One Year

Contract Date : 2005

II. Hotels and Resorts

Page 101: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Project One Million EGPProject 2 Million EGP

Officers House in Sidi Barani

Construction of officers hotel which

comprises 100 rooms

Location : Sidi Barani

Consultant: Egyptian Engineering House PhD. Eng. Hany El Gamal

Owner : Region of Western Military

Duration : One Year

Contract Date : 2001

Pyramisa Hotel

Foundations works and retaining walls for the

Pyramisa Hotel in Dokki

Location : Cairo City

Consultant: Arab Consulting Group

Owner : Pyramisa Tourism “Mahmoud Azab”

Duration : One Year

Contract Date : 1999

II. Hotels and Resorts

Page 102: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

III. COMMERCIAL

BUILDINGS

Success story extends for more than 28 years

Page 103: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

III. Commercial Buildings

Rofayda Health Park 75 Million EGP

Cairo Business Park 95 Million EGP

Shorouk Academy 30 Million EGP

Hyper One 10th of Ramadan 23 Million EGP

Eastern Suburbs Mall in 5th Settlement 20 Million EGP

Tivoli Dome Zayed 15 Million EGP

Extension of ITS Company Building 14 Million EGP

Convention & Conference Hall in Sidi Barani 4 Million EGP

Presidential Hall Building –Nozha Airport 3 Million EGP

Schools in Fayoum City 2.5 Million EGP

Olympic Boxing & Martial Arts in Siwa 1.5 Million EGP

Mosque in Cairo Alexandria Road One Million EGP

Mosque in Al Ahram Heights 850,000 EGP

Page 104: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Rofayda Health Park

Construction of a medical center of two main buildings;

Clinics building, Maternity & Dar Al Oyoun Hospitals

Location: Zayed

Area: 17,000 m2

Consultant: Engineering Office-

Eng. Alaa Abou El Ezz

Owner: Mabany for Real

Estate Investment

Duration: 2 Years

Contract Date: 2013

Project Value 75 Million EGP

Page 105: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Rofayda Health Park

Page 106: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Rofayda Health Park

Page 107: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Rofayda Health Park

Page 108: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Cairo Business Park

Administrative Buildings comprises 4 Multi Story Semi

finished Buildings, on two phases, on a total BUA of 33,000

m2

Location: New Cairo

Area: 33,000 m2

Consultant: ECB Consulting –

PhD. Eng. Hany El Zyat

Owner: Misr Italia

Duration: 2 Years

Contract Date: 2017

Project Status: Under Construction

Project Value 95 Million EGP

Page 109: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Cairo Business Park

Page 110: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Cairo Business Park

Page 111: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Shorouk Academy

Construction of Applied Arts building, Economy building,

and R&D Building with a total BUA of 23,000 m2

Location: El Shorouk City

Area: 23,000 m2

Consultant: PhD. Eng. Amr El Halafawy

Owner: 10th of Ramadan for development and educational

services Co.

Duration : 9 Months

Contract Date : 2016

Project Status: Under Construction

Project Value 30 Million EGP

Page 112: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Shorouk Academy

Page 113: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Shorouk Academy

Page 114: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Hyper One in 10th of Ramadan City

Construction of Hyper One commercial mall at Cairo

Ismailia main road on an area of 12,000 m2 comprising :

1. Exhibition Area

2. Administration Building

3.Infrastructure Work

Project Value 23 Million EGP

Page 115: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Hyper One in 10th of Ramadan City

Location: 10th of Ramadan City

Area: 12,000 m2

Consultant: MA Consulting

Office-Dr. Moamen Afify

Owner : Eng. M. Hawary

Duration : 2 Years

Contract Date : 2011

Page 116: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Hyper One in 10th of Ramadan City

Page 117: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Hyper One in 10th of Ramadan City

Page 118: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Eastern Suburbs Mall in 5th Settlement

Construction of “Eastern Suburbs” commercial mall in 5th

Settlement in front of AUC’s Gate 4

Location : 5th Settlement

Area: 10,000 m2

Consultant: Space Consultants

Owner : Misr Real Estate Management

Duration : 18 Months

Contract Date : 2013

Project Value 20 Million EGP

Page 119: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Tivoli Dome in Zayed

Construction of “Tivoli Dome” commercial mall on an area of

6,000 m2 , consisting of basement , ground floor and three

typical floors

Location : Zayed

Area: 6,000 m2

Owner : Mabany for Real Estate Investment

Duration : 2 Years

Contract Date : 2010

Project Value 15 Million EGP

Page 120: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Tivoli Dome in Zayed

Page 121: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Tivoli Dome in Zayed

Page 122: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Extension of ITS Company Building

Construction and finishing work of the ITS extension

building

Location : Nasr City

Consultant: Building Consulting

Group PhD. Alaa Sayed

Owner : ITS Company

Duration : 2 Years

Contract Date : 2008

Project Value 14 Million EGP

Page 123: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Extension of ITS Company Building

Page 124: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Extension of ITS Company Building

Page 125: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Project Value 4 Million EGP Project Value 3 Million EGP

Convention & Conference Hall

in Sedi Barani

Construction and finishing work of the

convention & conference hall in Sidi Barani

Location : Sidi Barani

Consultant: Egyptian Engineering House PhD. Eng. Hany El Gamal

Owner : Region of Western Military

Contract Date : 2000

Presidential Hall Building –

Nozha Airport

Construction and finishing work of the

Presidential Hall Building –Nozha Airport

Location : Alexandria City

Consultant: Egyptian Engineering House PhD. Hany El Gamal

Owner : Northern Compound Military

Duration : One Year

Contract Date : 2002

III. Commercial Buildings

Page 126: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Project Value 2.5 Million EGP Project Value 1.5 Million EGP

Schools in Fayoum City

Construction and finishing works of 4

schools

Location : Fayoum City

Consultant: PhD. Eng. Maher El Nemer

Owner : General Authority for Educational Buildings

Duration : One Year

Contract Date : 2002

Olympic Boxing & Martial

Arts Hall in Siwa

Construction and finishing work of the

Olympic Boxing & Martial Arts Hall in Siwa

Location : Siwa

Consultant: Egyptian Engineering House PhD. Hany El Gamal

Owner : Region of Western Military

Duration: One Year

Contract Date : 2000

III. Commercial Buildings

Page 127: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Mosque in Cairo Alexandria

Road

Construction and finishing work of a 600 m2

Ottoman Style Mosque

Location : Cairo Alexandria Road

Area : 600 m2

Consultant: Eng. Mohamed Ghazal

Owner : Mabany for Investment

Contract Date : 2004

Mosque in Al Ahram Heights

Construction and finishing work of a 400 m2

Mosque

Location : El Ahram Heights

Area : 400 m2

Owner : 6 October Association

Contract Date : 2002

III. Commercial Buildings

Project Value 1 Million EGP Project Value 850,000 EGP

Page 128: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

IV. INDUSTRIAL &

WAREHOUSES

Success story extends for more than 28 years

Page 129: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

IV. Industrial & Warehouses

Jushi Fiberglass Factory 85 Million EGP

Abou Rawash Warehouse 77 Million EGP

Infofort Warehouse in 6th October City 38 Million EGP

Aramex Warehouse in Borg El Arab City 24 Million EGP

F2 Factory in Sokhna 16 Million EGP

F5 Factory in Sokhna 16 Million EGP

F3 Factory in Sokhna 12 Million EGP

Aramex Warehouse in 6th October City 10 Million EGP

Metex Factory in Port Said 2 Million EGP

Master Leather Factory in 6th October City 1.5 Million EGP

Salmiya Factory in El Salhia El Gedida One Million EGP

Mill in 10th of Ramadan City One Million EGP

Page 130: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Jushi Fiberglass Factory

Construction and finishing of 45,000 m2 reinforced concrete

industrial facility

Location: Industrial Zone - Sokhna

Area:45,000 m2

Consultant: Building Consulting Group

“Benaa” Dr. Alaa El Sayed

Owner : Jushi Egypt for Fiber Glass

Industry S.A.E

Duration : 2 Years

Contract Date : 2012

Project Value 85 Million EGP

Page 131: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Jushi Fiberglass Factory

Page 132: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Jushi Fiberglass Factory

Page 133: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Jushi Fiberglass Factory

Page 134: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Jushi Fiberglass Factory

Page 135: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Abou Rawash Warehouse

Construction of 5 Warehouses on a total area of 100,000 m2

Location : Abou Rawash

Area:100,000 m2

Consultant: Egyptian House

Engineer-Ph.D. Hany El Gamal

Owner : Egyptian Company

for Storage Services

Duration : 3 Years

Contract Date : 2005

Project Value 77 Million EGP

Page 136: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Abou Rawash Warehouse

Page 137: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Abou Rawash Warehouse

Page 138: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Infofort Warehouse

Construction of steel structure warehouse with a total area of

23,000 m2 and reinforced administration building

Location : 6th October City

Area:23,000 m2

Consultant: MA Consulting Office-

Dr. Moamen Afify

Owner : Infofort Company

Duration : 2 Years

Contract Date : 2010

Project Value 38 Million EGP

Page 139: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Infofort Warehouse

Page 140: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Infofort Warehouse

Page 141: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Infofort Warehouse

Page 142: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Infofort Warehouse

Page 143: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Aramex Warehouse – Borg El Arab

Construction of Aramex Company Warehouse, consisting of a

steel structure warehouse with a total area of 2,500 m2 and

reinforced administration building

Location : Borg El Arab City

Area: 2,500 m2

Consultant: MA Consulting Office-

Dr. Moamen Afify

Owner : Aramex –Masharek Company

Duration : One Year

Contract Date : 2012

Project Value 24 Million EGP

Page 144: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Aramex Warehouse – Borg El Arab

Page 145: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Aramex Warehouse – Borg El Arab

Page 146: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

F2 Factory

Construction of steel truss of 4,000 m2 area and two story

reinforced concrete administration buildings with an area of

800 m2

Location: Sokhna

Area: 4,800 m2

Consultant: Building Consulting Group

“Benaa” Dr. Alaa El Sayed

Owner : Egypt TEDA Investment Company

Duration : One Year

Contract Date : 2004

Project Value 16 Million EGP

Page 147: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

F5 Factory

Construction of F5 factory comprising 2 story concrete

structure with an area of 5,400 m2

Location: Sokhna

Area: 5,400 m2

Consultant: Building Consulting Group

“Benaa” Dr. Alaa El Sayed

Owner: Egypt’s Suez China

Real Estate Development

Duration: One Year

Contract Date: 2008

Project Value 16 Million EGP

Page 148: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

F5 Factory

Page 149: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

F3 Factory

Construction of F3 factory comprising 2 story concrete

structure with an area of 5,400 m2

Location: Sokhna

Area: 5,400 m2

Consultant: Building Consulting Group

“Benaa” Dr. Alaa El Sayed

Owner : Egypt’s Suez China

Real Estate Development

Duration : 9 Months

Contract Date : 2008

Project Value 12 Million EGP

Page 150: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

F3 Factory

Page 151: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Aramex Warehouse – 6th October

Construction of Aramex Company Warehouse, consisting of a

steel structure warehouse with a total area of 2,500 m2 and

reinforced administration building

Location: 6th October City

Consultant: MA Consulting Office-

Dr. Moamen Afify

Owner : Aramex-Masharek Company

Duration : One Year

Contract Date : 2012

Project Value 10 Million EGP

Page 152: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Metex Factory in Port Said

Design and Construction of Metex factory for paper production

Location: Port Said City

Area : 2,000 m2

Consultant: Egyptian Engineer House

Owner : Metex for International Industries

Contract Date : 1990

Leather Factory

Construction of a leather factory on an area of 2,000 m2

Location : 6th October City

Area: 2,000 m2

Consultant: PhD Eng. Sherif Abou El Maged

Contract Date : 1997

IV. Industrial & Warehouses

Project Value 2 Million EGP Project Value 1.5 Million EGP

Page 153: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Mill in 10th Of Ramadan City

Production of reinforced concrete of 1,200 m2 for the manufacturing and operation of the sheet and an adjoining office building

Location : 10th of Ramadan City

Area: 1,200 m2

Owner : Ms. Amany Abd El Rahman

Contract Date : 1999

Salmiya Factory

Construction of a warehouse Building and refrigerated products

Location : El Salhiya El Gedida

Area: 1,000 m2

Consultant: PhD Eng. Sherif Abou El Maged

Owner : Salmiya for Food Industry

Contract Date : 1998

IV. Industrial & Warehouses

Project Value One Million EGP Project Value One Million EGP

Page 154: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

V. INFRASTRUCTURE

PROJECTS

Success story extends for more than 28 years

Page 155: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

V. Infrastructure Projects

Beltag WWTP - Tanta 200 Million EGP

EFC Water Desalination Plant in Sokhna 35 Million EGP

Rehabilitation and renovation of

Luxor Cornish , City Gates and Roundabouts 10 Million EGP

Aircraft Engines Industry 8 Million EGP

Water Tank in Sokhna 6 Million EGP

Main Substation of Phosphate Factory – Sokhna 4 Million EGP

Waste Water Treatment Plant in Wadi Hof 4 Million EGP

Waste Water Treatment Plant in El Mahala El Kobra 3 Million EGP

Waste Water Treatment Plant in Mansoura One Million EGP

Water Desalination Plant in Sokhna One Million EGP

Page 156: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Beltag WWTP

By “EMIT GROUP – CONSTEC JV”

Turn key project for the construction of 6500 m3/day

including all civil works, tanks, electromechanical works and

water treatment systems.

Location : Tanta

Consultant: Moharam Bakhoum (ACE)

Owner : Gharbia HCWW

Duration : Two years

Contract Date : 2018

Project Status: Under Construction

Project Value 200 Million EGP

Page 157: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Beltag WWTP

Page 158: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Beltag WWTP

Page 159: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Water Desalination Plant

Construction of 4500 m3/day including all A/M, tanks, pumps

and administration buildings and RO System (Severn Trent

Service Company)

Location : Sokhna

Consultant: Moharam Bakhoum

Owner : Egyptian Fertilizers

Company

Duration : One Year

Contract Date : 2005

Project Value 35 Million EGP

Page 160: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Water Desalination Plant

Page 161: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Water Desalination Plant

Page 162: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Water Desalination Plant

Page 163: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Water Desalination Plant

Page 164: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Water Desalination Plant

Page 165: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Water Desalination Plant

Page 166: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Water Desalination Plant

Page 167: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Rehabilitation and renovation of Luxor

Cornish ,City Gates and roundabout

Rehabilitation and renovation of 3.5 Km Luxor Cornish ,

City Gates and roundabouts

Location : Luxor City

Distance: 3.5 Km

Consultant: Eng. Hassan

Dahrouj

Owner : Luxor City Council

Duration : One Year

Contract Date : 2001

Project Value 10 Million EGP

Page 168: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Rehabilitation and renovation of Luxor

Cornish ,City Gates and roundabout

Page 169: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Rehabilitation and renovation of Luxor

Cornish ,City Gates and roundabout

Page 170: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Rehabilitation and renovation of Luxor

Cornish ,City Gates and roundabout

Page 171: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Aircraft Engines Factory

Construction of inspection chamber nutrition , sewage

network and roads

Location: Cairo-Helwan

Consultant: Benaa Consultant

Dr. Alaa El Sayed

Owner : Arab Organization

for Industrialization

Duration : One Year

Contract Date : 2004

Project Value 8 Million EGP

Page 172: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Water Tank in Sokhna

Construction of TEDA city Under ground Water Tank with a

capacity of 1500 m3

Location: Sokhna

Consultant: Building Consulting Group PhD. Alaa El Sayed

Owner : Egypt Suez China Real Estate Development

Duration: 18 Months

Contract Date : 2009

Project Value 6 Million EGP

Page 173: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Water Tank in Sokhna

Page 174: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Water Tank in Sokhna

Page 175: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Main Substation of Phosphate &

compound fertilizers complex in Sokhna

Civil and finishing works of the Main Substation. The

substation consists of transformer room, Ring Main Unit,

MDB, Generator and Switch gear

Location : Sokhna

Consultant: Enppi

Owner : El Nasr For Intermediate

Chemicals

Duration : 3 Months

Contract Date : 2016

Project Value 4 Million EGP

Page 176: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Main Substation of Phosphate &

compound fertilizers complex in Sokhna

Page 177: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Waste Water Treatment Plant in Wadi

Hof

Construction of 3000 m3/day Waste

Water Treatment Plant

Location: Wadi Hof

Consultant: Arab Organization for

Industrialization

Owner : El Nasr Automotive

Manufacturing

Duration : One Year

Contract Date : 2002

Project Value 4 Million EGP

Page 178: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Waste Water Treatment Plant in El

Mahla El Kobra

Construction of 3600 m3/day

Waste Water Treatment Plant

Location: El Mahla El Kobra

Consultant: Arab Organization

for Industrialization

Owner : Tanta for oil and soap

Duration : One Year

Contract Date : 1999

Project Value 3 Million EGP

Page 179: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Project One Million EGP

Waste Water Treatment Plant in

Mansoura

Construction of 3500 m3/day Waste Water

Treatment Plant in Mansoura

Location: Mansoura City

Consultant: Arab Organization for Industrialization

Owner : El Shourbagy Company

Duration : 6 Months

Contract Date : 2001

Sea Water desalination Plant

Construction of 3600 m3/day Sea Water

Desalination Plant in Sokhna

Location: Sokhna City

Consultant: Moharam Bakhoum

Owner : Egyptian Fertilizers

Duration : 6 Months

Contract Date : 2004

V. Infrastructure Projects

Project One Million EGP

Page 180: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90

Announcement

We are proud to announce that we are singing

new project with:

Hyde Park residential project, the project’s value is

EGP 150,000,000 in New Cairo

Page 181: Portfolio Portfolio.pdf · I. Residential Buildings & Compounds SODIC Projects 270 Million EGP Hyde Park –CL 19 140 Million EGP October Plaza 125 Million EGP Block 34 Eastown 90