portfolio_jaime luaces
DESCRIPTION
Portfolio and resumeTRANSCRIPT
Resume + Selected Work Jaime Luaces
resume
personal data Jaime Luaces / Resume
personal data
Name: Jaime LuacesDate of birth: October, the 29th, 1976Adress: USA 32 King Street
01364-Orange MAMEXICO
Pitagoras 441, Narvarte03020-Mexico City
SPAIN Donoso Cortes 8, 6º dcha 28015-Madrid, Spain
Cellular: USA +1 (978)-726-7415 Spain (+34) 654140771E-mail: [email protected]
academic references Jaime Luaces/resume
academic references
1994-2002 Architect BA/MA Degree in Las Palmas de Gran Canaria, Spain6 year degree + 1 year thesis
2001-2002 Politecnico di MilanoMuseography course
2003 LEONARDO European mobility programLisbon (Portugal)
2001-2002 ERASMUS European mobility college programMantova (Italy)
1993-1994 USA High school degreeRalph C. Mahar High school, Orange, Massachusetts
Jaime Luaces / resume professional experience
professional experience
2012 Project Architect at Parque Humano (Mexico City, Mexico) Andaz hotel (Hyatt) in Mayakoba beach, Mexico- Project leader-
2011-2012 Own Practice Refurbishment of one single family house in Los Angeles, CA, US
Refurbishment 2 apartments in Madrid, Spain.Refurbishment of a dettached house in Campanet, Majorca, Spain.
2010-2011 Project Architect at Exedra/RCR Architects (Barcelona, Spain)Projects:Soulages Museum in Rodez, France -PRO and DCE (construction doc. phases) -Project leader-Competition for the refurbishment of the new “Praedium” Headquarters-1st prize- Project leader-
2003-2010 Project Architect at B720/David Chipperfield Architects (Barcelona, Spain)
Projects:Diagonal 197 office building , with David Chipperfield Architects, Barcelona -Project leader-World Trade Center, in Igualada, Barcelona -Project leader-Single family house in Llabià, Girona -Project leader-School in Puigcerdà, Girona -Project leader-City of Justice, Barcelona, with David Chipperfield Architects”Veles e vents” building for America’s cup, with David Chipperfield Architects Agbar Tower interior design, Barcelona, with Ateliers Jean Nouvel Encants market, Barcelona Lleida-Alguarire airport, LleidaHospital in Cerdanyola, BarcelonaQuiron Multy housing building, Barcelona
2 towers in A Coruña, A CoruñaMulty housing in Sabadell, BarcelonaInterior design of 3 subway stations in Barcelona, L9I+D façade sustainable developmentUrban development in Santander St area, BarcelonaUrban development in Mercedes Benz lot, Sant Adrià, Barcelona
Competitions:World Trade Center, in Igualada, Barcelona -1st prize-”Veles e vents” building for America’s cup, in collaboration with David Chipperfield Architects -1st prize-Housing in Abu Dhabi Office building for Junta de Andalucia, CádizAGE office building, CádizMuseum of polish History, WarsawChamber of commerce, BarcelonaSant Jordi Swimming pool complex, Barcelona
2003 Intern Architect at atelier AIRES MATEUS (Lisbon)Projects:Tourist Enterprise “Heredade Do Corte Velho”. Guadiana. Portugal – in courseSingle family house in Alentejo -completedHotel and Housing Buildings Grand Canal Square. Dublin. IRELAND – in courseTown Hall Market in Caxias. Caxias. Portugal – in courseCompetition for the “Grand Egyptian Museum”. Cairo. EGYPT – Honor mentionInternational Competition for the “Maison De La Paix”. Geneva. SWITZERLAND – finalist
Jaime Luaces / resume professional experience
computer skills/languages/others Jaime Luaces/resume
computer skills
Drawing Autocad, Revit, 3D Studio, Sketch upImage Photoshop, illustratorLayout In design, corel drawOthers MS Office
languages
Spanish Native languageEnglish Fluent levelPortuguese Proficient levelItalian Proficient levelCatalonian Fluent levelFrench Working knowledge
others
2012 LEED Green Associate. Currently getting ready for the AP exam. LEED credit experience completed in 2 different projects in Tucson, AZ.2011 Seminar/ Sustainability .Architecture week.Matadero Madrid2010 Guest teacher at ESDI School of Design in Barcelona.2006-2010 Sustainable systems&materials in arch formation. b720, Barcelona2009 Development of project documentation manual. b720, Barcelona2003-2007 Project seeker at A+T Architectural publishers2007 Seminar and meeting Virgilius d’ Oro 2007, Mantova (Italy)2003- Development of traditional housing in Majorca book (in process)
selected work
Campus Audiovisual/Diagonal 197with David Chipperfield Architects and b7202001-2008CompletedArchitect/Project leaderRol: Project leader. Tasks: Team coordination, General drawings, façade and interior design, construction drawings, interior design and facade details, junior staff supervision, coordination with collaborators, engineers, client, consultants and contractor. Budget supervision, project narrative and specifications.Phases: Schematic Design, Design Development, Construc-tion Documents and Construction Administration.
Campus Audiovisual/D197 Jaime Luaces/Selected Work
Campus Audiovisual/D197 Jaime Luaces/Selected Work
Campus Audiovisual/D197 Jaime Luaces/Selected Work
Campus Audiovisual/D197 Jaime Luaces/Selected Work
Campus Audiovisual/D197 Jaime Luaces/Selected Work
Campus Audiovisual/D197 Jaime Luaces/Selected Work
Campus Audiovisual/D197 Jaime Luaces/Selected Work
Campus Audiovisual/D197 Jaime Luaces/Selected Work
America’s Cup building “Veles e vents”with David Chipperfield Architects and b7202005-2006
Rol: Team member in charge of interior design package/team.Tasks: Competition team member, developing schemes, ideas, concepts, plans, elevations, sections, etc. After competition, took charge of the interior design package and some shell de-tails. Developing all interior design elevations, plans, sections and technical details. Also specifying and researching new ma-terials and systems.Phases: Competition, Schematic Design, Design Development, Construction Docs and first Construction Administration stages.
America’s Cup Jaime Luaces/Selected Work
America’s Cup Jaime Luaces/Selected Work
America’s Cup Jaime Luaces/Selected Work
America’s Cup Jaime Luaces/Selected Work
America’s Cup Jaime Luaces/Selected Work
America’s Cup Jaime Luaces/Selected Work
House in Llabia (Girona)with b7202005-2006Completed
Rol: Project leader and project manager. Tasks: Designing, developing construction drawings, details, coordination with collaborators, engineers, cli-ent, craftsmen and contractor. Budget and schedule supervisionPhases: Construction Documents and Construction Administration until final completion.
House in Llabia Jaime Luaces/Selected Work
House in Llabia Jaime Luaces/Selected Work
House in Llabia Jaime Luaces/Selected Work
House in Llabia Jaime Luaces/Selected Work
House in Llabia Jaime Luaces/Selected Work
House in Llabia Jaime Luaces/Selected Work
World Trade Center Igualada (Offices, Retail Stores and Hotel complex) with b7202008-Rol: Project leader.Tasks: Led the competition to win this 53,000 m2 pro-ject. Coordinating the team members, developing de-sign and concepts Development of next phases, coordi-nating a 7 member team, contact with client, town hall staff, engineers and consultants. Supervising budgets and schedule, writting project narrative Revit software. Phases: Competition, Schematic Design, Design Devel-opment and Construction Documents.
WTC Igualada Jaime Luaces/Selected Work
WTC Igualada Jaime Luaces/Selected Work
WTC Igualada Jaime Luaces/Selected Work
WTC Igualada Jaime Luaces/Selected Work
3 4 5 6 7 8 10 11 12 13 14 15 16 17 18 19
C
B'
D'
9
7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80
7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80
1.95 1.95 1.95 1.95
1.20 1.20
127.20
6.80 6.80
4.00
8.75
9.00
3.75
25.5
0
127.20
1.201.20
16.30 79.00 6.80 25.10
25.5
0
3.75
9.00
8.75
4.00
7.8017.30 15.60 17.30
18.0
07.
50
7.8047.80
+25.23+25.08escalones
E1.N1
24PS1 - P05
30 x 16 cmescalones
E1.N2
24PS1 - P05
30 x 16 cm
3 4 5 6 7 8 10 11 12 13 14 15 16 17 18 19
C
B'
D'
9
7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80
7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80
1.95 1.95 1.95 1.95
127.20
1.20 1.20
17.30 6.80 47.80 7.80 6.80 40.70
25.2
75
3.77
58.
759.
003.
75
127.20
1.201.20
6.8016.30
25.5
0
4.00
8.75
9.00
3.75
18.0
07.
50
17.307.8071.207.80
+29.07+28.92escalones
E1.N1
24PS1 - P05
30 x 16 cmescalones
E1.N2
24PS1 - P05
30 x 16 cm
Nº Plano
Escalas
Archivo informático
Plano
[email protected] +34 93 363 7979Fax +34 93 363 0139Josep Tarradellas 123E-08029 Barcelona
La propiedad
Sellos
Fase
Emplazamiento
Colaboradores
Proyecto
Notas Generales
Modificaciones
El arquitecto
Fecha Nº Revisión
- No tomar medidas sobre planos.- Todas las dimensiones se deben comprobar en obra.- Posibles contradicciones entre documentos del proyecto deben
ser comunicadas inmediatamente a la D.F. que determinará suvalidez y prioridad.
- Los planos deben ser leidos en conjunto con todos losdocumentos relevantes del proyecto, incluida la documentaciónescrita y los planos de estructuras, instalaciones y fachada.
- Consultar los pliegos de condiciones antes de la puesta en obra.- No válido para construir sin el sello de aprobación de la D.F.- Prohibida la reproducción o difusión total o parcial de cualquier
documento del proyecto sin la autorización expresa de la D.F.- Las bases informáticas de los documentos del proyecto son
propiedad intelectual de los autores. Prohibida su reproducción odifusión.
Nº Proyecto
FERMÍN VÁZQUEZ HUARTE-MENDICOAnº de colegiado 19784-1
N
Capítulo / Subcapítulo
Plantas P04 - P05
Septiembre 2008
1 : 200 (A1)
A2B08
0807
Proyecto Básico
World Trade Center Igualada
WTC Igualada
0807.3-CENTRAL.rvt
Estructuras: BOMAInstalaciones: Grupo JGPaisajismo: Arquitectura AgronomiaMediciones: G3
Centre Direccional - Avinguda deCatalunya (Igualada)
2.PlantasB.Distribucion Edificio 1
E 1 : 200Planta Edificio 1 P.4
E 1 : 200Planta Edificio 1 P.5
City of Justicewith David Chipperfield architects and b7202003-2010CompletedRol: Interior design and building team memberTasks: Developing all the interior design elevations, sections and other drawings in the basement, type construction details and drawing. Also rearanging to new programming the general plans. Research of ma-terials, systems and manufacturers.Phases: Design development, Construction Docu-ment phase and occasionally Construction Adminis-tration for specific issues.
City of Justice Jaime Luaces/Selected Work
City of Justice Jaime Luaces/Selected Work
City of Justice Jaime Luaces/Selected Work
City of Justice Jaime Luaces/Selected Work
Agbar Tower interior designwith Atelier Jean Nouvel and b7202004-2005CompletedRol: Interior design team member. Tasks: Review and redrawing construction documents for 2 different areas in the tower. Upper levels, con-taining the high staff offices and Lower levels includ-ing Ground Floor entrance and auditorium and its premises. Phases: Construction Document phase and begining of construction.
Agbar tower interior design Jaime Luaces/Selected Work
Agbar tower interior design Jaime Luaces/Selected Work
Agbar tower interior design Jaime Luaces/Selected Work
Agbar tower interior design Jaime Luaces/Selected Work
Lleida-Alguaire Airportwith b7202008-2010CompletedRol: Team member. Tasks: Reviewing and coordinating the project differ-ent teams to compose all the written docs such as pro-ject narrative and specifications.Phases: Design Development and Construction Docu-ments.
Lleida-Alguaire Airport Jaime Luaces/Selected Work
Lleida-Alguaire Airport Jaime Luaces/Selected Work
Lleida-Alguaire Airport Jaime Luaces/Selected Work
Lleida-Alguaire Airport Jaime Luaces/Selected Work
Encants Market (Retail stores + flea market)with b7202009-In courseRol: Team member, Tasks: Developing Construction Documents with revit.Phases: Design Development and Construction Docu-ments.
Encants Market Jaime Luaces/Selected Work
Encants Market Jaime Luaces/Selected Work
SW8
Jaime Luaces Resume and selected work
http://issuu.com/jaime_luaces/docs/portfolio_issuu_sq
t/ +1 (978) 726 7415
t2/ (+34) 654 140 771