portfolio september 2009

20
Architect Deirdre Gaffney 2006 › BEE › Bachelor of Architecture - Final Project selected by Queensland University of Technology http://shapeofthingstocome.ci.qut.edu.au/?q=students/deirdre-gaffney PORTFOLIO

Upload: deirdregaffney

Post on 27-Jan-2015

110 views

Category:

Design


2 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Portfolio September 2009

ArchitectDeirdre Gaffney

2006 › BEE › Bachelor of Architecture - Final Project selected by Queensland University of Technology http://shapeofthingstocome.ci.qut.edu.au/?q=students/deirdre-gaffneyPORTFOLIO

Page 2: Portfolio September 2009

ArchitectDeirdre Gaffney

CONTACTOman (+968) 97 215 213 Dubai (+971) 566 9211 58

Personal Date of Birth 24 March 1983Marital Status SingleVisas Australian Citizen / Passport holder UAE Residency Expiry - Sep 2011Drivers Licences Qld, Australia Expiry - 2013 UAE Expiry – 2018Education Queensland University of TechnologyBachelor of Built Environment (Architectural Studies), Brisbane Australia 2003Bachelor of Architecture, Brisbane, Australia. 2006. Final Architectural design project selected to represent QUT ‘The Shape of Things to come’ exhibition, 2007 http://shapeofthingstocome.ci.qut.edu.au/

Royal Australian Institute of Architects Student Member 2002-2006 inclusive.Participant of the 2003 student exchange program – Tongji University, Shanghai 2003.Undergraduate thesis research involved a 6-week endeavour to the UK & Europe 2005.

Experience July 2008 to Jan 2009 - Earc, Dubai - Architect (Full Time)Jan 2009 to present - Earc, Muscatwww.earc.com.au Engaged on a full time 3-year contract in Dubai, United Arab Emirates by an Australian-based company, owned and operated by multi-award winning architect Noel Robinson. Role to provide assistance to the practice manager in establishing the company’s new premier design branch office in Dubai. Recent relocation to Muscat office to assist with major projects.Preparation of prequalification documents, fee proposals, marketing strategies and conducting business networking events including an earc company launch at Cityscape Dubai.Organisation of a Cityscape Dubai stand build and advertising materials.Design and presentation of a number of 5 star conceptual and masterplanning projects for middle-eastern clients. January 2005 to November 2006 Ellivo Architects, Brisbane - Student Architect (Full Time)November 2006 to June 2008 www.ellivo.com - Graduate Architect (Full Time)Completion of various residential, commercial and development projects under the sole supervi-sion of company directors & project architects. Participated in on-site measure and inspections. Liase with consultant teams, co-ordination of documentation, and chairing of consultant meetings, preparation of meeting minutes & client design presentations.Design Development, BA/ DA Drawings, Construction Drawings and 3D Renderings.

August 2002 to December 2004 Suters Architects, Brisbane - Architectural Assistantwww.sutersarchitects.com.au (Full Time) Participated in a team to assist the Project Architect on various hospital, health care, commercial tenancy interior fit-outs, multi-residential and residential projects.Liase with consultant teams and co-ordination of documentation under the supervision of senior associates.Schematic Design, Design Development, Construction Drawings and 3D Renderings.Preparation and presentation of 3D Models, interior designs, joinery designs, colour and sample

[email protected]

CURRENT ADDRESSAl Azaiba, Muscat, OMAN

B.BEnv. Architectural Studies / B.Architecture

Page 3: Portfolio September 2009

CLIENTEXPLORE INVESTMENTS

Masterplanned multi-use development on prime position land in Al Jadaf, Dubai, involving G+30 height allowance. Includes the preparation of numerous design options and area calculations studies for a Kuwait-based development client, 3D massing studies and submission to the Dubai Municipality. Currently awaiting approvals.

Estimated $200m

DEIRDRE GAFFNEYPORTFOLIO OF WORKS

EMPLOYEREARC DUBAI / NOEL ROBINSON ARCHITECTS

Dubai GatewayDubai, United Arab Emirates

Page 4: Portfolio September 2009

Deep DiveDubai, United Arab Emirates

CLIENTSELECT NY

Conceptual project commissioned by Geneva-based development company for a new world-class deep dive facility based in Dubai with the view to develop the same concept in further locations around the world such as Russia and New York.

Deep Dive Dubai seeks to encapsulate in a single building the holistic nature of the diving experi-ence from its immediate sense of enjoyment and discovery to its broader context of training, science and education. The proposed complex is a unique opportunity to develop an entity that will be a point of reference for the divers of the world. The architecture has been considered as an assemblage of minimalistic and pure forms that are independent of each other but overlap and interlock to form a more complex object, like the mechanism of a watch.

Estimated $200m

DEIRDRE GAFFNEYPORTFOLIO OF WORKS

EMPLOYEREARC DUBAI / NOEL ROBINSON ARCHITECTS

Page 5: Portfolio September 2009

Government Guest HouseMuscat, Oman

CLIENTSULTANATE OF OMAN

Schematic Concept Design for a 5-star Government Guest House on prime-position land over-looking the omani coastline. Parliamentary guests including heads of state, prime ministers and their entourage will be housed in VIP guest suites including a 40-room hotel, 200 capacity function facility and private serviced apartments.

Currently awaiting signoff to proceed with design development.

Estimated 10m Euros build price.

DEIRDRE GAFFNEYPORTFOLIO OF WORKS

EMPLOYEREARC DUBAI / NOEL ROBINSON ARCHITECTS

Page 6: Portfolio September 2009

Government Guest HouseMuscat, Oman

CLIENTSULTANATE OF OMAN

DEIRDRE GAFFNEYPORTFOLIO OF WORKS

EMPLOYEREARC DUBAI / NOEL ROBINSON ARCHITECTS

Schematic Concept Design for a 5-star Government Guest House on prime-position land over-looking the omani coastline. Parliamentary guests including heads of state, prime ministers and their entourage will be housed in VIP guest suites including a 40-room hotel, 200 capacity function facility and private serviced apartments.

Currently awaiting signoff to proceed with design development.

Estimated 20m Euros build price.

Page 7: Portfolio September 2009

Sohar UniversitySohar, Oman

CLIENTSOHAR UNIVERSITY

earc was appointed by Sohar University to design and document 12 buildings within the two-hectare campus on the back of their intiial master planning commission.

Assistance to the team involved tender documentation and 3D visualisation of 4 of the main campus Stage 1 Buildings.

Estiamated $120m

DEIRDRE GAFFNEYPORTFOLIO OF WORKS

EMPLOYEREARC DUBAI / NOEL ROBINSON ARCHITECTS

Page 8: Portfolio September 2009

CLIENTMUSCAT MUNICIPALITY

Masterplanned VIP recreational club development on prime position land in Muscat, Oman, involving community facilities for use by the Muscat Municipality and it’s employees. Includes fa-cilities such as a 5-star hammam, gymnasium, indoor pool and mens/ladies quarters, 200 capacity function facility, and prestige beach-front recreational facilities.

Currently awaiting signoff to proceed with design development with the view to further develop masterplans of adjacent sites.

Estimated $100m

DEIRDRE GAFFNEYPORTFOLIO OF WORKS

EMPLOYEREARC DUBAI / NOEL ROBINSON ARCHITECTS

Muscat Municipality Recreation ClubMuscat, Oman

Page 9: Portfolio September 2009

Al Azaiba HotelMuscat, Oman

CLIENTSHEIKH MOHAMMAD

earc was appointed to provide a number of conceptual designs and preliminary feasilibility studies for a new 4 star hotel on prime position property in the heart of a tourism precinct in Muscat. Involvement including concept design, 3D visualisation and presentation to the Sheikh. Drawings prepared in softline sketch and sketchup 7.

DEIRDRE GAFFNEYPORTFOLIO OF WORKS

EMPLOYEREARC DUBAI / NOEL ROBINSON ARCHITECTS

Page 10: Portfolio September 2009

DEIRDRE GAFFNEYPORTFOLIO OF WORKS

EMPLOYEREARC DUBAI / NOEL ROBINSON ARCHITECTS

Al Azaiba HotelMuscat, Omanearc was appointed to provide a number of conceptual designs and preliminary feasilibility studies for a new 4 star hotel on prime position property in the heart of a tourism precinct in Muscat. Involvement including concept design, 3D visualisation and presentation to the Sheikh. Drawings prepared in softline sketch and sketchup 7.

Page 11: Portfolio September 2009

MDC Al Mawalih - 3D Massing Study

Al Mawalih Mixed Use Development Muscat, Oman

DEIRDRE GAFFNEYPORTFOLIO OF WORKS

EMPLOYEREARC DUBAI / NOEL ROBINSON ARCHITECTS

MDC Al Mawalih - Master Planning

Masterplanned multi-use development in Al Sahwa, Oman involving G+5 commercial height allowance. Includes the preparation of numerous design options and area calculations studies for feasibility / subdivision approval, 3D massing studies and submission to the Muscat Municipality.

Currently awaiting client signoff to proceed with design development.

Estimated $200m

MDC Al Mawalih - Streetscape Section

OVERLOOKING: Overlooking of duplexes has been controlled by the separation to the residential units of the internal road system providing a distance in excess of twenty (20) metres.Each duplex will also be provided with screening devices where appropriate.

RETAIL / COMMERCIAL: The retail / commercial component is located at ground �oor level at the perimeter of the site providing easy access from both outside and from within the site, maintaining residents privacy.

Project Features:Sence of Comunity spiritSocial InteractivityProvision of open comunal spaceIntegrated landscaped environmentintegrated vehicular movement with the provision of ample open and besment carparkingAdding value to the surrounding neighbourhoodProvision of neighbourhood school and hospitalProvision of a�ordable alternate living stylesValue added facility for the surrounding neighbourhood

SITE CONSIDERATIONS

COMMUNAL SPACE: Private communal space for residents has been provided in three parts - centrally in Zones A, D and E.These spaces will provide recreation and leisure activities for access by all residents.

PARKING: Private parking for duplexes is provided on site attached to each residence.Private parking for residential units will be provided via access to a basement carpark.Sta� car parking for retail / commercial zones will be provided in the basement.Visitor car parking is provided on site alongside the internal road system.Customer car parking to the retail / commercial sector is proposed to be located on eitherside of the Entry No1 within the road reserve.

PRIVACY: Privacy to all residential units is ensured by maintaining a minimum setback to any plot boundary (excluding site boundary) of six (6) metres and between residential buildings a minimum of twenty (20) metres.

MDC Al Mawalih - 3D Massing Study

Dev

elop

men

ts in

sur

roun

ding

are

a

Adjoining Developments + Height Analysis- Analysis of heights and adoining development densities

CLIENTMAJAN DEVELOPMENT COMPANY

Page 12: Portfolio September 2009

CLIENTANTHONY JOHN GROUP

Masterplanned multi-use Transit Oriented Development (TOD) involving G+25 residential, hotel and office towers.

Currently awaiting Development Approval.

DEIRDRE GAFFNEYPORTFOLIO OF WORKS

EMPLOYEREARC DUBAI / NOEL ROBINSON ARCHITECTS

‘The Boulevard’Buranda TOD, Brisbane, Australia

Page 13: Portfolio September 2009

Santai Saltwater ResortTownsville, Queensland, Australia

CLIENTRESORTCORP

The first stage of the city’s prime waterfront development sites, Santai Resort Townsville (Lot 3), is a $150 million waterfront project, approved by the council in July 2008.

Forming a part of a masterplanned Saltwater development proposed by Resort Corp next to Jupiters casino, the mixed-use project of around 450 units built around an `eat street’ restaurant and retail hub features a 15-level tower as the centrepiece.

Estimated $500 millionhttp://www.saltwatertownsville.com.au/

DEIRDRE GAFFNEYPORTFOLIO OF WORKS

EMPLOYEREARC DUBAI / NOEL ROBINSON ARCHITECTS

Page 14: Portfolio September 2009

CLIENTPETRAC

Residential development in state-protected bushland involving the design and documentation of 17 individual holiday homes over 3 stages, an undertaking shared amongst 5 multi-award winning Queensland architectural practices. Each residence averages 280m². Lightweight construction, including fibre cement, timber weatherboard, metal cladding & glazing.

Stage 1 complete Aug 2007. Stage 2 currently under construction.

$70m Budgethttp://www.noosanorthshore.com.au/

DEIRDRE GAFFNEYPORTFOLIO OF WORKS

EMPLOYERELLIVO ARCHITECTS

Noosa North Shore ResortNoosa, Queensland, Australia

Page 15: Portfolio September 2009

Jade Luxury ApartmentsGold Coast, Queensland, Australia

CLIENTBEZZINA

Hi-end residential tower project including 13 apartments, each boasting an exclusive level and private plunge pool within the building. Building floor plate averages 300m² including maid’s quar-ters. In-situ and precast concrete construction, including glazing and cladding including imported stones and metal.

Construction completed October 2006.

$50m Budgethttp://www.bezzina.com.au/sitehome.aspx

DEIRDRE GAFFNEYPORTFOLIO OF WORKS

EMPLOYERELLIVO ARCHITECTS

Page 16: Portfolio September 2009

CLIENTROBINA LAND CORPORATION

Rising tall and elegant at the heart of Riverwalk and overlooking a tranquil lake, 38 Riverwalk Av-enue is the signature Riverwalk address. Multi-residential apartment tower project aimed at afford-able inner-city living demographic within Robina city centre, Gold Coast. The 39 apartments and 4 penthouses are all north east facing, featuring luxuries such as a porte-cochere, reception, pool and function area. Apartments average 100-120 m². Masonry construction, including lightweight FC cladding & cantilevering roof designs.

Construction complete October 2008.$20m Budgethttp://www.robina.com.au/38-riverwalk-avenue.html

DEIRDRE GAFFNEYPORTFOLIO OF WORKS

EMPLOYERELLIVO ARCHITECTS

38 Riverwalk Avenue ResidentialRobina, Queensland, Australia

Page 17: Portfolio September 2009

Cairns Hilton HotelCairns, Queensland, AustraliaMixed-use masterplan for a 25,000sqm hotel development on a prime-position vacant block of land in the heart of Cairns city, North Queensland. With the assistance of a company director, we shaped the building to meet the client’s request that the project be the ‘most photographed and iconic building in Cairns’, incorporating a major podium level public ‘thoroughfare’ and several water features and exposed wet-edge pools to the eastern street frontage. The 15-storey tower aimed at a 250-room hotel for the anticipated new ‘Hilton’ tenant, a mixture of private residential beach-view apartments and penthouse opportunities, 2 stories of office-commercial space and podium-level retail.

Estimated $120m Budget

DEIRDRE GAFFNEYPORTFOLIO OF WORKS

EMPLOYERELLIVO ARCHITECTS

Page 18: Portfolio September 2009

Commercial/ Retail development including 6 strata-titled tenancies to be retro-fitted post-construction. Development site area including external works of 1130 m² involving construction documentation in Revit for tender purposes. Masonry construction, including glazing, lightweight infill panels and external works.

Construction to commence March 2008.

$1m Budget

DEIRDRE GAFFNEYPORTFOLIO OF WORKS

EMPLOYERELLIVO ARCHITECTS

Market Street DevelopmentIndooroopilly, Queensland, Australia

Ground Floor

9100

Level 1

13100

Top of Parapet

18100

ABCDEFGH

1

A3-104

2

A3-103

2

A3-102

Roof Pitching Point

15860

HFC RB SC1

RB

RB

RB

RB

RB RB

RB

HFC

6310 7480 2110 2780 2610 5800 5590

2240

2760

4000

1000

Site

Boun

dary

Line

Site

Boun

dary

Line

W-06 W-05 W-04 W-03W-07

W-12 W-32 W-33

RB

2240

2760

4000

1000

1

A3-103

RB

HFCSCR-04screen to detail

SCR-02screen to detail

RB RB

SC1

SC1

?

?

HFC

HFC

6A6-301 8

A6-301

GB

GB

FGFG

FG

4200

300

SGN-08

SGN-07SGN-06

1000

0

SGN-05

SGN-02

SGN-01

Ground Floor

9100

Level 1

13100

Top of Parapet

18100

A B C D E F G H

1

A3-104

2

A3-103

2

A3-102

Roof Pitching Point

15860

Carpark Level

8100

1

A3-103

RBRB ?

D-03

Site

Boun

dary

Line

Site

Boun

dary

Line

1000

2240

2760

4000

1000

5590 5800 2610 2780 2110 7480 6360

1000

0

ABOVE FINISHED FLOOR LEVELAFFL

AWNINGAWN

BATTENS, TIMBERBT

BATTENS, ALUMINIUMBA

CENTRE POINTCEN

CH CEILING HEIGHT

CO COLORBOND ROOF SHEETING

DP DOWNPIPE (SPIRAL GALV U.N.O)

FFL FINISHED FLOOR LEVEL

FHR FIRE HOSE REEL

FG FIXED GLAZING

FGD FIXED GLAZED DOOR

HFC HARDIES FLUSH-SET FC CLADDING

HYD HYDRAULIC PIPEWORK

LV VENTILATION LOUVRES

MC SELECT METAL WALL CLADDING

PEN MASONRY PENETRATION

PFC HOT DIPPED GALVANIZED,WELDED PARALLEL FLANGECHANNEL + PAINT FINISH

TFC HOT DIPPED GALVANIZED,WELDED TAPERED FLANGECHANNEL + PAINT FINISH

RB RENDERED/PAINTED MASONRY

RDL RECESSED DOWNLIGHT

RWH RAINWATER HEAD

SP DRAINAGE SPITTER

S SIGNAGE PANEL TO CONTRACTOR'S DETAIL

SC1 SCYON MATRIX CLADDING (HARDIES)

SGD SLIDING GLASS DOOR

SPR DOWNPIPE SPREADER

SCR SCREEN TO DETAIL

SSL STRUCTURAL SLAB LEVEL

STF STEEL TROWEL FINISH

VP VENT PIPE TO HYDRAULIC ENG'S SPECS

TD GALVANIZED TRIMDEK ROOF SHEETING

DO DRAIN OUTLET

CONSTRUCTION NOTES:

1. REFER TO THESE DRAWINGS IN CONJUNCTION WITH ALL SCHEDULES ANDOTHER DOCUMENTATION PROVIDED BY PLANIT ARCHITECTS.2. REFER TO THESE DRAWINGS IN CONJUNCTION WITH THE PROJECTSPECIFICATION(S) AND OTHER DOCUMENTATION PROVIDED BY THE PROJECTMANAGER AND DOUMENTATION PROVIDED BY CONSULTANTS TO THE PROJECT.3. REFER ANY DISCREPANCIES TO THE PROJECT MANAGER AND COPY THECORESPONDANCE TO PLANIT ARCHITECTS.

N

0 1 2 3 cm54

01

23

cm5

4CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORECOMMENCING ANY WORK OR PRODUCING SHOP DRAWINGS. THESEDRAWINGS ARE PROTECTED BY THE LAWS OF COPYRIGHT AND MAYNOT BE COPIED OR REPRODUCED WITHOUT THE WRITTENPERMISSION OF PLANIT ARCHITECTURE AND MANAGEMENT P/L.DI

SCLA

IMER

PLANIT ARCHITECTS LEVEL 1, 112 BARRY PDE FORTITUDE VALLEY PO BOX 494 SPRING HILL Q 4004 T:[07] 3831 5055 F:[07] 3831 5066 W:planitarc.com.au E:[email protected] ACN 082 197 966

DRAW

ING

PRO

JECT

CLIE

NTDR

AWIN

G N

o.

JOB NUMBER DESIGN / DRAWN

A1 SCALE DATE CREATED

ISSUED FOR

ISSUE

PRICING

As indicated

11 Market Street, Indooroopilly

Lots 1 & 3 on SP158414

Dean FlemingPty Ltd

Commercial Development

06-063 SP/DG06/12/07

Building Elevations - East &West

A2-102

1 : 100East Elevation1

1 : 100West Elevation2

11-12-07 PRELIMINARY ISSUE P1

MATERIALS LEGEND:

KEY PLAN:

22-01-08 PRELIMINARY ISSUE BA

DATE REVISION ISSUE

01

14-02-08 PRELIMINARY ISSUE 01

FALL FALL

FALL

FALL

Top of Parapet

18100

CD

2

A3-103

20 150 0

950

30

50 100

Column in carpark below

LIFTCORE

LIFTOVER-RUN

LIFTCORE

2610

100mm spiral galv downpipebehind column at shownlocations on plans

Line of 150SHS post behind

1312 808

Lift construction to be confirmedupon sucessful tender of manufacturer.Refer to manufacturer'srecommendations and check structuralengineering requirements onsite.

Top of Lift over-run height to be confirmed.Flash over entire parapet perimeter.

opening heightto be confirmed

Drained balcony slab - 50mmmaximum cast-in pipework at minimumallowable fall to hyd eng's specification.

Fascia Truss 150mm wide x950mm high as required bystructural eng. along fulllength of balustrade edge.

100mm steel posts atcentres nominated onarchitect's elevation drawings

Allow 50mm fixing gap betweenmembers for fixing of 50x10mmwelded plates.

30mm cladding zone allowanceeither side of steel posts

190 x 50mm top plate rail alongfull length of balutrade edge.

1A5-201

506

FC lining on 20mm furringchannels direct fixed to u/sraking structure over. Referto elevation for raked ceilingpitching point heights.

190 x 50mm top plate rail alongfull length of balutrade edge.

190 x 50mm top plate rail alongfull length of balutrade edge.

Fascia Truss 150mm wide x652mm high as required bystructural eng. along full lengthof balustrade edge.

650

652

506

20 150 20 10

105

Galvanised Trimdek roof sheeting

20

20

100mm spiralgalv downpipebehind

10

10

TrimmingPurlin

PT4

PT4

PT4

PT4

PT4

Tiled surface T1

CONSTRUCTION NOTES:

1. REFER TO THESE DRAWINGS IN CONJUNCTION WITH ALL SCHEDULES ANDOTHER DOCUMENTATION PROVIDED BY PLANIT ARCHITECTS.2. REFER TO THESE DRAWINGS IN CONJUNCTION WITH THE PROJECTSPECIFICATION(S) AND OTHER DOCUMENTATION PROVIDED BY THE PROJECTMANAGER AND DOUMENTATION PROVIDED BY CONSULTANTS TO THE PROJECT.3. REFER ANY DISCREPANCIES TO THE PROJECT MANAGER AND COPY THECORESPONDANCE TO PLANIT ARCHITECTS.

Top of Parapet

18100

3A5-201

Webforge - 1mspans (width)with associatedfixings toperimeter edgebeam.

Perimeter Beam

1000

5020

0

Sim3

A5-201

provide stub columns in locationsnominated by structural engineer.provide collar flashing to all roofsheeting penetrations.

4016

030

170

3017

030

170

3017

0

Mechanical ductwithin ceiling.

R2.5 foil-backedinsulation

30200

310200

Galvanised Trimdekroof sheeting

SuspendedPlasterboard CeilingGrid as specified.

Welded proprietarysteel balustrade toBCA & Aust Standardsregulations.

Level 1

13100

Roof Pitching Point

15860

provide falls in slabsurface as per setouts.

line of 44 x 101mmglazing frame.

101

line of column behind

beam size to structuraleng's specifications.

select carpetfinish to

tenancy.

line of 44 x 101mmglazing frame.

suspendedceiling grid

as specified.

10mm FC

R1.5 insulatedstud wall over

reflectivesarking layer

10mm PB

cornice

provide fallsin slab

surface asper setouts.

90mm Steelstud layer

20mm metal furringchannel zone

10mm FC sheetcladding. Render &

Paint finish.

10mm FC sheetcladding. Render &Paint finish.

Drained balconyslab as per setouts.

line of downpipebehind

1000

250

5

1020 90 10

190

line of SHS postbehind

reflective sarkinglayer

F

50

P50 shadow angle direct fixed to wall & ceiling grid.Ensure rigid fixing to wall & ceiling grids to providesealed airconditioned environment within tenancy.

R1.8 insulated external wall.Maximum 120mm width.

35 120 35

Suspended Plasterboardceiling grid as specified.

FoyerTenancy

N

0 1 2 3 cm54

01

23

cm5

4

CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORECOMMENCING ANY WORK OR PRODUCING SHOP DRAWINGS. THESEDRAWINGS ARE PROTECTED BY THE LAWS OF COPYRIGHT AND MAYNOT BE COPIED OR REPRODUCED WITHOUT THE WRITTENPERMISSION OF PLANIT ARCHITECTURE AND MANAGEMENT P/L.DI

SCLA

IMER

PLANIT ARCHITECTS LEVEL 1, 112 BARRY PDE FORTITUDE VALLEY PO BOX 494 SPRING HILL Q 4004 T:[07] 3831 5055 F:[07] 3831 5066 W:planitarc.com.au E:[email protected] ACN 082 197 966

DRAW

ING

PRO

JECT

CLIE

NTDR

AWIN

G N

o.

JOB NUMBER DESIGN / DRAWN

A1 SCALE DATE CREATED

ISSUED FOR

ISSUE

PRICING

As indicated

11 Market Street, Indooroopilly

Lots 1 & 3 on SP158414

Dean FlemingPty Ltd

Commercial Development

06-063 SP/DG12/05/07

General Construction Details

A5-101

1 : 20Detail Section - Access Bridge Balcony1

06-12-07 PRELIMINARY ISSUE P1

KEY PLAN:

1 : 10Detail Section - Typical Trafficable Walkway Construction2

1 : 10Detail Section - Typical Sub-Sill / Head Detail4

1 : 10Detail Section - Hob Spitter3

22-01-08 PRELIMINARY ISSUE BA

DATE REVISION ISSUE

1 : 10Detail Section - Typical Concealed Cornice Detail5

01

14-02-08 PRELIMINARY ISSUE 01

FALL FALL

FALL FALL

FALL

Ground Floor

9100

Level 1

13100

Top of Parapet

18100

ABCDEFGH

1

A3-104

2

A3-1032

A3-102

Roof Pitching Point

15860

Carpark Level

8100

350

1

A3-103

2240

2760

4000

1000

6310 7480 2110 2780 2610 5800 5590

450w x 150d Box Gutter to detail

Line of parapet behind

RB

1500

Site

Boun

dary

Line

A/CUnitbehind

TrafficableWalkway & A/C

plant decks to detail

Line of lift core parapetbehind

HFC SC1

Line ofbulkhead overentry behind

7A5-201

KITCHENETTESTAIRVOID

2A3-201

TENANCY 6

outline painted SHS in wall behind

lightweight stud wall infill between SHS posts

Drained AwningSlab similar detail toaccess bridge

TFC to slab edge

Drained balcony slab

Signage to contractor's detail ?

TENANCY 1

90/90/90 FRL Masonry wall behind entry ramp to detailPlanter to landscapedetail drawings

Planter to landscapedetail drawings Planter to landscape

detail drawings

ramped concretedriveway surface tostructural & civilengineer'sspecifications.

solid balustrade to detail

eaves beam tostructural eng's

detail

Sim3

A5-103Allow minimum200mm clear zonefor select light fittings.

310

Sim1

A5-101

RB

A/C Ductwork asper Mech Eng'sDocumentationl

A/C Ductwork asper Mech Eng'sDocumentationl

2

A3-202

3

A3-202

6A5-201

applied waterproofing toretaining wall surface wherebelow finished ground level.

CONSTRUCTION NOTES:

1. REFER TO THESE DRAWINGS IN CONJUNCTION WITH ALL SCHEDULES ANDOTHER DOCUMENTATION PROVIDED BY PLANIT ARCHITECTS.2. REFER TO THESE DRAWINGS IN CONJUNCTION WITH THE PROJECTSPECIFICATION(S) AND OTHER DOCUMENTATION PROVIDED BY THE PROJECTMANAGER AND DOUMENTATION PROVIDED BY CONSULTANTS TO THE PROJECT.3. REFER ANY DISCREPANCIES TO THE PROJECT MANAGER AND COPY THECORESPONDANCE TO PLANIT ARCHITECTS.

ABOVE FINISHED FLOOR LEVELAFFL

AWNINGAWN

BATTENS, TIMBERBT

BATTENS, ALUMINIUMBA

CENTRE POINTCEN

CH CEILING HEIGHT

CO COLORBOND ROOF SHEETING

DP DOWNPIPE (SPIRAL GALV U.N.O)

FFL FINISHED FLOOR LEVEL

FHR FIRE HOSE REEL

FG FIXED GLAZING

FGD FIXED GLAZED DOOR

HFC HARDIES FLUSH-SET FC CLADDING

HYD HYDRAULIC PIPEWORK

LV VENTILATION LOUVRES

MC SELECT METAL WALL CLADDING

PEN MASONRY PENETRATION

PFC HOT DIPPED GALVANIZED,WELDED PARALLEL FLANGECHANNEL + PAINT FINISH

TFC HOT DIPPED GALVANIZED,WELDED TAPERED FLANGECHANNEL + PAINT FINISH

RB RENDERED/PAINTED MASONRY

RDL RECESSED DOWNLIGHT

RWH RAINWATER HEAD

SP DRAINAGE SPITTER

S SIGNAGE PANEL TO CONTRACTOR'S DETAIL

SC1 SCYON MATRIX CLADDING (HARDIES)

SGD SLIDING GLASS DOOR

SPR DOWNPIPE SPREADER

SCR SCREEN TO DETAIL

SSL STRUCTURAL SLAB LEVEL

STF STEEL TROWEL FINISH

VP VENT PIPE TO HYDRAULIC ENG'S SPECS

TD GALVANIZED TRIMDEK ROOF SHEETING

DO DRAIN OUTLET

Ground Floor

9100

Level 1

13100

Top of Parapet

18100

01 02

03 04 05 06 07 08

1

A3-101

2

A3-101

1

A3-102

Carpark Level

8100

Site

Boun

dary

Line

5590 5850 12000 2780 1200 3580 3850

A/CUnitbehind

TrafficableWalkway & A/C

plant decks todetail

A/CUnitbehind

A/CUnitbehind

A/CUnitbehind

W-09 W-11W-10

W-02W-01 W-03

W-12W-25 W-27W-26W-24W-23W-22W-20 W-21W-19

2700h ceiling

2240

2760

4000

1000

2700

FRL 60/60/60

FRL 90/90/90

FRL 90/90/90

HFCRB

?

RB RB RBDP RBDP HFC

RB

TD

line of parapet behind

Structural beamStructural beam

top of liftover-run

TD

Structural beam

Drained AwningSlab similar detail toaccess bridgebalcony slab.Refer to detail.

ramp up to ladderaccess point

3A3-201

OPEN DECK CARPARK

2000

1000

1000

RB

HFC

eaves beam tostructural eng's

detail

footing detail tostructural eng'sdocumentation

ag drain to civileng's doc's

TENANCY 3 TENANCY 4 TENANCY 5 TENANCY 6

TENANCY 1

Awning Type 2refer detail.

5

A5-201

applied waterproofing toretaining wall surface wherebelow finished ground level.

N

0 1 2 3 cm54

01

23

cm5

4

CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORECOMMENCING ANY WORK OR PRODUCING SHOP DRAWINGS. THESEDRAWINGS ARE PROTECTED BY THE LAWS OF COPYRIGHT AND MAYNOT BE COPIED OR REPRODUCED WITHOUT THE WRITTENPERMISSION OF PLANIT ARCHITECTURE AND MANAGEMENT P/L.DI

SCLA

IMER

PLANIT ARCHITECTS LEVEL 1, 112 BARRY PDE FORTITUDE VALLEY PO BOX 494 SPRING HILL Q 4004 T:[07] 3831 5055 F:[07] 3831 5066 W:planitarc.com.au E:[email protected] ACN 082 197 966

DRAW

ING

PRO

JECT

CLIE

NTDR

AWIN

G N

o.

JOB NUMBER DESIGN / DRAWN

A1 SCALE DATE CREATED

ISSUED FOR

ISSUE

PRICING

As indicated

11 Market Street, Indooroopilly

Lots 1 & 3 on SP158414

Dean FlemingPty Ltd

Commercial Development

06-063 SP/DG12/18/07

Building Sections - C-C &D-D

A3-102

1 : 100Section C-C1 MATERIALS LEGEND:

1 : 100Section D-D2

20-12-07 PRELIMINARY ISSUE P1

KEY PLAN:

22-01-08 PRELIMINARY ISSUE BA

DATE REVISION ISSUE

01

14-02-08 PRELIMINARY ISSUE 01

Page 19: Portfolio September 2009

Residential Community DevelopmentMurwillumbah, NSW, AustraliaResidential Development in the heart of a small country township in Murwillumbah for low-income demographic. Scheme includes a mix of 2 & 3 bed townhouses & rowhouses on a steeply sloping site.

Preparation of all schematic drawings involving cad plans, typical unit design, photoshop eleva-tions, open space and GFA calculations for preliminary approval by council.

DEIRDRE GAFFNEYPORTFOLIO OF WORKS

EMPLOYERELLIVO ARCHITECTS

Page 20: Portfolio September 2009

DEIRDRE GAFFNEYPORTFOLIO OF WORKS

EMPLOYERELLIVO ARCHITECTS

Residential Community DevelopmentMurwillumbah, NSW, AustraliaResidential Development in the heart of a small country township in Murwillumbah for low-income demographic. Scheme includes a mix of 2 & 3 bed townhouses & rowhouses on a steeply sloping site.

Preparation of all schematic drawings involving cad plans, typical unit design, photoshop eleva-tions, open space and GFA calculations for preliminary approval by council.