portfolio september 2009
DESCRIPTION
TRANSCRIPT
ArchitectDeirdre Gaffney
2006 › BEE › Bachelor of Architecture - Final Project selected by Queensland University of Technology http://shapeofthingstocome.ci.qut.edu.au/?q=students/deirdre-gaffneyPORTFOLIO
ArchitectDeirdre Gaffney
CONTACTOman (+968) 97 215 213 Dubai (+971) 566 9211 58
Personal Date of Birth 24 March 1983Marital Status SingleVisas Australian Citizen / Passport holder UAE Residency Expiry - Sep 2011Drivers Licences Qld, Australia Expiry - 2013 UAE Expiry – 2018Education Queensland University of TechnologyBachelor of Built Environment (Architectural Studies), Brisbane Australia 2003Bachelor of Architecture, Brisbane, Australia. 2006. Final Architectural design project selected to represent QUT ‘The Shape of Things to come’ exhibition, 2007 http://shapeofthingstocome.ci.qut.edu.au/
Royal Australian Institute of Architects Student Member 2002-2006 inclusive.Participant of the 2003 student exchange program – Tongji University, Shanghai 2003.Undergraduate thesis research involved a 6-week endeavour to the UK & Europe 2005.
Experience July 2008 to Jan 2009 - Earc, Dubai - Architect (Full Time)Jan 2009 to present - Earc, Muscatwww.earc.com.au Engaged on a full time 3-year contract in Dubai, United Arab Emirates by an Australian-based company, owned and operated by multi-award winning architect Noel Robinson. Role to provide assistance to the practice manager in establishing the company’s new premier design branch office in Dubai. Recent relocation to Muscat office to assist with major projects.Preparation of prequalification documents, fee proposals, marketing strategies and conducting business networking events including an earc company launch at Cityscape Dubai.Organisation of a Cityscape Dubai stand build and advertising materials.Design and presentation of a number of 5 star conceptual and masterplanning projects for middle-eastern clients. January 2005 to November 2006 Ellivo Architects, Brisbane - Student Architect (Full Time)November 2006 to June 2008 www.ellivo.com - Graduate Architect (Full Time)Completion of various residential, commercial and development projects under the sole supervi-sion of company directors & project architects. Participated in on-site measure and inspections. Liase with consultant teams, co-ordination of documentation, and chairing of consultant meetings, preparation of meeting minutes & client design presentations.Design Development, BA/ DA Drawings, Construction Drawings and 3D Renderings.
August 2002 to December 2004 Suters Architects, Brisbane - Architectural Assistantwww.sutersarchitects.com.au (Full Time) Participated in a team to assist the Project Architect on various hospital, health care, commercial tenancy interior fit-outs, multi-residential and residential projects.Liase with consultant teams and co-ordination of documentation under the supervision of senior associates.Schematic Design, Design Development, Construction Drawings and 3D Renderings.Preparation and presentation of 3D Models, interior designs, joinery designs, colour and sample
CURRENT ADDRESSAl Azaiba, Muscat, OMAN
B.BEnv. Architectural Studies / B.Architecture
CLIENTEXPLORE INVESTMENTS
Masterplanned multi-use development on prime position land in Al Jadaf, Dubai, involving G+30 height allowance. Includes the preparation of numerous design options and area calculations studies for a Kuwait-based development client, 3D massing studies and submission to the Dubai Municipality. Currently awaiting approvals.
Estimated $200m
DEIRDRE GAFFNEYPORTFOLIO OF WORKS
EMPLOYEREARC DUBAI / NOEL ROBINSON ARCHITECTS
Dubai GatewayDubai, United Arab Emirates
Deep DiveDubai, United Arab Emirates
CLIENTSELECT NY
Conceptual project commissioned by Geneva-based development company for a new world-class deep dive facility based in Dubai with the view to develop the same concept in further locations around the world such as Russia and New York.
Deep Dive Dubai seeks to encapsulate in a single building the holistic nature of the diving experi-ence from its immediate sense of enjoyment and discovery to its broader context of training, science and education. The proposed complex is a unique opportunity to develop an entity that will be a point of reference for the divers of the world. The architecture has been considered as an assemblage of minimalistic and pure forms that are independent of each other but overlap and interlock to form a more complex object, like the mechanism of a watch.
Estimated $200m
DEIRDRE GAFFNEYPORTFOLIO OF WORKS
EMPLOYEREARC DUBAI / NOEL ROBINSON ARCHITECTS
Government Guest HouseMuscat, Oman
CLIENTSULTANATE OF OMAN
Schematic Concept Design for a 5-star Government Guest House on prime-position land over-looking the omani coastline. Parliamentary guests including heads of state, prime ministers and their entourage will be housed in VIP guest suites including a 40-room hotel, 200 capacity function facility and private serviced apartments.
Currently awaiting signoff to proceed with design development.
Estimated 10m Euros build price.
DEIRDRE GAFFNEYPORTFOLIO OF WORKS
EMPLOYEREARC DUBAI / NOEL ROBINSON ARCHITECTS
Government Guest HouseMuscat, Oman
CLIENTSULTANATE OF OMAN
DEIRDRE GAFFNEYPORTFOLIO OF WORKS
EMPLOYEREARC DUBAI / NOEL ROBINSON ARCHITECTS
Schematic Concept Design for a 5-star Government Guest House on prime-position land over-looking the omani coastline. Parliamentary guests including heads of state, prime ministers and their entourage will be housed in VIP guest suites including a 40-room hotel, 200 capacity function facility and private serviced apartments.
Currently awaiting signoff to proceed with design development.
Estimated 20m Euros build price.
Sohar UniversitySohar, Oman
CLIENTSOHAR UNIVERSITY
earc was appointed by Sohar University to design and document 12 buildings within the two-hectare campus on the back of their intiial master planning commission.
Assistance to the team involved tender documentation and 3D visualisation of 4 of the main campus Stage 1 Buildings.
Estiamated $120m
DEIRDRE GAFFNEYPORTFOLIO OF WORKS
EMPLOYEREARC DUBAI / NOEL ROBINSON ARCHITECTS
CLIENTMUSCAT MUNICIPALITY
Masterplanned VIP recreational club development on prime position land in Muscat, Oman, involving community facilities for use by the Muscat Municipality and it’s employees. Includes fa-cilities such as a 5-star hammam, gymnasium, indoor pool and mens/ladies quarters, 200 capacity function facility, and prestige beach-front recreational facilities.
Currently awaiting signoff to proceed with design development with the view to further develop masterplans of adjacent sites.
Estimated $100m
DEIRDRE GAFFNEYPORTFOLIO OF WORKS
EMPLOYEREARC DUBAI / NOEL ROBINSON ARCHITECTS
Muscat Municipality Recreation ClubMuscat, Oman
Al Azaiba HotelMuscat, Oman
CLIENTSHEIKH MOHAMMAD
earc was appointed to provide a number of conceptual designs and preliminary feasilibility studies for a new 4 star hotel on prime position property in the heart of a tourism precinct in Muscat. Involvement including concept design, 3D visualisation and presentation to the Sheikh. Drawings prepared in softline sketch and sketchup 7.
DEIRDRE GAFFNEYPORTFOLIO OF WORKS
EMPLOYEREARC DUBAI / NOEL ROBINSON ARCHITECTS
DEIRDRE GAFFNEYPORTFOLIO OF WORKS
EMPLOYEREARC DUBAI / NOEL ROBINSON ARCHITECTS
Al Azaiba HotelMuscat, Omanearc was appointed to provide a number of conceptual designs and preliminary feasilibility studies for a new 4 star hotel on prime position property in the heart of a tourism precinct in Muscat. Involvement including concept design, 3D visualisation and presentation to the Sheikh. Drawings prepared in softline sketch and sketchup 7.
MDC Al Mawalih - 3D Massing Study
Al Mawalih Mixed Use Development Muscat, Oman
DEIRDRE GAFFNEYPORTFOLIO OF WORKS
EMPLOYEREARC DUBAI / NOEL ROBINSON ARCHITECTS
MDC Al Mawalih - Master Planning
Masterplanned multi-use development in Al Sahwa, Oman involving G+5 commercial height allowance. Includes the preparation of numerous design options and area calculations studies for feasibility / subdivision approval, 3D massing studies and submission to the Muscat Municipality.
Currently awaiting client signoff to proceed with design development.
Estimated $200m
MDC Al Mawalih - Streetscape Section
OVERLOOKING: Overlooking of duplexes has been controlled by the separation to the residential units of the internal road system providing a distance in excess of twenty (20) metres.Each duplex will also be provided with screening devices where appropriate.
RETAIL / COMMERCIAL: The retail / commercial component is located at ground �oor level at the perimeter of the site providing easy access from both outside and from within the site, maintaining residents privacy.
Project Features:Sence of Comunity spiritSocial InteractivityProvision of open comunal spaceIntegrated landscaped environmentintegrated vehicular movement with the provision of ample open and besment carparkingAdding value to the surrounding neighbourhoodProvision of neighbourhood school and hospitalProvision of a�ordable alternate living stylesValue added facility for the surrounding neighbourhood
SITE CONSIDERATIONS
COMMUNAL SPACE: Private communal space for residents has been provided in three parts - centrally in Zones A, D and E.These spaces will provide recreation and leisure activities for access by all residents.
PARKING: Private parking for duplexes is provided on site attached to each residence.Private parking for residential units will be provided via access to a basement carpark.Sta� car parking for retail / commercial zones will be provided in the basement.Visitor car parking is provided on site alongside the internal road system.Customer car parking to the retail / commercial sector is proposed to be located on eitherside of the Entry No1 within the road reserve.
PRIVACY: Privacy to all residential units is ensured by maintaining a minimum setback to any plot boundary (excluding site boundary) of six (6) metres and between residential buildings a minimum of twenty (20) metres.
MDC Al Mawalih - 3D Massing Study
Dev
elop
men
ts in
sur
roun
ding
are
a
Adjoining Developments + Height Analysis- Analysis of heights and adoining development densities
CLIENTMAJAN DEVELOPMENT COMPANY
CLIENTANTHONY JOHN GROUP
Masterplanned multi-use Transit Oriented Development (TOD) involving G+25 residential, hotel and office towers.
Currently awaiting Development Approval.
DEIRDRE GAFFNEYPORTFOLIO OF WORKS
EMPLOYEREARC DUBAI / NOEL ROBINSON ARCHITECTS
‘The Boulevard’Buranda TOD, Brisbane, Australia
Santai Saltwater ResortTownsville, Queensland, Australia
CLIENTRESORTCORP
The first stage of the city’s prime waterfront development sites, Santai Resort Townsville (Lot 3), is a $150 million waterfront project, approved by the council in July 2008.
Forming a part of a masterplanned Saltwater development proposed by Resort Corp next to Jupiters casino, the mixed-use project of around 450 units built around an `eat street’ restaurant and retail hub features a 15-level tower as the centrepiece.
Estimated $500 millionhttp://www.saltwatertownsville.com.au/
DEIRDRE GAFFNEYPORTFOLIO OF WORKS
EMPLOYEREARC DUBAI / NOEL ROBINSON ARCHITECTS
CLIENTPETRAC
Residential development in state-protected bushland involving the design and documentation of 17 individual holiday homes over 3 stages, an undertaking shared amongst 5 multi-award winning Queensland architectural practices. Each residence averages 280m². Lightweight construction, including fibre cement, timber weatherboard, metal cladding & glazing.
Stage 1 complete Aug 2007. Stage 2 currently under construction.
$70m Budgethttp://www.noosanorthshore.com.au/
DEIRDRE GAFFNEYPORTFOLIO OF WORKS
EMPLOYERELLIVO ARCHITECTS
Noosa North Shore ResortNoosa, Queensland, Australia
Jade Luxury ApartmentsGold Coast, Queensland, Australia
CLIENTBEZZINA
Hi-end residential tower project including 13 apartments, each boasting an exclusive level and private plunge pool within the building. Building floor plate averages 300m² including maid’s quar-ters. In-situ and precast concrete construction, including glazing and cladding including imported stones and metal.
Construction completed October 2006.
$50m Budgethttp://www.bezzina.com.au/sitehome.aspx
DEIRDRE GAFFNEYPORTFOLIO OF WORKS
EMPLOYERELLIVO ARCHITECTS
CLIENTROBINA LAND CORPORATION
Rising tall and elegant at the heart of Riverwalk and overlooking a tranquil lake, 38 Riverwalk Av-enue is the signature Riverwalk address. Multi-residential apartment tower project aimed at afford-able inner-city living demographic within Robina city centre, Gold Coast. The 39 apartments and 4 penthouses are all north east facing, featuring luxuries such as a porte-cochere, reception, pool and function area. Apartments average 100-120 m². Masonry construction, including lightweight FC cladding & cantilevering roof designs.
Construction complete October 2008.$20m Budgethttp://www.robina.com.au/38-riverwalk-avenue.html
DEIRDRE GAFFNEYPORTFOLIO OF WORKS
EMPLOYERELLIVO ARCHITECTS
38 Riverwalk Avenue ResidentialRobina, Queensland, Australia
Cairns Hilton HotelCairns, Queensland, AustraliaMixed-use masterplan for a 25,000sqm hotel development on a prime-position vacant block of land in the heart of Cairns city, North Queensland. With the assistance of a company director, we shaped the building to meet the client’s request that the project be the ‘most photographed and iconic building in Cairns’, incorporating a major podium level public ‘thoroughfare’ and several water features and exposed wet-edge pools to the eastern street frontage. The 15-storey tower aimed at a 250-room hotel for the anticipated new ‘Hilton’ tenant, a mixture of private residential beach-view apartments and penthouse opportunities, 2 stories of office-commercial space and podium-level retail.
Estimated $120m Budget
DEIRDRE GAFFNEYPORTFOLIO OF WORKS
EMPLOYERELLIVO ARCHITECTS
Commercial/ Retail development including 6 strata-titled tenancies to be retro-fitted post-construction. Development site area including external works of 1130 m² involving construction documentation in Revit for tender purposes. Masonry construction, including glazing, lightweight infill panels and external works.
Construction to commence March 2008.
$1m Budget
DEIRDRE GAFFNEYPORTFOLIO OF WORKS
EMPLOYERELLIVO ARCHITECTS
Market Street DevelopmentIndooroopilly, Queensland, Australia
Ground Floor
9100
Level 1
13100
Top of Parapet
18100
ABCDEFGH
1
A3-104
2
A3-103
2
A3-102
Roof Pitching Point
15860
HFC RB SC1
RB
RB
RB
RB
RB RB
RB
HFC
6310 7480 2110 2780 2610 5800 5590
2240
2760
4000
1000
Site
Boun
dary
Line
Site
Boun
dary
Line
W-06 W-05 W-04 W-03W-07
W-12 W-32 W-33
RB
2240
2760
4000
1000
1
A3-103
RB
HFCSCR-04screen to detail
SCR-02screen to detail
RB RB
SC1
SC1
?
?
HFC
HFC
6A6-301 8
A6-301
GB
GB
FGFG
FG
4200
300
SGN-08
SGN-07SGN-06
1000
0
SGN-05
SGN-02
SGN-01
Ground Floor
9100
Level 1
13100
Top of Parapet
18100
A B C D E F G H
1
A3-104
2
A3-103
2
A3-102
Roof Pitching Point
15860
Carpark Level
8100
1
A3-103
RBRB ?
D-03
Site
Boun
dary
Line
Site
Boun
dary
Line
1000
2240
2760
4000
1000
5590 5800 2610 2780 2110 7480 6360
1000
0
ABOVE FINISHED FLOOR LEVELAFFL
AWNINGAWN
BATTENS, TIMBERBT
BATTENS, ALUMINIUMBA
CENTRE POINTCEN
CH CEILING HEIGHT
CO COLORBOND ROOF SHEETING
DP DOWNPIPE (SPIRAL GALV U.N.O)
FFL FINISHED FLOOR LEVEL
FHR FIRE HOSE REEL
FG FIXED GLAZING
FGD FIXED GLAZED DOOR
HFC HARDIES FLUSH-SET FC CLADDING
HYD HYDRAULIC PIPEWORK
LV VENTILATION LOUVRES
MC SELECT METAL WALL CLADDING
PEN MASONRY PENETRATION
PFC HOT DIPPED GALVANIZED,WELDED PARALLEL FLANGECHANNEL + PAINT FINISH
TFC HOT DIPPED GALVANIZED,WELDED TAPERED FLANGECHANNEL + PAINT FINISH
RB RENDERED/PAINTED MASONRY
RDL RECESSED DOWNLIGHT
RWH RAINWATER HEAD
SP DRAINAGE SPITTER
S SIGNAGE PANEL TO CONTRACTOR'S DETAIL
SC1 SCYON MATRIX CLADDING (HARDIES)
SGD SLIDING GLASS DOOR
SPR DOWNPIPE SPREADER
SCR SCREEN TO DETAIL
SSL STRUCTURAL SLAB LEVEL
STF STEEL TROWEL FINISH
VP VENT PIPE TO HYDRAULIC ENG'S SPECS
TD GALVANIZED TRIMDEK ROOF SHEETING
DO DRAIN OUTLET
CONSTRUCTION NOTES:
1. REFER TO THESE DRAWINGS IN CONJUNCTION WITH ALL SCHEDULES ANDOTHER DOCUMENTATION PROVIDED BY PLANIT ARCHITECTS.2. REFER TO THESE DRAWINGS IN CONJUNCTION WITH THE PROJECTSPECIFICATION(S) AND OTHER DOCUMENTATION PROVIDED BY THE PROJECTMANAGER AND DOUMENTATION PROVIDED BY CONSULTANTS TO THE PROJECT.3. REFER ANY DISCREPANCIES TO THE PROJECT MANAGER AND COPY THECORESPONDANCE TO PLANIT ARCHITECTS.
N
0 1 2 3 cm54
01
23
cm5
4CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORECOMMENCING ANY WORK OR PRODUCING SHOP DRAWINGS. THESEDRAWINGS ARE PROTECTED BY THE LAWS OF COPYRIGHT AND MAYNOT BE COPIED OR REPRODUCED WITHOUT THE WRITTENPERMISSION OF PLANIT ARCHITECTURE AND MANAGEMENT P/L.DI
SCLA
IMER
PLANIT ARCHITECTS LEVEL 1, 112 BARRY PDE FORTITUDE VALLEY PO BOX 494 SPRING HILL Q 4004 T:[07] 3831 5055 F:[07] 3831 5066 W:planitarc.com.au E:[email protected] ACN 082 197 966
DRAW
ING
PRO
JECT
CLIE
NTDR
AWIN
G N
o.
JOB NUMBER DESIGN / DRAWN
A1 SCALE DATE CREATED
ISSUED FOR
ISSUE
PRICING
As indicated
11 Market Street, Indooroopilly
Lots 1 & 3 on SP158414
Dean FlemingPty Ltd
Commercial Development
06-063 SP/DG06/12/07
Building Elevations - East &West
A2-102
1 : 100East Elevation1
1 : 100West Elevation2
11-12-07 PRELIMINARY ISSUE P1
MATERIALS LEGEND:
KEY PLAN:
22-01-08 PRELIMINARY ISSUE BA
DATE REVISION ISSUE
01
14-02-08 PRELIMINARY ISSUE 01
FALL FALL
FALL
FALL
Top of Parapet
18100
CD
2
A3-103
20 150 0
950
30
50 100
Column in carpark below
LIFTCORE
LIFTOVER-RUN
LIFTCORE
2610
100mm spiral galv downpipebehind column at shownlocations on plans
Line of 150SHS post behind
1312 808
Lift construction to be confirmedupon sucessful tender of manufacturer.Refer to manufacturer'srecommendations and check structuralengineering requirements onsite.
Top of Lift over-run height to be confirmed.Flash over entire parapet perimeter.
opening heightto be confirmed
Drained balcony slab - 50mmmaximum cast-in pipework at minimumallowable fall to hyd eng's specification.
Fascia Truss 150mm wide x950mm high as required bystructural eng. along fulllength of balustrade edge.
100mm steel posts atcentres nominated onarchitect's elevation drawings
Allow 50mm fixing gap betweenmembers for fixing of 50x10mmwelded plates.
30mm cladding zone allowanceeither side of steel posts
190 x 50mm top plate rail alongfull length of balutrade edge.
1A5-201
506
FC lining on 20mm furringchannels direct fixed to u/sraking structure over. Referto elevation for raked ceilingpitching point heights.
190 x 50mm top plate rail alongfull length of balutrade edge.
190 x 50mm top plate rail alongfull length of balutrade edge.
Fascia Truss 150mm wide x652mm high as required bystructural eng. along full lengthof balustrade edge.
650
652
506
20 150 20 10
105
Galvanised Trimdek roof sheeting
20
20
100mm spiralgalv downpipebehind
10
10
TrimmingPurlin
PT4
PT4
PT4
PT4
PT4
Tiled surface T1
CONSTRUCTION NOTES:
1. REFER TO THESE DRAWINGS IN CONJUNCTION WITH ALL SCHEDULES ANDOTHER DOCUMENTATION PROVIDED BY PLANIT ARCHITECTS.2. REFER TO THESE DRAWINGS IN CONJUNCTION WITH THE PROJECTSPECIFICATION(S) AND OTHER DOCUMENTATION PROVIDED BY THE PROJECTMANAGER AND DOUMENTATION PROVIDED BY CONSULTANTS TO THE PROJECT.3. REFER ANY DISCREPANCIES TO THE PROJECT MANAGER AND COPY THECORESPONDANCE TO PLANIT ARCHITECTS.
Top of Parapet
18100
3A5-201
Webforge - 1mspans (width)with associatedfixings toperimeter edgebeam.
Perimeter Beam
1000
5020
0
Sim3
A5-201
provide stub columns in locationsnominated by structural engineer.provide collar flashing to all roofsheeting penetrations.
4016
030
170
3017
030
170
3017
0
Mechanical ductwithin ceiling.
R2.5 foil-backedinsulation
30200
310200
Galvanised Trimdekroof sheeting
SuspendedPlasterboard CeilingGrid as specified.
Welded proprietarysteel balustrade toBCA & Aust Standardsregulations.
Level 1
13100
Roof Pitching Point
15860
provide falls in slabsurface as per setouts.
line of 44 x 101mmglazing frame.
101
line of column behind
beam size to structuraleng's specifications.
select carpetfinish to
tenancy.
line of 44 x 101mmglazing frame.
suspendedceiling grid
as specified.
10mm FC
R1.5 insulatedstud wall over
reflectivesarking layer
10mm PB
cornice
provide fallsin slab
surface asper setouts.
90mm Steelstud layer
20mm metal furringchannel zone
10mm FC sheetcladding. Render &
Paint finish.
10mm FC sheetcladding. Render &Paint finish.
Drained balconyslab as per setouts.
line of downpipebehind
1000
250
5
1020 90 10
190
line of SHS postbehind
reflective sarkinglayer
F
50
P50 shadow angle direct fixed to wall & ceiling grid.Ensure rigid fixing to wall & ceiling grids to providesealed airconditioned environment within tenancy.
R1.8 insulated external wall.Maximum 120mm width.
35 120 35
Suspended Plasterboardceiling grid as specified.
FoyerTenancy
N
0 1 2 3 cm54
01
23
cm5
4
CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORECOMMENCING ANY WORK OR PRODUCING SHOP DRAWINGS. THESEDRAWINGS ARE PROTECTED BY THE LAWS OF COPYRIGHT AND MAYNOT BE COPIED OR REPRODUCED WITHOUT THE WRITTENPERMISSION OF PLANIT ARCHITECTURE AND MANAGEMENT P/L.DI
SCLA
IMER
PLANIT ARCHITECTS LEVEL 1, 112 BARRY PDE FORTITUDE VALLEY PO BOX 494 SPRING HILL Q 4004 T:[07] 3831 5055 F:[07] 3831 5066 W:planitarc.com.au E:[email protected] ACN 082 197 966
DRAW
ING
PRO
JECT
CLIE
NTDR
AWIN
G N
o.
JOB NUMBER DESIGN / DRAWN
A1 SCALE DATE CREATED
ISSUED FOR
ISSUE
PRICING
As indicated
11 Market Street, Indooroopilly
Lots 1 & 3 on SP158414
Dean FlemingPty Ltd
Commercial Development
06-063 SP/DG12/05/07
General Construction Details
A5-101
1 : 20Detail Section - Access Bridge Balcony1
06-12-07 PRELIMINARY ISSUE P1
KEY PLAN:
1 : 10Detail Section - Typical Trafficable Walkway Construction2
1 : 10Detail Section - Typical Sub-Sill / Head Detail4
1 : 10Detail Section - Hob Spitter3
22-01-08 PRELIMINARY ISSUE BA
DATE REVISION ISSUE
1 : 10Detail Section - Typical Concealed Cornice Detail5
01
14-02-08 PRELIMINARY ISSUE 01
FALL FALL
FALL FALL
FALL
Ground Floor
9100
Level 1
13100
Top of Parapet
18100
ABCDEFGH
1
A3-104
2
A3-1032
A3-102
Roof Pitching Point
15860
Carpark Level
8100
350
1
A3-103
2240
2760
4000
1000
6310 7480 2110 2780 2610 5800 5590
450w x 150d Box Gutter to detail
Line of parapet behind
RB
1500
Site
Boun
dary
Line
A/CUnitbehind
TrafficableWalkway & A/C
plant decks to detail
Line of lift core parapetbehind
HFC SC1
Line ofbulkhead overentry behind
7A5-201
KITCHENETTESTAIRVOID
2A3-201
TENANCY 6
outline painted SHS in wall behind
lightweight stud wall infill between SHS posts
Drained AwningSlab similar detail toaccess bridge
TFC to slab edge
Drained balcony slab
Signage to contractor's detail ?
TENANCY 1
90/90/90 FRL Masonry wall behind entry ramp to detailPlanter to landscapedetail drawings
Planter to landscapedetail drawings Planter to landscape
detail drawings
ramped concretedriveway surface tostructural & civilengineer'sspecifications.
solid balustrade to detail
eaves beam tostructural eng's
detail
Sim3
A5-103Allow minimum200mm clear zonefor select light fittings.
310
Sim1
A5-101
RB
A/C Ductwork asper Mech Eng'sDocumentationl
A/C Ductwork asper Mech Eng'sDocumentationl
2
A3-202
3
A3-202
6A5-201
applied waterproofing toretaining wall surface wherebelow finished ground level.
CONSTRUCTION NOTES:
1. REFER TO THESE DRAWINGS IN CONJUNCTION WITH ALL SCHEDULES ANDOTHER DOCUMENTATION PROVIDED BY PLANIT ARCHITECTS.2. REFER TO THESE DRAWINGS IN CONJUNCTION WITH THE PROJECTSPECIFICATION(S) AND OTHER DOCUMENTATION PROVIDED BY THE PROJECTMANAGER AND DOUMENTATION PROVIDED BY CONSULTANTS TO THE PROJECT.3. REFER ANY DISCREPANCIES TO THE PROJECT MANAGER AND COPY THECORESPONDANCE TO PLANIT ARCHITECTS.
ABOVE FINISHED FLOOR LEVELAFFL
AWNINGAWN
BATTENS, TIMBERBT
BATTENS, ALUMINIUMBA
CENTRE POINTCEN
CH CEILING HEIGHT
CO COLORBOND ROOF SHEETING
DP DOWNPIPE (SPIRAL GALV U.N.O)
FFL FINISHED FLOOR LEVEL
FHR FIRE HOSE REEL
FG FIXED GLAZING
FGD FIXED GLAZED DOOR
HFC HARDIES FLUSH-SET FC CLADDING
HYD HYDRAULIC PIPEWORK
LV VENTILATION LOUVRES
MC SELECT METAL WALL CLADDING
PEN MASONRY PENETRATION
PFC HOT DIPPED GALVANIZED,WELDED PARALLEL FLANGECHANNEL + PAINT FINISH
TFC HOT DIPPED GALVANIZED,WELDED TAPERED FLANGECHANNEL + PAINT FINISH
RB RENDERED/PAINTED MASONRY
RDL RECESSED DOWNLIGHT
RWH RAINWATER HEAD
SP DRAINAGE SPITTER
S SIGNAGE PANEL TO CONTRACTOR'S DETAIL
SC1 SCYON MATRIX CLADDING (HARDIES)
SGD SLIDING GLASS DOOR
SPR DOWNPIPE SPREADER
SCR SCREEN TO DETAIL
SSL STRUCTURAL SLAB LEVEL
STF STEEL TROWEL FINISH
VP VENT PIPE TO HYDRAULIC ENG'S SPECS
TD GALVANIZED TRIMDEK ROOF SHEETING
DO DRAIN OUTLET
Ground Floor
9100
Level 1
13100
Top of Parapet
18100
01 02
03 04 05 06 07 08
1
A3-101
2
A3-101
1
A3-102
Carpark Level
8100
Site
Boun
dary
Line
5590 5850 12000 2780 1200 3580 3850
A/CUnitbehind
TrafficableWalkway & A/C
plant decks todetail
A/CUnitbehind
A/CUnitbehind
A/CUnitbehind
W-09 W-11W-10
W-02W-01 W-03
W-12W-25 W-27W-26W-24W-23W-22W-20 W-21W-19
2700h ceiling
2240
2760
4000
1000
2700
FRL 60/60/60
FRL 90/90/90
FRL 90/90/90
HFCRB
?
RB RB RBDP RBDP HFC
RB
TD
line of parapet behind
Structural beamStructural beam
top of liftover-run
TD
Structural beam
Drained AwningSlab similar detail toaccess bridgebalcony slab.Refer to detail.
ramp up to ladderaccess point
3A3-201
OPEN DECK CARPARK
2000
1000
1000
RB
HFC
eaves beam tostructural eng's
detail
footing detail tostructural eng'sdocumentation
ag drain to civileng's doc's
TENANCY 3 TENANCY 4 TENANCY 5 TENANCY 6
TENANCY 1
Awning Type 2refer detail.
5
A5-201
applied waterproofing toretaining wall surface wherebelow finished ground level.
N
0 1 2 3 cm54
01
23
cm5
4
CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORECOMMENCING ANY WORK OR PRODUCING SHOP DRAWINGS. THESEDRAWINGS ARE PROTECTED BY THE LAWS OF COPYRIGHT AND MAYNOT BE COPIED OR REPRODUCED WITHOUT THE WRITTENPERMISSION OF PLANIT ARCHITECTURE AND MANAGEMENT P/L.DI
SCLA
IMER
PLANIT ARCHITECTS LEVEL 1, 112 BARRY PDE FORTITUDE VALLEY PO BOX 494 SPRING HILL Q 4004 T:[07] 3831 5055 F:[07] 3831 5066 W:planitarc.com.au E:[email protected] ACN 082 197 966
DRAW
ING
PRO
JECT
CLIE
NTDR
AWIN
G N
o.
JOB NUMBER DESIGN / DRAWN
A1 SCALE DATE CREATED
ISSUED FOR
ISSUE
PRICING
As indicated
11 Market Street, Indooroopilly
Lots 1 & 3 on SP158414
Dean FlemingPty Ltd
Commercial Development
06-063 SP/DG12/18/07
Building Sections - C-C &D-D
A3-102
1 : 100Section C-C1 MATERIALS LEGEND:
1 : 100Section D-D2
20-12-07 PRELIMINARY ISSUE P1
KEY PLAN:
22-01-08 PRELIMINARY ISSUE BA
DATE REVISION ISSUE
01
14-02-08 PRELIMINARY ISSUE 01
Residential Community DevelopmentMurwillumbah, NSW, AustraliaResidential Development in the heart of a small country township in Murwillumbah for low-income demographic. Scheme includes a mix of 2 & 3 bed townhouses & rowhouses on a steeply sloping site.
Preparation of all schematic drawings involving cad plans, typical unit design, photoshop eleva-tions, open space and GFA calculations for preliminary approval by council.
DEIRDRE GAFFNEYPORTFOLIO OF WORKS
EMPLOYERELLIVO ARCHITECTS
DEIRDRE GAFFNEYPORTFOLIO OF WORKS
EMPLOYERELLIVO ARCHITECTS
Residential Community DevelopmentMurwillumbah, NSW, AustraliaResidential Development in the heart of a small country township in Murwillumbah for low-income demographic. Scheme includes a mix of 2 & 3 bed townhouses & rowhouses on a steeply sloping site.
Preparation of all schematic drawings involving cad plans, typical unit design, photoshop eleva-tions, open space and GFA calculations for preliminary approval by council.