portfolio pontem (english)
DESCRIPTION
ÂTRANSCRIPT
PORTFOLIO
ENGINEERING SERVICES
WORLD CLASS ENGINEERED ART®
INDEX
BRIDGES Viaduct over the Ulla River for the Atlantic High-Speed Railway (Spain) Viaduct over the Tagus River for High-Speed Railway (Cáceres-Spain) New Gerald-Desmond Bridge (Long Beach, CA-USA) Deck Closures for the New Forth Bridge (Edinburgh-Scotland) Viaduct for High-Speed Railway in Santa Ana (Málaga-Spain) Viaduct for High-Speed Railway in Archidona (Málaga-Spain) Viaduct over the San Pedro River (Cádiz-Spain) Viaduct over the Cadiz Bay (Spain) Removable Bridge over the Cadiz Bay (Spain) Ibn-Firnas Bridge over the Guadalquivir River (Córdoba-Spain) Bridge over the Guadalquivir River for Seville’s Metro (Spain) Bridge over the A-376 Highway for Seville’s Metro (Spain) Guardian del Castillo Bridge (Sevilla-Spain) Arroyo de la Miel Viaduct (Málaga-Spain) Lanjarón Bridge (Granada-Spain)
FOOTBRIDGES Espejo's Footbridge (Córdoba-Spain) Maro’s Cable-stayed Footbridge (Málaga-Spain)
OFFSHORE Mariner Project: Buoyancy Tanks (North Sea) Jet-Grouting Auxiliary Platforms for the New Forth Bridge (Edinburgh-Scotland) Buoyancy Tanks For Eldfisk 2/75 Jackets (North Sea) Ekofisk 2/4 Z Project Jacket (North Sea)
DESIGN OF MANEUVERS AND AUXILIARY ELEMENTS Raise Up System for the Bridge over the Guadalimar River (Jaén-Spain) Supports for the Viaduct Over The Tagus River Cranes (Cáceres-Spain) Third Bridge over the Orinoco River (Venezuela) New Forth Bridge Cofferdams (Edinburgh-Scotland) Modular Movable Industrial Facility
PUBLICATIONS, ARTICLES AND OTHER WORKS
WO R L D C L A S S E N G I N E E R E D A R T®
BRIDGES
WO R L D C L A S S E N G I N E E R E D A R T®
VIADUCT OVER THE ULLA RIVER FOR THE ATLANTIC HIGH-SPEED RAILWAY (SPAIN)
DATA BOX
Date: 2014-ongoing
Client: DRAGADOS
Scope of work: Technical consultancy during construction
Typology: Continuous steel & concrete composite truss beam with double composite action in hogging areas
Main Spans: 50 m + 80 m + 3 x 120 m + 225 m + 240 m + 225 m + 3x 120 m + 80 m (164’ + 263’ + 3 x 394’ + 738’ + 787’ + 738’ + 3 x 394’ + 263 ‘)
Owner: ADIF
WO R L D C L A S S E N G I N E E R E D A R T®
BRIDGES
DATA BOX
Date: 2013-ongoing
Client: CARLOS FERNÁNDEZ CASADO, S. L. y CAÑAVERAL (Joint Venture)
Scope of work: Technical consultancy during construction
Typology: World record concrete arch bridge with box-section post-tensioned concrete deck
Main Spans: 45 m + 9 x 60 m + 324 m + 7 x 60 m + 45 m (148’ + 9 x 197 m + 1063’ + 7 x 197’ + 148’)
Owner: ADIF. SPANISH GOVERNMENT
VIADUCT OVER THE TAGUS RIVER FOR HIGH-SPEED RAILWAY (CÁCERES-SPAIN)
WO R L D C L A S S E N G I N E E R E D A R T®
BRIDGES
DATA BOX
Date: 2013-ongoing
Client: CALTROP-CALTRANS (California Department of Transportation)
Scope of work: Technical consultancy for the execution of singular structural elements (stays, bearings, dumpers, steel structures)
Typology: Cable-Stayed Bridge.
Main Spans: 152 m + 305 m + 152 m (500’ + 1000’ + 500’)
Owner: PORT OF LONG BEACH-STATE OF CALIFORNIA
NEW GERALD-DESMOND BRIDGE (LONG BEACH, CA-USA)
WO R L D C L A S S E N G I N E E R E D A R T®
BRIDGES
DECK CLOSURES FOR THE NEW FORTH BRIDGE (EDINBURGH-SCOTLAND)
DATA BOX
Date: 2012-ongoing
Client: FORTH CROSSING BRIDGE CONSTRUCTORS (Joint Venture)
Scope of work: Design
Typology: Auxiliary structure for the cable-stayed bridge’s deck closures
Main Spans: 87 m + 104 m + 223 m + 2 x 650 m + 223 m + 104 m + 101.5 m (285’ + 341’ + 732’ + 2 x 2132’ + 732’ + 341’ + 333’)
Owner: SCOTTISH GOVERNMENT
WO R L D C L A S S E N G I N E E R E D A R T®
BRIDGES
DATA BOX
Date: 2010-2011
Client: VIADUCTO SANTA ANA (Joint Venture)
Scope of work: Technical consultancy during construction
Typology: Arch bridge for high-speed train
Main Spans: 86,4 m (283’)
Owner: ADIF
VIADUCT FOR HIGH-SPEED RAILWAY IN SANTA ANA (MÁLAGA-SPAIN)
WO R L D C L A S S E N G I N E E R E D A R T®
BRIDGES
DATA BOX
Date: 2010-2011
Client: VIADUCTO ARCHIDONA (DRAGADOS-VÍAS) (Joint Venture)
Scope of work: Technical consultancy during construction
Typology: Deck with general double composite action
Main Spans: 50 m (164’) in the whole itinerary except two central spans of 65 m (213’).
Owner: ADIF
VIADUCT FOR HIGH-SPEED RAILWAY IN ARCHIDONA (MÁLAGA-SPAIN)
WO R L D C L A S S E N G I N E E R E D A R T®
BRIDGES
DATA BOX
Date: 2008
Client: SPANISH MINISTRY OF PUBLIC WORKS
Scope of work: Project/ Technical consultancy during construction
Typology: Continuous 800 m-long viaduct with composite deck
Main Spans: From 31,5 m (103’) to 55,5 m (182’)
Owner: SPANISH MINISTRY OF PUBLIC WORKS
VIADUCT OVER THE SAN PEDRO RIVER (CÁDIZ-SPAIN)
WO R L D C L A S S E N G I N E E R E D A R T®
BRIDGES
DATA BOX
Date: 2007-2013
Client: GINPROSA-CARLOS FERNÁNDEZ CASADO (Joint Venture)
Scope of work: Constructive project/ Technical consultancy during construction
Typology: Cable-stayed bridge with composite deck. 4 lanes (road) + 2 lanes (tramway) + pedestrian walks
Main Spans: 120 m + 200 m + 540 m + 200 m + 120 m (394’ + 656’ + 1772’ + 656’ + 394’)
Owner: SPANISH MINISTRY OF PUBLIC WORKS
VIADUCT OVER THE CADIZ BAY (SPAIN)
WO R L D C L A S S E N G I N E E R E D A R T®
BRIDGES
DATA BOX
Date: 2007-2012
Client: GINPROSA-CARLOS FERNÁNDEZ CASADO (Joint Venture)
Scope of work: Constructive project/ Technical consultancy during construction
Typology: Steel simple-supported deck with orthotropic upper plate
Main Spans: 150 m (variable depth from 3 to 8 m, 33.2 m wide) (492’ m (variable depth from 10 to 26’, 109’ wide)
Owner: SPANISH MINISTRY OF PUBLIC WORKS
REMOVABLE BRIDGE OVER THE CADIZ BAY (SPAIN)
WO R L D C L A S S E N G I N E E R E D A R T®
BRIDGES
DATA BOX
Date: 2007-2010
Client: DRAGADOS
Scope of work: Constructive project/ Technical consultancy
Typology: Double bow-string cable-stayed arch bridge with composite deck
Main Spans: 25 m + 2 x 37.5 m + 2 x 132.5 m (82’ + 2 x 123’ + 2 x 435’)
Owner: SPANISH MINISTRY OF PUBLIC WORKS
IBN-FIRNAS BRIDGE OVER THE GUADALQUIVIR RIVER (CÓRDOBA-SPAIN)
WO R L D C L A S S E N G I N E E R E D A R T®
BRIDGES
DATA BOX
Date: 2007-2008
Client: METRO DE SEVILLA (SACYR-DRAGADOS-GEA 21) (Joint Venture)
Scope of work: Project/ Technical consultancy during construction
Typology: Composite launched continuous deck
Main Spans: 70.25 m + 3 x 82.5 m + 70.25 m (230’ + 3 x 271’ + 230’)
Owner: SEVILLE’S METRO
BRIDGE OVER THE GUADALQUIVIR RIVER FOR SEVILLE’S METRO (SPAIN)
WO R L D C L A S S E N G I N E E R E D A R T®
BRIDGES
DATA BOX
Date: 2006
Client: METRO DE SEVILLA (SACYR-DRAGADOS-GEA 21) (Joint Venture)
Scope of work: Design/ Technical consultancy during construction
Typology: Curved composite deck
Main Spans: 37 + 2 x 47 + 37 m (122’ + 2 x 155’ + 122’)
Owner: SEVILLE’S METRO
BRIDGE OVER THE A-376 HIGHWAY FOR SEVILLE’S METRO (SPAIN)
WO R L D C L A S S E N G I N E E R E D A R T®
BRIDGES
DATA BOX
Date: 2005-2006
Client: U.T.E. BRUES-MODECAR (Joint Venture)
Scope of work: Constructive project/ Technical consultancy during construction
Typology: Continuous prestressed concrete bridge
Main Spans: 18.5 m + 2 x 43 m + 18.5 m (61’ + 2 x 141’ + 61’)
Owner: ANDALUSIA REGIONAL GOVERNMENT
GUARDIAN DEL CASTILLO BRIDGE (SEVILLA-SPAIN)
WO R L D C L A S S E N G I N E E R E D A R T®
BRIDGES
DATA BOX
Date: 2003-2004
Client: NERJA-ALMUÑÉCAR (Joint Venture)
Scope of work: Technical consultancy during construction
Typology: Steel composite deck, steel structure formed with two parallel double T beams with middle bracings
Main Spans: 60 m (197’) of minimum length and 80 m (262’) of maximum length.
Owner: SPANISH MINISTRY OF PUBLIC WORKS
ARROYO DE LA MIEL VIADUCT (MÁLAGA-SPAIN)
WO R L D C L A S S E N G I N E E R E D A R T®
BRIDGES
DATA BOX
Date: 2001
Client: DRAGADOS
Scope of work: Project/ Technical consultancy during construction
Typology: Steel Arch Bridge
Main Spans: 115 m (377’)
Owner: SPANISH MINISTRY OF PUBLIC WORKS
LANJARÓN BRIDGE (GRANADA-SPAIN)
WO R L D C L A S S E N G I N E E R E D A R T®
BRIDGES
FOOTBRIDGES
WO R L D C L A S S E N G I N E E R E D A R T®
DATA BOX
Date: 2009
Client: SPANISH MINISTRY OF PUBLIC WORKS
Scope of work: Project
Typology: Curved composite-deck footbridge
Main Spans: 30 m + 15 m + 26 m (98’ + 49’ + 85’)
Owner: SPANISH MINISTRY OF PUBLIC WORKS
ESPEJO’S FOOTBRIDGE (CÓRDOBA-SPAIN)
WO R L D C L A S S E N G I N E E R E D A R T®
FOOTBRIDGES
DATA BOX
Date: 2007-2008
Client: DRAGADOS
Scope of work: Constructive project/ Technical consultancy during construction
Typology: Cable-stayed footbridge with composite deck
Main Spans: 16.5 m + 46.5 m (54’ + 153’)
Owner: SPANISH MINISTRY OF PUBLIC WORKS
MARO’S CABLE-STAYED FOOTBRIDGE (MÁLAGA-SPAIN)
WO R L D C L A S S E N G I N E E R E D A R T®
FOOTBRIDGES
OFFSHORE
WO R L D C L A S S E N G I N E E R E D A R T®
MARINER PROJECT: BUOYANCY TANKS (NORTH SEA)
DATA BOX
Date: 2014-ongoing
Client: DRAGADOS OFFSHORE
Scope of work: Workshop drawings/ material nesting/ Maneuvers/ Auxiliary elements
Typology: Offshore platform
Main Spans: STATOIL
WO R L D C L A S S E N G I N E E R E D A R T®
OFFSHORE
JET-GROUTING AUXILIARY PLATFORMS FOR THE NEW FORTH BRIDGE (EDINBURGH-SCOTLAND)
DATA BOX
Date: 2012-ongoing
Client: FORTH CROSSING BRIDGE CONSTRUCTORS (Joint Venture)
Scope of work: Design/ Technical consultancy during construction
Typology: Ring segment.
Main Spans: 7 m wide; Radios 13.70 m, 16.20 m and 15.90 m (23’ wide; Radios 45’, 53’ and 52’)
Owner: SCOTTISH GOVERNMENT
WO R L D C L A S S E N G I N E E R E D A R T®
OFFSHORE
BUOYANCY TANKS FOR ELDFISK 2/75 JACKETS (NORTH SEA)
DATA BOX
Date: 2012
Client: DRAGADOS OFFSHORE
Scope of work: Workshop drawings/ Material nesting/ Maneuvers/ Auxiliary elements
Typology: 6 cylindrical tanks with valves and fastening elements for launch maneuvers of the Eldfisk jacket
Main Spans: 57 m (187’) length and 5,2 m (17’) diameter
Owner: CONOCO PHILLIPS – AKER SOLUTIONS
WO R L D C L A S S E N G I N E E R E D A R T®
OFFSHORE
EKOFISK 2/4 Z PROJECT JACKET (NORTH SEA)
DATA BOX
Date: 2011
Client: DRAGADOS OFFSHORE
Scope of work: Workshop drawings/ Material nesting/ Maneuvers/ Auxiliary elements.
Typology: Coffin beam.
Main Spans: 50 m (2,75 m wide; 4 m high) (164’ (9’ wide; 13’ high))
Owner: ENCANA
WO R L D C L A S S E N G I N E E R E D A R T®
OFFSHORE
DESIGN OF MANEUVERS AND
AUXILIARY ELEMENTS
WO R L D C L A S S E N G I N E E R E D A R T®
RAISE UP SYSTEM FOR THE BRIDGE OVER THE GUADALIMAR RIVER (JAÉN-SPAIN)
DATA BOX
Date: 2014-ongoing
Client: DRAGADOS
Scope of work: Design of auxiliary elements and maneuvers/ Technical consultancy
Typology: Composite deck with variable deck
Main Spans: 65 m + 100 m + 75 m + 45 m (213’ + 328’ + 246’ + 148’)
Owner: SPANISH MINISTRY OF PUBLIC WORKS
WO R L D C L A S S E N G I N E E R E D A R T®
DESIGN OF MANEUVERS AND AUXILIARY ELEMENTS
SUPPORTS FOR THE VIADUCT OVER THE TAGUS RIVER CRANES (CÁCERES-SPAIN)
DATA BOX
Date: 2014
Client: CARLOS FERNÁNDEZ CASADO, S. L. and CAÑAVERAL (Joint Venture)
Scope of work: Design of auxiliary elements and maneuvers/ Technical consultancy
Typology: Arch bridge with box-section superior deck with post-tensioned concrete
Main Spans: 45 m + 9 x 60 m + 324 m + 7 x 60 m + 45 m (148’ + 9 x 197’ + 1063’ + 7 x 197’ + 148’)
Owner: ADIF. SPANISH GOVERNMENT
WO R L D C L A S S E N G I N E E R E D A R T®
DESIGN OF MANEUVERS AND AUXILIARY ELEMENTS
THIRD BRIDGE OVER THE ORINOCO RIVER (VENEZUELA)
DATA BOX
Date: 2013-ongoing
Client: CARLOS FERNÁNDEZ CASADO, S.L. and CAÑAVERAL (Joint Venture)
Scope of work: Design of auxiliary elements and maneuvers
Typology: Steel deck with for cabled-stayed bridge
Main Spans: 120 m (394’)
Owner: INFRASTRUCTURE MINISTRY “PROPATRIA 2000” FOUNDATION
WO R L D C L A S S E N G I N E E R E D A R T®
DESIGN OF MANEUVERS AND AUXILIARY ELEMENTS
NEW FORTH BRIDGE COFFERDAMS (EDINBURGH-SCOTLAND)
DATA BOX
Date: 2012-ongoing
Client: FORTH CROSSING BRIDGE CONSTRUCTORS (Joint Venture)
Scope of work: Design of auxiliary elements and maneuvers
Typology: 15 mm-thick steel sheet pile cofferdams with inner reinforcement trusses for the execution of subsea foundations
Owner: SCOTTISH GOVERNMENT
WO R L D C L A S S E N G I N E E R E D A R T®
DESIGN OF MANEUVERS AND AUXILIARY ELEMENTS
MODULAR MOVABLE INDUSTRIAL FACILITY
DATA BOX
Date: 2011
Client: TECADE
Scope of work: Design/ Technical consultancy during construction
Typology: Movable and modular industrial facility with rails
Main Spans: 36 m (118’)
Owner: TECADE
WO R L D C L A S S E N G I N E E R E D A R T®
BRIDGES
PUBLICATIONS, ARTICLES AND OTHER WORKS
WO R L D C L A S S E N G I N E E R E D A R T®
Date: October-November 2003, Málaga (Spain)
Title: Tema 16: Estructuras Enterradas en Suelos.
Author: M. Escamilla García-Galán (et al.)
Publication: Curso de Geotecnia para Infraestructuras
Publisher: Colegio de Ingenieros de Caminos, Canales y Puertos
Date: 2005
Title: Tema 10: Aplicaciones del Método de Bielas y Tirantes en el Cálculo de
Puentes de Hormigón.
Author: M. Escamilla García-Galán (et al.)
Publication: Curso de Cálculo y Aplicaciones Avanzadas del Hormigón Estructural
Publisher: Colegio de Ingenieros de Caminos, Canales y Puertos
Date: April 2005
Title: Análisis de la vulnerabilidad en la fase constructiva de las vigas de hormigón
de sección doble T frente al fenómeno aeroelástico de desprendimiento de
remolinos en la estela generada por el flujo de viento transversal.
Author: M. Escamilla García-Galán
Client: Spanish Ministry of Public Works
PUBLICATIONS, ARTICLES AND OTHER WORKS
Date: November 2007, Sevilla (Spain)
Title: - “Construcción del Nuevo Puente sobre el río Guadaíra en Alcalá de
Guadaíra.”
- “Construcción del Nuevo Puente sobre el río Guadalquivir para la Línea
1 Interurbana del Metro de Sevilla.”
Author: M. Escamilla García-Galán (et al.)
Publication: V Congreso de Ingeniería Civil
WO R L D C L A S S E N G I N E E R E D A R T®
PUBLICATIONS, ARTICLES AND OTHER WORKS
Date: November 2008, Valencia (Spain)
Title: - “Algunas estructuras singulares proyectadas en Andalucía.”
- “Ejecución de cimentaciones del Viaducto de la Bahía de Cádiz.”
- “Puente sobre el Río Guadalquivir para la Línea 1 Interurbana del Metro
de Sevilla – Estructura E-8.”
Author: M. Escamilla García-Galán (et al.)
Publication: IV Congreso Internacional de Estructuras (ACHE)
Date: September 2010, Venezia (Italy)
Title: - “Second Bay of Cádiz Bridge-Latest Construction Challenges.”
- “New Removable Bridge over the Bay of Cadiz.”
- “Urban Bridges-Latest Experiences in Andalusia.”
- “Second Bay of Cadiz Bridge. Quality Control and Monitoring.”
Author: M. Escamilla García-Galán (et al.)
Publication: Proceedings of The 34th IABSE Symposium on Large Structures and
Infrastructures for Environmentally Constrained and Urbanised Areas.
Publisher: International Association for Bridge and Structural Engineering (IABSE)
Zürich, Switzerland
ISBN: 978-3-85748-122-2
Date: November 2010
Title: Open Access: “A slender new bridge is taking shape in Cadiz Bay.”
Author: M. Escamilla García-Galán (et al.)
Publication: Bridge Design & Engineering
Publisher: Hemming Information
ISBN: 1359-7493
WO R L D C L A S S E N G I N E E R E D A R T®
PUBLICATIONS, ARTICLES AND OTHER WORKS
Date: Decembre 2011
Title: - “Diseño y construcción del Viaducto de Río San Pedro en Puerto Real
(Cádiz).”
- “Nuevo Puente Desmontable sobre la Bahía de Cádiz.”
- “Mejora del terreno y ejecución de cimentaciones especiales en el nuevo
acceso a Cádiz. Retos constructivos y resultados finales.”
Author: M. Escamilla García-Galán (et al.)
Publication: V Congreso de ACHE
Date: January 2011
Title: Early experiments in flight inspire Spanish crossing.
Author: M. Escamilla García-Galán (et al.)
Publication: Bridge Design & Engineering
Publisher: Hemming Information Services
Londres, Inglaterra
ISSN: 1359-7493
Date: January 2011
Title: Second Bay of Cadiz Bridge-Latest Construction Challenges.
Author: M. Escamilla García-Galán (et al.)
Publication: World Bridge Construction (Мостостроение мира) (Issue No. 1, 2011)
Publisher: Amost Foundation (Russian Association of Bridge Engineers)
Moscú, Rusia
Date: February 2014
Title: Bridge over the Cádiz Bay.
Author: M. Escamilla García-Galán (et al.)
Publication: Structural Engineering International (SEI) - IABSE
Publisher: International Association for Bridge and Structural Engineering (IABSE)
Zürich, Switzerland
WO R L D C L A S S E N G I N E E R E D A R T®
PUBLICATIONS, ARTICLES AND OTHER WORKS
Date: Marth 2014, Canadá
Title: Steel and composite bridges for high speed rail: Advanced solutions for
challenging designs
Author: M. Escamilla García-Galán
Publication: AISC World Bridge Symposium
Date: 2014, Chile
Title: Posibilidades actuales de los puentes atirantados: Grandes luces, luces medias
y configuraciones especiales.
Author: M. Escamilla García-Galán (et al.)
Publication: Primera Conferencia Internacional de Puentes
Date: 2014, Madrid (Spain)
Title: Bridge over the Cádiz Bay.
Author: M. Escamilla García-Galán (et al.)
Publication: Proceedings of The 37th IABSE Symposium Engineering for Progress, Nature
and People.
Publisher: International Association for Bridge and Structural Engineering (IABSE)
Zürich, Switzerland
WO R L D C L A S S E N G I N E E R E D A R T®
PUBLICATIONS, ARTICLES AND OTHER WORKS