Page 1: Portfolio   Dott. Ing Antonio Menghi   Chartered Construction Engineer

Dott.Ing. Antonio Menghi

[email protected]

+39/3381662369

Chartered Construction Engineer

Page 2: Portfolio   Dott. Ing Antonio Menghi   Chartered Construction Engineer

EDUCATION AND TRAINING COMPUTER SKILLS AND COMPETENCES

ECDL Course - Office Pack Design Builder

Energy PlusBentley Tas

EcotectVasari

RadianceAutocad

Rhinoceros Cinema 4d

Inventor SketchUp

Pyrosim ( FDS ) Pathfinder ( Evac )

Sap Tridmetrix

Photoshop Illustrator InDesign

WORK EXPERIENCE LANGUAGES

Portoguese Proficient user

EnglishIndipendent

Italian Mother tongue

Ars Berlin Summer accademy: Energy Efficiency, Climate, Building Envelope Beuth Hochschule für Technik” - Berlin

Master’s Degrees in Construction engineering Faculty of Engineering - Università Politecnica delle Marche, Ancona

Bachelor’s degree in Building construction and salvage engineering Faculty of Engineering - Università Politecnica delle Marche, Ancona

Erasmus - Universidade de Coimbra (Portugal) Faculty of Civil Engineering University Entrance Diploma mechanical surveyor Istituto Tecnico Industriale E.mattei, Recanati (Mc)

July2011

October2008

2007

2003

February2011

March - July2008

InternshipGabinete pela candidatura UNESCO da Cidade de Coimbra - Portogallo

CollaborationZiegert | Roswag | Seiler Architekten Ingenieure - Berlino , Germania

July 2011

December - February2011

Part-TimeInternational Office - Università Politecnica Delle Marche

April - July2011

Part-TimePresidency Faculty of Agriculture - Università Politecnica Delle Marche

CollaborationDeal Progetti - Integrated Engineering - Milano, Italy

October 2011- Today

Page 3: Portfolio   Dott. Ing Antonio Menghi   Chartered Construction Engineer

Collaboration with Deal Progetti - Integrated engineering - Milan ( Italy ) Fire Safety Engineering: Computational fluid dynamic analysis of the fire with FDS (Pyrosim) and

Evacuation analysis with Pathfinder for an amphitheater with 1600 people.

Software used: Pyrosim ( FSD ), Smoke view, Pathfinder, Autocad

October 2011 - Today

Page 4: Portfolio   Dott. Ing Antonio Menghi   Chartered Construction Engineer

Scenario di Evacuazione X1 – 1.600 occupanti Velocità minime – Dall’alto

20 s

40 s

60s

Scenario di Evacuazione Y1 – 1.128 occupanti Velocità minime – Corpi scala A e B

40 s

60 s

80 s

Combustion analysis

Scenario B

Scenario C

Scenario A

1- Scenari d’incendio – t = 600 s

Sd

s

2 - Analisi della propagazione dei fumi –t = 900 s ( in viola il limite di 10m )

Scenario B

Scenario A

Scenario C

COMPUTATIONAL FLUID DYNAMIC ANALYSIS OF THE FIRE EVACUATION ANALYSIS OF THE OCCUPANTS

Scenario C - Visibilità U.S. 3.3

Analysis of the termperature, visibility and toxicity

3 - Fumi in corrispondenza delle U.S. durante l’esodo – t = 225 s ( in viola il limite di 10m )

di10mù) )

Scenario B

Scenario A

Scenario C

Page 5: Portfolio   Dott. Ing Antonio Menghi   Chartered Construction Engineer

Collaboration with studio Ziegert | Roswag | Seiler Architekten Ingenieure - BerlinEnergy Audit and optimization through the Autodesk Ecotect of a school under construction in Pakistan.

(www.zrs-berlin.de)

Software used: Ecotect, InDesign, VectorWork

July 2011

Page 6: Portfolio   Dott. Ing Antonio Menghi   Chartered Construction Engineer

MODELING WITH ECOTECT AUTODESK

. Weather Data

. Geometry

. Materials

. Occupancy

Current Position (- 9°)

Shadows range - 28th February - 07:00 - 14:00

Rotated (-34°)

Hourly temperature1st of may1st of may

CATEGORY LOSSES GAINS

FABRIC 15.2% 26.9% SOL-AIR 0.0% 29.7% SOLAR 0.0% 5.2%

Passive gains breakdown CATEGORY LOSSES GAINS

FABRIC 14.1% 25.6% SOL-AIR 0.0% 26.1% SOLAR 0.0% 6.5%

800 Wh/m2 LESS in the hot months

Fabric Gains

Shadows range - 1st of May - 07:00 - 14:00

INITIAL SITUATION IMPROVED SITUATION

COMPARING THE PERFORMANCE OF PROCESS OPTIMIZATION

comparison of two different orientation

angles of the ‘building

Comparison with the veranda to the north and south

Comparison between two different thicknesses of the roof

INTERNAL DAYLIGHT ANALYSIS

CLIMATE ANALYSIS

Direct Solar Raditation

Diffuse Solar Radiation

SCHOOL in PAKISTAN

Energy optimization at an early stage by choosing the best among severalarchitectural layouts after they have been quantified and compared in terms ofenergy performance.

a couple of degree LESS inside

Page 7: Portfolio   Dott. Ing Antonio Menghi   Chartered Construction Engineer

Master’s Degrees in Construction Engineeing Thesis: Probabilistics models for supporting energy planning: analysis of school buildings

Energy audits of existing school in Italy,Germany Spain with different energy classes and individuation of correlation between the geometric technloogy and climate parameters in order to maximize, withproper prediction tools (Bayesian networks), the energy design.

Software used: Design Builder, Ecotect, Energy Plus, Excel, Power Point

February 2011

Page 8: Portfolio   Dott. Ing Antonio Menghi   Chartered Construction Engineer

Daylight Factor - Lighting Analysis

The Bayesian Network allows a feedback between geome-trical characteistic and performance obteined permitting to choosing enrgy performance desired and going back to the parameters that determine them

Modeling with software

_Geometry_Materials_Climate

Energy Audit in Dynamic Regime

Study of an interface for software that will allow an early stage the designer to determine the climatic characteristics, geometric, technological performance attended. Thanks to Bayesian network that binds in a probabilistic way parameters and performances. Is possible for example fix the energy needs in winter and based to the simulations entered in the database ,will return the geometry and the technol-ogy that determines the en-ergy requirements.

PARAMETERS PERFORMANCE

Page 9: Portfolio   Dott. Ing Antonio Menghi   Chartered Construction Engineer

Bachelor’s degree in Building construction and salvage engineering - Thesis “ Architectural survey and guidelines for conservation’s action of structural wooden roof of the building

‘Paço das escolas’ site in Coimbra – Portugal”

Contributor ‘s engineer Fernando Marques for Architectural survey and guidelines for conservation’s action of structural wooden roof of the building ‘Paço das escolas’ site in Coimbra, in the multidisciplinary office for the design of conservation and recovery on

the ‘historic town and urban development of the Coimbra’s candidacy to UNESCO world heritage’ of humanity.

Software used: Autocad, Rhinoceros, Sap

October 2008

Page 10: Portfolio   Dott. Ing Antonio Menghi   Chartered Construction Engineer
Page 11: Portfolio   Dott. Ing Antonio Menghi   Chartered Construction Engineer
Page 12: Portfolio   Dott. Ing Antonio Menghi   Chartered Construction Engineer
Page 13: Portfolio   Dott. Ing Antonio Menghi   Chartered Construction Engineer
Page 14: Portfolio   Dott. Ing Antonio Menghi   Chartered Construction Engineer

Project of building elements - Wooden House in Augsburg (Germany)

Study and reworking of an existing building elements. Energy audits with different orientation’s building and stratigraphy of the wall.

Software used: Autocad, Ecotect,Rhinoceros

University subject

Page 15: Portfolio   Dott. Ing Antonio Menghi   Chartered Construction Engineer
Page 16: Portfolio   Dott. Ing Antonio Menghi   Chartered Construction Engineer
Page 17: Portfolio   Dott. Ing Antonio Menghi   Chartered Construction Engineer
Page 18: Portfolio   Dott. Ing Antonio Menghi   Chartered Construction Engineer

Recovery and Conservation of Buildings

Examination conducted in a group of eight - Geometric and technology Relief, analysis of the mechanisms of damage and possible

conservation work.

Software used: Autocad, SketchUp, Power Point

University subject

Page 19: Portfolio   Dott. Ing Antonio Menghi   Chartered Construction Engineer
Page 20: Portfolio   Dott. Ing Antonio Menghi   Chartered Construction Engineer
Page 21: Portfolio   Dott. Ing Antonio Menghi   Chartered Construction Engineer
Page 22: Portfolio   Dott. Ing Antonio Menghi   Chartered Construction Engineer

Project management

Site organization and construction phases of a building two residential floors.

Software used: Microsoft Project, Microsoft Visio, Excel

University subject

Page 23: Portfolio   Dott. Ing Antonio Menghi   Chartered Construction Engineer

ID WBS Nome attività Durata

0 0 riepilogo 385,26 g1 1 Incantieramento 1a fase 12,09 g2 1.1 Recinzione ed accesso 16 h3 1.2 Box Ufficio 0,04 h4 1.3 Servizi igienico assistenziali 0,11 h6 1.4 Impianto elettrico 8,46 h7 1.5 Deposito chiuso 0,11 h8 1.6 Messa a terra 57,99 h9 1.7 Impianto Idrico 6,83 h

10 1.8 Viabilità 11,56 h11 1.9 Quadro generale di distrbuzione 2,5 h12 2 Demolizione totale di fabbricati. 7,81 g13 2.1 Demolizione totale fabbricato A1 62,5 h14 3 Incantieramento 2a Fase 2,5 g16 3.1 Montaggio gru a torre 20 h17 4 Scavi 10,25 g18 4.1 Scavo di sbancamento 38,26 h19 4.2 Scavo di sbancamento per rampa 5,79 h20 4.3 Scavo a sez. obbl. con uso di mezzi meccanici - Fond. Edificio3 h21 4.4 Scavo a sez. obbl. con uso di mezzi meccanici - Cunic. Perim34,95 h22 5 Opere di fondazioe 36,12 g23 5.1 Fondazione a Travi Rovesce 36,12 g24 5.1.1 Posa in opera magrone - travi rovesce6,85 h25 5.1.2 Posa Barre in acciaio FeB44K per opere di fondazione 39,07 h26 5.1.3 Casseratura - Fondazioni edificio 73 h27 5.1.4 Getto - Conglomerato cem. per strutture armate di fondazione - Fond.Edificio20,2 h28 5.1.5 Scasseratura Fondazione Edificio19,47 h29 5.1.6 Vespaio interrato - ciottoli o pietrame calcareo47,47 h30 5.1.7 Rete in acciaio elettrosaldata - armatura soletta su vespaio4,19 h31 5.1.8 Massetto di calcestruzzo vibrato non armato - Solet.su vespaio fino a 7cm55,07 h32 5.2 Fondazione Cunicolo Perimetrale 10,19 g33 5.2.1 Conglomerato cem.- Magrone Cunic Perim.0,35 h34 5.2.2 Posa Barre in acciaio FeB44K per opere di fondazione - Fond.parete Perim.2,66 g35 5.2.3 Casseratura - Fondazioni cunicolo perimetrale8,73 h36 5.2.4 Getto -Conglomerato cem. per strutture armate di fondazione - Fond.Cunic Perim.10,29 h37 5.2.5 Scasseratura cunicolo perimetrale3,67 h38 5.3 Fondazione Rampa 30,43 g39 5.3.1 Conglomerato cem. - Magrone Rampa4,33 h40 5.3.2 Lavorazione e Posa - Barre in acciaio FeB44K per armatura soletta e parete -Rampa32,87 h41 5.3.3 Casseforme - per strut. di fond. di eleva e muri cont. Rampa79,2 h42 5.3.4 Getto fondazione armata - Rampa 10,5 h43 5.3.5 Getto di muri continui perim. Rampa6,4 h44 5.3.6 Scasseratura - fondazione e muri contr. Rampa21,23 h45 6 Opere in Elevazione - Seminterrato 83,14 g46 6.1 Parete perimetrale 44,66 g47 6.1.1 Lavorazione e Posa Barre in acciaio FeB44K - Parete perim.46,75 h48 6.1.2 Casseforme - Parete perimetrale197,5 h49 6.1.3 Getto - Muri continui perim. 26 h50 6.1.4 Scasseratura - Parete Perimetrale 79 h52 6.2 Pilastri -seminterrato 12,97 g53 6.2.1 Lavorazione e Posa Barre in acciaio FeB44K - Pilastri (27)18,3 h54 6.2.2 Casseforme - Pilastri Seminterrato(27)43 h55 6.2.3 Getto - Pilastri (27) 4 h56 6.2.4 Scasseratura - Pilastri seminterrrato17,2 h57 6.3 Primo Impalcato 34,99 g58 6.3.1 Casseforme - 1°Solaio 59 h59 6.3.2 Casseforme - Soletta copertura tunnel16 h60 6.3.3 Lavorazione e Posa Barre in acciaio FeB44K - 1° solaio31,39 h61 6.3.4 Lavorazione e Posa Barre in acciaio FeB44K - Soletta Cunic.10,02 h62 6.3.5 Solaio in latero cemento gettato in opera. 1°solaio ( luci fino a 5,00)77,2 h63 6.3.6 Solaio per luci netta da 7 a 8,1 m - Copertura Garage39,6 h64 6.3.7 Getto - Soletta cunic. 1,2 h65 6.3.8 Getto - 1° Solaio 9,07 h66 6.3.9 Scasseratura - 1° Solaio 15,73 h67 6.3.10 Scasseratura - Soletta copertura tunnel2,67 h68 6.4 Scale seminterrato 2,87 g69 6.4.1 Casseforme - Aggetti e scale - Seminterrato5 h70 6.4.2 Lavorazione e Posa Barre in acciaio FeB44K - Scale1,2 h71 6.4.3 Getto - Scale seminterrato 1 h72 6.4.4 Scasseratura - Scale Seminterrato1,33 h73 6.5 Impermeabilizzazione pareti perimetrali12,48 g74 6.5.1 Impermeabilizzazione pareti controterra - primer bituminoso41,4 h75 6.5.2 Drenaggio pareti controterra - ghiaia o pietrisco58,44 h76 7 Rinterri 2,74 g77 7.1 Rinterri con uso di mezzi meccanici - Fondazioni0,7 h78 7.2 Rinterri con uso di mezzi meccanici - Edificio21,2 h79 8 Opere in elevazione - Piano Terra 24,3 g80 8.1 Pilastri - piano Terra 6,98 g81 8.1.1 Lavorazione e Posa Barre in acciaio FeB44K - Pilastri (16) piano terra10,8 h83 8.1.2 Casseratura - Pilastri (16) Piano terra12,7 h84 8.1.3 Getto - Pilastri (16) piano terra 2,3 h85 8.1.4 Scasseratura - Pilastri Piano Terra10,16 h86 8.1.6 Ponteggi in elementi portanti metallici 22,17 h87 8.2 Secondo Impalcato 16,91 g88 8.2.1 Casseratura - 2°Solaio 38,6 h89 8.2.2 Lavorazione e Posa Barre in acciaio FeB44K - 2° solaio11,82 h90 8.2.3 Lavorazione e posa barre in acciaio FeB44K - 2° Solaio (coperture)11,55 h91 8.2.4 Posa Solaio in latero cemento gettato in opera. 2°sola io (luci fino a 5,00)54,02 h92 8.2.5 Posa Solaio in latero cemento gettato in opera. 2°sola io (coperture) (luci fino a 5,00)28,47 h93 8.2.6 Getto - 2° Solaio 6,6 h94 8.2.7 Scasseratura 2° solaio coperture 15,44 h95 8.3 Scale - Piano terra 4,16 g96 8.3.1 Casseratura - scale Piano Terra 5 h97 8.3.2 Lavorazione e Posa Barre in acciaio FeB44K - Scale1,29 h98 8.3.3 Getto- Scale Piano Terra 1 h99 8.3.4 Scasseratura - Scale Piano terra 2 h100 9 Opere in elevazione - Primo piano 26,9 g101 9.1 Ponteggi in elementi portanti metallici 15,8 h102 9.2 Pilastri Primo Piano 8,64 g103 9.2.1 Lavorazione e Posa Barre in acciaio FeB44K - Pilastri (16)7,22 h104 9.2.2 Casseratura - Pilastri (16) Primo Piano25,4 h105 9.2.3 Getto - Pilastri (16) Primo Piano 5,76 h106 9.2.4 Scasseratura - Pilastri Primo Piano6,77 h107 9.3 Copertura 16,28 g108 9.3.1 Casseratura - Copertura 30,04 h109 9.3.2 Lavorazione e Posa Barre in acciaio FeB44K - Copertura17,28 h110 9.3.3 Posa Solaio in latero cemento gettato in opera. 2°sola io (copertura) (luci fino a 5,00)49,72 h111 9.3.4 Getto - Copetura 2,35 g112 9.3.5 Scasseratura - Copertura 4 h113 10 Murature 98,11 g114 10.1 Murature - Primo Piano 31,7 g115 10.1.1 Isolante termico in polistirene espanso estruso - pilastri perimetrali primo piano2,18 h116 10.1.2 Isolamento termoacustico con sughero sp. 5 mm - pilastri perimetrali 1° piano8,2 h117 10.1.3 Murat a cassa vuota parete est ed int in for(12-13) - 1° piano14,35 h118 10.1.4 Muratura a cassa vuota con mattoni pieni e blocchi "Alveolater"- 1° piano146 h119 10.1.5 Idrorepellente protettivo - su muratura facciavista3,68 h120 10.1.6 Muratura in mattoni forati a 6 fori posti a coltello - Piano primo61,32 h121 10.1.7 Intonaco grezzo con malta di cemento - bagni13,85 h122 10.1.8 Intonaco grezzo con malta di cemento - riquadratura aperture1,84 h123 10.1.9 Intonaco grezzo con malta di cemento - bagni 1°piano10,09 h124 10.2 Murature - Piano Terra 23,16 g125 10.2.1 Isolante termico in polistirene espanso estruso - pilastri perimetrali piano terra2,55 h126 10.2.2 Muratura a cassa vuota con mattoni pieni e blocchi Alveolater- P.T. 130,1 h127 10.2.3 Muratura a cassa vuota 8+4+15 - Muratura P.T. lato bagni e cucine12,98 h128 10.2.4 Muratura a cassa vuota con parete esterna ed interna in forati(12-13) - P.T.12,24 h129 10.2.5 Idrorepellente protettivo - su muratura facciavista3,68 h130 10.2.6 Muratura in mattoni forati a 6 fori posti a coltello - Piano terra13,6 h131 10.2.7 Intonaco grezzo con malta di cemento - bagni piano terra10,09 h132 10.2.8 Intonaco grezzo con malta di cemento - cucine piano terra6,86 h133 10.2.9 Intonaco grezzo con malta di cemento - riquadratura aperture1,12 h134 10.3 Murature - Piano Interrato 43,5 g135 10.3.1 Muratura a cassa vuota con parete esterna ed interna in forati (12-13) - P .I.262,92 h136 10.3.2 Muratura in mattoni forati a 6 fori posti a coltello - Piano interrato16,79 h137 10.3.3 Intonaco grezzo con malta di cemento - bagni13,03 h138 10.3.4 Intonaco grezzo con malta di cemento - interno pozzi luce9,95 h139 10.3.5 Intonaco grezzo con malta di cemento - riquadratura aperture1,12 h140 10.3.6 Intonaco grezzo con malta di cemento - lavanderie15,35 h141 10.3.7 Intonaco grezzo con malta di cemento - su muratura lato scannafosso55,91 h142 10.3.8 Intonaco grezzo con malta di cemento -chiusure su scannafosso12,41 h143 11 Finiture 80,92 g144 11.1 Finiture - Piano Interrato 31,01 g145 11.1.1 Isolante termico in polistirene espanso estruso - su pavimentazione P.I.37,28 h146 11.1.2 Massetto di sabbia e cemento 47,33 h147 11.1.3 Pavimento in gres porcellanato - Locali interrato81,94 h148 11.1.4 Pavimento in piastrelle in ceramica - Bagni piano interrato3,8 h149 11.1.5 Lastre di travertino spessore 3 cm - soglie piano interrato5,35 h150 11.1.6 Rivestimento in piastrelle in ceramica - Bagni interrato22,99 h151 11.1.7 Rivestimento in piastrelle in ceramica - Lavanderie interrato28,27 h152 11.1.8 Posa zoccoletto battiscopa in legno - piano interrato15,31 h153 11.2 Finiture Piano Terra 21,74 g154 11.2.1 Isolante termico in polistirene espanso estruso15,6 h155 11.2.2 Pannello isolante in fibra di vetro - su solaio piano terra abitazione42,54 h156 11.2.3 Massetto di sabbia e cemento 22,33 h157 11.2.4 Lastre di travertino spessore 3 cm - soglie piano terra4,08 h158 11.2.5 Pavimento in gres porcellanato - Locali piano terra31,08 h159 11.2.6 Pavimento in piastrelle in ceramica - Bagni piano terra2,47 h160 11.2.7 Rivestimento in piastrelle in ceramica - Bagni piano terra18,59 h161 11.2.8 Rivestimento in piastrelle in ceramica - Cucine piano terra12,64 h162 11.2.9 Posa zoccoletto battiscopa in legno - piano terra11,96 h163 11.3 finiture copertura autorimessa 10,84 g164 11.3.1 isolante termico 18,26 h165 11.3.2 Massetto di sabbia e cemento 36,25 h166 11.3.3 Copertura autorimessa (imperm) 16,57 h167 11.4 Finiture Primo Piano 16,99 g168 11.4.1 Isolante termico in polistirene espanso estruso15,6 h169 11.4.2 Massetto di sabbia e cemento 18,22 h170 11.4.3 Lastre di travertino spessore 3 cm - soglie piano primo2,56 h171 11.4.4 Lastre di travertino spessore 3 cm - soglie piano primo3,59 h172 11.4.5 Pavimento in listoncini di legno - pavimento 1° piano2,91 h173 11.4.6 Rivestimento in piastrelle in ceramica - Bagni 1° piano45,76 h174 11.4.7 Posa zoccoletto battiscopa in legno - piano primo13,29 h175 11.5 Copertura Abitazione 20,97 g176 11.5.1 Isolante termico in polistirene espanso estruso - su copertura abitazione23,94 h177 11.5.2 Tetto ventilato - copertura alta 119,42 h178 11.5.3 Caminetto in elementi prefabbricati e rivestimento in mattoni a facciavista8 h179 11.5.4 Manto di copertura con coppi 21,91 h180 11.5.5 Smontaggio gru 2,5 h181 11.6 Tinteggiatura 37,57 g182 11.6.1 Tinteggiatura con idropittura - piano interrato74,32 h183 11.6.2 Tineggiatura con pittura a base di silicati di potassio - esterna4,8 h184 11.6.3 Tineggiatura con idropittura - piano terra55,25 h185 11.6.4 Intonaco per uso civile eseguito all'esterno - su tamponatura piano terra7,08 h186 11.6.5 Tineggiatura con idropittura - piano primo70,79 h187 11.6.6 intonaco per uso civile eseguito all'interno - Piano seminterrato153,94 h188 11.6.7 Intonaco per uso civile eseguito all'interno - Piano terra115,46 h189 11.6.8 Intonaco per uso civile eseguito all'interno - Piano primo146,64 h190 11.6.9 Intonaco per uso civile eseguito all'esterno - cornicione4,84 h191 11.7 Sistemi di raccolta acque pluviali 0,91 g192 11.7.1 Pluviale in rame 2,4 h193 11.7.2 Canale di gronda in rame 3,74 h194 11.7.3 Terminale di pluviale in ghisa 0,1 h195 11.7.4 Converse, scossaline e compluvi in lamiera di rame1,06 h196 11.8 Marciapiede 19,29 g197 11.8.1 Massetto di sabbia e cemento 9,59 h198 11.8.2 Pavimentazione marciapiedi e piazzale con cotto naturale97,44 h199 12 Sistemazioni Esterne 43,64 g200 12.1 Scavi 5,92 g201 12.1.1 Scavo di sbancamento con uso di mezzi meccanici per sistemazioni esterne. 2,03 h202 12.1.2 Scavo a sezione obbligata con uso di mezzi meccanici - per recinzione21,12 h203 12.1.3 Scavo a sezione obbligata con uso di mezzi meccanici - per fognature24,17 h204 12.2 Recinzione (opere c.a) 6,4 g205 12.2.1 Conglomerato cementizio per opere di fondazione - cls magro per recinzione0,13 h206 12.2.2 Casseformi recinzioni 10,01 h207 12.2.3 Lavorazione e Posa Barre in acciaio FeB44K - fondaz recinzione34,38 h208 12.2.4 Getto per fond. Recinzione 6,67 h209 12.3 Fognature e acque bianche 10,12 g210 12.3.1 tubo in PVC 303/2 - diametro esterno 200mm.23,45 h211 12.3.2 Serbatoi idrici in vetroresina per uso potabile - raccolta acqua meteorica5,33 h212 12.3.3 Tubi drenanti per interv. Sino alla profondita' di 4m. - diametro 300 mm11,34 h213 12.3.4 tubo in PVC 303/2 - diametro esterno 250mm.9,24 h214 12.3.5 tubo in PVC 303/2 - diametro esterno 315mm.7,15 h215 12.3.6 tubo in PVC 303/2 - diametro esterno 200mm.27,74 h216 12.3.7 Fossa Imhoff - con capacita' di circa 2000 l. per n.12 utenti2 h217 12.3.8 Pozzetto di raccordo diaframmato - dimensioni interne 40x40x406,4 h218 12.3.9 Pozzetto di raccordo diaframmato - dimensioni interne 50x50x601,7 h219 12.3.10 Prolunghe per pozzetti di raccordo - dim. Int. 40x40 per altezze da 10cm. A 40cm.2,24 h220 12.3.11 Prolunghe per pozzetti di raccordo - dim. Int. 50x50 per altezze da 10cm. A 60cm.0,56 h221 12.3.12 Drenaggio eseguito con ghiaia o pietrisco-con ghiaia di fiume lavata8 h222 12.4 Rinterri 2,65 g223 12.4.1 Rinterri con uso di mezzi meccanici - materiale proveniente scavi cantiere17,48 h224 12.4.2 Rinterri con uso di mezzi meccanici3,74 h225 12.5 Passaggi interni 10,37 g226 12.5.1 Stabilizzato 0,86 h227 12.5.2 Posa ghiaietto 6,34 h228 12.5.3 Fond. Stradale in misto granulometrico frantumato - fondazione stradale26,82 h229 12.5.4 Conglomerato cementizio per strut. Armate di fond.- cls per soletta lato ingr.1,79 h230 12.5.5 Congl. Cementizio non armato per- cls magro per soletta lato ingresso1,79 h231 12.5.6 Conglomerato cementizio per strut. Armate di fond.- soletta per pav. A porfido25,27 h232 12.5.7 Cordolo prefabbricato in calcestruzzo vibrato3,58 h233 12.5.8 Cunette in calcestruzzo perimetrale16,6 h234 12.6 Pavimentazione stradale 3,1 g235 12.6.1 Pavimentazione in porfido 24,81 h236 12.7 Recinzione 1,03 g237 12.7.1 Recinzione rete metallica elettrosaldata plastificata 8,25 h238 13 Smobilizzo Cantiere 4,15 g239 13.1 Smontaggio Box 0,7 h240 13.2 Impianto elettrico 0,5 h241 13.3 Recinzione ed accesso 32 h242243244245 9 Gru a noleggio 420 gt246 15 Buldozer per scavi 44,05 h247 12 Buldozer per reinterri 22,1 h248 12 Buldozer per finiture esterne scavo di sbancamento2,3 h249 12 Buldozer per finiture esterne reinterri e formazione ghiaietto10,08 h250 12 Buldozer per finiture esterne reinterri finali 25,48 h251 12 Buldozer per progetto B 2,23 h252 21 Escavatore B(projectB) 5,96 h254 23 Escavatore C(sbancamento) 82 h255 24 Escavatore D 23,15 h256 25 Escavatore A(fogne) 24,17 h257 26 Motolivellatore 0,86 h258 27 Trattore gommato per traino carrello pigi A 26,82 h259 28 Trattore gommato per traino carrello pigi B 11,56 h260261262263 29 Sottoprogetto B 141,24 g

2 2 Demolizione 53,7 h4 4 Scavi di sbancamento 2,23 h6 6 Scavi a sezione obbligata 3,73 h9 9 Muratura 91,3 h

12 12 Muratura in mattoni forati a 3 fori 89,72 h13 13 Intonaco per uso civile 66 h

riepilogoIncantieramento 1a fase

Recinzione ed accesso Rete metall.;O.1° A;O.2° A;O.1° B;O.2° B;O.3° A;O.3 ° BBox Ufficio box ;O.2° A;O.3° A;Autocarro;O.1° A

Servizi igienico assistenziali box wc;O.2° A;O.3° A;Autocarro;O.1° AImpianto elettrico O.Elett.spec;cavo but;interrutt.;O.2° B

Deposito chiuso box ;O.2° A;O.3° A;Autocarro;O.1° AMessa a terra O.Elett.spec;cavo but;Punt.;mors.;O.2° B;O.3° BImpianto Idrico o.idr;tub;O.2° B;O.3° B

Viabilità Gh30/50;Trattore;Rullo a piè;O.1° B;O.2° B;O.3° BQuadro generale di distrbuzione O.Elett.spec;Q;O.3° BDemolizione totale di fabbricati.Demolizione totale fabbricato A1 Barriera pro.;Autocarro;Mart. A;O.2° B;O.1° B;O.3° B ;Mart. B;O.1° A;O.2° A;O.3° A

Incantieramento 2a FaseMontaggio gru a torre O.2° A;O.3° A

ScaviScavo di sbancamento E;Buldozer;O.2° A;O.1° A;O.3° A;O.3° B

Scavo di sbancamento per rampa O.2° A;E;Buldozer;O.1° A;O.3° A;O.3° BScavo a sez. obbl. con uso di mezzi meccanici - Fond. Edificio O.2° A;E;O.1° A;O.3° A

Scavo a sez. obbl. con uso di mezzi meccanici - Cunic. Perim O.2° A;E;O.1° A;O.3° AOpere di fondazioe

Fondazione a Travi RovescePosa in opera magrone - travi rovesce Cls260;Disarm.;O.2° B;O.3° B;O.1° B;Vibr.B

Posa Barre in acciaio FeB44K per opere di fondazione Feb44k;GruT-Dir;O.2° B;O.3° B;O.1° BCasseratura - Fondazioni edificio Tav.ab.sottom;Tav.abete uso trieste;Chiodi;O.1° B;O.2° B ;O.3° B

Getto - Conglomerato cem. per strutture armate di fondazione - Fond.Edificio Disarm.;Cls300;O.2° B;O.3° B;O.1° B;Vibr.BScasseratura Fondazione Edificio O.2° B;O.3° B;O.1° B

Vespaio interrato - ciottoli o pietrame calcareo Pietrame;Gh10/30;O.2° B;O.1° B;O.3° BRete in acciaio elettrosaldata - armatura soletta su vespaio O.2° B;O.3° B;Ret.elettr.;GruT-Dir;O.1° B

Massetto di calcestruzzo vibrato non armato - Solet.su vespaio fino a 7cm Cls160;O.2° B;O.3° B;O.1° BFondazione Cunicolo Perimetrale

Conglomerato cem.- Magrone Cunic Perim. O.2° A;O.3° A;O.1° A;Cls260;Disarm.;Vibr.APosa Barre in acciaio FeB44K per opere di fondazione - Fond.parete Perim. O.2° A;O.3° A;Feb44k;GruT-Dir;O.1° A

Casseratura - Fondazioni cunicolo perimetrale O.1° A;O.2° A;O.3° A;Tav.ab.sottom;Tav.abete uso trieste ;ChiodiGetto -Conglomerato cem. per strutture armate di fondazione - Fond.Cunic Perim. O.2° A;O.3° A;O.1° A;Disarm.;Cls300;Vibr.A

Scasseratura cunicolo perimetrale O.2° A;O.3° A;O.1° AFondazione Rampa

Conglomerato cem. - Magrone Rampa O.2° A;O.3° A;O.1° A;Cls260;Disarm.;Vibr.ALavorazione e Posa - Barre in acciaio FeB44K per armatura soletta e parete -Rampa O.2° A;O.3° A;Feb44k;GruT-Dir;O.1° A

Casseforme - per strut. di fond. di eleva e muri cont. Rampa O.1° A;O.2° A;O.3° A;Tav.ab.sottom;Tav.abete uso trieste ;ChiodiGetto fondazione armata - Rampa O.2° A;O.3° A;O.1° A;Cls260;Disarm.;Vibr.AGetto di muri continui perim. Rampa O.2° A;O.3° A;O.1° A;Cls260;Disarm.;Vibr.A

Scasseratura - fondazione e muri contr. Rampa O.2° A;O.3° A;O.1° AOpere in Elevazione - Seminterrato

Parete perimetraleLavorazione e Posa Barre in acciaio FeB44K - Parete perim. Feb44k;GruT-Dir;O.2° B;O.3° B;O.1° B

Casseforme - Parete perimetrale Tav.ab.sottom;Tav.abete uso trieste;Chiodi;O.1° B;O.2° B ;O.3° BGetto - Muri continui perim. Disarm.;Cls300;O.2° B;O.3° B;O.1° B;Vibr.B

Scasseratura - Parete Perimetrale O.2° B;O.3° B;O.1° BPilastri -seminterrato

Lavorazione e Posa Barre in acciaio FeB44K - Pilastri (27) O.2° A;O.3° A;Feb44k;GruT-DirCasseforme - Pilastri Seminterrato(27) O.1° A;O.2° A;O.3° A;Tav.ab.sottom;Tav.abete uso trieste ;Chiodi

Getto - Pilastri (27) O.3° A;O.2° A;Cls300;P;Vibr.AScasseratura - Pilastri seminterrrato O.2° A;O.3° A

Primo ImpalcatoCasseforme - 1°Solaio O.1° A;O.2° A;O.3° A;Tav.ab.sottom;Tav.abete uso trieste ;Chiodi

Casseforme - Soletta copertura tunnel O.1° A;O.2° A;O.3° A;Tav.ab.sottom;Tav.abete uso trieste ;ChiodiLavorazione e Posa Barre in acciaio FeB44K - 1° solaio O.2° A;O.3° A;Feb44k;GruT-Dir;O.1° A

Lavorazione e Posa Barre in acciaio FeB44K - Soletta Cunic. O.2° A;O.3° A;Feb44k;GruT-Dir;O.1° ASolaio in latero cemento gettato in opera. 1°solaio ( luci fino a 5,00) O.3° A;O.2° A;Bloc. later solai;Cls260;Feb44k;Tav.abete uso trieste;Tav.ab.sottom;Chiodi;GruT-Dir;O.1° A

Solaio per luci netta da 7 a 8,1 m - Copertura Garage O.2° A;O.3° A;L;Malta bast acri;GruT-Dir;O.1° AGetto - Soletta cunic. O.2° A;O.3° A;Cls300;P;Vibr.A

Getto - 1° Solaio O.2° A;O.3° A;Cls300;P;Vibr.A;O.1° AScasseratura - 1° Solaio O.2° A;O.3° A;O.1° A

Scasseratura - Soletta copertura tunnel O.2° A;O.3° A;O.1° AScale seminterrato

Casseforme - Aggetti e scale - Seminterrato O.1° A;O.2° A;O.3° A;Tav.ab.sottom;Tav.abete uso trieste ;ChiodiLavorazione e Posa Barre in acciaio FeB44K - Scale O.2° A;O.3° A;Feb44k;GruT-Dir;O.1° A

Getto - Scale seminterrato O.2° A;O.3° A;Cls350/425;P;Vibr.A;O.1° AScasseratura - Scale Seminterrato O.2° A;O.3° A;O.1° A

Impermeabilizzazione pareti perimetraliImpermeabilizzazione pareti controterra - primer bituminoso Primer;Rot.poli.;O.3° A;O.1° A;O.2° A

Drenaggio pareti controterra - ghiaia o pietrisco O.3° A;O.2° A;Gh30/50;Malta bast.;Malta cem326;Buldoz er;O.1° ARinterri

Rinterri con uso di mezzi meccanici - Fondazioni O.2° A;O.1° A;Buldozer;C;O.3° ARinterri con uso di mezzi meccanici - Edificio O.2° A;O.1° A;Buldozer;C;O.3° A

Opere in elevazione - Piano TerraPilastri - piano Terra

Lavorazione e Posa Barre in acciaio FeB44K - Pilastri (16) piano terra O.2° A;O.3° A;Feb44k;GruT-Dir;O.1° ACasseratura - Pilastri (16) Piano terra O.1° A;O.2° A;O.3° A;Tav.ab.sottom;Tav.abete uso trieste ;Chiodi;O.1° B;O.2° B;O.3° B

Getto - Pilastri (16) piano terra O.3° A;O.2° A;Cls300;P;Vibr.A;O.1° AScasseratura - Pilastri Piano Terra O.1° B;O.2° B;O.3° B

Ponteggi in elementi portanti metallici P;O.2° B;O.3° B;O.1° BSecondo Impalcato

Casseratura - 2°Solaio O.1° A;O.2° A;O.3° A;Tav.ab.sottom;Chiodi;Tav.abete uso triesteLavorazione e Posa Barre in acciaio FeB44K - 2° solaio O.3° B;O.2° B;Feb44k;GruT-Dir;O.1° B

Lavorazione e posa barre in acciaio FeB44K - 2° Solaio (coperture) O.2° A;O.3° A;Feb44k;GruT-Dir;O.1° APosa Solaio in latero cemento gettato in opera. 2°sola io (luci fino a 5,00) Cls260;Feb44k;Tav.ab.sottom;Tav.abete uso trieste;Chiodi;GruT-Dir;O.3° B;O.2° B;O.1° B;Bloc. later solai

Posa Solaio in latero cemento gettato in opera. 2°sola io (coperture) (luci fino a 5,00) O.2° A;O.3° A;Bloc. later solai;Cls260;Feb44k;Tav.abete uso trieste;Chiodi;O.1° AGetto - 2° Solaio O.2° A;O.3° A;Cls300;P;Vibr.A;O.1° A

Scasseratura 2° solaio coperture O.2° B;O.3° B;O.1° BScale - Piano terra

Casseratura - scale Piano Terra Tav.ab.sottom;Tav.abete uso trieste;Chiodi;O.1° B;O.2° B ;O.3° BLavorazione e Posa Barre in acciaio FeB44K - Scale O.3° B;O.2° B;Feb44k;GruT-Dir;O.1° B

Getto- Scale Piano Terra Cls350/425;P;O.2° B;O.3° B;Vibr.B;O.1° BScasseratura - Scale Piano terra O.2° B;O.3° B;O.1° B

Opere in elevazione - Primo pianoPonteggi in elementi portanti metallici O.2° A;O.3° A;P;O.1° A

Pilastri Primo PianoLavorazione e Posa Barre in acciaio FeB44K - Pilastri (16) O.3° A;O.2° A;Feb44k;O.1° A

Casseratura - Pilastri (16) Primo Piano O.2° A;O.1° A;O.3° A;Tav.ab.sottom;Tav.abete uso trieste ;ChiodiGetto - Pilastri (16) Primo Piano O.2° A;O.3° A;Cls300;P;Vibr.A;O.1° A

Scasseratura - Pilastri Primo Piano O.2° A;O.3° A;O.1° ACopertura

Casseratura - Copertura Tav.ab.sottom;Tav.abete uso trieste;Chiodi;O.2° B;O.1° B ;O.3° B;O.1° A;O.2° A;O.3° ALavorazione e Posa Barre in acciaio FeB44K - Copertura O.3° A;O.2° A;Feb44k;GruT-Dir;O.1° A;O.1° B;O.2° B;O .3° B

Posa Solaio in latero cemento gettato in opera. 2°sola io (copertura) (luci fino a 5,00) O.2° B;O.3° B;Bloc. later solai;Cls260;Feb44k;Tav.abete uso trieste;Tav.ab.sottom;Chiodi;GruT-Dir;O.1° B;O.1° AGetto - Copetura O.2° A;O.3° A;Cls300;P;Vibr.A;O.2° B;O.3° B;Vibr.B;O .1° A;O.1° B

Scasseratura - Copertura O.2° A;O.3° A;O.1° A;O.1° B;O.2° B;O.3° BMurature

Murature - Primo PianoIsolante termico in polistirene espanso estruso - pilastri perimetrali primo piano O.1° B;O.2° B;Primer;Rot.poli.;O.3° B;O.1° A;O.2° A ;O.3° A

Isolamento termoacustico con sughero sp. 5 mm - pilastri perimetrali 1° piano O.3° B;O.1° B;Granu.sugh;Malta cem326;Spruz.malta;O.2 ° B;O.1° A;O.2° A;O.3° AMurat a cassa vuota parete est ed int in for(12-13) - 1° piano O.1° A;O.1° B;O.2° A;O.2° B;O.3° A;O.3° B;Mat.tampo ;Malta cem326;Tav.ab.sottom;GruT-Dir;Coll.piast.;Lana

Muratura a cassa vuota con mattoni pieni e blocchi "Alveolater"- 1° piano O.3° A;O.2° A;O.1° A;Mattpieni;Tav.ab.sottom;Mat.tamp o;GruT-Dir;Malta cem326;Coll.piast.;Lana;O.1° B;O.2° B;O.3° BIdrorepellente protettivo - su muratura facciavista O.3° A;Idrorepell;O.2° A;O.1° A;O.1° B;O.2° B;O.3° B

Muratura in mattoni forati a 6 fori posti a coltello - Piano primo O.3° A;O.1° A;Matt.6fori;Malta cem326;Tav.ab.sottom;Gr uT-Dir;O.2° A;O.1° B;O.2° B;O.3° BIntonaco grezzo con malta di cemento - bagni O.3° A;O.1° A;Cem 325;Sabbia;H2o;Betoniera;O.2° A

Intonaco grezzo con malta di cemento - riquadratura aperture Cem 325;Sabbia;H2o;Betoniera;O.3° B;O.1° B;O.2° BIntonaco grezzo con malta di cemento - bagni 1°piano Cem 325;Sabbia;H2o;Betoniera;O.3° B;O.1° B;O.2° B

Murature - Piano TerraIsolante termico in polistirene espanso estruso - pilastri perimetrali piano terra O.1° B;O.3° B;Primer;Rot.poli.;O.2° B

Muratura a cassa vuota con mattoni pieni e blocchi Alveolater- P.T. O.1° A;O.2° A;O.3° A;Mattpieni;Malta cem326;Tav.ab.sot tom;Mat.tampo;Lana;Coll.piast.;O.1° B;O.2° B;O.3° BMuratura a cassa vuota 8+4+15 - Muratura P.T. lato bagni e cucine O.1° A;O.2° A;O.3° A;Mat.tampo;Malta cem326;Tav.ab.sot tom;GruT-Dir;Lana;Coll.piast.;O.1° B;O.2° B;O.3° B

Muratura a cassa vuota con parete esterna ed interna in forati(12-13) - P.T. O.1° A;O.2° A;O.3° A;Mat.tampo;Malta cem326;Tav.ab.sot tom;GruT-Dir;Coll.piast.;Lana;O.1° B;O.2° B;O.3° BIdrorepellente protettivo - su muratura facciavista O.3° A;Idrorepell;O.1° A;O.1° B;O.2° A;O.3° B;O.2° B

Muratura in mattoni forati a 6 fori posti a coltello - Piano terra O.1° A;O.3° A;Matt.6fori;Malta cem326;GruT-Dir;Tav.ab .sottom;O.1° B;O.2° A;O.2° B;O.3° BIntonaco grezzo con malta di cemento - bagni piano terra O.1° A;O.3° A;Cem 325;Sabbia;H2o;Betoniera;O.2° A

Intonaco grezzo con malta di cemento - cucine piano terra O.3° B;O.1° B;Cem325;Sabbia;H2o;Betoniera;O.2° BIntonaco grezzo con malta di cemento - riquadratura aperture O.1° B;O.3° B;Cem 325;Sabbia;H2o;Betoniera;O.2° B

Murature - Piano InterratoMuratura a cassa vuota con parete esterna ed interna in forati (12-13) - P .I. O.1° A;O.2° A;O.3° A;Mat.tampo;Malta cem326;GruT-Dir ;O.1° B;O.3° B;Primer;Rot.poli.;O.2° B

Muratura in mattoni forati a 6 fori posti a coltello - Piano interrato O.1° A;O.3° A;Matt3fori;Malta cem326;Tav.ab.sottom;Gru T-Dir;O.2° A;O.1° B;O.3° B;O.2° BIntonaco grezzo con malta di cemento - bagni O.2° A;O.3° A;Cem 325;Sabbia;H2o;Betoniera;O.1° A

Intonaco grezzo con malta di cemento - interno pozzi luce Cem 325;Sabbia;H2o;Betoniera;O.2° A;O.3° A;O.1° AIntonaco grezzo con malta di cemento - riquadratura aperture Cem 325;Sabbia;H2o;Betoniera;O.2° A;O.3° A;O.1° A

Intonaco grezzo con malta di cemento - lavanderie O.2° A;O.3° A;Cem 325;Sabbia;H2o;Betoniera;O.1° AIntonaco grezzo con malta di cemento - su muratura lato scannafosso Cem 325;Sabbia;H2o;Betoniera;O.3° B;O.1° B;O.2° B

Intonaco grezzo con malta di cemento -chiusure su scannafosso Cem 325;Sabbia;H2o;Betoniera;O.3° B;O.1° B;O.2° BFiniture

Finiture - Piano InterratoIsolante termico in polistirene espanso estruso - su pavimentazione P.I. O.3° A;O.1° A;Primer;Rot.poli.;O.2° A

Massetto di sabbia e cemento Cls160;O.3° B;O.2° B;O.1° BPavimento in gres porcellanato - Locali interrato O;O; Gres;Cem 325;Sabbia;H2o;Betoniera;O.3° B;O.1° B

Pavimento in piastrelle in ceramica - Bagni piano interrato O;O;Pias;Cem325;Cem 325;Sabbia;H2o;Betoniera;O.1° BLastre di travertino spessore 3 cm - soglie piano interrato O;O;Marmo;Cem 325;Sabbia;H2o;Olio;Betoniera;Levigatr.;O.1° B;O.3° B

Rivestimento in piastrelle in ceramica - Bagni interrato O;O;Piastr.smalt;Coll.piast.;Cem325Rivestimento in piastrelle in ceramica - Lavanderie interrato O;O;Piastr.smalt;Coll.piast.;Cem325

Posa zoccoletto battiscopa in legno - piano interrato O;Zocc;ChiodiFiniture Piano Terra

Isolante termico in polistirene espanso estruso O.3° A;O.1° A;Primer;Rot.poli.;O.2° APannello isolante in fibra di vetro - su solaio piano terra abitazione O.2° A;Lana;Coll.piast.

Massetto di sabbia e cemento O.2° A;O.3° A;C;O.1° ALastre di travertino spessore 3 cm - soglie piano terra O.3° A;O.1° A;Marmo;Cem 325;Sabbia;H2o;Olio;Betonie ra;Levigatr.;Pav.spec.B;Pav.Qual.B;O.2° A

Pavimento in gres porcellanato - Locali piano terra O.3° A;O.1° A; Gres;Cem 325;Sabbia;H2o;Betoniera;Pav. Qual.B;Pav.spec.B;O.2° APavimento in piastrelle in ceramica - Bagni piano terra Pias;Cem325;Cem 325;Sabbia;H2o;Betoniera;Pav.Qual.B;Pav.spec.B;O.2° A

Rivestimento in piastrelle in ceramica - Bagni piano terra Piastr.smalt;Coll.piast.;Cem325;Pav.spec.B;Pav.Qual.BRivestimento in piastrelle in ceramica - Cucine piano terra Piastr.smalt;Coll.piast.;Cem325;Pav.spec.B;Pav.Qual.B

Posa zoccoletto battiscopa in legno - piano terra Zocc;Chiodi;Pav.Qual.Bfiniture copertura autorimessa

isolante termico O.1° A;O.3° A;P;Rot.poli.;O.2° AMassetto di sabbia e cemento O.2° A;O.3° A;Cls160;O.1° A

Copertura autorimessa (imperm) O.1° A;O.2° A;Riscald bitumi;Sabbia;Asf;Bitume;O.3° AFiniture Primo Piano

Isolante termico in polistirene espanso estruso O.1° A;O.3° A;Primer;Rot.poli.;O.2° AMassetto di sabbia e cemento Cls160;O.1° A;O.3° A;O.2° A

Lastre di travertino spessore 3 cm - soglie piano primo O.1° A;O.3° A;O;O;Betoniera;Levigatr.;Marmo;Cem 325; Sabbia;H2o;Olio;O.2° ALastre di travertino spessore 3 cm - soglie piano primo O.3° A;O;O;Betoniera;Levigatr.;Marmo;Cem 325;Sabbia; H2o;Olio;O.2° A;O.1° A

Pavimento in listoncini di legno - pavimento 1° piano O;O;Levigatr.;Parquet;Coll.legno;Vern;F;O.1° A;O.2° A;O.3° ARivestimento in piastrelle in ceramica - Bagni 1° piano O;O;Piastr.smalt;Coll.piast.;Cem325

Posa zoccoletto battiscopa in legno - piano primo O;Chiodi;ZoccCopertura Abitazione

Isolante termico in polistirene espanso estruso - su copertura abitazione Primer;Rot.poli.;O.1° B;O.3° B;O.2° BTetto ventilato - copertura alta Chiodi;L;M;C;P;B;L;O.1° B;O.2° B;O.3° B

Caminetto in elementi prefabbricati e rivestimento in mattoni a facciavista cManto di copertura con coppi O.2° A;O.3° A;GruT-Dir;Malta bast.;Tegole;Colmi;Term .Colm;Incr.Colm;Aeratore.Copp;O.1° A;O.1° B;O.2° B;O .3° B

Smontaggio gru O.2° A;O.3° ATinteggiatura

Tinteggiatura con idropittura - piano interrato O;Idrorepell;OTineggiatura con pittura a base di silicati di potassio - esterna O;Fissati.;Pitt est.;O

Tineggiatura con idropittura - piano terra O;Idrorepell;OIntonaco per uso civile eseguito all'esterno - su tamponatura piano terra O.1° A;O.3° A;Betoniera;Sabbia;H2o;Calc.idrata;O.2° A

Tineggiatura con idropittura - piano primo O;Idrorepell;Ointonaco per uso civile eseguito all'interno - Piano seminterrato Calc.idrata;Sabbia;H2o;Betoniera;O.1° B;O.3° B;O.2° B

Intonaco per uso civile eseguito all'interno - Piano terra O.1° A;O.3° A;Betoniera;Sabbia;H2o;Calc.idrata;O.2° AIntonaco per uso civile eseguito all'interno - Piano primo O.1° B;O.3° B;Betoniera;Sabbia;H2o;Calc.idrata;O.2° B

Intonaco per uso civile eseguito all'esterno - cornicione O.3° A;Betoniera;Sabbia;H2o;Calc.idrata;O.2° A;O.1° ASistemi di raccolta acque pluviali

Pluviale in rame O;Pluv;OCanale di gronda in rame O;Canal.gron;O

Terminale di pluviale in ghisa O;Term.pluv;OConverse, scossaline e compluvi in lamiera di rame O;Canal.gron;O

MarciapiedeMassetto di sabbia e cemento O.3° A;Cls160;O.2° A;O.1° A

Pavimentazione marciapiedi e piazzale con cotto naturale O.1° A;O;O;Betoniera;Cem 325;Sabbia;H2o;Olio; Piastr .cotgrez;O.2° A;O.3° ASistemazioni Esterne

ScaviScavo di sbancamento con uso di mezzi meccanici per sistemazioni esterne. O.2° A;E;Buldozer;O.1° A;O.3° A

Scavo a sezione obbligata con uso di mezzi meccanici - per recinzione O.2° A;E;Tav.ab.sottom;O.1° A;L;O.3° AScavo a sezione obbligata con uso di mezzi meccanici - per fognature E;Tav.ab.sottom;L;O.1° A;O.2° A;O.3° A

Recinzione (opere c.a)Conglomerato cementizio per opere di fondazione - cls magro per recinzione O.2° A;O.3° A;Vibr.A;Disarm.;C;O.1° A

Casseformi recinzioni O.1° A;O.2° A;O.3° A;Tav.ab.sottom;Tav.abete uso trieste ;ChiodiLavorazione e Posa Barre in acciaio FeB44K - fondaz recinzione O.3° A;O.2° A;Feb44k;O.1° A

Getto per fond. Recinzione O.2° A;O.3° A;Vibr.A;Disarm.;C;O.1° AFognature e acque bianche

tubo in PVC 303/2 - diametro esterno 200mm. Autocarro;Sabbia;Tpvc200;O.2° B;O.3° B;O.1° BSerbatoi idrici in vetroresina per uso potabile - raccolta acqua meteorica S;O.1° B;O.2° B;O.3° B

Tubi drenanti per interv. Sino alla profondita' di 4m. - diametro 300 mm O.3° B;O.2° B;Autocarro;Sabbia;T;O.1° Btubo in PVC 303/2 - diametro esterno 250mm. O.2° A;O.3° A;Autocarro;Sabbia;Tpvc250;O.1° A

tubo in PVC 303/2 - diametro esterno 315mm. O.2° A;O.3° A;Autocarro;Sabbia;Tpvc315;O.1° Atubo in PVC 303/2 - diametro esterno 200mm. O.2° A;O.3° A;Autocarro;Sabbia;Tpvc200;O.1° A

Fossa Imhoff - con capacita' di circa 2000 l. per n.12 utenti O.1° A;Autocarro;Malta cem326;FosImhof;O.2° A;O.3° APozzetto di raccordo diaframmato - dimensioni interne 40x40x40 Cls300;Pozz45;O.2° B;O.1° B;O.3° B

Pozzetto di raccordo diaframmato - dimensioni interne 50x50x60 Cls300;Pozz55;O.2° B;O.1° B;O.3° BProlunghe per pozzetti di raccordo - dim. Int. 40x40 per altezze da 10cm. A 40cm. O.2° B;Cls300;Malta cem326;PPozz45;O.1° B;O.3° BProlunghe per pozzetti di raccordo - dim. Int. 50x50 per altezze da 10cm. A 60cm. O.2° B;Cls300;Malta cem326;PPozz55;O.1° B;O.3° B

Drenaggio eseguito con ghiaia o pietrisco-con ghiaia di fiume lavata Buldozer;Gh30/50;Malta bast.;Malta cem326;O.2° B;O.3° B;O.1° BRinterri

Rinterri con uso di mezzi meccanici - materiale proveniente scavi cantiere Buldozer;C;O.2° B;O.1° B;O.3° BRinterri con uso di mezzi meccanici Buldozer;C;O.1° B;O.2° B;O.3° B

Passaggi interniStabilizzato O.1° B;O.3° B;Motolivell.cost dir.;Rullo compres.;Gh30/5 0;H2o;Gran.cav;O.2° B

Posa ghiaietto O.1° A;Buldozer;O.2° A;O.3° AFond. Stradale in misto granulometrico frantumato - fondazione stradale Buldozer;C;Rullo compres.;Cem 325;H2o;Mist.gran;Trattore;O.1° A;O.3° A;O.2° A

Conglomerato cementizio per strut. Armate di fond.- cls per soletta lato ingr. O.2° A;O.3° A;Vibr.A;Cls260;Disarm.;O.1° ACongl. Cementizio non armato per- cls magro per soletta lato ingresso O.2° A;O.3° A;Vibr.A;Cls260;Disarm.

Conglomerato cementizio per strut. Armate di fond.- soletta per pav. A porfido O.2° A;O.3° A;Vibr.A;Cls260;Disarm.;O.1° ACordolo prefabbricato in calcestruzzo vibrato O.2° A;O.3° A;Vibr.A;Disarm.;C;O.1° A

Cunette in calcestruzzo perimetrale Cunet;O.1° A;O.2° A;O.3° APavimentazione stradalePavimentazione in porfido Pav.spec.B;Pav.Qual.B;Betoniera;Cem 325;Sabbia;H2o;Piastr.porf;Malcem;O.1° A;O.2° A;O.3° A

RecinzioneRecinzione rete metallica elettrosaldata plastificata R;O.1° B;O.2° B;O.3° B

Smobilizzo CantiereSmontaggio Box O.2° A;O.3° A;Autocarro;O.1° AImpianto elettrico O.Elett.spec;O.2° A

Recinzione ed accesso O.1° A;O.2° A;O.3° A

Gru a noleggio GruT-INDBuldozer per scavi Buldozer

Buldozer per reinterri BuldozerBuldozer per finiture esterne scavo di sbancamento Buldozer

Buldozer per finiture esterne reinterri e formazione ghiaietto BuldozerBuldozer per finiture esterne reinterri finali Buldozer

Buldozer per progetto B BuldozerEscavatore B(projectB)

Escavatore C(sbancamento) EEscavatore D E

Escavatore A(fogne)Motolivellatore Motolivell.cost ind.

Trattore gommato per traino carrello pigi A TrattoreTrattore gommato per traino carrello pigi B Trattore

Sottoprogetto BDemolizione O.2° A;Autocarro;Mart. A;Rete metall.;Barriera pro.; O.1° A;O.3° A;Mart. B

Scavi di sbancamento O.2° A;E;Buldozer;O.1° AScavi a sezione obbligata O.2° A;E;O.1° A

Muratura Mattpieni;Matt.6fori;Tav.ab.sottom;Malta cem326;Granu.sugh;O.1° A;O.2° A;O.3° A;O.1° B;O.2° B;O.3° BMuratura in mattoni forati a 3 fori O.1° B;O.2° B;O.3° B;Matt3fori;Tav.ab.sottom;Malta cem 326

Intonaco per uso civile O.1° B;O.2° B;O.3° B;Calc.idrata;Sabbia;H2o;Betonier a

16 23 30 06 13 20 27 04 11 18 25 01 08 15 22 29 06 13 20 27 03 10 17 24 31 07 14 21 28 07 14 21 28 04 11 18 25 02 09 16 23 30 06 13 20 27 04 11 18 25 01 08 15 22 29 05 12 19 26 03 10 17 24 31 07 14 21 28 05 12 19 26 02 09 16 23 30 06 13 20 27 05 12 19 26 02set 10 ott 10 nov 10 dic 10 gen 11 feb 11 mar 11 apr 11 mag 11 giu 11 lug 11 ago 11 set 11 ott 11 nov 11 dic 11 gen 12 feb 12 mar 12 apr 12

Attività Divisione Avanzamento Cardine Riepilogo Riepilogo progetto Attività esterne Cardine esterno Scadenza

Pagina 1

Progetto: riepilogoData: mar 13/04/10

SITE LAYOUTORGANIZATION OF THE SITE AND THE PHASES OF CONSTRUCTION

TIME SCHEDULEID Nome attività Durata Inizio Fine

1 Demolizioni 10 g lun 15/02/10 ven 26/02/102 scavi 9 g lun 01/03/10 gio 11/03/103 strutture in C.A. 231 g ven 12/03/10 ven 28/01/114 finiture 254 g lun 31/01/11 gio 19/01/125 sistemazione esterna 60 g ven 20/01/12 gio 12/04/12

F M A M G L A S O N D G F M A M G L A S O N D G F M Aestre 1, 2010 Semestre 2, 2010 Semestre 1, 2011 Semestre 2, 2011 Semestre 1, 2012

Attività

Divisione

Avanzamento

Cardine

Riepilogo

Riepilogo progetto

Attività esterne

Cardine esterno

Scadenza

Pagina 1

Progetto: Stima 1Data: gio 11/02/10

ID Nome attività Durata Inizio Fine

1 Demolizioni 10 g lun 15/02/10 ven 26/02/102 scavi 9 g lun 01/03/10 gio 11/03/103 strutture in C.A. 231 g ven 12/03/10 ven 28/01/114 finiture 254 g lun 31/01/11 gio 19/01/125 sistemazione esterna 60 g ven 20/01/12 gio 12/04/12

F M A M G L A S O N D G F M A M G L A S O N D G F M Aestre 1, 2010 Semestre 2, 2010 Semestre 1, 2011 Semestre 2, 2011 Semestre 1, 2012

Attività

Divisione

Avanzamento

Cardine

Riepilogo

Riepilogo progetto

Attività esterne

Cardine esterno

Scadenza

Pagina 1

Progetto: Stima 1Data: gio 11/02/10

ANALISI TECNOLOGICASTRUTTURA

Incantieramento Codice Computo UM Quantità

Ponteggi in elementi portanti metallici 02.06.003 mq 450.00

Demolizione Codice Computo UM Quantità

Demolizione totale di fabbricati. 02.03.001 mc 830.00

Scavi Codice Computo UM Quantità

Scavo di sbancamento con uso di mezzi meccanici. 02.01.001 mc 1,912.90

Scavo a sez. obbl. con uso di mezzi meccanici - Fond. Edificio 02.01.003 mc 50.89

Scavo a sez. obbl. con uso di mezzi meccanici - Cunic. Perim 02.01.003 mc 34.95

Rinterri con uso di mezzi meccanici - Fondazioni 02.02.001 mc 12.41

Rinterri con uso di mezzi meccanici - Edificio 02.02.001 mc 282.77

Fondazioni Codice Computo UM Quantità

Vespaio interrato - ciottoli o pietrame calcareo 03.01.009 mc 94.99

Massetto di calcestruzzo vibrato non armato - Solet.su vespaio fino a 7cm 03.01.002.001 mq 330.52

Massetto di calcestruzzo vibrato non armato - Solet.su vespaio oltre i 7cm 03.01.002.002 mq 991.58

Rete in acciaio elettrosaldata - Armatura soletta su vespaio 03.05.003 kg 630

Barre in acciaio FeB44K per opere di fondazione 03.05.002 kg 4503,76

Casseforme - Fondazioni edificio 03.03.014.001 mq 182,7

Casseforme - Fondazioni cunicolo perimetrale 03.03.014.001 mq 21,84

Conglomerato cem. per opere di fond. non armate - Edificio 03.03.001 mc 25.03

Conglomerato cem. per opere di fond. non armate - Cunic Perim. 03.03.001 mc 17.72

Conglomerato cem. per strutture armate di fondazione - Fond.Edificio 03.03.003 mc 50.67

Conglomerato cem. per stru armate di fondazione - Fond.Cunic Perim. 03.03.003 mc 24.02

Barre in acciaio FeB44K per opere di fondazione - Fond.parete Perim. 03.05.002 kg 2402

Barre in acciaio FeB44K per parete perim. 03.05.002 kg 5347,23

Casseforme - Parete perimetrale 03.03.014.001 mq 493,49

Conglomerato cem. per strutture armate - di muri continui perim. 03.03.006.003 mc 64.78

Impermeabilizzazione pareti controterra - primer bituminoso 07.01.002 mq 283,79

Impermeabilizzazione pareti controterra - membrana elastoplastomerica 07.01.010 mq 283,79

Drenaggio parete controtera - in elementi forati laterizio 03.01.006 mc 29.45

Drenaggio pareti controterra - ghiaia o pietrisco 03.01.007 mc 141.89

Conglomerato cem. per strutture armate di fondazione - Marciapiede 03.03.003 mc 4.90

Cunette in calcestruzzo perimetrale N.P. 01 m 76,7

Strutture armate in elevazione Codice Computo UM Quantità

Barre in acciaio FeB44K per Pilastri (27) 03.05.002 kg 1397,1

COD. WBSA commessa A

A.1 INCANTIERAMENTO - 1a FASE cod Comp. cod prezzi U.M Quantità

A.1.1 Recinzione ed accesso mq 230A.1.2 Box Ufficio n° 1A.1.3 Servizi igienico assistenziali n° 2A.1.4 Deposito chiuso n° 1A.1.5 Impianto elettrico m 330A.1.6 Messa a terraA.1.7 Impianto IdricoA.1.8 Quadro generale di distrbuzione n° 1A.1.9 Viabilità

A.2 DEMOLIZIONE cod Comp. cod prezzi U.M Quantità

A.2.1 Demolizione totale di fabbricato A 02.03.001 02.03.01 mc 830.00

A.3 INCANTIERAMENTO - 2a FASE cod Comp. cod prezzi U.M Quantità

A.3.1 Montaggio gru a torre

A.4 SCAVI cod Comp. cod prezzi U.M Quantità

A.4.1 Scavo di sbancamento 02.01.001 02.01.01 mc 1,912.90A.4.2 Scavo di sbancamento Rampa con uso di mezzi meccanici. 02.01.001 02.01.01 mc 289.90A.4.3 Scavo a sez. obbl. con uso di mezzi meccanici - Fond. Edificio 02.01.003 02.01.05 mc 50.89A.4.4 Scavo a sez. obbl. con uso di mezzi meccanici - Cunic. Perim 02.01.003 02.01.05 mc 34.95

A.5 OPERE DI FONDAZIONE cod Comp. cod prezzi U.M Quantità

A.5.1 FONDAZIONI A TRAVI ROVESCEA.5.1.1 Conglomerato cem. per opere di fond. non armate -Magrone travi rovesce 03.03.001 03.01.09 mc 25.03A.5.1.2 Barre in acciaio FeB44K per opere di fondazione 03.05.002 03.04.01 kg 4503,76A.5.1.3 Casseforme - Fondazioni edificio 03.03.014.001 03.01.11 a mq 182,7A.5.1.4 Conglomerato cem. per strutture armate di fondazione - Fond.Edificio 03.03.003 03.01.10 mc 50.67A.5.1.5 Scasseratura Fondazioni edificioA.5.1.6 Vespaio interrato - ciottoli o pietrame calcareo 03.01.009 02.02.02 mc 94.99A.5.1.7 Rete in acciaio elettrosaldata - Armatura soletta su vespaio 03.05.003 03.04.02 kg 630A.5.1.8 Massetto di calcestruzzo vibrato non armato - Solet.su vespaio fino a 7cm 03.01.002.001 03.02.03 mq 330.52

A.5.2 FONDAZIONE CUNICOLO PERIMETRALEA.5.2.1 Conglomerato cem. per opere di fond. non armate - Cunic Perim. 03.03.001 03.01.09 mc 17.72A.5.2.2 Barre in acciaio FeB44K per opere di fondazione - Fond.parete Perim. 03.05.002 03.04.01 kg 2402A.5.2.3 Casseforme - Fondazioni cunicolo perimetrale 03.03.014.001 03.01.11 a mq 21,84A.5.2.4 Conglomerato cem. per strutture armate di fondazione - Fond.Cunic Perim. 03.03.003 03.01.10 mc 24.02A.5.2.5 Scasseratura cunicolo perimetrale

Codice Descrizione U.M Q.uni Quantita COSTO TOT Costo uni.1.1 Recinzione ed accesso mq 1,0000 230Manodopera

Operaio 1° Liv.A h 0,0696 16 298,56 18,66Operaio 2° Liv.A h 0,0696 16 316,96 19,81Operaio 3° Liv.A h 0,0696 16 327,2 20,45Operaio 1° Liv.B h 0,0696 16 298,56 18,66Operaio 2° Liv.B h 0,0696 16 316,96 19,81Operaio 3° Liv.B h 0,0696 16 327,2 20,45

Materialirete metallica mq 1,0000 230 264,5 1,15

Mezzi e attrezzaturaordinari

costo tot 2149,94

Codice Descrizione U.M Q.uni Quantita COSTO TOT Costo uni.1.2 Box ufficio cad 1,0000 1Manodopera

Operaio 2° Liv.A h 0,0400 0,04 0,7924 19,81Operaio 3° Liv.A h 0,0400 0,04 0,818 20,45Operaio 1° Liv.A h 0,0400 0,04 0,7464 18,66

Materiali 0Box coibentato cad 1,0000 1 2200 2200,00

Mezzi e attrezzatura 0Autocarro di portata 100 quintali con gru h 0,1500 0,15 46,23costi diretti 0,549 3,66costi indiretti 42,57

costo tot 2202,9058

Codice Descrizione U.M Q.uni Quantita COSTO TOT Costo uni.1.3 Servizi igenico cad 1,0000 1Manodopera

Operaio 1° Liv.A h 0,1100 0,11 2,0526 18,66Operaio 2° Liv.A h 0,1100 0,11 2,1791 19,81Operaio 3° Liv.A h 0,1100 0,11 2,2495 20,45

MaterialiBagno chimico cad 1,0000 1 500 500,00

Mezzi e attrezzaturaAutocarro di portata 100 quintali con gru h 0,1000 0,1 4,623 46,23

0,366 3,6642,57

costo tot 511,4702

Codice Descrizione U.M Q.uni Quantita COSTO TOT Costo uni.1.4 Impianto elettrico m 1,0000 282Manodopera

Operaio specializzato (elettricista) h 0,0300 8,46 184,0896 21,76Operaio 2° Liv.B h 0,0300 8,46 167,5926 19,81

MaterialiCavo butile G50R/4 Zx6.0 + T m 1,0000 282 583,74 2,07Interruttore unipolare cad 0,0035 1 1,74 1,74

Mezzi e attrezzaturaordinari

costo tot 937,1622

Codice Descrizione U.M Q.uni Quantita COSTO TOT Costo uni.1.5 Deposito chiuso cad 1,0000 1Manodopera

Operaio 2° Liv.A h 0,1100 0,11 2,1791 19,81Operaio 3° Liv.A h 0,1100 0,11 2,2495 20,45Operaio 1° Liv.A h 0,1100 0,11 2,0526 18,66

MaterialiBox coibentato cad 1,0000 1 2200 2200,00

DIAGRAM OF OF ACTIVITIES

ANALYSIS TECHNOLOGY WORK BREAKDOWN STRUCTURE

COST BREAKDOWN STRUCTURE

Page 24: Portfolio   Dott. Ing Antonio Menghi   Chartered Construction Engineer

Laboratory of Restoration of Building

Historical and constructive analysis ,Recovery hypothes

Software utilizzati: Autocad, Sketch-up

University subject

Page 25: Portfolio   Dott. Ing Antonio Menghi   Chartered Construction Engineer
Page 26: Portfolio   Dott. Ing Antonio Menghi   Chartered Construction Engineer
Page 27: Portfolio   Dott. Ing Antonio Menghi   Chartered Construction Engineer

Laboratory of Reinforced Concrete

Design of a six-storey building following the 2008 earthquake legislation NTC

Software utilizzati: SAP, Autocad

University subject

Page 28: Portfolio   Dott. Ing Antonio Menghi   Chartered Construction Engineer

Dott.Ing. Antonio Menghi

[email protected]

+39/3381662369

Chartered Construction Engineer

Page 29: Portfolio   Dott. Ing Antonio Menghi   Chartered Construction Engineer

SCALA

PILASTRITRAVI

PARTICOLARI