Port of Long Beach 76 Foot Main Channel Dredging Project
Doug Thiessen, Port of Long Beach (POLB),Al Moro, Chief Harbor Engineer, POLB Emily Ueda, Program Manager, POLB, Janna Watanabe, Environmental Specialist, POLB Jim Fields, U.S. Army Corps of Engineers, Alan Alcorn, Moffatt & Nichol Todd Graham, KPFF, Steve Cappellino, Anchor QEA
![Page 2: Port of Long Beach 76 Foot Main Channel Dredging Project · 2017-06-07 · Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro,](https://reader033.vdocuments.mx/reader033/viewer/2022042809/5f92bb4f75687e2efa2ea47a/html5/thumbnails/2.jpg)
![Page 3: Port of Long Beach 76 Foot Main Channel Dredging Project · 2017-06-07 · Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro,](https://reader033.vdocuments.mx/reader033/viewer/2022042809/5f92bb4f75687e2efa2ea47a/html5/thumbnails/3.jpg)
Project Goal
• Improve navigation and environmental safety
– Economical sediment remediation (IR Site 7)
• Deepen and widen
turning Basin and Main Channel
• Create Port property for commerce
![Page 4: Port of Long Beach 76 Foot Main Channel Dredging Project · 2017-06-07 · Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro,](https://reader033.vdocuments.mx/reader033/viewer/2022042809/5f92bb4f75687e2efa2ea47a/html5/thumbnails/4.jpg)
Project Sites
![Page 5: Port of Long Beach 76 Foot Main Channel Dredging Project · 2017-06-07 · Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro,](https://reader033.vdocuments.mx/reader033/viewer/2022042809/5f92bb4f75687e2efa2ea47a/html5/thumbnails/5.jpg)
Disposal Site: Pier G North Slip
![Page 6: Port of Long Beach 76 Foot Main Channel Dredging Project · 2017-06-07 · Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro,](https://reader033.vdocuments.mx/reader033/viewer/2022042809/5f92bb4f75687e2efa2ea47a/html5/thumbnails/6.jpg)
Pier G North Slip Fill
![Page 7: Port of Long Beach 76 Foot Main Channel Dredging Project · 2017-06-07 · Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro,](https://reader033.vdocuments.mx/reader033/viewer/2022042809/5f92bb4f75687e2efa2ea47a/html5/thumbnails/7.jpg)
Pier G Fill
![Page 8: Port of Long Beach 76 Foot Main Channel Dredging Project · 2017-06-07 · Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro,](https://reader033.vdocuments.mx/reader033/viewer/2022042809/5f92bb4f75687e2efa2ea47a/html5/thumbnails/8.jpg)
Catalina Express Terminal Maintenance Dredging
![Page 9: Port of Long Beach 76 Foot Main Channel Dredging Project · 2017-06-07 · Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro,](https://reader033.vdocuments.mx/reader033/viewer/2022042809/5f92bb4f75687e2efa2ea47a/html5/thumbnails/9.jpg)
Target Dredge Depths Area A = 4’+2’ OD Area C (west) = 4’+2” OD Area C (east) = 2’+2’ OD
Final Removal Volume Area A = 147,000 CY Area C (west) = 221,000 CY Area C (east) = 134,000 CY Total = 502,000 CY
IR Site 7 West Basin Dredge Areas
IR Site 7 West Basin Dredge Areas
![Page 10: Port of Long Beach 76 Foot Main Channel Dredging Project · 2017-06-07 · Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro,](https://reader033.vdocuments.mx/reader033/viewer/2022042809/5f92bb4f75687e2efa2ea47a/html5/thumbnails/10.jpg)
Clamshell Dredge at IR Site -7
![Page 11: Port of Long Beach 76 Foot Main Channel Dredging Project · 2017-06-07 · Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro,](https://reader033.vdocuments.mx/reader033/viewer/2022042809/5f92bb4f75687e2efa2ea47a/html5/thumbnails/11.jpg)
IR Site -7 Material in Dump Scow
![Page 12: Port of Long Beach 76 Foot Main Channel Dredging Project · 2017-06-07 · Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro,](https://reader033.vdocuments.mx/reader033/viewer/2022042809/5f92bb4f75687e2efa2ea47a/html5/thumbnails/12.jpg)
IR Site -7 Material at Pier G Fill
![Page 13: Port of Long Beach 76 Foot Main Channel Dredging Project · 2017-06-07 · Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro,](https://reader033.vdocuments.mx/reader033/viewer/2022042809/5f92bb4f75687e2efa2ea47a/html5/thumbnails/13.jpg)
Phase 2 – Dredging Turning Basin
PIER G
80’ STEELPIPE
SCHEDULE: 4/6/2011 – 4/26/2011 (21 DAYS – 24/7) EQUIPMENT: H.R. MORRIS (CUTTER HEAD) DREDGE POWER: ELECTRIC (from Pier T) DREDGE QUANTITY: 430,000 CY DISPOSE METHOD: PUMP (24” PIPE) PRODUCTION: 17,000 PER DAY
![Page 14: Port of Long Beach 76 Foot Main Channel Dredging Project · 2017-06-07 · Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro,](https://reader033.vdocuments.mx/reader033/viewer/2022042809/5f92bb4f75687e2efa2ea47a/html5/thumbnails/14.jpg)
Dike Construction
![Page 15: Port of Long Beach 76 Foot Main Channel Dredging Project · 2017-06-07 · Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro,](https://reader033.vdocuments.mx/reader033/viewer/2022042809/5f92bb4f75687e2efa2ea47a/html5/thumbnails/15.jpg)
HR Morris Cutterhead
![Page 16: Port of Long Beach 76 Foot Main Channel Dredging Project · 2017-06-07 · Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro,](https://reader033.vdocuments.mx/reader033/viewer/2022042809/5f92bb4f75687e2efa2ea47a/html5/thumbnails/16.jpg)
Channel Dredging
![Page 17: Port of Long Beach 76 Foot Main Channel Dredging Project · 2017-06-07 · Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro,](https://reader033.vdocuments.mx/reader033/viewer/2022042809/5f92bb4f75687e2efa2ea47a/html5/thumbnails/17.jpg)
Turning Basin Dredging
![Page 18: Port of Long Beach 76 Foot Main Channel Dredging Project · 2017-06-07 · Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro,](https://reader033.vdocuments.mx/reader033/viewer/2022042809/5f92bb4f75687e2efa2ea47a/html5/thumbnails/18.jpg)
Hydraulic Discharge within Fill
![Page 19: Port of Long Beach 76 Foot Main Channel Dredging Project · 2017-06-07 · Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro,](https://reader033.vdocuments.mx/reader033/viewer/2022042809/5f92bb4f75687e2efa2ea47a/html5/thumbnails/19.jpg)
Emergent Fill at Pier G
![Page 20: Port of Long Beach 76 Foot Main Channel Dredging Project · 2017-06-07 · Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro,](https://reader033.vdocuments.mx/reader033/viewer/2022042809/5f92bb4f75687e2efa2ea47a/html5/thumbnails/20.jpg)
Surcharge Material
• Originally planned to use Western Anchorage sand mine
• Revised to include rolling surcharge using Port supplied crushed miscellaneous base (CMB)
• 2/3 of CMB left on-site for use in developing site
• Excess material used for other Port project (Middle Harbor)
![Page 21: Port of Long Beach 76 Foot Main Channel Dredging Project · 2017-06-07 · Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro,](https://reader033.vdocuments.mx/reader033/viewer/2022042809/5f92bb4f75687e2efa2ea47a/html5/thumbnails/21.jpg)
Construction Costs
Engineer’s Cost Estimate: $44M
Area Cost
Fill Area (Wall, Dike, dredging) $15.7 Million
Catalina Express Terminal $0.8 Million
IR Site 7 $11.5 Million
Turning Basin and Channel (50/50 Fed Funded project)
$9.6 Million
Miscellaneous Items $2.2 Million
Total Bid Amount: $39.8 Million
Army Corps of Engineers cost share amount:
$4.8 Million
![Page 22: Port of Long Beach 76 Foot Main Channel Dredging Project · 2017-06-07 · Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro,](https://reader033.vdocuments.mx/reader033/viewer/2022042809/5f92bb4f75687e2efa2ea47a/html5/thumbnails/22.jpg)
http://www.polb.com
Questions