Lekki Port LFTZ EnterpriseLekki Port LFTZ EnterpriseLekki Port LFTZ EnterpriseLekki Port LFTZ Enterprise
WWWWeellccccoommmmee
TT
port@lekkiport@lekkioo
Nigeria 2020 (Growth & Infrastructure)Nigeria 2020 (Growth & Infrastructure)
Nigeria - a Country that has 140 millionthat has 140 millionpeople handles only
600 000 TEU600,000 TEUs per annum.
----------------------------Mainly due to
insufficient capacity at the Ports
Nigeria 2020 (Growth & Infrastructure)Nigeria 2020 (Growth & Infrastructure)
Comparative AnalysisSR COUNTRY TEU'S TRAFFIC YEAR POPULATIONNO (2007 NOS) (DATA) (NOS)
1 SINGAPORE 27,932,000 2007 4,588,600
2 HONG KONG 23,881,000 2007 7,040,885
3 SOUTH KOREA 13,270,000 2007 49,044,790
4 GERMANY 13,507,039 2005 82,689,210
5 MALAYSIA 12 620 000 2007 27 250 3705 MALAYSIA 12,620,000 2007 27,250,370
6 JAPAN 16,777,410 2005 128,084,700
7 EGYPT 4,500,000 2007 74,032,880
8 SOUTH AFRICA 2,867,909 2005 47,431,830
9 NIGERIA 600,000 2006 140,000,000
Data source:- World Port Ranking & World Container countryLeague 2005
Nigeria 2020 (Growth & Infrastructure)Nigeria 2020 (Growth & Infrastructure)
Ni i ill b Af i ’ L tNigeria will be Africa’s Largest economy by 2020.GG yGG
rroowwwwtt
Double digit growth forecast in port hhtraffic till 2020.
Nigeria 2020 (Growth & Infrastructure)Nigeria 2020 (Growth & Infrastructure)
GGSerious Congestion and Melt DownSerious Congestion and Melt Down
GGrrooww
TheThe forecastforecast isis thatthat byby 20112011 therethere willwill bebe aa shortshort fallfall
wwtt
TheThe forecastforecast isis thatthat byby 20112011 therethere willwill bebe aa shortshort fallfallinin terminalterminal capacitycapacity ofof approximatelyapproximately 160160,,000000 TEU’sTEU’swithinwithin NigerianNigerian portsports WithoutWithout infrastructureinfrastructure thethe
hhwithinwithin NigerianNigerian portsports.. WithoutWithout infrastructureinfrastructure thetheexpectedexpected growthgrowth willwill bebe hamperedhampered..
Nigeria 2020 (Growth & Infrastructure)Nigeria 2020 (Growth & Infrastructure)
The additionalThe additionalThe additional The additional growth of growth of
approximatelyapproximatelyGG approximately approximately 160,000 TEU’S due 160,000 TEU’S due
t t@l kkit t@l kki
GGrr
to port@lekki to port@lekki would increase the would increase the
ooww Nigerian GDP by 8 Nigerian GDP by 8
billion US$ (920 billion US$ (920 wwtt
billion Naira). billion Naira).
A tiA ti EE dditi ldditi l 2020 f tf t t it i b htb ht i ti t
hhAssumptionAssumption :: EveryEvery additionaladditional 2020 footfoot containercontainer broughtbrought intointoNigeriaNigeria wouldwould addadd valuevalue worthworth approximatelyapproximately 5050,,000000 USUS$$..
Nigeria 2020 (Growth & Infrastructure)Nigeria 2020 (Growth & Infrastructure)g ( )g ( )
GGGGrroowwwwtt
Nigeria has the potential to be a majorNigeria has the potential to be a majorhh
Nigeria has the potential to be a major Nigeria has the potential to be a major transshipment hub for West African countries.transshipment hub for West African countries.
Nigeria 2020 (Growth & Infrastructure)Nigeria 2020 (Growth & Infrastructure)
To s pport theII To support the double digit growth
IInnff
forecast for Nigeria and transshipment
rraass p
potential.ssttrr --------------------------
Requires the
rruucc
development of a new port
ttuurr new portrree
Introduction to [email protected] to [email protected] @p @
Jointly promoted by:Jointly promoted by:--
Other Strategic InvestorsOther Strategic InvestorsOther Strategic Investors.Other Strategic Investors.
Introduction to [email protected] to [email protected] @p @
LLooooccaatt
The approximate Project Site coordinate are 4˚00’E, 6˚25’ N in Lekki Peninsula, Nigeria.tt
iioonn
Concept & Concept & DesignDesign..
SALIENT FEATURES:-
pp gg
SALIENT FEATURES:-port@lekki has a 1,500 meters long “Main
FFee Breakwater”.
A “Turning Circle” 600 meter in diameter.
eeaatt “Draft” of 16 to 18 meters.
A 200 meters wide “Approach Channel”.ttuu
port@Lekki will be the 1st “Deep Water”port in West Africa to berth larger vessels
uurr p g
then the current ports can accommodate.The port is designed to berth vessels of
eess p g
8,000 TEU’s and 160,000 DWT.
Concept & Concept & DesignDesign..
Design Vessel Size
pp gg
Design Vessel Size• Container vessel up 8,000 TEU with a
maximum draft of 14.5 m and length of 335 m.FFee
• Suez Max and Aframax Tankers of 160,000DWT and with maximum draft of 17.1 m andlength of 310 m
eeaatt length of 310 m.
Dredge Channelttuu Dredge Channel
• Will be 16.0 to 19.5 m deep.• 7.4 km long, 150 to 200 m wide.
uurr
g,• Volume of capital dredging – 22 million cubic
meters.D d d t i l ill b d f l ti
eess
• Dredged material will be used for reclamation.
Concept & Concept & DesignDesign..pp gg
BreakwatersFFee
Breakwaters“Main Breakwater” of 1,500 m length oriented toavoid wave penetration and facilitating naturalee
aatt
p gsediment bye-pass & designed for 1:100 yearreturn period storm.
ttuuuurr
Channel Length 7.4 KMChannel Length 7.4 KMeess
gg
Dredged to 19.5mDredged to 19.5m
Width 150m Width 150m -- Widening to 200mWidening to 200m
Concept & Concept & DesignDesign..TT
pp gg
eerrmmmmiinnaal l
DDeeeessiiggnn
VEHICULAR ENTRANCE TO THE TERMINAL
Concept & Concept & DesignDesign..pp ggTTeerrmmmmiinnaal l
DDeeeessii
VIEW FROM NORTHggnn
Concept & Concept & DesignDesign..pp ggTTeerrmmmmiinnaal l
DDee
VIEW FROM SOUTH
eessii VIEW FROM SOUTHggnn
Concept & Concept & DesignDesign..pp ggTTeerrmmmmiinnaal l
DDee
VIEW FROM EAST
eessii VIEW FROM EASTggnn
Concept & Concept & DesignDesign..pp ggTTeerrmmmmiinnaal l
DDeeeessii
VIEW FROM WESTggnn
Concept & Concept & DesignDesign..pp ggTTeerrmm 3
1mmiinn
600m600maal l
DDeeeessii 2ggnn
6 = Berths
Concept & Concept & DesignDesign..Maritime Services Fleet
pp ggMM
WithWith thethe ApprovalApproval andand assistanceassistance ofof thethe NigerianNigerianPortsPorts AuthorityAuthority LekkiLekki PortsPorts LFTZLFTZ EnterpriseEnterprise WillWill
aar r II yy pp
operateoperate andand managemanage itsits ownown MaritimeMaritime ServicesServices FleetFleetofof VesselsVessels andand TrainedTrained PilotsPilots..
I I t t iiiimmee
FFll Fast Pilot Fast Pilot
LaunchesLaunchesTug Boats of Tug Boats of
50 ton +50 ton +Bollard Pull Bollard Pull
lleeee
Latest Navigational Aids will be InstalledLatest Navigational Aids will be Installedeett
Concept & Concept & DesignDesign..
Key Container Handling EquipmentKey Container Handling Equipment
pp gg
ey Co ta e a d g qu p e tey Co ta e a d g qu p e tEEqq
TYPE NOS. TYPE NOS.qquuii
STS CRANES 8 RTG’S 28
TERMINAL 114 TERMINAL 85iipp
BUMP CARTS TRACTORSREACH 4 EMPTY STACKER 4
mmee
STACKERSFORKLIFT 11
The latest state of the art terminal handling equipmenttogether with international productivity standards will
nntt together with international productivity standards will
make Lekki Port the most efficient port in West Africa,
Concept & Concept & DesignDesign..pp gg
EEqqqquuiiiippmmeenntt
STS (SHIP TO SHORE) CRANESSTS (SHIP TO SHORE) CRANES
Concept & Concept & DesignDesign..pp gg
EEqqqquuiiiippmmeenntt
RTG’S (RUBBER TYRED GANTRY CRANES)RTG’S (RUBBER TYRED GANTRY CRANES)
Concept & Concept & DesignDesign..pp gg
EEqq
REACH & EMPTY STACKERREACH & EMPTY STACKERqquuiiiippmmeenntt
Concept & Concept & DesignDesign..pp gg
EEqqqquuiiiippmmee TERMINAL TRACTORS TERMINAL TRACTORS
BUMP CARTS ANDBUMP CARTS ANDnntt
BUMP CARTS ANDBUMP CARTS ANDFORK LIFTSFORK LIFTS
Work Already Undertaken.Work Already Undertaken.
The following studies have been completed :The following studies have been completed :--
yy
CC g pg p
•• Oceanographic StudiesOceanographic Studies•• BathymetryBathymetry
uurr
•• BathymetryBathymetry•• EnvironmentalEnvironmental•• Offshore Geotechnical InvestigationOffshore Geotechnical Investigation
rree
Offshore Geotechnical InvestigationOffshore Geotechnical Investigation•• Model StudiesModel Studies•• Sediment Transport Sediment Transport
nntt
pp•• Nautical Simulation (Maritime Maneuvering & Berthing)Nautical Simulation (Maritime Maneuvering & Berthing)•• 2D & 3D Break Water Testing and Simulation2D & 3D Break Water Testing and Simulation
SSttaattuuuuss
Work Already Undertaken.Work Already Undertaken.
2D Tests:
yy
CC 2D Tests:
2D Tests for Caissonti f th M i
CCuurr
portion of the MainBreakwater conducted.
rreenntt
SSttaattuuuuss
Work Already Undertaken.Work Already Undertaken.Environmental Impact Assessment :Environmental Impact Assessment :
yy
CC• EIA completed and
clearance obtained to
CCuurr
construct the Port@Lekki from
Federal Ministry of
rree
Federal Ministry of Environment.
nntt
• No significant environmental issues h b f d th t
SStt
have been found that would restrict the
expansion & operation
aattuu expansion & operation
of the Portuuss
Work Already Undertaken.Work Already Undertaken.Nautical Simulation:
yy
CC
A Container Vessel of 8,000 teus
CCuurr
A Tanker of 160,000 dwt
rreenntt
SStt
Nautical Simulation undertaken by Alkyon of Holland to
aattuu determine the criteria necessary to ensure safe berthing
of vessels at Lekki Portuuss
Work Already Undertaken.Work Already Undertaken.Port Infrastructure already in place
yy
CCCCuurrrreenntt
SSttaattuuuuss
Work Already Undertaken.Work Already Undertaken.Port Infrastructure already in place
yy
CC
Office space in warehouse - ICCuurrrreenntt
SSttaattuuuuss
Work Already Undertaken.Work Already Undertaken.Port Infrastructure already in place
yy
CCCCuurr Development of Corporate Headquatersrreenntt
SSttaattuuuuss
Work Already Undertaken.Work Already Undertaken.Provisional construction approval from NPA.
yy
CCOn the 3rd June On the 3rd June 2008 “Lekki Port2008 “Lekki Port
CCuurr 2008, Lekki Port 2008, Lekki Port
LFTZ Enterprise”LFTZ Enterprise”obtainedobtained
rree
obtained obtained “Provisional“ProvisionalConstructionConstruction
nntt
Construction Construction Approval” FromApproval” From
“The Nigerian Port“The Nigerian Port
SStt
The Nigerian Port The Nigerian Port Authority”Authority”
aattuu W ki l l i ti ithW ki l l i ti ithuuss
Working closely in cooperation with Working closely in cooperation with Nigerian Port AuthoritiesNigerian Port Authorities
Work Already Undertaken.Work Already Undertaken.Port project team in place
yy
CCManaging Director
Project Director.
CCuurr Project Director.
Finance Director.
Project Development Manager
rree
Project Development Manager.
Admin Manager.nntt
Site Manager.
Civil Engineer – PortSStt
Civil Engineer – Buildings & Infrastructure
Civil Engineer – Utilities.
aattuu g
Chief Security Officer.uuss
Activity Schedule.Activity Schedule.August 2008 - Invitation to Bid Document will be released
yy
CCto prospective construction companies.
October 2008 – Bid Documents will be received.
CCuurr
October 2008 – Financial Closure will be achieved.November 2008 – Bid Documents will be scrutinised and
l t d
rree
evaluated.December 2008 – Construction contract will be awarded.J 2009 M bil ti f C t ti t t
nntt
January 2009 – Mobilsation of Construction contractor.SSttaattuuuuss
Activity Schedule.Activity Schedule.yyMarch 2009 – Quay wall and Onshore construction toCC y
commence.March 2009 – Dredging of Inner Basin will commence.
CCuurr
July 2009 – Channel Dredging operations will commence.July 2010 – Part of Berth will be ready for receiving terminal
equipment
rree
equipment.March 2011 – Expected date when the terminal will be
completed to allow the berthing of container vessels break
nntt
completed to allow the berthing of container vessels, breakbulk vessels and project cargo ashore.SS
ttaattuuuuss
Expansion Plan.Expansion Plan.pp
CCCCuurrrreenntt
SStt
ToTo copecope withwith thethe expectedexpected demand,demand, moremore landland willwill bebe requiredrequired ininaattuu orderorder toto catercater forfor thethe increaseincrease inin containerscontainers traffictraffic andand bulkbulk
cargoescargoes..uuss
Lekki Port LFTZ EnterpriseLekki Port LFTZ EnterpriseLekki Port LFTZ EnterpriseLekki Port LFTZ Enterprise