POROUS PAVEMENT

“A GREEN STEP FORWARD”

OTEC 2009

Page 2: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:

Ft. Wright TANK Park & Ride

Engineer:

KZF Design Inc.Henry L. (Hank) Fedders – Project Manager

Contractor:

Eaton Asphalt Paving Company, Inc.Anthony Ridgeway – Construction Manager

Owner:

Transit Authority of Northern KentuckyAndrew Aiello - Deputy General Manager

Storm Water Permitting & Monitoring:

SD#1Craig Frye – Assistant Project Manager

Page 3: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:

project

Page 4: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:

Background

• October 2005 - TANK issues RFP for a design/build project for two Park & Rides.

• Mt. Zion Road in Boone County – 75-150 parking spaces and Ft. Wright adjacent to TANK facility – 150-250 parking spaces.

• KZF and Eaton Asphalt Paving Co. partnered to submit bids for both projects and the team was selected for both projects.

Page 5: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:

design

Page 6: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:

Site Plan

Page 7: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:

Porous Pavement Design

Non-Woven Geotextile Fabric

Uncompacted Soil Subgrade

6” Open-Graded HMA

with PG 76-22

24-36” of #2 Stone

Recharge Bed

Aggregate Interlayer 6”Thick (#8 stone)

Page 8: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:

Grading and Drainage Plan

Page 9: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:

Grading and Drainage Plan2

Page 10: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:

Design Challenge

• 36” CMP storm pipe from KY 17 outlet extended under the entire lot.

Page 11: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:

• Monitoring device on outlet pipe from control structure.

Post Construction

Page 12: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:

Flow Baffle

• Flow baffle.

Page 13: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:

construction

Page 14: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:

Pre-Construction

• Future site of Park & Ride was gravel and vegetated terrain.

Page 15: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:

Porous Pavement Design

Non-Woven Geotextile Fabric

Uncompacted Soil Subgrade

6” Open-Graded HMA

with PG 76-22

24-36” of #2 Stone

Recharge Bed

Aggregate Interlayer 6”Thick (#8 stone)

Page 16: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:

Construction Process

• Trucks kept off of subgrade to avoid further compaction.

Page 17: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:

Construction

• Soil composition affects design of pavement system.

Page 18: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:

Construction

• TOPCON GPS system used to establish level grade.

Page 19: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:

Construction

Page 20: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:

Construction

• Park & Ride had to be tied in with KyTCHighland Ave extension being constructed at the same time.

• Design/Build made it easy to make design changes on the fly for the tie in.

Page 21: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:

completion

Page 22: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:

Dry Porous Pavement

• Pervious pavement.

Page 23: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:

After Rain Event

• Pervious pavement vs Standard Pavement.

Page 24: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:

Before & After

Page 25: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:

Before & After

Page 26: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:

Before & After

Page 27: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:

Before

Point of Reference

Page 28: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:

After - Completed Facility

• Completed facility.

Point of reference

Page 29: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:

Post Construction

• Newly designed shelters, decorative lighting and landscaping.

Page 30: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:

storm monitoring

Page 31: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:

• Monitoring Efforts

Monitoring

Page 32: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:

• Quantity

Monitoring

Page 33: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:

• Volume Reduction

Monitoring

Page 34: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:

Monitoring

• Peak Flow Reduction

Peak Flow Reduction

0

0.05

0.1

0.15

0.2

0.25

0.3

0:001:152:303:455:006:157:308:4510:0011:1512:3013:4515:0016:1517:3018:4520:0021:1522:3023:45

Time

Runoff (cfs)

Impervious Asphalt

Porous Asphalt

Page 35: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:

Q & A

Page 36: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:

Contact Information

Engineer: KZF Design Inc.Henry L. (Hank) Fedders – Project [email protected]

Contractor: Eaton Asphalt Paving Company, Inc.Anthony Ridgeway – Construction [email protected]

Owner: Transit Authority of Northern KentuckyAndrew Aiello - Deputy General [email protected]

Storm Water Permitting & Monitoring: SD#1Craig Frye – Environmental [email protected]