POROUS PAVEMENT
“A GREEN STEP FORWARD”
OTEC 2009
![Page 2: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:](https://reader034.vdocuments.mx/reader034/viewer/2022042507/5f77d9d85b95df5c89348859/html5/thumbnails/2.jpg)
Ft. Wright TANK Park & Ride
Engineer:
KZF Design Inc.Henry L. (Hank) Fedders – Project Manager
Contractor:
Eaton Asphalt Paving Company, Inc.Anthony Ridgeway – Construction Manager
Owner:
Transit Authority of Northern KentuckyAndrew Aiello - Deputy General Manager
Storm Water Permitting & Monitoring:
SD#1Craig Frye – Assistant Project Manager
![Page 3: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:](https://reader034.vdocuments.mx/reader034/viewer/2022042507/5f77d9d85b95df5c89348859/html5/thumbnails/3.jpg)
project
![Page 4: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:](https://reader034.vdocuments.mx/reader034/viewer/2022042507/5f77d9d85b95df5c89348859/html5/thumbnails/4.jpg)
Background
• October 2005 - TANK issues RFP for a design/build project for two Park & Rides.
• Mt. Zion Road in Boone County – 75-150 parking spaces and Ft. Wright adjacent to TANK facility – 150-250 parking spaces.
• KZF and Eaton Asphalt Paving Co. partnered to submit bids for both projects and the team was selected for both projects.
![Page 5: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:](https://reader034.vdocuments.mx/reader034/viewer/2022042507/5f77d9d85b95df5c89348859/html5/thumbnails/5.jpg)
design
![Page 6: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:](https://reader034.vdocuments.mx/reader034/viewer/2022042507/5f77d9d85b95df5c89348859/html5/thumbnails/6.jpg)
Site Plan
![Page 7: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:](https://reader034.vdocuments.mx/reader034/viewer/2022042507/5f77d9d85b95df5c89348859/html5/thumbnails/7.jpg)
Porous Pavement Design
Non-Woven Geotextile Fabric
Uncompacted Soil Subgrade
6” Open-Graded HMA
with PG 76-22
24-36” of #2 Stone
Recharge Bed
Aggregate Interlayer 6”Thick (#8 stone)
![Page 8: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:](https://reader034.vdocuments.mx/reader034/viewer/2022042507/5f77d9d85b95df5c89348859/html5/thumbnails/8.jpg)
Grading and Drainage Plan
![Page 9: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:](https://reader034.vdocuments.mx/reader034/viewer/2022042507/5f77d9d85b95df5c89348859/html5/thumbnails/9.jpg)
Grading and Drainage Plan2
![Page 10: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:](https://reader034.vdocuments.mx/reader034/viewer/2022042507/5f77d9d85b95df5c89348859/html5/thumbnails/10.jpg)
Design Challenge
• 36” CMP storm pipe from KY 17 outlet extended under the entire lot.
![Page 11: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:](https://reader034.vdocuments.mx/reader034/viewer/2022042507/5f77d9d85b95df5c89348859/html5/thumbnails/11.jpg)
• Monitoring device on outlet pipe from control structure.
Post Construction
![Page 12: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:](https://reader034.vdocuments.mx/reader034/viewer/2022042507/5f77d9d85b95df5c89348859/html5/thumbnails/12.jpg)
Flow Baffle
• Flow baffle.
![Page 13: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:](https://reader034.vdocuments.mx/reader034/viewer/2022042507/5f77d9d85b95df5c89348859/html5/thumbnails/13.jpg)
construction
![Page 14: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:](https://reader034.vdocuments.mx/reader034/viewer/2022042507/5f77d9d85b95df5c89348859/html5/thumbnails/14.jpg)
Pre-Construction
• Future site of Park & Ride was gravel and vegetated terrain.
![Page 15: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:](https://reader034.vdocuments.mx/reader034/viewer/2022042507/5f77d9d85b95df5c89348859/html5/thumbnails/15.jpg)
Porous Pavement Design
Non-Woven Geotextile Fabric
Uncompacted Soil Subgrade
6” Open-Graded HMA
with PG 76-22
24-36” of #2 Stone
Recharge Bed
Aggregate Interlayer 6”Thick (#8 stone)
![Page 16: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:](https://reader034.vdocuments.mx/reader034/viewer/2022042507/5f77d9d85b95df5c89348859/html5/thumbnails/16.jpg)
Construction Process
• Trucks kept off of subgrade to avoid further compaction.
![Page 17: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:](https://reader034.vdocuments.mx/reader034/viewer/2022042507/5f77d9d85b95df5c89348859/html5/thumbnails/17.jpg)
Construction
• Soil composition affects design of pavement system.
![Page 18: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:](https://reader034.vdocuments.mx/reader034/viewer/2022042507/5f77d9d85b95df5c89348859/html5/thumbnails/18.jpg)
Construction
• TOPCON GPS system used to establish level grade.
![Page 19: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:](https://reader034.vdocuments.mx/reader034/viewer/2022042507/5f77d9d85b95df5c89348859/html5/thumbnails/19.jpg)
Construction
![Page 20: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:](https://reader034.vdocuments.mx/reader034/viewer/2022042507/5f77d9d85b95df5c89348859/html5/thumbnails/20.jpg)
Construction
• Park & Ride had to be tied in with KyTCHighland Ave extension being constructed at the same time.
• Design/Build made it easy to make design changes on the fly for the tie in.
![Page 21: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:](https://reader034.vdocuments.mx/reader034/viewer/2022042507/5f77d9d85b95df5c89348859/html5/thumbnails/21.jpg)
completion
![Page 22: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:](https://reader034.vdocuments.mx/reader034/viewer/2022042507/5f77d9d85b95df5c89348859/html5/thumbnails/22.jpg)
Dry Porous Pavement
• Pervious pavement.
![Page 23: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:](https://reader034.vdocuments.mx/reader034/viewer/2022042507/5f77d9d85b95df5c89348859/html5/thumbnails/23.jpg)
After Rain Event
• Pervious pavement vs Standard Pavement.
![Page 24: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:](https://reader034.vdocuments.mx/reader034/viewer/2022042507/5f77d9d85b95df5c89348859/html5/thumbnails/24.jpg)
Before & After
![Page 25: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:](https://reader034.vdocuments.mx/reader034/viewer/2022042507/5f77d9d85b95df5c89348859/html5/thumbnails/25.jpg)
Before & After
![Page 26: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:](https://reader034.vdocuments.mx/reader034/viewer/2022042507/5f77d9d85b95df5c89348859/html5/thumbnails/26.jpg)
Before & After
![Page 27: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:](https://reader034.vdocuments.mx/reader034/viewer/2022042507/5f77d9d85b95df5c89348859/html5/thumbnails/27.jpg)
Before
Point of Reference
![Page 28: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:](https://reader034.vdocuments.mx/reader034/viewer/2022042507/5f77d9d85b95df5c89348859/html5/thumbnails/28.jpg)
After - Completed Facility
• Completed facility.
Point of reference
![Page 29: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:](https://reader034.vdocuments.mx/reader034/viewer/2022042507/5f77d9d85b95df5c89348859/html5/thumbnails/29.jpg)
Post Construction
• Newly designed shelters, decorative lighting and landscaping.
![Page 30: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:](https://reader034.vdocuments.mx/reader034/viewer/2022042507/5f77d9d85b95df5c89348859/html5/thumbnails/30.jpg)
storm monitoring
![Page 31: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:](https://reader034.vdocuments.mx/reader034/viewer/2022042507/5f77d9d85b95df5c89348859/html5/thumbnails/31.jpg)
• Monitoring Efforts
Monitoring
![Page 32: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:](https://reader034.vdocuments.mx/reader034/viewer/2022042507/5f77d9d85b95df5c89348859/html5/thumbnails/32.jpg)
• Quantity
Monitoring
![Page 33: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:](https://reader034.vdocuments.mx/reader034/viewer/2022042507/5f77d9d85b95df5c89348859/html5/thumbnails/33.jpg)
• Volume Reduction
Monitoring
![Page 34: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:](https://reader034.vdocuments.mx/reader034/viewer/2022042507/5f77d9d85b95df5c89348859/html5/thumbnails/34.jpg)
Monitoring
• Peak Flow Reduction
Peak Flow Reduction
0
0.05
0.1
0.15
0.2
0.25
0.3
0:001:152:303:455:006:157:308:4510:0011:1512:3013:4515:0016:1517:3018:4520:0021:1522:3023:45
Time
Runoff (cfs)
Impervious Asphalt
Porous Asphalt
![Page 35: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:](https://reader034.vdocuments.mx/reader034/viewer/2022042507/5f77d9d85b95df5c89348859/html5/thumbnails/35.jpg)
Q & A
![Page 36: POROUS PAVEMENT “A GREEN STEP FORWARD”...Contractor: Eaton Asphalt Paving Company, Inc. Anthony Ridgeway –Construction Manager anthony.ridgway@jrjnet.com 859-331-2303 Owner:](https://reader034.vdocuments.mx/reader034/viewer/2022042507/5f77d9d85b95df5c89348859/html5/thumbnails/36.jpg)
Contact Information
Engineer: KZF Design Inc.Henry L. (Hank) Fedders – Project [email protected]
Contractor: Eaton Asphalt Paving Company, Inc.Anthony Ridgeway – Construction [email protected]
Owner: Transit Authority of Northern KentuckyAndrew Aiello - Deputy General [email protected]
Storm Water Permitting & Monitoring: SD#1Craig Frye – Environmental [email protected]