porfermance at a glance - south eastern railway zone performance.pdfporfermance at a glance capacity...

15
PORFERMANCE AT A GLANCE CAPACITY UTILISATION Year Trainee days Trainee Capacity Actual days Trainee Capacity Capacity Utilisation in percentage 2009 90312 3120 298 77480 116.56% 2010 79225 2840 301 71288 111.13% 2011 87208 4354 304 110053 79.24% 2012 110290 4548 304 115236 95.71% 2013 101346 4482 299 112125 90.39% 2014(up to Nov-13) 104500 3000 203 76125 137.27%

Upload: others

Post on 10-Mar-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PORFERMANCE AT A GLANCE - South Eastern Railway zone Performance.pdfPORFERMANCE AT A GLANCE CAPACITY UTILISATION Year Trainee days Trainee Capacity Actual days Trainee Capacity Capacity

PORFERMANCE AT A GLANCECAPACITY UTILISATION

Year Trainee daysTrainee

Capacity

Actual

days

Trainee

Capacity

Capacity

Utilisation

in

percentage

2009 90312 3120 298 77480 116.56%

2010 79225 2840 301 71288 111.13%

2011 87208 4354 304 110053 79.24%

2012 110290 4548 304 115236 95.71%

2013 101346 4482 299 112125 90.39%

2014(up to

Nov-13) 104500 3000 203 76125 137.27%

Page 2: PORFERMANCE AT A GLANCE - South Eastern Railway zone Performance.pdfPORFERMANCE AT A GLANCE CAPACITY UTILISATION Year Trainee days Trainee Capacity Actual days Trainee Capacity Capacity

INITIAL COURSE

DETAILS OF TRAINEE TRAINED DURING THE

LAST FIVE YEARS

Sr.

NoCOURSE

2009-

2010

2010-

2011

2011-

2012

2012-

2013

2013-14

(Nov,13)

1

Directly Recruited

Trainee Electric ALP

(AD-RRB)

423 372 561 472 322

2Supervisory Initial

Course16 23 16 24 4

3Initial Course for

Unskilled0 3 4 0 4

4

Intermediate

Apprentice

Mechanics

0 0 4 19 0

Page 3: PORFERMANCE AT A GLANCE - South Eastern Railway zone Performance.pdfPORFERMANCE AT A GLANCE CAPACITY UTILISATION Year Trainee days Trainee Capacity Actual days Trainee Capacity Capacity

REFRESHER COURSES

Sr.

NoCOURSE

2009-

2010

2010

-2011

2011-

2012

2012-

2013

2013-14

(Nov,13)

1

Electric LP

Goods/Coaching &

Motorman (CRC)

864 892 797 911

632

2ALP Refresher course (ACRC)

104 242 496 474324

3Running Supervisors

Refresher Course (RSRC)17 14 64 22

0

4Electric Loco Shunter

Refresher Course(ELS-R)43 36 43 69

17

5

Maintenance

Supervisors Refresher

Course (MSRC)

0 1 2 3

0

6Maintenance Artisan

Refresher Course (MARC)16 9 4 5

4

Page 4: PORFERMANCE AT A GLANCE - South Eastern Railway zone Performance.pdfPORFERMANCE AT A GLANCE CAPACITY UTILISATION Year Trainee days Trainee Capacity Actual days Trainee Capacity Capacity

PROMOTIONAL COURSE

Sr.

NoCOURSE

2009-

2010

2010

-2011

2011-

2012

2012-

2013

2013-14

(Nov,13)

1

Electric Loco

Shunter to Electric

Driver (DP)

144 224 102 263126

2Electric ALP to ELS

(ELS)70 122 70 26 80

3

Passenger LP

Promotional Course

(PDC)

45 97 96 10049

4Fitter Promotional

course (F)0 8 4 5 0

5Supervisors

Promotional Course4 0 8 0 0

Page 5: PORFERMANCE AT A GLANCE - South Eastern Railway zone Performance.pdfPORFERMANCE AT A GLANCE CAPACITY UTILISATION Year Trainee days Trainee Capacity Actual days Trainee Capacity Capacity

CONVERSION COURSES

Sr.

NoCOURSE

2009-

2010

2010

-2011

2011-

2012

2012-

2013

2013-14

(Nov,13)

1Diesel LP to

Electric LP (DC)172 93 124 73

56

2

Diesel ALP/Skilled

Fitter to Electric

ALP (ADC)

24 44 35 24 4

Page 6: PORFERMANCE AT A GLANCE - South Eastern Railway zone Performance.pdfPORFERMANCE AT A GLANCE CAPACITY UTILISATION Year Trainee days Trainee Capacity Actual days Trainee Capacity Capacity

SPECIAL COURSES

Sr.

NoCOURSE

2009-

2010

2010-

2011

2011-

2012

2012-

2013

2013-14

(Nov,13)

1Weak LP Course(WDC)/Spl.CRC/

Spl.SWR/TW2 3 99 39

0

2 Special Course for Maint. Sup. 6 6 0 0 0

3Pre Selection Coaching for

LI/ALP/Helper/JE/Tech/ADEE8 93 104 23

0

4 WAG-9 28 0 3 0 0

5 Special course for CC/TLC 0 0 0 00

6 Special Course of IAM/TRD 0 0 0 0 0

7

Special Course on

Seminar/Quiz/Fire Fighting/

Static Inv.

54 0 2 53

0

8Running Supervisor Induction

Course(RSIC)6 37 0 9

6

9Specila Course for Maintennce

staff (Spl Trg.Maint)0 0 0 0

0

TOTAL 2046 2319 2638 2614 1628

Page 7: PORFERMANCE AT A GLANCE - South Eastern Railway zone Performance.pdfPORFERMANCE AT A GLANCE CAPACITY UTILISATION Year Trainee days Trainee Capacity Actual days Trainee Capacity Capacity

TRAINING POSITION OF ‘CLI’ AT ELTC/TATA

YEAR ADA CKP KGP RNC TPKR TOTAL VSKP KUR TOTAL

2010-

2011

RSRC 1 2 3 2 - 8 2 4 6

RSIC 2 20 2 5 - 29 4 4 8

2011-

2012

RSRC10 23 8 6 - 47 - 7 7

RSIC - - - - - - - - -

2012-

2013

RSRC5 22 2 2 - 31 1 - 1

RSIC 1 1 - - - 2 6 1 72013-

2014(Up to

Nov-13)

RSRC

RSIC - - 3 1 2 6 - - -Grand

TOTAL123 29

Page 8: PORFERMANCE AT A GLANCE - South Eastern Railway zone Performance.pdfPORFERMANCE AT A GLANCE CAPACITY UTILISATION Year Trainee days Trainee Capacity Actual days Trainee Capacity Capacity

YEAR SER ECOR SECR Total

2010-2011 327 14 86 427

2011-2012 425 127 80 632

2012-2013 232 47 02 281

2013-2014(up to Nov-13)

917 115 40 1072

INDUCTION COURSE FOR TRAINEE ALP

Page 9: PORFERMANCE AT A GLANCE - South Eastern Railway zone Performance.pdfPORFERMANCE AT A GLANCE CAPACITY UTILISATION Year Trainee days Trainee Capacity Actual days Trainee Capacity Capacity

DC & ADC COURSE AT ELTC/ TATA

YEAR RNC ADA BSP CKP KGP KUR NGP VSKP TPKRTOTAL

SER ECOR SECR

2009-2010(DC) 5 19 7 22 40 87 1 5 0 186 86 92

2009-2010(ADC) 2 2 0 4 3 2 0 0 0 13 11 2

2010-2011(DC) 2 8 0 15 29 26 0 0 0 0 54 26

2010-2011(ADC) 0 0 0 6 2 34 0 0 0 0 8 34

2011-2012(DC) 7 3 0 51 16 47 0 0 0 77 47 0

2011-2012(ADC) 0 4 0 18 1 13 0 0 0 23 13 0

2012-2013(DC) 0 11 0 49 38 0 0 0 0 98 0 0

2012-2013(ADC) 0 0 0 22 3 0 0 0 0 25 0 0

2013-2014(DC)

UPTO Nov-13 0 8 0 17 2 0 0 4 0 27 4 0

2013-2014(ADC)

UPTO Nov-13 0 0 0 2 0 0 0 0 0 2 0 0

TOTAL 16 55 7 206 134 209 1 9 0 451 223 154

GRAND

TOTAL 828

Page 10: PORFERMANCE AT A GLANCE - South Eastern Railway zone Performance.pdfPORFERMANCE AT A GLANCE CAPACITY UTILISATION Year Trainee days Trainee Capacity Actual days Trainee Capacity Capacity

DISASTER MANAGEMENT TRAINING

Name

of the

course

No. of Batches in

last two year

Total strength of

trainees.

Average

duration of

course.2012-13 2013-14(Up to Nov-13)

2012-

13

2013-14(Up to Nov-13)

CRC 18 15 580 503 1 Day

ACRC 10 07 268 237 1Day

PDC 03 03 74 69 1Day

DP 09 07 299 212 1Day

RRB 15 14 491 594 1Day

RSRC 05 00 65 00 ½ Day

RSIC 01 02 09 08 ½ Day

Total 61 48 1786 1623

Page 11: PORFERMANCE AT A GLANCE - South Eastern Railway zone Performance.pdfPORFERMANCE AT A GLANCE CAPACITY UTILISATION Year Trainee days Trainee Capacity Actual days Trainee Capacity Capacity

Batch

No.

No.

of

Can

didat

e

At ELTC

(only Tech)

(58 days)

from

At ZRTI/SNY for

Transporting

portion ( 25

days) from

Footplate at

Division

(20 days)

from

Completion

of Training

(103 days)

ADA CKP KGP RNC

83days

02/13 45 15.07.2013 25.10.2013 18.11.2013 -- -- 45

03/13 45 15.07.2013 25.10.2013 18.11.2013 11 19+4 11

04/13 46 22.07.2013 31.10.2013 25.11.2013 14 27 05

05/13 45 22.07.2013 31.10.2013 25.11.2013 -- -- 45

06/13 45 29.07.2013 07.11.2013 02.12.2013 45

07/13 46 29.07.2013 07.11.2013 02.12.2013 18 06 22

08/13 42+

4/HQ

05.08.2013 18.11.2013 09.12.2013 23 16 03

09/13 45 06.09.2013 05.08.2013 18.11.2013 09.12.2013 45

10/13 46 13.09.2013 12.08.2013 23.11.2013 16.12.2013 09 37 --

11/13 44 19.08.2013 28.11.2013 20.12.2013 17 27 --

12/13 48 09.10.2013 09.09.2013 19.12.2013 11.01.2014 23 22 03

13/13 45 30.09.2013 09.01.2014 01.02.2014 39 4 - 2

12

batch

546 153 253 134 2

Training status of new ALP’s at ELTC/SINI (1st Batch)

Page 12: PORFERMANCE AT A GLANCE - South Eastern Railway zone Performance.pdfPORFERMANCE AT A GLANCE CAPACITY UTILISATION Year Trainee days Trainee Capacity Actual days Trainee Capacity Capacity

TRAINING STATUS OF NEW ALP’S AT ELTC/SINI (2ND BATCH)

Batch

No.

No. of

Candid-

ate

At ELTC

(only Tech)

(58 days)

from

At ZRTI/SNY for

Transporting

portion ( 25

days) from

Footplate at

Division (20

days) from

Completion of

Training (103

days)

ADA CKP KGP ECoR

83days

14/13 45 04.11.2013 13.02.2014 08.03.2014 45 -- -- --

15/13 45 05.12.2013 04.11.2013 13.02.2014 08.03.2014 -- 45 -- --

16/13(A) 46 11.11.2013

AT USL for 83 Days22.02.2014 17.03.2014 02 44 -- --

16/13(B 46 11.12.2013 11.11.2013 20.02.2014 15.03.2014 -- -- 46 --

16/13(C) 46 11.11.2013 20.02.2014 15.03.2014 11 35 -- --

16/13(D) 46 11.11.2013 20.02.2014 15.03.2014 -- 46 -- --

17/13 40 18.11.2013 27.02.2014 24.03.2014 03 10(2) 27 --

--- --- 18.11.2013 27.02.2014 24.03.2014 CANCELLED

18/13 43 25.11.2013 06.03.2014 29.03.2014 -- 03 18 22

---- --- 25.11.2013 06.03.2014 29.03.2014 CANCELLED

19/13 44 02.12.2013 13.03.2014 08.04.2014 01 05 30 09

Eco.R 46 02.12.2013 13.03.2014 08.04.2014 -- -- -- 46

20/13 09.01.2014 09.12.2013 20.03.2014 15.04.2014

21/13 16.01.2014 16.12.2013 27.03.2014 22.04.2014

Total 448

SER-371

Eco.R-77

62 188 121 77

Page 13: PORFERMANCE AT A GLANCE - South Eastern Railway zone Performance.pdfPORFERMANCE AT A GLANCE CAPACITY UTILISATION Year Trainee days Trainee Capacity Actual days Trainee Capacity Capacity

SEMINARS AT ELTC ( 2012-13) Seminar on SPAD on 15.06.12

Seminar on 27.07.12 on MPCS by M/s Stesalit Ltd, Kolkata

Seminar on 08.08.12 on SPAD

Seminar on 04.09.12 on on line failure and its trouble shooting on SIV Loco

Seminar on 19.09.12 on SPAD

Programme on First Aid & Health Awareness by CMS/TATA on 11.10.12

Seminar on 12.10.12 on Train Operation during Fog

Seminar on 30.10.12 on VCD

Seminar on 22.11.12 on A&C of GR & SR

Seminar on 27.11.12 on DBR

Seminar on 14.12.12 on Stress Management during Train Operation

Seminar on 22.12.12 on SPAD

Seminar on 15.01.13 on Quick Trouble Shooting of Tripping failure

Seminar on 21.01.13 on Computer Controlled Brake System (CCB)

Seminar on 29.01.13 on Causes & Prevention of Rolling Down

Workshop from 18.02.13 to 20.02.13 on Manual Operation & Wedging of Relay

& Contactor during the line failure

Seminar on 28.02.13 on Environment Management System

Seminar on 26.03.13 on Train Parting

Page 14: PORFERMANCE AT A GLANCE - South Eastern Railway zone Performance.pdfPORFERMANCE AT A GLANCE CAPACITY UTILISATION Year Trainee days Trainee Capacity Actual days Trainee Capacity Capacity

SEMINARS AT ELTC (2013-14)

Seminar on “Fire Prevention” on 26/04/2013

Seminar on quick troubleshooting of SIV loco on 24/05/2013

Seminar on “SPAD”on 21/06/2013

Seminar on “STALLING” on 19/07/2013

Seminar on quick troubleshooting of 3-phase loco on 28/08/2013

Workshop on “ON LINE FAILURE OF SIV FITTED LOCO” from 27/09/2013 to

30/09/2013.

Seminar organised by Central Board for Workers Education on “ATTITUDE &

PERSONAL DEVELOPMENT” on 28/09/2013

Seminar on “PEAK PERFORMANCE PRACTICES” on 04,10,2013.

Seminar on “CAN WE AVOID SPAD” on 11.10.2013.

Seminar on “TRAIN OPERATION DURING FUGGY WEATHER” was organized

on 14.11.2013.

Seminar on “MAINTAINING MOTIVATION AT WORK PLACE” on 28/11/2013

by central board for workers education.

Page 15: PORFERMANCE AT A GLANCE - South Eastern Railway zone Performance.pdfPORFERMANCE AT A GLANCE CAPACITY UTILISATION Year Trainee days Trainee Capacity Actual days Trainee Capacity Capacity

COMENDABLE WORK DONE AT ELTC/TATA

• Publication of quarterly magazine “SANDESH” for all

the trainees of ELTC as well as for all running staff of

south eastern railway.

•The old model room for WAM-4 loco have been

completely renovated with microprocessor & STC

based WAG-7 locomotive.

• ELTC website was made public through the website of

south eastern railway i.e. www.ser.indianrailways.gov.in

(about us)

• Regular seminars and workshops are being conducted

on every month over different topics related to train

operation.

• Field training period was enhanced to almost 30 to

40% in all the course modules.