POLY HOUSE

STANDARD 1, 2 & 3 BEDROOM

RESIDENTIAL PROPOSAL

POLYSTYRENE

INDUSTRIES

LIMITED

One Bedroom Polyhouse Two Bedroom Polyhouse Three Bedroom Polyhouse

Page 2: POLY HOUSE 1,2,3 BEDROOMS

w w w . P o l y i n d u s t r i e s . c o m . n g

COMPOSITION OF PIL PANELS

Plot 416 Idu Industrial Layout, Phase 1, Abuja, Nigeria | Tel: +234 9 2416411 | Email: [email protected] | Website: www.polyindustries.com.ng

• This system can be used autonomously in structural load-bearing applications or it can be integrated into traditional post-beam construction. •It employs versatile, light weight panels that can be cut and shaped to create any architectural feature. The panels consist of a corrugated Expanded Polystyrene (EPS) core surrounded by an electro-welded galvanized steel mesh. After the panels have been assembled, concrete is applied in layers by means of high velocity spray guns

2

ADVANTAGES OF THE PIL SYSTEM • Excellent heat and sound insulation

• Easy to move, rapid assembly and high durability

• High Structural capacity and resistance to earthquakes and hurricanes

• PIL Integrates well with traditional building systems

• Does not incorporate Lintels

• Easy and rapid installation of mechanical and electrical systems

• Panels of customized length and thickness

• PIL Panels also include connection mesh, Angle mesh, Flat mesh, & Cup Mesh

COMPARATIVE MERITS Material Properties, Speed and Cost

Page 3: POLY HOUSE 1,2,3 BEDROOMS

CONSTRUCTION TECHNIQUE

1. FOUNDATION Typical foundation incorporating DPCs should be used. Starter bars either from foundation or ground floor slab.

Plot 416 Idu Industrial Layout, Phase 1, Abuja, Nigeria | Tel: +234 9 2416411 | Email: [email protected] | Website: www.polyindustries.com.ng 3

2. ASSEMBLY OF WALL PANELS PIL Panels are anchored to the foundation or floor slab at ground level with starter bars. In order to guarantee the continuity among the elements, the PIL panels are equipped on both sides with mesh overlap from panel to panel and binding wire is used to secure the mesh panels.

3. BRACING AND MESHWORK INSTALLATION

All Internal walls are reinforced with angular mesh which gives the structural mesh greater continuity. By reinforcing corners where two walls join. This mesh is applied to the inside and outside of the wall and every intersection.

Door & Window Openings are braced using flat mesh at 45° above (this acts as the lintel therefore no lintel is needed) and below corners of the opening. U shaped mesh reinforces the top of every panel, door frames and window sills to provide extra-strong threshold to anchor frames.

w w w . P o l y i n d u s t r i e s . c o m . n g

Page 4: POLY HOUSE 1,2,3 BEDROOMS

5. SPRAYED CONCRETE An approved concrete mix of 25Mpa is sprayed on the panels using a plaster sprayer/spray gun.

4. SERVICES The layering of pipes for plumbing, electrical installation...etc takes place after the polystyrene panels have been erected and before the spraying of concrete take place. The polystyrene is melted using a hot air gun or similar tool. The electrical flexible pipes are placed under the meshwork. The area surrounding the cut should be restored by the addition of extra mesh connected to the meshwork of the panel.

Plot 416 Idu Industrial Layout, Phase 1, Abuja, Nigeria | Tel: +234 9 2416411 | Email: [email protected] | Website: www.polyindustries.com.ng 4

w w w . P o l y i n d u s t r i e s . c o m . n g

Page 5: POLY HOUSE 1,2,3 BEDROOMS

Advantages of PIL Technology vs. Conventional Block Building

• High Heat Shield for Tropics

• Fast Build: 5 to 9 days

• Labour: 4 to 7 persons

• Large indigenous employment skilled/semi-skilled

• Inexpensive fast & exact Replications

• Rapid Manufacture

• Best for mass production and speed

• 15% Lower Costs

• 42% Energy Savings**

• 29% Higher Acoustic Performance

• 8x Speed of Construction

Plot 416 Idu Industrial Layout, Phase 1, Abuja, Nigeria | Tel: +234 9 2416411 | Email: [email protected] | Website: www.polyindustries.com.ng 5

• High Heat Shield for Tropics

• Slow Build: 25-40 days

• Labour: 25 to 26 persons

• Primarily Semi-skilled

• Can Run into Major Cost Overruns

• Rapid Manufacture

• Bulk, heavy & expensive concrete structures

w w w . P o l y i n d u s t r i e s . c o m . n g

Page 6: POLY HOUSE 1,2,3 BEDROOMS

Plot 416 Idu Industrial Layout, Phase 1, Abuja, Nigeria | Tel: +234 9 2416411 | Email: [email protected] | Website: www.polyindustries.com.ng 6

ONE BEDROOM POLY-HOUSE Total: Floor Area 49sqm No. of Wall Panels: 40

PIL Standard One Bedroom 40sqm

w w w . P o l y i n d u s t r i e s . c o m . n g

Page 7: POLY HOUSE 1,2,3 BEDROOMS

Plot 416 Idu Industrial Layout, Phase 1, Abuja, Nigeria | Tel: +234 9 2416411 | Email: [email protected] | Website: www.polyindustries.com.ng 7

TWO BEDROOM POLY-HOUSE Total: Floor Area 60sqm No. of Wall Panels: 50

PIL Standard Two Bedroom 50sqm

w w w . P o l y i n d u s t r i e s . c o m . n g

Page 8: POLY HOUSE 1,2,3 BEDROOMS

Plot 416 Idu Industrial Layout, Phase 1, Abuja, Nigeria | Tel: +234 9 2416411 | Email: [email protected] | Website: www.polyindustries.com.ng 8

TWO BEDROOM POLY-HOUSE Total: Floor Area 80sqm No. of Wall Panels: 62

PIL Standard Three Bedroom 80sqm

w w w . P o l y i n d u s t r i e s . c o m . n g

Page 9: POLY HOUSE 1,2,3 BEDROOMS

Plot 416 Idu Industrial Layout, Phase 1, Abuja, Nigeria | Tel: +234 9 2416411 | Email: [email protected] | Website: www.polyindustries.com.ng 9

w w w . P o l y i n d u s t r i e s . c o m . n g

Internal Finishes

Page 10: POLY HOUSE 1,2,3 BEDROOMS

Plot 416 Idu Industrial Layout, Phase 1, Abuja, Nigeria | Tel: +234 9 2416411 | Email: [email protected] | Website: www.polyindustries.com.ng 10

Prospective Mass Housing

w w w . P o l y i n d u s t r i e s . c o m . n g

Page 11: POLY HOUSE 1,2,3 BEDROOMS

Plot 416 Idu Industrial Layout, Phase 1, Abuja, Nigeria | Tel: +234 9 2416411 | Email: [email protected] | Website: www.polyindustries.com.ng 11

Airtel Call Center, Lagos Fare Park, Lagos

w w w . P o l y i n d u s t r i e s . c o m . n g

Page 12: POLY HOUSE 1,2,3 BEDROOMS

Plot 416 Idu Industrial Layout, Phase 1, Abuja, Nigeria | Tel: +234 9 2416411 | Email: [email protected] | Website: www.polyindustries.com.ng 12

Lake View Estate, Jabi Abuja West Land Property, Ikoyi Lagos

w w w . P o l y i n d u s t r i e s . c o m . n g

Page 13: POLY HOUSE 1,2,3 BEDROOMS

Plot 416 Idu Industrial Layout, Phase 1, Abuja, Nigeria | Tel: +234 9 2416411 | Email: [email protected] | Website: www.polyindustries.com.ng 13

w w w . P o l y i n d u s t r i e s . c o m . n g

Page 14: POLY HOUSE 1,2,3 BEDROOMS

HEAD OFFICE/FACTORY:

ABUJA OFFICE:

PLOT 416 IDU INDUSTRIAL AREA

PHASE 1, ABUJA F.C.T. NIGERIA.