Page 1: Policies/Programmes to Promote the Development  of ESCO 5 March, 2012

1/14

   Policies/Programmes to Promote the Development of ESCO

5 March, 2012

APERC Workshop, Kuala Lumpur

Bing-Chwen YangTeam Leader

Asia Pacific Energy Research Centre

Page 2: Policies/Programmes to Promote the Development  of ESCO 5 March, 2012

2/14

• Introduction• Concept for ESCO• Value for the promotion of ESCO• Highlight of CEEDS Phase 4• Key question to be solved

OutlineOutline

Page 3: Policies/Programmes to Promote the Development  of ESCO 5 March, 2012

3/14

Characteristics of ESCOCharacteristics of ESCO

An ESCO is a business that provides a wide range of solutions to reduce energy consumption for client energy consumers. A full ESCO business has the following characteristics: (1) it implements energy efficient technology and

infrastructure, and sometimes energy supply measures;

(2) it provides the capital to carry out the project; (3) it gets paid for its work from the energy cost savings

(ESPC, Energy Saving Performance Contract)); (4) it maintains the efficiency monitoring system during

the payback period.

Page 4: Policies/Programmes to Promote the Development  of ESCO 5 March, 2012

4/14

Process for ESCOProcess for ESCOPhase Customer ESCO Activity

1. Planning Consider project motivation.

2. Project Development

Review M&V Plan,

Review Risk & Responsibility Matrix.

Develop Initial Proposal,

Develop Initial M&V Plan and Risk & Responsibility Matrix.

3. Negotiation and Award

Evaluate M&V Plan(s).

Witness DES and M&V activities.

Perform Detailed Energy Survey (DES),Develop Baseline,Refine M&V Plan.

4. Implement DO

Witness M&V activities. Review and approve reports.

Commission Project,Submit Post-Installation Report,Submit Annual Reports

Page 5: Policies/Programmes to Promote the Development  of ESCO 5 March, 2012

5/14

Operation of ESCOOperation of ESCO

En

ergy Cost

En

ergy Cost

En

ergy Cost

En

ergy Cost

En

ergy C

ostE

nergy

Cost

En

ergy C

ostE

nergy

Cost

Before implement ESCO Project

During ESCO Contract Period

End of ESCO Contract

Improvement

Benefit of CustomerBenefit of Customer

Benefit of ESCOBenefit of ESCO

Initial capital cost and interest

Initial capital cost and interest

Benefit of Customer

Benefit of Customer

$

Page 6: Policies/Programmes to Promote the Development  of ESCO 5 March, 2012

6/14

• Energy Savings = UseBaseline - UsePost-Retrofit

• Energy Savings = (UseBaseline Adjustment) - UsePost-Retrofit

Co

sts

Co

sts

TimeTime

ECMs ECMs installed hereinstalled here

ECMs ECMs installed hereinstalled here Baseline or adjusted baselineBaseline or adjusted baselineBaselineBaseline

Measured or calculated performanceMeasured or calculated performance

SavinSavingsgs

Definition of Energy ConservationDefinition of Energy Conservation

Page 7: Policies/Programmes to Promote the Development  of ESCO 5 March, 2012

7/14

Option for M&VOption for M&V

Options A&B are retrofit isolation methods.

Options C&D are whole-facility methods.

The difference is where the boundary lines are drawn.

By IPMVP

Page 8: Policies/Programmes to Promote the Development  of ESCO 5 March, 2012

8/14

Why ? ESCOWhy ? ESCO

1. Provide professional design, construction, operation and maintenance – for technology integration

2. Handle the financial problem to reduce the burden of customer

3. Keep the system in the optimum operation condition

4. Maintain a good monitoring and reporting mechanism to fully understanding the real energy consumption for further improvement

Page 9: Policies/Programmes to Promote the Development  of ESCO 5 March, 2012

9/14

Value of ESCOValue of ESCO

1. Introduce the professional engineer to help the improvement the energy efficiency

2. Create a new energy service company to help the implementation of energy conservation policy

3. Encourage the energy user to improve their energy consumption system for cost and carbon emission reduction

Page 10: Policies/Programmes to Promote the Development  of ESCO 5 March, 2012

10/14

Highlight for CEEDS Phase 4Highlight for CEEDS Phase 4

1. A set of the two workshops to discuss the key issue for the promotion of ESCO in APEC Region

2. Support the participating economies to set up the roadmap and mechanism for the development of ESCO

3. Identify the key technology for the energy conservation or low carbon technology

4. Set up a platform for the experience exchange on the promotion of each economy

komori
Page 11: Policies/Programmes to Promote the Development  of ESCO 5 March, 2012

11/14

Key Questions to be Addressed (1/3)Key Questions to be Addressed (1/3)

1. Key policies to encourage private sector firms to become clients of the ESCO industry (such as tax credits, low interest loans, energy indexes for building or manufacturing process, etc.), this will create the market opportunity for ESCOs.

2. Set up infrastructure to support the ESCO industry (such as licensing, regulations, specifications, etc.) in order to ensure that there is mutual trust between ESCOs and their client firms.

Page 12: Policies/Programmes to Promote the Development  of ESCO 5 March, 2012

12/14

Key Questions to be Addressed (2/3)Key Questions to be Addressed (2/3)

3. Upgrade the capabilities of professional engineer to support the ESCO industry (such as through changes to professional licensing, training courses, academic involvement, etc.)

4. Identify the measurement and verification (M&V) processes/regulations to increase the confidence of potential clients in the ESCO business (such as ensuring impartiality in energy saving performance verification, transparency for the system commissioning processes, etc.), thus ensuring that the reported energy and cost saving can be accepted by both parties.

Page 13: Policies/Programmes to Promote the Development  of ESCO 5 March, 2012

13/14

Key Questions to be Addressed (3/3)Key Questions to be Addressed (3/3)

5. Support the R&D to develop the necessary technology for carrying out ESCO projects (such as monitoring and metering technology or instruments, energy conservation technologies/measures, low carbon energy supply technologies, etc.) in order to implement highly energy-efficient operations.

Page 14: Policies/Programmes to Promote the Development  of ESCO 5 March, 2012

14/14

Thank youThank you for your kind attentionfor your kind attention

http://www.ieej.or.jp/aperc/http://www.ieej.or.jp/aperc/