China Promising Mold Plastic Co.Ltd T: +86 755 29091485 F: +86-755 81775084 Add: Add: Building A5, Lantian Science & Tech Park, Lougang Village,Songgang Town, Bao'an District, Shenzhen, PR China Feedback Hold a Meeting and analysis: Mold construction, gate location, parting line, slide, ejector ways. Etc... Meeting with design,project,QC, CNC team leader. 1. Confirm T1 time 2.point out customers demands. 3.processing technic 4.mold construction reasonability 5. Any possible problems with the Products PO Oder Analysis / prepare schematic diagram / Product Analysis All files send to designer Dep. Analysis & Design Got Final drawing or problems To customer for feedback Received feedback Manufacturing meeting MP3 systems on file PMP Process report & follow up Emergency fixes Customer Confirm 1.Mold NO. 2.Mold steel requires, design standards. 3.Machines files, locating ring, KO hole etc.. 4. Surface requires. (polish,texture...) 5. Cavity num. ?Gate? etc.. 6.special device? Cylinder,hot nozzle, limit switch Claim to design Dep: 1.modify 3D tolerance, offset, add draft angle. 2.do not add draft angle onto product’s base level. 3.as TOP Theories, design insert onto mold as much as possible, for mold repair in the future. Etc.... 1.Hold a meeting every Monday, Talk about mold process schedule. 2. According to customers requires. Send report & pictures weekly.

Upload: jim-wu

Post on 21-Mar-2017

8 views

Category:

Services


0 download

TRANSCRIPT

Page 1: PMP MOLD project management workflow

China Promising Mold Plastic Co.Ltd

T: +86 755 29091485 F: +86-755 81775084Add: Add: Building A5, Lantian Science & Tech Park, Lougang Village,Songgang Town,

Bao'an District, Shenzhen, PR China

Feedback

Hold a Meeting andanalysis:Mold construction,gate location, partingline, slide, ejectorways. Etc...

Meeting with design,project,QC,CNC team leader.1. Confirm T1 time2.point out customers demands.3.processing technic4.mold construction reasonability5. Any possible problems with theProducts

PO

Oder Analysis / prepare schematic diagram / Product Analysis

All files send to designer Dep.

Analysis & Design

Got Final drawing or problems

To customer for feedback

Received feedback

Manufacturing meeting

MP3 systems on file

PMP Process report & follow up

Emergency fixes

Customer Confirm

1.Mold NO.2.Mold steel requires, design standards.3.Machines files, locating ring, KO hole etc..4. Surface requires. (polish,texture...)5. Cavity num. ?Gate? etc..6.special device? Cylinder,hot nozzle, limit switch

Claim to design Dep:1.modify 3D tolerance,offset, add draft angle.2.do not add draft angleonto product’s base level.3.as TOP Theories, designinsert onto mold as much aspossible, for mold repair inthe future.Etc....

1.Hold a meeting everyMonday, Talk about moldprocess schedule.2. According to customersrequires. Send report &pictures weekly.

Page 2: PMP MOLD project management workflow

China Promising Mold Plastic Co.Ltd

T: +86 755 29091485 F: +86-755 81775084Add: Add: Building A5, Lantian Science & Tech Park, Lougang Village,Songgang Town,

Bao'an District, Shenzhen, PR China

Got Data Quote

** every time ship samples ,project dep. need more keep2 samples for check.

1. Containerprepare.(wood,metal.)2. All documents(treatment certificate,materiel certificate,Dimensionalinspection report,molding processreport.)3. Mold testing video

QC

Modify Mold and samples

Send T1 Samples & FAI report

Received customer’s feedback

(ready for modify mold)

T2..T3...samples checked,

got customer’s green light

Ship the mold

Balance Payment

Move to injection Dep.

Project MRP

T1 mold test

1. T1 mold testing watch, knowproduct feature, and how moldrunning (take drawings,caliper)2.molding process data.(parameter,trouble spots etc..)3. Temperature.4.molding customers require num.And more 3 samples for test.

Data of Modify Mold