pmod/wrc davos 29-30 november 2010

10
DAVOS, 29-30 November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 1 PMOD/WRC Davos 29-30 november 2010 Présenté par : JP. Marcovici Sigle : LATMOS PLATFORM STATUS I

Upload: ira

Post on 13-Jan-2016

35 views

Category:

Documents


0 download

DESCRIPTION

PLATFORM STATUS I. PMOD/WRC Davos 29-30 november 2010. Présenté par : JP. Marcovici Sigle : LATMOS. SOMMAIRE. STATUS OF PGCU AND FLIGHT SOFTWARE OPERATING MODE CHANGE OF CONFIGURATION FLOW SODISM SCIENCE TM SOME PRELIMINARY REPORT FOR SODISM UPDATE OF THE OPERATIONNEL FLIGHT SOFWARE. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: PMOD/WRC Davos 29-30 november 2010

DAVOS, 29-30 November 2010 group GETCU (JP Marcovici)

PICARD : Consortium meeting

1

PMOD/WRC Davos 29-30 november 2010

Présenté par : JP. MarcoviciSigle : LATMOS

PLATFORM STATUS I

Page 2: PMOD/WRC Davos 29-30 november 2010

DAVOS, 29-30 November 2010 group GETCU (JP Marcovici)

PICARD : Consortium meeting

2

SOMMAIRE

- STATUS OF PGCU AND FLIGHT SOFTWARE- OPERATING MODE- CHANGE OF CONFIGURATION- FLOW SODISM SCIENCE TM- SOME PRELIMINARY REPORT FOR SODISM- UPDATE OF THE OPERATIONNEL FLIGHT SOFWARE

Page 3: PMOD/WRC Davos 29-30 november 2010

DAVOS, 29-30 November 2010 group GETCU (JP Marcovici)

PICARD : Consortium meeting

3

STATUS OF PGCU AND FLIGHT SOFTWRE

- Load a new operational flight software after launch with dump of the flash and verification by dowload of the code status : OK

- Communications PGCU SODISM SOVAP PREMOS status : OK

- No error detected

- Patch operation (28/9/2010) status : OK

Page 4: PMOD/WRC Davos 29-30 november 2010

DAVOS, 29-30 November 2010 group GETCU (JP Marcovici)

PICARD : Consortium meeting

4

OPERATING MODES

SODISM :ETH mode Decontamination, NominalScientific mode : Nominal mode, Night Mode, Distortion, Stellar

PREMOS : Science and Night mode

SYNCHRONIZATION :SODISM SOVAP Each daySODISM PREMOS : Twice per orbit for 215nm and 607nm with HEAD B Channel 1 and 2

SOVAP : A02, A03, A04,A09, A14R04, R05, R06, R10 MUX0, MUX5

Page 5: PMOD/WRC Davos 29-30 november 2010

DAVOS, 29-30 November 2010 group GETCU (JP Marcovici)

PICARD : Consortium meeting

5

CHANGE OF CONFIGURATIONSODISM : change thermal configuration

Date Temp CCD Date Temp CCD

31/7/2010 -18°C 4/9/2010 -10°C

3/8/2010 -13°C 21/9/2010 -9.25°C

PREMOS : change thermal configuration

Date Temp CCD Date Temp CCD

26/7/2010 TH1=24°CTH2=23°C

13/9/2010 TH1=26°C

TH2=25°C

6/9/2010 TH1=26°CTH2=26°CSOVAP : mode used on board

A02, A03, A04,A09, A14 R04, R05, R06, R10 MUX0, MUX5

Page 6: PMOD/WRC Davos 29-30 november 2010

DAVOS, 29-30 November 2010 group GETCU (JP Marcovici)

PICARD : Consortium meeting

6

FLOW SODISM SCIENCE TM

They are two compression on boardLossless compression (PLLC)With degradation (Langevin)

The compression rate of PLLC depend of the noise on the pixels of CCDSo the commissioning period allow to define the size of limb PLTMand macro-pixels

The perspective is to allow about 51 pixels of large for the diameter measurements

Page 7: PMOD/WRC Davos 29-30 november 2010

DAVOS, 29-30 November 2010 group GETCU (JP Marcovici)

PICARD : Consortium meeting

7

REPORT ABOUT SODISM SHUTTERS (Electronic point of view)

Page 8: PMOD/WRC Davos 29-30 november 2010

DAVOS, 29-30 November 2010 group GETCU (JP Marcovici)

PICARD : Consortium meeting

8

REPORT ABOUT SODISM SHUTTERS (Electronic point of view)

Page 9: PMOD/WRC Davos 29-30 november 2010

DAVOS, 29-30 November 2010 group GETCU (JP Marcovici)

PICARD : Consortium meeting

9

SODISM Filter wheels from 01/08 to 30/09

Pm : 2 steps correspond to 0.2 mm to 0.5 mm of movement on the filter

 Go and back to RAZ

position

Erreur de pas

  + 1 - 1 + 2 - 2 + 3 - 3

Roue1 5960 1536 1510 27 39 0 1

Roue2 7368 753 752 0 0 0 0

The requirement To have to steps or less of difference is respected

Extract from a slide of M. Meissonnier (revue of end of Commissioning period)

Page 10: PMOD/WRC Davos 29-30 november 2010

DAVOS, 29-30 November 2010 group GETCU (JP Marcovici)

PICARD : Consortium meeting

10

When they are new requirements on the payload, the only possibility is to try to treat them, with the operational software

2 problems now1) SOVAP: it become necessary to prevent all telecommand that closethe right shutter2) SOVAP : This requirement can becomes obsolete if need3) SODISM : Necessity to have full images compressed by Langevin with filters helio

Point 1 and 3 will be treated thanks to a new version of the software (planning max February 2011)Point 2 will be treated by a patch of the memory (very easy processes)

UPDATE OF THE OPERATIONNEL FLIGHT SOFWARE